JPH078106A - Tailing treating apparatus of thresher - Google Patents
Tailing treating apparatus of thresherInfo
- Publication number
- JPH078106A JPH078106A JP15863293A JP15863293A JPH078106A JP H078106 A JPH078106 A JP H078106A JP 15863293 A JP15863293 A JP 15863293A JP 15863293 A JP15863293 A JP 15863293A JP H078106 A JPH078106 A JP H078106A
- Authority
- JP
- Japan
- Prior art keywords
- chamber
- tailing
- processing
- sorting
- thresher
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Threshing Machine Elements (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、脱穀機の二番処理装置
に関し、コンバインやハ−ベスタ−等に搭載して利用す
るものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a second processing device for a thresher, which is used by being mounted on a combine or a harvester.
【0002】[0002]
【従来の技術】従来のこの種脱穀機の二番処理装置にお
ける二番処理胴は、扱胴と共に駆動され、常にほぼ同速
度で回転駆動されている。すなはち、二番処理胴は、二
番処理室に供給される二番物の量の多少に関係なく、常
時同じ回転速度で駆動されている。2. Description of the Related Art The second processing cylinder in the conventional second processing device of this type of thresher is driven together with the handling cylinder, and is always rotationally driven at substantially the same speed. That is, the second processing cylinder is always driven at the same rotation speed regardless of the amount of the second material supplied to the second processing chamber.
【0003】したがって、この従来型にあっては、二番
処理室内に二番処理物の量が少ないときには処理が不十
分に終わり、枝梗付着のまま選別室に排出されて再度二
番処理室に還元される不具合が発生していた。Therefore, in this conventional type, when the amount of the second treated material in the second treatment chamber is small, the treatment is not completed sufficiently, and the second treatment chamber is discharged again to the second treatment chamber with the branch vein attached. There was a problem that was returned to.
【0004】[0004]
【発明が解決しようとする課題】脱穀機の二番処理装置
は、二番処理作用を確実に行って枝梗を取り除くもので
なければならず、常に、同じ性能を発揮できることが要
求される。一般には、二番処理性能は、二番処理室の二
番物の充填量に左右され、充填量が多い場合は良く処理
されるが少ないときは枝梗付着粒がそのまま未処理状態
で排出されることが多い。The second treating device of the thresher must be capable of surely performing the second treating action to remove the branch shoot, and is required to always exhibit the same performance. In general, the No. 2 treatment performance depends on the filling amount of No. 2 substance in the No. 2 treatment chamber. Often.
【0005】本発明は、上述の課題を解決し、処理作用
を二番処理室の二番物の量に左右されることなく、常
に、良好に行うことが出来る装置を具現せんとするもの
であるThe present invention is intended to solve the above-mentioned problems and to embody a device capable of always performing well without depending on the amount of the second material in the second processing chamber. is there
【0006】[0006]
【課題を解決するための手段】本発明は、上述の如き課
題を解決するために次の如き技術手段を講ずるものであ
る。すなわち、扱胴1を内装軸架した扱室2の下方に揺
動選別装置3を装備した選別室4を設け、該選別室4の
前記揺動選別装置3の下方には一側から圧風唐箕5、一
番移送螺旋6、二番移送螺旋7の順に装備して設け、該
二番移送螺旋7の終端部分には上部を二番処理室8に開
放させた二番揚穀装置9の下部を連通させて設け、前記
二番処理室8には供給された二番物の量を測定する測定
装置10を設け、該測定装置10の測定結果に基づいて
二番処理胴11の回転速度を調節できる構成とした脱穀
機における二番処理装置である。The present invention takes the following technical means in order to solve the above problems. That is, a sorting chamber 4 equipped with a swing sorting device 3 is provided below a handling chamber 2 in which the handling barrel 1 is internally mounted, and a pressure air is blown from one side below the swing sorting device 3 in the sorting chamber 4. It is equipped with the Karakin 5, the 1st transfer spiral 6 and the 2nd transfer spiral 7 in this order, and at the end of the 2nd transfer spiral 7, the upper part of the second grain lifting device 9 is opened to the second processing chamber 8. A lower part is provided so as to communicate with each other, and a measuring device 10 for measuring the amount of the supplied second material is provided in the second processing chamber 8, and the rotation speed of the second processing cylinder 11 is based on the measurement result of the measuring device 10. It is the second processing device in the thresher having a configuration capable of adjusting.
【0007】[0007]
【実施例】まず、その構成について述べる。扱室2は、
一方の穀稈供給口12と、他方の藁排出口13とを扱口
14によって連通させ、この扱口14に沿わせてフィ−
ドチエン15を設けている。そして扱胴1は、外周に扱
歯16を配列して前記扱室2に回転自由に軸架してい
る。17は処理室、18は選別網を示す。EXAMPLE First, the structure will be described. The handling room 2 is
One grain culm supply port 12 and the other straw discharge port 13 are made to communicate with each other by a handling port 14, and a fiber is provided along this handling port 14.
Dochien 15 is provided. The handle cylinder 1 has handle teeth 16 arranged on the outer circumference thereof and is rotatably mounted on the handle chamber 2 in a rotatable manner. Reference numeral 17 indicates a processing chamber, and 18 indicates a selection network.
【0008】つぎに、選別室4は、前記扱室2の下方に
設け、揺動選別棚装置3を揺動可能に吊持しており、扱
室2から落下した脱穀物を揺動選別できる構成としてい
る。そして、圧風唐箕5は、揺動選別装置3の下方にお
いて選別室4の低位置で、しかも選別室4の始端側に第
1唐箕5aと第2唐箕5bとの2機から構成している。Next, the sorting chamber 4 is provided below the handling chamber 2 and the swing sorting shelf device 3 is swingably suspended so that the grain removed from the handling chamber 2 can be swing sorted. It is configured. The compressed-air Karato 5 is composed of two machines, a first Kara5a and a second Kara5b, located at a lower position of the sorting chamber 4 below the swing sorting apparatus 3 and on the starting end side of the sorting chamber 4. .
【0009】そして、選別室4の低部には、前記圧風唐
箕5に近い側から一番移送螺旋6、二番移送螺旋7の順
に設けている。一番移送螺旋6は、脱穀後選別された一
番穀粒を集めて機外に搬出する構成としている。つぎに
二番移送螺旋7は、選別室4において落下した二番物を
集めて一側に搬送する構成とし、その終端部に二番揚穀
装置9を設けている。二番揚穀装置9は揚穀螺旋からな
り始端部を前記二番移送螺旋7の終端部に連通させ、終
端部を上部の二番処理室8に開放して連通させて構成し
ている。In the lower part of the sorting chamber 4, the first transfer spiral 6 and the second transfer spiral 7 are provided in this order from the side closer to the compressed air sardines 5. The first transfer spiral 6 is configured to collect the first selected grains after threshing and carry them out of the machine. Next, the No. 2 transfer spiral 7 is configured to collect the No. 2 objects dropped in the sorting chamber 4 and convey them to one side, and the No. 2 lifting grain device 9 is provided at the end portion thereof. The second fried grain device 9 is composed of a fried grain spiral, and has a starting end portion connected to the end portion of the second transfer spiral 7 and an end portion opened to the upper second processing chamber 8 for communication.
【0010】そして、二番処理室8は、扱室2の始端側
の背後(扱口14の反対側)に設け二番処理胴11を軸
架させて前記二番揚穀装置9から供給された二番物を処
理して下方の揺動選別装置3上に供給できる構成として
いる。二番処理胴11は、軸端に回転センサ19を装備
して回転速度を測定してコントロ−ラ装置20に信号と
して送る構成としている。The second processing chamber 8 is provided behind the starting end side of the handling chamber 2 (on the side opposite to the handling port 14), and the second processing drum 11 is mounted on the second processing chamber 8 to be supplied from the second lifting grain device 9. It is configured so that the second object can be processed and supplied to the lower swing selecting device 3. The second processing cylinder 11 is equipped with a rotation sensor 19 at the shaft end, measures the rotation speed, and sends it to the controller device 20 as a signal.
【0011】測定装置10は、二番処理室8に装備し、
供給された二番処理物の量を測定してコントロ−ラ装置
20に送信できる回路構成としている。そして、前述の
二番処理胴11は、扱胴1の扱胴軸22から二番処理胴
軸23の変速プ−リ24に変速ベルト25を巻回し、こ
の変速ベルト25を変速モ−タ26によって作動するテ
ンションプ−リ27によって変速操作が出来る構成とし
ている。The measuring device 10 is installed in the second processing chamber 8,
The circuit configuration is such that the amount of the second processed material supplied can be measured and transmitted to the controller device 20. In the second processing cylinder 11, the speed changing belt 25 is wound around the speed changing pulley 24 of the second processing cylinder shaft 23 of the processing cylinder 1 and the speed changing belt 25 is used to change the speed change belt 26. The tension pulley 27 is operated by the gear shift operation.
【0012】そして、変速モ−タ26は、コントロ−ラ
装置20からの出力信号に基づいて駆動されたり停止さ
れる構成としている。したがって、二番処理胴11は、
二番処理室8内の二番処理物の供給量を測定装置10に
よって測定してコントロ−ラ装置20へ送信し、一方、
回転センサ19が二番処理胴11の回転速度をコントロ
−ラ装置20に送信して二番処理室8内における充填量
(又は二番処理物の充填率)が基準値より少ない場合に
は、回転速度を所定値まで減速して充填量を増加するよ
うに制御できる構成としている。The shift motor 26 is configured to be driven or stopped based on the output signal from the controller device 20. Therefore, the second processing cylinder 11
The supply amount of the second processed material in the second processing chamber 8 is measured by the measuring device 10 and transmitted to the controller device 20, while
When the rotation sensor 19 transmits the rotation speed of the second processing cylinder 11 to the controller device 20 and the filling amount (or the filling rate of the second processing object) in the second processing chamber 8 is smaller than the reference value, The rotation speed is decelerated to a predetermined value so that the filling amount can be increased.
【0013】別実施例 図4に示す実施例は、二番処理螺旋28を二番揚穀装置
9の終端部分に装着したものである。すなわち、二番処
理螺旋28は、上処理螺旋28aと下処理螺旋28bと
の一対からなり、二番揚穀装置9の終端部に空隙29を
おいて上下両側に一巻づつ設けている。そして、処理板
30は、固定されている外側の筒に取り付け、上記空隙
29部分にあって揚穀螺旋の軸方向から見て処理螺旋2
8a,28bの回転範囲内に突入した状態に構成してい
る。Another Embodiment In the embodiment shown in FIG. 4, the second processing spiral 28 is attached to the end portion of the second lifting grain device 9. That is, the second processing spiral 28 is composed of a pair of an upper processing spiral 28a and a lower processing spiral 28b, and is provided on both the upper and lower sides with a gap 29 at the end of the second lifting grain device 9. Then, the treatment plate 30 is attached to the fixed outer cylinder, and the treatment spiral 2 is present in the gap 29 and seen from the axial direction of the fried helix.
It is configured so as to rush into the rotation range of 8a, 28b.
【0014】なお、31は跳ね出し用の羽根を示す。次
にその作用について説明する。まず、機体の回転各部を
駆動しながらフィ−ドチエン15の始端部分に穀稈を供
給し、穂先部分を扱室2に送りこむ。すると、穀稈は、
フィ−ドチエン15に挾持されて穀稈供給口12から扱
口14を通って穀稈排出口13に達する過程において、
回転している扱胴1によって脱穀処理される。そして、
脱穀物は、未処理物が処理室17に送り込まれて再処理
され、選別網18や排塵口(図外)を通って選別室4に
落下するものである。Reference numeral 31 indicates a blade for jumping out. Next, the operation will be described. First, while driving the rotating parts of the machine body, the grain culm is supplied to the starting end portion of the feed chain 15 and the tip portion is sent to the handling chamber 2. Then, the culm is
In the process of being held by the feed chain 15 and reaching the grain culvert discharge port 13 from the grain culm supply port 12 through the handling port 14,
Threshing processing is performed by the rotating barrel 1. And
In the grain removal, the unprocessed material is sent to the processing chamber 17 to be reprocessed, and drops into the sorting chamber 4 through the sorting net 18 and the dust outlet (not shown).
【0015】このようにして選別室4に達した被選別物
は、揺動している揺動選別装置3上に達して揺動されな
がら選別され、下方に落下して選別風の中に達する。そ
して、圧風唐箕5は、第1唐箕5aによる起風が揺動選
別装置3の中央部分を吹き抜け、第2唐箕5の起風が一
番移送螺旋6や二番移送螺旋7の上方を吹き抜けて風路
中に達した被選別物を風選する。The objects to be sorted thus reached the sorting chamber 4 reach the swinging sorting device 3 and are sorted while being swung, and fall down to reach the sorting wind. . In the compressed air Kara5, the wind generated by the first Kara5a blows through the central portion of the rocking sorting device 3, and the wind of the second Kara5 blows above the first transfer spiral 6 and the second transfer spiral 7. The objects to be sorted that have reached the wind path are selected.
【0016】以上のようにして、被選別物は、揺動選別
装置3の揺動作用と圧風唐箕5による選別風とによって
選別分離され、一番移送螺旋6に一番物が流入し、二番
移送螺旋7に二番物がそれぞれ流入して機体の一側に搬
送される。そして、一番物は、適宜の揚穀装置によって
機外に搬出されて貯溜され、二番物は二番揚穀装置9の
始端部に供給されて上方へ搬送を開始される。As described above, the objects to be sorted are sorted and separated by the swinging action of the swing sorting device 3 and the sorting wind by the compressed air Karako 5, and the ones most flow into the first transfer spiral 6. The second material flows into the second transfer spiral 7 and is conveyed to one side of the machine body. Then, the first product is carried out of the machine and stored by an appropriate fried device, and the second product is supplied to the starting end of the second fried device 9 and starts to be conveyed upward.
【0017】このようにして、二番物は、二番揚穀装置
9の終端部から二番処理室8に供給され、回転を続けて
いる二番処理胴11によって脱粒処理されたのち下方の
揺動選別装置3上に落下する。さて、そこで、二番処理
作用が続いている二番処理室8は、供給された二番物が
測定装置10によって計測され、そのデ−タ−がコント
ロ−ラ装置20に送信されている。二番処理胴11は、
その回転速度が回転センサ19によって検出されてその
デ−タがコントロ−ラ装置20に送信されている。In this way, the second grain is supplied from the end portion of the second grain raising device 9 to the second treatment chamber 8 and, after the second grain is continuously shredded by the second treatment cylinder 11, the lower grain is processed. It falls on the swing sorting device 3. Now, in the second processing chamber 8 where the second processing operation continues, the supplied second material is measured by the measuring device 10, and the data is transmitted to the controller device 20. The second processing cylinder 11 is
The rotation speed is detected by the rotation sensor 19 and the data is transmitted to the controller device 20.
【0018】そして、二番処理胴11は、上述のように
してコントロ−ラ装置20に送信されたデ−タにおい
て、二番処理室8に供給された二番物の量が基準値より
少量の場合にあってはコントロ−ラ装置20から変速モ
−タ26にテンションプ−リ27を低速側に作動させる
ように回転する出力信号が発せられる。したがって、二
番処理胴11は、処理室8内の二番物が基準量に満たな
いときには上述の通り出力信号が発せられると、変速モ
−タ26、テンションプ−リ27、変速ベルト25、変
速プ−リ24を介して低速に変速されて二番処理作用の
能率を落すこととなる。そのため、二番処理室8内にお
ける二番物は、順次蓄積されて増量し、充填率が高まる
こととなる。In the second processing cylinder 11, the amount of the second material supplied to the second processing chamber 8 in the data transmitted to the controller device 20 as described above is smaller than the reference value. In this case, an output signal for rotating the tension pulley 27 so as to operate the tension pulley 27 at a low speed side is issued from the controller device 20 to the speed change motor 26. Therefore, the second processing cylinder 11 receives the output signal as described above when the second material in the processing chamber 8 does not reach the reference amount, and the speed change motor 26, the tension pulley 27, the speed change belt 25, The speed is changed to a low speed through the speed change pulley 24, and the efficiency of the second processing action is reduced. Therefore, the second material in the second processing chamber 8 is sequentially accumulated and increased in amount, and the filling rate is increased.
【0019】このようにして、二番処理胴11は、二番
処理室8内の二番物の充填率が基準値に達するまで低速
回転し、測定装置10の測定結果が基準値に達すると、
コントロ−ラ装置20から変速モ−タ26に出力信号が
発せられる。すると、二番処理胴11は、変速モ−タ2
6、テンションプ−リ27、変速ベルト25、変速プ−
リ24を介して高速に変速され通常の二番処理作用を行
うこととなる。In this way, the second processing cylinder 11 rotates at a low speed until the filling rate of the second material in the second processing chamber 8 reaches the reference value, and when the measurement result of the measuring device 10 reaches the reference value. ,
An output signal is issued from the controller device 20 to the shift motor 26. Then, the second processing cylinder 11 shifts to the shift motor 2
6, tension pulley 27, speed change belt 25, speed change pulley
The gear is shifted at a high speed through the lever 24, and the normal second processing operation is performed.
【0020】すなわち、二番処理胴11は、二番処理室
8内の二番物の充填量が増加したことと、あわせて高速
回転になるために、処理精度が高まり枝梗付きのまま選
別室4に排出されることが少なくなるものである。That is, since the second processing cylinder 11 is rotated at a high speed in accordance with the increase in the filling amount of the second material in the second processing chamber 8, the processing accuracy is improved and the processing is performed with branching. It is less discharged to the chamber 4.
【0021】[0021]
【発明の作用効果】以上説明したように本発明は、扱胴
1を内装軸架した扱室2の下方に揺動選別装置3を装備
した選別室4を設け、該選別室4の前記揺動選別装置3
の下方には一側から圧風唐箕5、一番移送螺旋6、二番
移送螺旋7の順に装備して設け、該二番移送螺旋7の終
端部分には上部を二番処理室8に開放させた二番揚穀装
置9の下部を連通させて設け、前記二番処理室8には供
給された二番物の量を測定する測定装置10を設け、該
測定装置10の測定結果に基づいて二番処理胴11の回
転速度を調節できる構成としたものであるから、二番処
理作用を常に的確に行うことが出来るものである。As described above, according to the present invention, the sorting chamber 4 equipped with the swing sorting device 3 is provided below the handling chamber 2 in which the handling barrel 1 is internally mounted, and the shaking of the sorting chamber 4 is performed. Dynamic sorting device 3
Is installed in order from one side to the compressed wind Kara 5, the first transfer spiral 6, and the second transfer spiral 7, and the upper end of the second transfer spiral 7 is opened to the second processing chamber 8. The lower part of the second fried grain device 9 is provided so as to communicate with each other, and the second processing chamber 8 is provided with a measuring device 10 for measuring the amount of the second product supplied, and based on the measurement result of the measuring device 10. Since the configuration is such that the rotation speed of the second processing cylinder 11 can be adjusted, the second processing operation can always be performed accurately.
【0022】すなわち、本発明の構成は、上述の通り二
番処理室の二番処理物の充填量を常に所定量に保つよう
になっているから、二番処理作用が安定し、むらが少な
く、常に良好に脱粒処理ができる特徴を有するものであ
る。That is, according to the structure of the present invention, as described above, the filling amount of the second processed material in the second processing chamber is always kept at a predetermined amount, so that the second processing operation is stable and the unevenness is small. However, it has a feature that it can always perform good shaving treatment.
【図1】本発明の実施例であって、脱穀機の側面図であ
る。FIG. 1 is a side view of a thresher according to an embodiment of the present invention.
【図2】本発明の実施例であって、脱穀機の切断した正
面図である。FIG. 2 is a cutaway front view of the thresher according to the embodiment of the present invention.
【図3】本発明の実施例であって、ブロック回路図であ
る。FIG. 3 is a block circuit diagram showing an embodiment of the present invention.
【図4】本発明の他の実施例であって、要部の断面図で
ある。FIG. 4 is a cross-sectional view of a main part of another embodiment of the present invention.
1 扱胴 2 扱室 3 揺
動選別装置 4 選別室 5 圧風唐箕 5a 第
1唐箕 5b 第2唐箕 6 一番移送螺旋 7 二
番移送螺旋 8 二番処理室 9 二番揚穀装置 10 測
定装置 11 二番処理胴1 Handling Cylinder 2 Handling Room 3 Swing Sorting Device 4 Sorting Room 5 Pressure Wind Kara Mina 5a 1st Kara Minor 5b 2 Kara Minoh 6 First Transfer Spiral 7 Second Transfer Spiral 8 Second Processing Room 9 Second Lifting Machine 10 Measuring Device 11 second processing cylinder
Claims (1)
動選別装置3を装備した選別室4を設け、該選別室4の
前記揺動選別装置3の下方には一側から圧風唐箕5、一
番移送螺旋6、二番移送螺旋7の順に装備して設け、該
二番移送螺旋7の終端部分には上部を二番処理室8に開
放させた二番揚穀装置9の下部を連通させて設け、前記
二番処理室8には供給された二番物の量を測定する測定
装置10を設け、該測定装置10の測定結果に基づいて
二番処理胴11の回転速度を調節できる構成とした脱穀
機における二番処理装置1. A sorting chamber (4) equipped with a swing sorting device (3) is provided below a handling chamber (2) in which a handling barrel (1) is internally mounted, and one side of the sorting chamber (4) is below the swing sorting device (3). 2) the second fried grain whose upper part is opened to the second processing chamber 8 at the end portion of the second transfer spiral 7. A lower part of the device 9 is provided in communication with the second processing chamber 8 and a measuring device 10 for measuring the amount of the second material supplied is provided in the second processing chamber 8. Based on the measurement result of the measuring device 10, the second processing cylinder 11 is provided. No.2 treatment device in thresher with adjustable rotation speed
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP15863293A JP3214164B2 (en) | 1993-06-29 | 1993-06-29 | Second processing unit in threshing machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP15863293A JP3214164B2 (en) | 1993-06-29 | 1993-06-29 | Second processing unit in threshing machine |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH078106A true JPH078106A (en) | 1995-01-13 |
JP3214164B2 JP3214164B2 (en) | 2001-10-02 |
Family
ID=15675957
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP15863293A Expired - Fee Related JP3214164B2 (en) | 1993-06-29 | 1993-06-29 | Second processing unit in threshing machine |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3214164B2 (en) |
-
1993
- 1993-06-29 JP JP15863293A patent/JP3214164B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP3214164B2 (en) | 2001-10-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH078106A (en) | Tailing treating apparatus of thresher | |
JP3326347B2 (en) | Combine threshing equipment | |
JP3814210B2 (en) | Combine second processing equipment | |
JP2001095362A (en) | Screening device of thresher | |
JP3555897B2 (en) | Threshing and sorting equipment | |
JP3704798B2 (en) | Thresher | |
JPS63313524A (en) | Winnowing device of combine | |
JPH0618444Y2 (en) | Sorting control device | |
JPH0380017A (en) | Selection controlling apparatus for thresher | |
JPS5855075A (en) | Particle size sorting apparatus | |
JP2006067814A (en) | Recovery apparatus of free grain over rack for thresher | |
JPH0735A (en) | Tailing return apparatus in thresher | |
JP2001211730A (en) | Selection controlling apparatus of thresher | |
JPH0693813B2 (en) | Threshing sorter | |
JPH0731269A (en) | Shaking selector in grain thresher | |
JP2563321B2 (en) | Control device in grain sorter | |
JPH06226210A (en) | Suction dust discharger for rice hulling and screening machine and the like | |
JP2005110588A (en) | Threshing apparatus | |
JPH11332367A (en) | Threshing and grading apparatus | |
JPH0745029B2 (en) | Grain detection device of grain selection device | |
JPH0898623A (en) | Threshing sorting device | |
JPH1014369A (en) | Discharge dust flow detector for thresher | |
JPH0795814A (en) | Threshing apparatus | |
JPH07123846A (en) | Selecting device in thresher | |
JPH03169378A (en) | Rotary screening cylinder rotation control device of hulling and screening machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20070727 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100727 Year of fee payment: 9 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100727 Year of fee payment: 9 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120727 Year of fee payment: 11 |
|
LAPS | Cancellation because of no payment of annual fees |