JPH0762887A - Beam holding structure under post/beam installation structure - Google Patents
Beam holding structure under post/beam installation structureInfo
- Publication number
- JPH0762887A JPH0762887A JP20799993A JP20799993A JPH0762887A JP H0762887 A JPH0762887 A JP H0762887A JP 20799993 A JP20799993 A JP 20799993A JP 20799993 A JP20799993 A JP 20799993A JP H0762887 A JPH0762887 A JP H0762887A
- Authority
- JP
- Japan
- Prior art keywords
- gusset plate
- web
- receiving piece
- temporary receiving
- post
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】この発明は、既設柱の間に梁を配
置し、連結固定するまでの間に梁を仮設置出来るように
した柱梁の据付構造における梁の保持構造に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a beam-holding structure in a column-beam installation structure in which beams are arranged between existing columns and the beams can be temporarily installed before connection and fixing.
【0002】[0002]
【従来の技術】ウエブのみからなるガセットプレートを
突設した既設柱に鉄骨梁を据付けるには、一般にクレー
ンなどの揚重装置によって鉄骨梁を吊りながら横移動に
より柱間に挿入し、柱に突設されたガセットプレートに
前記鉄骨梁のウエブの端部側面を接触させ、両者に形成
されたボルト穴にボルトを挿通し、ナットを締め付ける
或いは両者間を溶接することで接合を完了する。2. Description of the Related Art Generally, a steel frame beam is installed on an existing column having a gusset plate made of only a web. The steel frame beam is generally hung by a lifting device such as a crane and laterally inserted between the columns. Joining is completed by bringing the end side surface of the web of the steel beam into contact with the protruding gusset plate, inserting the bolt into the bolt hole formed in both, tightening the nut, or welding between the two.
【0003】[0003]
【発明が解決しようとする課題】しかしながら、この据
付構造においては、ウエブの側面がガセットプレートの
一側面に接しているだけであるため、このまま鉄骨梁の
荷重をガセットプレートに預けると上部側フランジの下
縁にガセットプレートが接触した状態で荷重が預けら
れ、特にボルト接合方式の場合には両者のボルト穴同士
が上下にずれるなどの不具合があるとともに、一側部で
接触するので荷重が偏在し、鉄骨梁に脱落方向の回転モ
ーメントが生ずるため、梁をガセットプレートに完全固
定するまでは梁の仮設置は出来ない。However, in this installation structure, since the side surface of the web is only in contact with one side surface of the gusset plate, if the load of the steel beam is stored in the gusset plate as it is, the upper side flange The load is stored while the gusset plate is in contact with the lower edge.In particular, in the case of the bolt connection method, there is a problem that the bolt holes of both are displaced vertically, and the load is unevenly distributed because they contact at one side. Since the steel frame beam has a rotational moment in the falling direction, the beam cannot be temporarily installed until it is completely fixed to the gusset plate.
【0004】したがってこの種の据付け構造において
は、ボルトナット或いは溶接による固定が完了する時点
まではクレーンの玉掛けを外すことが出来ず、クレーン
の稼動率を低下させる原因となっていた。Therefore, in the installation structure of this type, the sling of the crane cannot be removed until the fixing by the bolt nut or welding is completed, which causes a decrease in the operating rate of the crane.
【0005】この発明は以上の問題を解決するものであ
って、その目的は、この種のウエブのみのガセットプレ
ートを有する柱に鉄骨梁を連結する上での仮固定を可能
とし、クレーンの稼動率を向上できるようにした柱梁の
据付構造における梁の保持構造を提供するものである。The present invention has been made to solve the above problems, and an object thereof is to enable temporary fixing when connecting a steel beam to a column having a gusset plate of only this type of web, and to operate the crane. (EN) A beam holding structure in a column-beam installation structure capable of improving the efficiency.
【0006】[0006]
【課題を解決するための手段】前記目的を達成するた
め、この発明は、既設柱の間にH形鋼からなる鉄骨梁を
横移動により挿入し、前記柱に突設されたガセットプレ
ートに前記鉄骨梁のウエブの端部側面を接触させて連結
するようにした柱梁の据付構造において、前記ウエブの
一側面の端部には、前記ガセットプレートと同一の肉厚
の位置決め用仮受けピースが一体に固定されているとと
もに、該仮受けピースの前面には下方に向けて垂設され
た設置ガイド兼抜止め用の鉤形金具を一体に設けたこと
を特徴とする。In order to achieve the above-mentioned object, according to the present invention, a steel frame beam made of H-shaped steel is laterally inserted between existing columns, and the gusset plates projecting from the columns are provided with the above-mentioned structure. In the installation structure of the column beam which is made to contact and connect the end side surfaces of the web of the steel frame beam, at one end portion of the one side surface of the web, a temporary positioning piece for positioning having the same thickness as the gusset plate is provided. It is characterized in that it is integrally fixed, and that a hook-shaped metal fitting for installation and also as a stopper is provided on the front surface of the temporary receiving piece so as to extend downward.
【0007】[0007]
【作用】以上の構成によれば、鉤形金具の下部内側をガ
セットプレートの上部に位置させた状態で鉄骨梁を下降
させれば、ガセットプレートの上部に仮受けピースが接
し、この仮受けピースを通じてガセットプレートに荷重
を預けることが出来、更に一側部が接することによる鉄
骨梁の回転モーメントは鉤形金具により止めることが出
来る。With the above construction, if the steel beam is lowered with the lower inside of the hook-shaped metal fitting positioned at the upper part of the gusset plate, the temporary receiving piece comes into contact with the upper part of the gusset plate. The load can be applied to the gusset plate through the gusset plate, and the rotation moment of the steel beam due to the contact of one side can be stopped by the hook-shaped metal fitting.
【0008】[0008]
【実施例】以下この発明の一実施例を図面を用いて詳細
に説明する。図1はこの発明による鉄骨梁の保持構造を
示す斜視図、図2は同断面図である。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described in detail below with reference to the drawings. FIG. 1 is a perspective view showing a structure for holding a steel beam according to the present invention, and FIG. 2 is a sectional view of the same.
【0009】図において、既設柱1は、断面矩形状をな
し、内部中空の鉄骨柱であって、その側部には多数のボ
ルト穴2aを穿設したガセットプレート2が一体に突設
されている。In the figure, an existing pillar 1 is a steel frame pillar having a rectangular cross section and a hollow inside, and a gusset plate 2 having a large number of bolt holes 2a formed on its side portion integrally projects. There is.
【0010】鉄骨梁3はウエブ3aの上下にフランジ3
bを一体化したH形鋼からなるもので、そのウエブ3a
の両端(図においては一端側のみ示す)には前記ガセッ
トプレート2のボルト穴2aに一致する多数のボルト穴
3cが穿設されているとともに、ウエブ3aの一側面に
おいてボルト穴3cの上部にはガセットプレート2と同
一の肉厚の仮受けピース4が溶接により一体に固定さ
れ、更にこの仮受けピース4の前面には下方に向けて垂
設された鉤形金具5が溶接などにより一体に突設されて
いる。The steel beam 3 has flanges 3 above and below the web 3a.
It is made of H-shaped steel integrated with b, and its web 3a
A large number of bolt holes 3c corresponding to the bolt holes 2a of the gusset plate 2 are formed at both ends (only one end side is shown in the drawing) of the gusset plate 2. A temporary receiving piece 4 having the same thickness as the gusset plate 2 is integrally fixed by welding, and a hook-shaped metal fitting 5 vertically hung downward is integrally projected on the front surface of the temporary receiving piece 4 by welding or the like. It is set up.
【0011】前記仮受けピース4は前記ガセットプレー
ト2に対する鉄骨梁3の位置決めを行うものであって、
この仮受けピース4の下部にガセットプレート2の上縁
が一致した状態で両者のボルト穴2a,3cの高さが一
致する。The temporary receiving piece 4 is for positioning the steel beam 3 with respect to the gusset plate 2,
With the upper edge of the gusset plate 2 aligned with the lower portion of the temporary receiving piece 4, the heights of the bolt holes 2a, 3c of the two are aligned.
【0012】前記鉤形金具5は設置ガイド兼抜止め用で
あって、その内側は仮受けピース4の下部から外側に向
けてテーパ状の傾斜面5aが形成されている。The hook-shaped metal fitting 5 also serves as an installation guide and a retaining member, and the inside thereof is formed with a tapered inclined surface 5a from the lower part of the temporary receiving piece 4 toward the outside.
【0013】以上の構成からなる鉄骨梁3を柱1間に据
付けるには、図示しないクレーンにワイヤを介して鉄骨
梁3を水平に吊り、図1の矢印方向に示すように鉄骨梁
3を横移動させ、そのウエブ3aの一側面両端をガセッ
トプレート2に接触することで移動を停止させる。In order to install the steel beam 3 having the above-mentioned configuration between the columns 1, the steel beam 3 is hung horizontally on a crane (not shown) via a wire, and the steel beam 3 is mounted as shown in the arrow direction in FIG. The web 3a is laterally moved, and both ends of one side of the web 3a are brought into contact with the gusset plate 2 to stop the movement.
【0014】次いで鉄骨梁3を下降させれば仮受けピー
ス4の下縁がガセットプレート4の上部に突き当たり、
鉄骨梁3の荷重は仮受けピース4を通じてガセットプレ
ート2に預けられる。なお、接触時の衝撃によりウエブ
3aが図2の想像線で示すように、ガセットプレート2
よりやや離間したり、完全に接合していない状態で下降
しても鉤形金具5の内側傾斜面5aに沿って仮受けピー
ス4までガイドされることになる。Next, when the steel beam 3 is lowered, the lower edge of the temporary receiving piece 4 hits the upper part of the gusset plate 4,
The load of the steel beam 3 is stored in the gusset plate 2 through the temporary receiving piece 4. The web 3a is urged by the impact at the time of contact as shown by the imaginary line in FIG.
Even if they are slightly separated or descend in a state where they are not completely joined, they will be guided to the temporary receiving piece 4 along the inner inclined surface 5a of the hook-shaped metal fitting 5.
【0015】荷重が預けられた状態で鉄骨梁3を長手方
向に沿って移動調整すれば、ボルト穴2a,3cは完全
に一致し、この時点でクレーンの玉掛けを外すことがで
きる。If the steel beam 3 is moved and adjusted along the longitudinal direction while the load is being applied, the bolt holes 2a and 3c are completely aligned with each other, and the sling of the crane can be removed at this point.
【0016】鉄骨梁3の仮受け状態では荷重の偏在によ
り仮受けピース4の反対側に回転モーメントが生ずる
が、前記鉤形金具5がガセットプレート2を挾むことで
止めることができ、仮設置時の安全性を確保できる。In the temporary receiving state of the steel frame beam 3, a rotational moment is generated on the opposite side of the temporary receiving piece 4 due to the uneven distribution of the load, but it can be stopped by the hook-shaped metal fitting 5 sandwiching the gusset plate 2 and temporarily installed. The safety of time can be secured.
【0017】[0017]
【発明の効果】以上実施例によって詳細に説明したよう
に、この発明に係る柱梁の据付構造における梁の保持構
造にあっては、鉤形金具の下部内側をガセットプレート
の上部に位置させた状態で鉄骨梁を下降させれば、ガセ
ットプレートの上部に仮受けピースが接し、この仮受け
ピースを通じてガセットプレートに荷重を預けることが
出来、更に一側部が接することによる鉄骨梁の回転モー
メントは鉤形金具により止めることが出来るので、この
種のガセットプレートを有する既設柱の間に梁を配置し
連結固定するまでの間に梁を安全性を保って仮設置出
来、クレーンの稼動率も向上できる。As described above in detail with reference to the embodiments, in the beam holding structure in the column-beam installation structure according to the present invention, the lower inside of the hook-shaped metal fitting is located above the gusset plate. If the steel beam is lowered in this state, the temporary receiving piece comes into contact with the upper part of the gusset plate, the load can be deposited on the gusset plate through this temporary receiving piece, and the rotation moment of the steel beam due to the contact with one side is Since it can be stopped with a hook-shaped metal fitting, the beam can be temporarily installed with safety while placing the beam between the existing columns with this type of gusset plate and connecting and fixing it, and the operating rate of the crane is also improved. it can.
【図1】この発明による鉄骨梁の据付け構造を示す斜視
図である。FIG. 1 is a perspective view showing an installation structure of a steel beam according to the present invention.
【図2】同断面図である。FIG. 2 is a sectional view of the same.
1 鉄骨柱 2 ガセットプレート 3 鉄骨梁 3a ウエブ 4 仮受けプレート 5 鉤形金具 1 Steel column 2 Gusset plate 3 Steel beam 3a Web 4 Temporary receiving plate 5 Hook type metal fitting
Claims (1)
移動により挿入し、前記柱に突設されたガセットプレー
トに前記鉄骨梁のウエブの端部側面を接触させて連結す
るようにした柱梁の据付構造において、 前記ウエブの一側面の端部には、前記ガセットプレート
と同一肉厚の位置決め用の仮受けピースが一体に固定さ
れているとともに、該仮受けピースの前面には下方に向
けて垂設された設置ガイド兼抜止め用の鉤形金具を一体
に設けたことを特徴とする柱梁の据付構造における梁の
保持構造。1. A steel frame beam made of an H-shaped steel is laterally inserted between existing columns, and a gusset plate projecting from the column is brought into contact with an end side surface of a web of the steel frame beam to connect them. In the installation structure of the column and beam, a temporary receiving piece for positioning having the same thickness as the gusset plate is integrally fixed to an end of one side surface of the web, and the temporary receiving piece is provided on the front surface of the temporary receiving piece. Is a beam-holding structure in a column-beam installation structure, which is integrally provided with a hook-shaped metal fitting that is installed downwardly and also serves as a retaining guide.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP20799993A JP2833430B2 (en) | 1993-08-23 | 1993-08-23 | Beam holding structure in column-beam installation structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP20799993A JP2833430B2 (en) | 1993-08-23 | 1993-08-23 | Beam holding structure in column-beam installation structure |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0762887A true JPH0762887A (en) | 1995-03-07 |
JP2833430B2 JP2833430B2 (en) | 1998-12-09 |
Family
ID=16549003
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP20799993A Expired - Fee Related JP2833430B2 (en) | 1993-08-23 | 1993-08-23 | Beam holding structure in column-beam installation structure |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2833430B2 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100488003B1 (en) * | 2002-02-02 | 2005-05-17 | 이연희 | Joining method of high strength steel structure |
JP2020133144A (en) * | 2019-02-14 | 2020-08-31 | 前田建設工業株式会社 | Beam member loading method, beam member and bracket member |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106013822B (en) * | 2016-07-06 | 2018-09-11 | 中铁城建集团北京工程有限公司 | A kind of construction method of the quick line setting device of odd-shaped cross section beam |
-
1993
- 1993-08-23 JP JP20799993A patent/JP2833430B2/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100488003B1 (en) * | 2002-02-02 | 2005-05-17 | 이연희 | Joining method of high strength steel structure |
JP2020133144A (en) * | 2019-02-14 | 2020-08-31 | 前田建設工業株式会社 | Beam member loading method, beam member and bracket member |
Also Published As
Publication number | Publication date |
---|---|
JP2833430B2 (en) | 1998-12-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6371249B1 (en) | Quick connector apparatus for elevator guide rail section | |
JPH0762887A (en) | Beam holding structure under post/beam installation structure | |
JPH0516347Y2 (en) | ||
US20040261339A1 (en) | Safety barrier | |
JPH0447287Y2 (en) | ||
JP2500019Y2 (en) | Floor beams | |
JPS6115147Y2 (en) | ||
JPH0642048Y2 (en) | Beam mounting device | |
JPH0732764Y2 (en) | Parent rope support device | |
JPH07116782B2 (en) | Wall panel support mechanism | |
JPH0988218A (en) | Metal fitting for external wall board | |
JP3045967U (en) | Connecting structure of lining plate | |
JPS60164531A (en) | Pillar anchoring apparatus | |
JPH021327Y2 (en) | ||
JPH108710A (en) | Scaffolding member | |
JPH07513Y2 (en) | Smashing hardware | |
JPH0849389A (en) | Mounting structure of external wall panel | |
JPS6135658Y2 (en) | ||
JP2570475Y2 (en) | Wall panel support mechanism | |
JPH086881Y2 (en) | Joiner for large and small beams | |
JPH11200479A (en) | Verandah handrail wall mounting structure and lightweight cellular concrete panel | |
JPS634145A (en) | Floor panel support apparatus | |
JPH04289357A (en) | Fitting device for wall panel | |
JPH05254756A (en) | Guide rail mounting device | |
JP2002129684A (en) | Fastener |