JPH0742353U - Mounting structure of load detector in crane - Google Patents

Mounting structure of load detector in crane

Info

Publication number
JPH0742353U
JPH0742353U JP7447393U JP7447393U JPH0742353U JP H0742353 U JPH0742353 U JP H0742353U JP 7447393 U JP7447393 U JP 7447393U JP 7447393 U JP7447393 U JP 7447393U JP H0742353 U JPH0742353 U JP H0742353U
Authority
JP
Japan
Prior art keywords
load detector
boom
load
hoisting rope
sheave
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP7447393U
Other languages
Japanese (ja)
Other versions
JP2594173Y2 (en
Inventor
哲一 赤羽
Original Assignee
石川島建機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 石川島建機株式会社 filed Critical 石川島建機株式会社
Priority to JP1993074473U priority Critical patent/JP2594173Y2/en
Publication of JPH0742353U publication Critical patent/JPH0742353U/en
Application granted granted Critical
Publication of JP2594173Y2 publication Critical patent/JP2594173Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Control And Safety Of Cranes (AREA)

Abstract

(57)【要約】 【構成】 ブーム1先端部近傍内に配置した荷重検出器
3の一方の負荷作用端をブーム1に枢支し、ブーム1の
先端部近傍の下方側にブーム1の幅方向へ水平に延びる
ピン11によって回転自在に枢支され且つ外周に巻上ロ
ープ溝12を有するガイドシーブ13を設け、ブーム1
の先端部に設けたシーブ4から垂下され且つフックブロ
ックのシーブに巻き掛けられた巻上ロープ7の先端部
を、前記のガイドシーブ13に巻き掛けたうえ、前記の
荷重検出器3の他方の負荷作用端に連結した構成とす
る。 【効果】 荷重検出器3は、地表等と直接接触すること
がなく、且つ荷重によるロープ張力のみを負荷するの
で、他の外力により損傷を受けることが防止される。
(57) [Summary] [Structure] One load acting end of the load detector 3 arranged in the vicinity of the front end of the boom 1 is pivotally supported on the boom 1, and the width of the boom 1 is located at a lower side near the front end of the boom 1. The guide sheave 13 rotatably supported by a pin 11 extending horizontally in the direction and having a hoisting rope groove 12 on the outer circumference is provided.
The tip end of the hoisting rope 7 hanging from the sheave 4 provided at the tip end of the hook block and wound around the sheave of the hook block is wound around the guide sheave 13 and the other end of the load detector 3 described above. It is connected to the load acting end. [Effect] Since the load detector 3 does not come into direct contact with the ground surface or the like and applies only the rope tension due to the load, it is prevented from being damaged by other external force.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

本考案は、クレーンにおける荷重検出器の取付構造に関するものである。 The present invention relates to a load detector mounting structure in a crane.

【0002】[0002]

【従来の技術】[Prior art]

ブームを備え、該ブームの先端部から巻上ロープを介して吊り下げられた吊り 具により荷物の吊り上げを行なうジブクレーン等では、図2に示すように一方の 負荷作用端をブーム1の幅方向へ水平に延びるピン2によってブーム1に連結す ることによりロードセルなどの荷重検出器3をブーム1の先端部近傍の下側に吊 り下げて支持し、ブーム1の先端部に設けたシーブ4から垂下され、且つフック ブロック5のシーブ6に巻き掛けられた巻上ロープ7の先端部を、前記の荷重検 出器3の他方の負荷作用端に前記のピン2と同じ方向へ延びるピン8によって連 結し、前記の荷重検出器3から出力される荷重検出信号に基づいてブーム1に作 用する負荷を表示させたり、或いは又、過負荷警報装置を作動させるようにして いる。 In a jib crane or the like that is equipped with a boom and hoists are suspended from the tip of the boom via a hoisting rope, one load acting end of the jib crane in the width direction of the boom 1 as shown in FIG. The load detector 3 such as a load cell is hung and supported below the boom 1 by connecting it to the boom 1 by a horizontally extending pin 2, and from a sheave 4 provided at the tip of the boom 1. The tip end of the hoisting rope 7 suspended from the sheave 6 of the hook block 5 is attached to the other load acting end of the load detector 3 by a pin 8 extending in the same direction as the pin 2. The load is applied to the boom 1 based on the load detection signal outputted from the load detector 3 or the overload alarm device is activated.

【0003】[0003]

【考案が解決しようとする課題】[Problems to be solved by the device]

しかしながら、前述のクレーンにおける荷重検出器の取付構造では、荷重検出 器3がブーム1の幅方向へ水平に延びるピン2によってブーム1の先端部近傍の 下側に吊り下げられているため、ブーム1を倒した際に荷重検出器3が地表に接 触して損傷することがある。 However, in the above-described load detector mounting structure in the crane, the load detector 3 is suspended below the vicinity of the tip of the boom 1 by the pin 2 that extends horizontally in the width direction of the boom 1. The load detector 3 may touch the ground surface and be damaged when it is tilted.

【0004】 また、荷重検出器3は、ブーム1の幅方向へ水平に延びるピン2,8によって ブーム1の先端部、及び巻上ロープ7の先端部に連結されているため、風によっ てフックブロック5がブーム1の幅方向へ揺動した際に、荷重検出器3に対して ブーム1の幅方向へ折り曲げようとする力が作用して荷重検出器3を損傷するこ とがあるなどの問題があった。Since the load detector 3 is connected to the tip of the boom 1 and the tip of the hoisting rope 7 by pins 2 and 8 that extend horizontally in the width direction of the boom 1, the load detector 3 is affected by wind. When the hook block 5 swings in the width direction of the boom 1, a force that bends the load detector 3 in the width direction of the boom 1 may act to damage the load detector 3. There was a problem.

【0005】 本考案は、前述の実情に鑑み、荷重検出器をブーム先端部近傍のブーム内に配 置することにより、荷重検出器の損傷を防止できるクレーンにおける荷重検出器 の取付構造を提供することを目的としてなしたものである。In view of the above situation, the present invention provides a load detector mounting structure in a crane that can prevent damage to the load detector by disposing the load detector in the boom near the boom tip. It was made for that purpose.

【0006】[0006]

【課題を解決するための手段】[Means for Solving the Problems]

第1の考案は、ブームの先端部近傍のブーム内に荷重検出器を配置して該荷重 検出器の一方の負荷作用端をブームに枢支し、ブームの幅方向へ水平に延びるピ ンにより回転自在に枢支され且つ外周に巻上ロープが当接可能なロープ当接部と 該ロープ当接部の両端部に連なるように形成されたフランジ部とを有する巻上ロ ープガイド部材を前記の荷重検出器の下方に位置するように設け、ブームの先端 部に設けたシーブから垂下され且つフックブロックのシーブに巻き掛けられた巻 上ロープの先端部を、前記の巻上ロープガイド部材に巻き掛けたうえ、前記の荷 重検出器の他方の負荷作用端に連結した構成とし、第2の考案は、第1の考案を 構成する巻上ロープガイド部材としてシーブを適用した構成としている。 The first invention is to arrange a load detector in the boom near the tip of the boom, pivot one end of the load detector to the boom, and use a pin extending horizontally in the width direction of the boom. The hoisting rope guide member is rotatably supported and has a rope abutting portion capable of abutting a hoisting rope on the outer periphery, and a flange portion formed so as to be connected to both ends of the rope abutting portion. The hoisting rope tip, which is provided below the load detector, is suspended from the sheave provided at the tip of the boom and is wound around the sheave of the hook block. In the second invention, a sheave is applied as the hoisting rope guide member constituting the first invention, after being hung and connected to the other load acting end of the load detector.

【0007】[0007]

【作用】[Action]

従って、本考案では、ブーム先端部近傍内にある荷重検出器は、ブーム構成部 材によって障害物との接触から庇護され、また巻上ロープガイド部材によってフ ックブロックの横振れに伴う横方向の外力が巻上ロープを介して伝播されること を防止され、巻上荷重のみを負荷する。 Therefore, in the present invention, the load detector in the vicinity of the tip of the boom is protected from contact with the obstacle by the boom component, and the lateral force applied by the hoisting rope guide member due to the lateral deflection of the hook block. Is prevented from propagating through the hoisting rope and carries only the hoisting load.

【0008】[0008]

【実施例】【Example】

以下、本考案の実施例を図面を参照しつつ説明する。 Hereinafter, embodiments of the present invention will be described with reference to the drawings.

【0009】 図1は本考案のクレーンにおける荷重検出器の取付構造の概略を表す側面図で あり、図中、図2と同じものには同じ符号を付してある。FIG. 1 is a side view showing an outline of a load detector mounting structure in a crane of the present invention. In the figure, the same parts as those in FIG. 2 are designated by the same reference numerals.

【0010】 本実施例では、鋼管によって形成されたブーム1の先端部近傍内の上部に、リ ンク10をブーム1の幅方向へ略水平に延びるピン9により枢支し、ロードセル 等の荷重検出器3の一方の負荷作用端を前記のリンク10に連結することによっ てブーム1の先端部近傍内に荷重検出器3を吊下げ支持する。In the present embodiment, the link 10 is pivotally supported by a pin 9 extending substantially horizontally in the width direction of the boom 1 on the upper portion in the vicinity of the tip end portion of the boom 1 formed of a steel pipe to detect a load such as a load cell. The load detector 3 is suspended and supported in the vicinity of the tip of the boom 1 by connecting one load acting end of the device 3 to the link 10.

【0011】 また、ブーム1の先端部近傍の下方側に設けられ、且つブーム1の幅方向へ水 平に延びるピン11によって、外周に巻上ロープ溝12を有するガイドシーブ1 3をブーム1の先端部近傍の下方側の所定位置に回転自在に枢支する。Further, a guide sheave 13 having a hoisting rope groove 12 on the outer circumference is provided on the boom 1 by a pin 11 provided on the lower side near the tip of the boom 1 and extending horizontally in the width direction of the boom 1. It is rotatably supported at a predetermined position on the lower side near the tip.

【0012】 さらに、ブーム1の先端部に設けたシーブ4から垂下され、且つ図2に示す従 来例と同様に、フックブロック5(図1には図示していない)のシーブ6に巻き 掛けられた巻上ロープ7の先端部を、前記のガイドシーブ13に巻き掛けたうえ 、前記の荷重検出器3の他方の負荷作用端に連結する。Further, as in the conventional example shown in FIG. 2, it is suspended from a sheave 4 provided at the tip of the boom 1, and is wound around a sheave 6 of a hook block 5 (not shown in FIG. 1). The tip end of the hoisting rope 7 thus wound is wound around the guide sheave 13 and then connected to the other load acting end of the load detector 3.

【0013】 図示していない巻上装置を作動させて巻上ロープ7を巻き取ることにより荷物 を吊り上げると、該荷物による荷重を巻上ロープ7を通して荷重検出器3が検出 し所要の荷重検出信号を発信する。When a load is hoisted by operating a hoisting device (not shown) to wind up the hoisting rope 7, the load detector 3 detects the load due to the load through the hoisting rope 7 and a required load detection signal. To send.

【0014】 前記によれば、荷重検出器3をブーム1の先端部近傍のブーム1内に配置した ので、荷重検出器3はブーム1構成部材によって地表などの外部障害物との接触 から庇護される。According to the above, since the load detector 3 is arranged in the boom 1 near the tip of the boom 1, the load detector 3 is protected from contact with external obstacles such as the ground surface by the components of the boom 1. It

【0015】 また、巻上ロープ7をガイドシーブ13に巻き掛けたうえで荷重検出器3に連 結したので、フックブロック5の横振れに伴う横方向の外力が巻上ロープ7を介 して荷重検出器3に伝播されることをガイドシーブ13が遮断するため、荷重検 出器3は巻上荷重による巻上ロープ7の張力のみを負荷し、従って、荷重検出器 3の損傷を防止できる。Further, since the hoisting rope 7 is wound around the guide sheave 13 and connected to the load detector 3, the external force in the lateral direction due to the lateral shake of the hook block 5 is passed through the hoisting rope 7. Since the guide sheave 13 blocks the propagation to the load detector 3, the load detector 3 applies only the tension of the hoisting rope 7 due to the hoisting load, and therefore the damage of the load detector 3 can be prevented. .

【0016】 なお、本考案は前述の実施例にのみ限定されるものではなく、シーブに替えて 管材等により形成した外周に巻上ロープが当接可能なロープ当接部と該ロープ当 接部の両端部に連なるように形成されたフランジ部とを有する巻上ロープガイド 部材を用いるようにしてもよく、その他本考案の要旨を逸脱しない範囲内におい て種々変更を加え得ることは勿論である。The present invention is not limited to the above-mentioned embodiment, and the rope contact portion and the rope contact portion on which the hoisting rope can come into contact with the outer periphery formed by the pipe material or the like instead of the sheave. It is of course possible to use a hoisting rope guide member having flange portions formed so as to be connected to both end portions of the above, and various changes can be made without departing from the scope of the present invention. .

【0017】[0017]

【考案の効果】[Effect of device]

本考案のクレーンにおける荷重検出器の取付構造によれば、下記のごとき種々 の優れた効果を奏し得る。 According to the load detector mounting structure in the crane of the present invention, various excellent effects as described below can be obtained.

【0018】 I)荷重検出器をブーム内に配置したので、該荷重検出器が地表などの外部障 害物と接触することを防止できる。I) Since the load detector is arranged inside the boom, it is possible to prevent the load detector from coming into contact with an external obstacle such as the ground surface.

【0019】 II)巻上ロープの先端部を巻上ロープガイド部に巻き掛けたうえで荷重検出 器に連結したので、荷重検出器は荷重によるロープ張力のみを負荷し、その他の 外力を受けることがない。II) Since the tip end of the hoisting rope is wound around the hoisting rope guide part and connected to the load detector, the load detector applies only the rope tension due to the load and receives other external force. There is no.

【0020】 III)従って、荷重検出器の損傷を未然に防止できる。III) Therefore, damage to the load detector can be prevented in advance.

【図面の簡単な説明】[Brief description of drawings]

【図1】本考案のクレーンにおける荷重検出器の取付構
造の一実施例の概略を表す側面図である。
FIG. 1 is a side view schematically showing an embodiment of an attachment structure of a load detector in a crane according to the present invention.

【図2】従来のクレーンにおける荷重検出器の取付構造
の一例の概略を表す側面図である。
FIG. 2 is a side view schematically showing an example of a load detector mounting structure in a conventional crane.

【符号の説明】[Explanation of symbols]

1 ブーム 3 荷重検出器 4 シーブ 5 フックブロック 6 シーブ 7 巻上ロープ 11 ピン 12 巻上ロープ溝(ロープ当接部)(フランジ部) 13 ガイドシーブ(巻上ロープガイド部材) 1 boom 3 load detector 4 sheave 5 hook block 6 sheave 7 hoisting rope 11 pin 12 hoisting rope groove (rope contact part) (flange part) 13 guide sheave (hoisting rope guide member)

Claims (2)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 ブームの先端部近傍内に荷重検出器を配
置して該荷重検出器の一方の負荷作用端をブームに枢支
し、ブームの幅方向へ水平に延びるピンによって回転自
在に枢支され且つ外周に巻上ロープが当接可能なロープ
当接部と該ロープ当接部の両端部に連なるように形成さ
れたフランジ部とを有する巻上ロープガイド部材を前記
の荷重検出器の下方に位置するように設け、ブームの先
端部に設けたシーブから垂下され且つフックブロックの
シーブに巻き掛けられた巻上ロープの先端部を、前記の
巻上ロープガイド部材に巻き掛けたうえ、前記の荷重検
出器の他方の負荷作用端に連結したことを特徴とするク
レーンにおける荷重検出器の取付構造。
1. A load detector is disposed in the vicinity of the tip of the boom, one load acting end of the load detector is pivotally supported on the boom, and the load detector is rotatably pivoted by a pin extending horizontally in the width direction of the boom. A hoisting rope guide member having a rope abutting portion supported by the outer circumference and capable of abutting a hoisting rope and flange portions formed so as to be connected to both ends of the rope abutting portion is provided in the load detector. It is provided so as to be located below, and the tip end of the hoisting rope hanging from the sheave provided at the tip of the boom and wound around the sheave of the hook block is wound around the hoisting rope guide member. A load detector mounting structure for a crane, characterized in that the load detector is connected to the other load acting end of the load detector.
【請求項2】 巻上ロープガイド部材にシーブを用いた
ことを特徴とする請求項1に記載のクレーンにおける荷
重検出器の取付構造。
2. The load detector mounting structure for a crane according to claim 1, wherein a sheave is used for the hoisting rope guide member.
JP1993074473U 1993-12-29 1993-12-29 Mounting structure of load detector in crane Expired - Lifetime JP2594173Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1993074473U JP2594173Y2 (en) 1993-12-29 1993-12-29 Mounting structure of load detector in crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1993074473U JP2594173Y2 (en) 1993-12-29 1993-12-29 Mounting structure of load detector in crane

Publications (2)

Publication Number Publication Date
JPH0742353U true JPH0742353U (en) 1995-08-04
JP2594173Y2 JP2594173Y2 (en) 1999-04-19

Family

ID=13548271

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1993074473U Expired - Lifetime JP2594173Y2 (en) 1993-12-29 1993-12-29 Mounting structure of load detector in crane

Country Status (1)

Country Link
JP (1) JP2594173Y2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09327357A (en) * 1996-06-13 1997-12-22 Mitsuyoshi Hamasu Multilayer bedding
CN106219411A (en) * 2016-07-26 2016-12-14 武汉船用机械有限责任公司 A kind of lifting rope that is provided with fixes the arm of end connection device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09327357A (en) * 1996-06-13 1997-12-22 Mitsuyoshi Hamasu Multilayer bedding
CN106219411A (en) * 2016-07-26 2016-12-14 武汉船用机械有限责任公司 A kind of lifting rope that is provided with fixes the arm of end connection device

Also Published As

Publication number Publication date
JP2594173Y2 (en) 1999-04-19

Similar Documents

Publication Publication Date Title
JPH0742353U (en) Mounting structure of load detector in crane
JP5374915B2 (en) Crane weight structure
JPH0873189A (en) Safety device for truck mounting crane
JP3227535B2 (en) Lifting mechanism at the middle of the crane's boom
JP3257508B2 (en) Crane safety device with roughing jib
JPH0344789Y2 (en)
JP3130459B2 (en) Crane rope detachment prevention device
JPH10258990A (en) Wire rope end coupler for mobile crane
JPS6348798B2 (en)
JPH0543027Y2 (en)
JPH041193Y2 (en)
JP2523815Y2 (en) Hook assembly for crane
JP2503141B2 (en) Crane wire rope terminal fixing device
JP2001302180A (en) Link device of tower crane
JPS6225515Y2 (en)
JP3399397B2 (en) Crane overload protection device
JP3724980B2 (en) Leader pile driver
JPH0338234Y2 (en)
JPH01317997A (en) Overload preventing method for crane
JPH11263583A (en) Load shake preventing device at starting lift of hoisted cargo by crane
JPH08259183A (en) Detection device of boom length and its method
JPH0754232Y2 (en) Safety equipment for work vehicles
JP2000185896A (en) Overwinding alarm device for crane with hook storing device
JPH0468096U (en)
JPH0715699U (en) Crane safety equipment

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090219

Year of fee payment: 10

EXPY Cancellation because of completion of term