Prior art keywords
wire
boom
receiver
crane
post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP6662093U
Other languages
Japanese (ja)
Other versions
JP2555500Y2 (en
Inventor
久 花田
盛貞 崎元
岩田  悟
恭伺 柴田
浩 石嶋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Corp
Original Assignee
Takenaka Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Corp filed Critical Takenaka Corp
Priority to JP6662093U priority Critical patent/JP2555500Y2/en
Publication of JPH0735482U publication Critical patent/JPH0735482U/en
Application granted granted Critical
Publication of JP2555500Y2 publication Critical patent/JP2555500Y2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

(57)【要約】 【目的】 建築用等に使用されるジブ式クレーンの使用
を開始するにあたり、起伏ワイヤーを正規に張り渡す仕
込み作業用に使用される受金物を提供する。 【構成】 ブーム2の側面部に、複数本のワイヤー受け
3が、その基端部をヒンジ4により取り付けられてい
る。ワイヤー受け3の先端部にポスト6が垂直上向きに
設けられ、前記ポスト6を受け止める位置に保持具7が
設けられている。前記ヒンジ4はブーム2の側面にコ字
形の軸受金物8を固定したもので、ワイヤー受け3の基
端部が回動自在に取り付けられている。 【効果】 ブーム2にワイヤー受け3が予め設置されて
いるので、作業員は単管を持つ必要がなく、クレーンの
ブームに登って身軽に仕込み作業をすることができる。
(57) [Abstract] [Purpose] To provide a receiving material used for the preparation work in which the undulating wire is regularly stretched when the use of the jib type crane used for construction is started. [Structure] A plurality of wire receivers 3 are attached to the side surface of the boom 2 by hinges 4 at the base ends thereof. A post 6 is provided vertically upward at the tip of the wire receiver 3, and a holder 7 is provided at a position for receiving the post 6. The hinge 4 is one in which a U-shaped bearing metal 8 is fixed to the side surface of the boom 2, and the base end of the wire receiver 3 is rotatably attached. [Effect] Since the wire receiver 3 is installed in advance on the boom 2, the operator does not need to have a single pipe, and can easily climb into the boom of the crane and carry out the preparation work.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

この考案は、建築用等に使用されるジブ式クレーンの使用を開始するにあたり 、起伏ワイヤーを正規に張り渡す仕込み作業用に使用される受金物に関する。 The present invention relates to a receiving object used for preparation work in which an undulating wire is regularly stretched when starting use of a jib type crane used for construction and the like.

【0002】[0002]

【従来の技術】[Prior art]

従来、ジブ式クレーンを組立て、その使用を開始するにあたっては、クレーン 起伏ワイヤーを仕込む作業が行なわれている。その際、垂れ下がるワイヤーを乱 れないように受け止める受金物として、従来は取り外し可能な単管をブームの両 外側へ突き出るように取り付け、ワイヤーを仕込む作業時に垂れるワイヤーを前 記単管にて支持させていた。また、ワイヤーを仕込む作業の終了後は前記単管を 取り外していた。 In the past, when assembling a jib-type crane and starting to use it, the crane erection wire was charged. At that time, as a hardware that receives the hanging wire without disturbing it, conventionally, a detachable single tube was attached so as to project to both outsides of the boom, and the wire that droops during the work of loading the wire is supported by the single tube described above. Was there. Further, after the work of charging the wire was completed, the single pipe was removed.

【0003】[0003]

【本考案が解決しようとする課題】[Problems to be solved by the present invention]

従来のように、クレーンのブームに、ワイヤー仕込用の受金物として単管を略 等間隔に複数本取り付ける作業は、作業員が単管を所持して高いブームに登って 行なうため、足場が悪く不安定であり、手間が掛かる上に高所作業であるため大 変危険でもあった。しかも、ワイヤーの仕込み作業終了後には同様な作業環境で 前記単管を取り外し、それを所持してブームを降りなければならないため、一層 大変である。 As in the past, when attaching multiple single pipes to the boom of a crane as receiving materials for wire preparation at approximately equal intervals, the worker carries the single pipe and climbs to a high boom, so the foothold is bad. It was unstable and labor-intensive, and it was dangerous because it was a work in high places. Moreover, it is even more difficult since the single pipe must be removed in the same working environment after carrying out the wire preparation work, and must carry the boom to get off the boom.

【0004】 従って、本考案の目的は、作業員が受金物を準備する高所作業を安全に短時間 に確実に遂行でき、単管の持ち運びを無用としたクレーン起伏ワイヤー仕込用受 金物を提供することである。[0004] Therefore, an object of the present invention is to provide a crane undulating wire charging receiver which enables workers to securely perform high-altitude work for preparing a receiver in a short time and without carrying a single pipe. It is to be.

【0005】[0005]

【課題を解決するための手段】[Means for Solving the Problems]

上記の課題を解決するための手段として、本考案に係るクレーン起伏ワイヤー 仕込用受金物は、 クレーン1のブーム2の側面部に、複数本のワイヤー受け3が、その基端部を ヒンジ4によりブーム2の側面から水平に展開した位置からブーム2に沿って折 り畳み収納される位置まで回動自在に取り付けられていることを特徴とする。 As means for solving the above-mentioned problems, a crane hoisting wire charging receiver according to the present invention has a plurality of wire receivers 3 on a side surface portion of a boom 2 of a crane 1 and a base end portion of which is supported by a hinge 4. It is characterized in that it is rotatably attached from a position where it is unfolded horizontally from the side of the boom 2 to a position where it is folded and stored along the boom 2.

【0006】 本考案はまた、ワイヤー受け3の先端部に、収納及びワイヤー5の外れ止め兼 用のポスト6が垂直上向きに設けられ、ブーム2においてワイヤー受け3がヒン ジ4により回動してブーム2と平行な姿勢となった際に前記ポスト6を受け止め る位置に保持具7が設けられていることも特徴とする。 さらに、前記ヒンジ4は、ブーム2の側面にコ字形の軸受金物8を固定し、同 軸受金物8へピン9によりワイヤー受け3の基端部が回動自在に取り付けられた 構成であり、前記軸受金物8は、前記ワイヤー受け3をブーム2の長手方向に対 し略直角な向きに展開した位置に制止する位置決め部8aを有することも特徴と する。According to the present invention, a post 6 for accommodating and preventing the wire 5 from coming off is provided vertically upward at the tip of the wire receiver 3, and the wire receiver 3 is rotated by the hinge 4 in the boom 2. It is also characterized in that a holder 7 is provided at a position for receiving the post 6 when the posture is parallel to the boom 2. Further, the hinge 4 has a configuration in which a U-shaped bearing metal 8 is fixed to the side surface of the boom 2, and the base end of the wire receiver 3 is rotatably attached to the bearing metal 8 by a pin 9. The bearing hardware 8 is also characterized in that it has a positioning portion 8a for stopping the wire receiver 3 at a position where the wire receiver 3 is deployed in a direction substantially perpendicular to the longitudinal direction of the boom 2.

【0007】[0007]

【作用】[Action]

ワイヤー受け3は、ヒンジ4を中心に回動してブーム2の側方へ略直角な位置 まで展開させ(突き出させ)、仕込み作業時に垂れるワイヤー5を受け止めさせ る。前記ワイヤー受け3には、先端部にポスト6が垂直上向きに設けられている から、受け止めたワイヤー5の外れが防止される。ワイヤー5を仕込む作業の終 了後は、ワイヤー受け3をブーム2の側面と平行に折り畳める。折り畳んだワイ ヤー受け3のポスト6は、ブーム2に設置されている保持具7に保持されきっち り固定されるからブーム2の稼動に支障がない。 The wire receiver 3 is rotated around the hinge 4 to be expanded (protruded) to the side of the boom 2 at a substantially right angle, and the wire 5 that hangs down during the preparation work is received. Since the post 6 is provided vertically upward on the tip of the wire receiver 3, detachment of the received wire 5 is prevented. After the work of loading the wire 5 is completed, the wire receiver 3 can be folded parallel to the side surface of the boom 2. The post 6 of the folded wire receiver 3 is held by the holder 7 installed on the boom 2 and is firmly fixed, so that the operation of the boom 2 is not hindered.

【0008】[0008]

【実施例】【Example】

以下に、図示した本考案の実施例を説明する。 図1は、組み立てられたジブ式クレーンにおける起伏ワイヤーの仕込み作業状 態を示している。クレーン1は、ワイヤー5の仕込み作業に適切な高さとされて いる。ワイヤー受け3は、クレーン1のブーム2の両側面部に対称的な配置で、 しかもブーム2の長さ方向に略等間隔に3対ヒンジ4で取り付けられている(図 2参照)。ワイヤー受け3は、少なくともワイヤー5の支持に必要な強度を有す るように、例えば1辺が10cm弱、長さ約1mの角鋼管で形成されている。 Hereinafter, the illustrated embodiment of the present invention will be described. FIG. 1 shows a state in which the hoisting wire is loaded in the assembled jib crane. The height of the crane 1 is suitable for the work of loading the wire 5. The wire receivers 3 are symmetrically arranged on both side surfaces of the boom 2 of the crane 1, and are attached by three-pair hinges 4 at substantially equal intervals in the length direction of the boom 2 (see FIG. 2). The wire receiver 3 is formed of, for example, a square steel tube having a side of a little less than 10 cm and a length of about 1 m so as to have a strength required to support at least the wire 5.

【0009】 ワイヤー受け3の基端部をブーム2の側面に取り付けるヒンジ4の具体的構成 としては、ブーム2を構成する上端材の側面にコ字形の軸受金物8を固定し(図 4参照)、同軸受金物8へピン9によりワイヤー受け3の基端部が回動可能に取 り付けられている(図3参照)。従って、ワイヤー受け3は、ブーム2の長手方 向に平行な面内で回動可能である。より具体的には、図3に示したように、軸受 金物8の位置決め部8aに制止される直角に突き出された展開位置から、ブーム 2の側面に沿って平行となる2点鎖線図示の折り畳み位置まで約90度の回動が 可能とされている。前記ワイヤー受け3は、略直角に展開された位置で仕込み作 業時のワイヤー5を受け止めて支持する。As a specific configuration of the hinge 4 for attaching the base end portion of the wire receiver 3 to the side surface of the boom 2, a U-shaped bearing metal fitting 8 is fixed to a side surface of an upper end material forming the boom 2 (see FIG. 4). The base end of the wire receiver 3 is rotatably attached to the bearing hardware 8 by a pin 9 (see FIG. 3). Therefore, the wire receiver 3 can rotate in a plane parallel to the longitudinal direction of the boom 2. To be more specific, as shown in FIG. 3, the folding position shown by the two-dot chain line that is parallel to the side surface of the boom 2 from the deployed position that is protruded at a right angle and is stopped by the positioning portion 8a of the bearing hardware 8 It is possible to rotate about 90 degrees to the position. The wire receiver 3 receives and supports the wire 5 at the time of preparation operation at a position where the wire receiver 3 is deployed at a substantially right angle.

【0010】 また、ワイヤー受け3の上面の先端部にポスト6が垂直上向きに設けられてい る。前記ポスト6は、ワイヤー5の仕込み作業時にワイヤー5が外れない程度の 高さとされている。一方、ブーム2には、ワイヤー受け3がヒンジ4を中心に回 動してブーム2と平行な折り畳み姿勢となった際に前記ポスト6を受け止める位 置に、保持具7が設けられている。図3に示したように、保持具7は、弾性な金 属板で前記ポスト6を弾力的に挟み持つ略コ字形に形成されている。従って、前 記ワイヤー受け3は、ワイヤー5を仕込む作業開始時には、ブームに登った作業 員の手によりポスト6を保持具7から引き外して軸受金物8の位置決め部8aに 当たるまで回動させ、ブーム2の側面に対して略直角に展開させる。A post 6 is provided vertically upward on the tip of the upper surface of the wire receiver 3. The post 6 has such a height that the wire 5 does not come off during the work of preparing the wire 5. On the other hand, the boom 2 is provided with a retainer 7 at a position for receiving the post 6 when the wire receiver 3 rotates about the hinge 4 and assumes a folding posture parallel to the boom 2. As shown in FIG. 3, the holder 7 is formed in a substantially U shape in which the post 6 is elastically sandwiched by an elastic metal plate. Therefore, at the start of the work of loading the wire 5, the wire receiver 3 is rotated until the post 6 is pulled out from the holder 7 by the hand of the worker who has climbed the boom and hits the positioning portion 8a of the bearing hardware 8, Deploy the boom 2 at a right angle to the side surface.

【0011】 ワイヤー5の仕込み作業の終了後は、仕込み作業の開始時とは逆に、やはりブ ームに登った作業員の手により、ワイヤー受け3をブーム2の側面に沿って平行 となる位置(図3に示す2点鎖線の折り畳み位置)まで約90度回動させて折り 畳み、前記ワイヤー受け3のポスト6をブーム2の保持具7に保持させ収納状態 が固定される。After the completion of the preparation work of the wire 5, the wire receiver 3 becomes parallel to the side surface of the boom 2 by the hand of the worker who also climbed the boom, contrary to the start of the preparation work. The post 6 of the wire receiver 3 is held by the holder 7 of the boom 2 and fixed in the stored state by rotating the post by about 90 degrees to the position (folding position of the chain double-dashed line shown in FIG. 3).

【0012】[0012]

【本考案が奏する効果】[Effects of the present invention]

本考案に係るクレーン起伏ワイヤー仕込用受金物によれば、ブーム2にワイヤ ー受け3が予め設置されているので、作業員は単管を持ち廻る必要がなく、クレ ーンのブームに登って身軽に仕込み作業をすることができる。従って、高所作業 をする作業員は、足場の悪いブーム上でも安全に短時間に作業することができる 。 According to the crane hoisting wire charging device according to the present invention, since the wire receiver 3 is pre-installed on the boom 2, the worker does not have to carry a single pipe around the boom boom of the crane. You can easily carry out the preparation work. Therefore, a worker working at a high place can safely work in a short time even on a boom with poor footing.

【図面の簡単な説明】[Brief description of drawings]

【図1】ジブ式クレーンにおける起伏ワイヤーの仕込み
作業状態を示した立面図である。
FIG. 1 is an elevational view showing a state in which a hoisting wire is loaded in a jib type crane.

【図2】ジブ式クレーンの起伏ワイヤーの仕込み作業状
態を示した平面図である。
FIG. 2 is a plan view showing a state in which a hoisting wire of a jib type crane is loaded.

【図3】ジブ式クレーンにおけるワイヤー受けの取り付
け状態を示した平面図である。
FIG. 3 is a plan view showing an attached state of a wire receiver in a jib type crane.

【図4】ジブ式クレーンにおけるワイヤー受けの取り付
け状態を示した断面図である。
FIG. 4 is a cross-sectional view showing an attached state of a wire receiver in a jib type crane.

【符号の説明】[Explanation of symbols]

1 クレーン 2 ブーム 3 ワイヤー受け 4 ヒンジ 5 ワイヤー 6 ポスト 7 保持具 8 軸受金物 9 ピン 8a 位置決め部 1 Crane 2 Boom 3 Wire Receiver 4 Hinge 5 Wire 6 Post 7 Holding Tool 8 Bearing Hardware 9 Pin 8a Positioning Section

───────────────────────────────────────────────────── フロントページの続き (72)考案者 柴田 恭伺 福岡市中央区天神四丁目2番20号 株式会 社竹中工務店九州支店内 (72)考案者 石嶋 浩 福岡市中央区天神四丁目2番20号 株式会 社竹中工務店九州支店内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inquirer, Kyoji Shibata, 4-20-20 Tenjin, Chuo-ku, Fukuoka City Stock company Takenaka Corporation Kyushu Branch (72) Inventor, Hiroshi Ishijima 4-chome, Tenjin, Chuo-ku, Fukuoka No. 20 Stock company Takenaka Corporation Kyushu Branch

Claims (3)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】クレーンのブーム側面部に、複数本のワイ
ヤー受けが、その基端部をヒンジにより、ブーム側面か
ら水平に展開した位置からブームに沿って折り畳み収納
される位置まで回動自在に取り付けられていることを特
徴とする、クレーン起伏ワイヤー仕込用受金物。
1. A plurality of wire receivers on a boom side surface of a crane are rotatably supported by hinges at base ends thereof from a position horizontally extended from a side surface of the boom to a position where the boom is folded and stored along the boom. Receiving material for loading crane undulating wire, characterized by being installed.
【請求項2】ワイヤー受けの先端部に、収納及びワイヤ
ー外れ止め兼用のポストが垂直上向きに設けられ、ブー
ムにおいてワイヤー受けがヒンジにより回動してブーム
と平行な姿勢となった際に前記ポストを受け止める位置
に保持具が設けられていることを特徴とする、請求項1
に記載されたクレーン起伏ワイヤー仕込用受金物。
2. A post for accommodating and preventing wire detachment is provided vertically upward at the tip of the wire receiver, and when the wire receiver is pivoted by a hinge in the boom and is in a posture parallel to the boom, the post is provided. The holding device is provided at a position for receiving the receiving member.
Receiving material for loading the crane undulation wire described in.
【請求項3】ヒンジはブーム側面にコ字形の軸受金物を
固定し、同軸受金物へピンによりワイヤー受けの基端部
が回動自在に取り付けられた構成であり、前記軸受金物
は、前記ワイヤー受けをブームの長手方向に対し略直角
な向きに展開した位置に制止する位置決め部を有するこ
とを特徴とする、請求項1に記載されたクレーン起伏ワ
イヤー仕込用受金物。
3. The hinge has a structure in which a U-shaped bearing metal fitting is fixed to a side surface of a boom, and a base end portion of a wire receiver is rotatably attached to the bearing metal fitting by a pin, and the bearing metal fitting is the wire. The crane undulating wire charging receiving article according to claim 1, further comprising: a positioning portion that stops the receiver at a position where the receiver is deployed in a direction substantially perpendicular to the longitudinal direction of the boom.
JP6662093U 1993-12-14 1993-12-14 Crane hoist wire charging hardware Expired - Fee Related JP2555500Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6662093U JP2555500Y2 (en) 1993-12-14 1993-12-14 Crane hoist wire charging hardware

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6662093U JP2555500Y2 (en) 1993-12-14 1993-12-14 Crane hoist wire charging hardware

Publications (2)

Publication Number Publication Date
JPH0735482U true JPH0735482U (en) 1995-07-04
JP2555500Y2 JP2555500Y2 (en) 1997-11-26

Family

ID=13321120

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6662093U Expired - Fee Related JP2555500Y2 (en) 1993-12-14 1993-12-14 Crane hoist wire charging hardware

Country Status (1)

Country Link
JP (1) JP2555500Y2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018167972A (en) * 2017-03-30 2018-11-01 コベルコ建機株式会社 Wiring method and crane

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018167972A (en) * 2017-03-30 2018-11-01 コベルコ建機株式会社 Wiring method and crane

Also Published As

Publication number Publication date
JP2555500Y2 (en) 1997-11-26

Similar Documents

Publication Publication Date Title
JPH0735482U (en) Receiving material for loading crane undulation wire
JP2000115929A (en) Working table on utility pole
JP3439196B2 (en) Hanging scaffold
JP4002869B2 (en) Safety handrail
JP3525106B2 (en) Net bracket
JPH0457682A (en) Folding type working bench
JP2583516Y2 (en) Bracket for temporary scaffold
JP3043691B2 (en) Mounting device for loading stage for frame scaffold
JP2963025B2 (en) Steel pipe for temporary scaffolding
JPH05106336A (en) Assembled scaffolding for work at high position
JP2000314234A (en) Device of mounting cargo receiving stage for single tube scaffolding
JP3071539U (en) Steel sheet pile hanging bracket
JPH046456Y2 (en)
JPH0627087Y2 (en) Horizontal material mounting aid
CN215914032U (en) Drawing fixed equipment for engineering cost
JPH0355755Y2 (en)
JP2505647B2 (en) How to fix the sleeve wall
JP3133909B2 (en) Sign removal equipment
JPH10244015A (en) Safety belt support device
JPH0628896Y2 (en) A manipulator-compatible arm hanging device for a pillar mounted on an aerial work vehicle
JPH0211708B2 (en)
JP3020344U (en) Untwisting jig for wire rope, etc.
JPH065334Y2 (en) Lifting container
JPH0249315Y2 (en)
JPH02115453A (en) Scaffold device for roofing

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees