JPH0733650B2 - Construction method of seawall - Google Patents

Construction method of seawall

Info

Publication number
JPH0733650B2
JPH0733650B2 JP2033836A JP3383690A JPH0733650B2 JP H0733650 B2 JPH0733650 B2 JP H0733650B2 JP 2033836 A JP2033836 A JP 2033836A JP 3383690 A JP3383690 A JP 3383690A JP H0733650 B2 JPH0733650 B2 JP H0733650B2
Authority
JP
Japan
Prior art keywords
gabion
slope
net
gabions
rotatably connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2033836A
Other languages
Japanese (ja)
Other versions
JPH03241112A (en
Inventor
保 千葉
良信 佐藤
徹 早川
和弥 羽鳥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Koiwa Kanaami Co Ltd
Original Assignee
Koiwa Kanaami Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Koiwa Kanaami Co Ltd filed Critical Koiwa Kanaami Co Ltd
Priority to JP2033836A priority Critical patent/JPH0733650B2/en
Publication of JPH03241112A publication Critical patent/JPH03241112A/en
Publication of JPH0733650B2 publication Critical patent/JPH0733650B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【発明の詳細な説明】 〈産業上の利用分野〉 本発明は蛇篭を用いた護岸の施工方法に関する。DETAILED DESCRIPTION OF THE INVENTION <Industrial field of application> The present invention relates to a method for constructing a revetment using a gabion.

〈従来の技術〉 河川工事において、斜面や河床に石詰した蛇篭を並べて
洗掘を防止する方法は既に知られている。
<Prior Art> In river construction, it is already known to prevent scouring by arranging stone-filled gabions on slopes and river beds.

蛇篭は上口を開放した箱本体と、箱本体と一体で開口を
閉鎖する蓋体で構成し、一般にピッチの大きい金網で製
作してある。
The gabion is composed of a box body with an open upper mouth and a lid body that is integrated with the box body and closes the opening, and is generally made of wire mesh with a large pitch.

〈本発明が解決しようとする問題点〉 前記した従来の護岸技術にはつぎのような問題点があ
る。
<Problems to be Solved by the Present Invention> The above-mentioned conventional revetment technique has the following problems.

〈イ〉詰石作業を、蛇篭の敷設現場とことなる場所で手
作業で行っている。
<a> Paving stone work is performed manually at a place different from the gabion laying site.

しかも各蛇篭毎の蓋体の固定作業を伴う。Moreover, the work of fixing the lid of each gabion is involved.

そのため、蛇篭の完成までに多大の手数を要し、施工性
の点で問題がある。
Therefore, it takes a great deal of work to complete the gabion, and there is a problem in workability.

〈ロ〉詰石した蛇篭を並べるためにクレーンを必要と
し、しかも機械力導入の効果を十分に発揮できず敷設に
時間がかかる。
<B> A crane is required to line up the gabions that are filled with stones, and the effect of introducing mechanical force cannot be fully exerted, and it takes time to lay.

〈ハ〉各蛇篭間は結束線や結束具などを用いて結束する
だけであるから、全蛇篭に連続性を付与することが難し
い。
<C> It is difficult to give continuity to all the gabions, because each gabion is only tied using a binding wire or a binding tool.

〈本発明の目的〉 本発明は以上の問題点を解決するために成されたもの
で、その目的とするところは施工性に優れて護岸方法を
提供することにある。
<Object of the Present Invention> The present invention has been made to solve the above problems, and an object thereof is to provide a revetment method with excellent workability.

〈問題点を解決するための手段〉 即ち本発明は、石詰した網製の蛇篭を敷設して護岸する
護岸方法において、底面と、この底面の各短辺に回動自
在に接続した2枚の短辺用側面と、前記底面の一方の長
辺に回動自在に接続した長辺用側面と、前記底面上に回
動自在に接続した仕切網とよりなる蛇篭ユニットを、前
記長辺用側面が斜面の縦方向に、前記短辺用側面が斜面
の横方向に位置するように、斜面の縦横方向に相互に連
続性を持たせて敷設し、次に各蛇篭ユニット内に詰石
し、最後にシート状で巻取り可能な柔軟性を有する蓋網
を巻取った状態で斜面上に運搬し、それを各蛇篭ユニッ
トの上に展開して一体に被覆したことを特徴とする、護
岸の施工方法である。
<Means for Solving Problems> That is, the present invention is a revetment method of laying a stone-filled net gabion and revetment, and a bottom surface and two pieces rotatably connected to each short side of the bottom surface. The side face for the short side, the side face for the long side rotatably connected to one of the long sides of the bottom face, and the partition net rotatably connected on the bottom face for the long side. Lay them so that the side faces are in the vertical direction of the slope and the side faces for the short sides are in the horizontal direction of the slope so that there is continuity in the vertical and horizontal directions of the slope, and then laying stones in each gabion unit. Finally, a sheet-like flexible cover net that can be wound up is carried on a slope in a rolled-up state, and it is spread on each gabion unit and integrally covered. Is the construction method.

〈本発明の説明〉 以下、図面を参照しながら本発明について説明する。ま
ず、本方法に使用する蛇篭について説明する。
<Description of the Present Invention> The present invention will be described below with reference to the drawings. First, the gabion used in this method will be described.

〈イ〉蛇篭 第1図に蛇篭Aの一例を示す。<A> Gabion Figure 1 shows an example of a gabion A.

蛇篭Aは長方形の底面1と、底面1の1つの長辺に回動
自在に接続する菱形または長方形の長辺用側面2と、底
面1の対面する2つの各短辺に回動自在に接続する短辺
用側面3、3と、底面1の何れかの辺と平行に配置し
(本実施例では底面1の短辺と平行に配置)、底面1に
回動自在に接続する仕切網4とよりなる。
The gabion A is a rectangular bottom surface 1, a rhombic or rectangular long side surface 2 rotatably connected to one long side of the bottom surface 1, and rotatably connected to each of two facing short sides of the bottom surface 1. The side walls 3 and 3 for the short side and the partition net 4 arranged in parallel with any one side of the bottom surface 1 (in this embodiment, arranged in parallel with the short side of the bottom surface 1) and rotatably connected to the bottom surface 1. And consists of.

これらの部材1〜4は何れも容易に変形しない程度の枠
体に従来と同様の金網を取り付けて製作してある。
Each of these members 1 to 4 is manufactured by attaching a wire mesh similar to the conventional one to a frame body that does not easily deform.

また、各部材1〜4間の連結手段としては、例えば第2
図に示すようなコイル線5を用い、連結予定の枠体間に
コイル線5の端を順次巻き付けて連結したり、或は公知
の連結具や結束線を用いて連結できる。
Further, as the connecting means between the members 1 to 4, for example, the second
By using the coil wire 5 as shown in the drawing, the ends of the coil wire 5 can be sequentially wound between the frame bodies to be connected, or can be connected by using a known connecting tool or a binding wire.

尚、第2図ではコイル線5で仕切網4と底面1間を連結
する場合について図示しているが、他の部材の枠体間を
連結する場合も同様である。
Although FIG. 2 illustrates the case where the partition wire 4 and the bottom surface 1 are connected by the coil wire 5, the same applies to the case where the frame bodies of other members are connected.

この蛇篭Aは工場等で予め製作しておき、現場で組み立
てて使用することになる。
This gabion A is manufactured in advance in a factory or the like, and assembled and used on site.

〈ロ〉仕切網 仕切網4は蛇篭Aの内空を複数に仕切る目的の部材で、
底面1の短辺或は長辺を横断する長さを有する。
<B> Partition network The partition network 4 is a member for partitioning the inner space of the gabion A into a plurality of parts.
It has a length across the short side or the long side of the bottom surface 1.

仕切網4を複数設ける場合の取付ピッチは底面1の全長
に応じて決定する。
The mounting pitch when a plurality of partition nets 4 are provided is determined according to the total length of the bottom surface 1.

〈ハ〉蓋体 各蛇篭Aの単位に従来のように一体の蓋体を持たないこ
とは前述した通りである。
<C> Lid As described above, the unit of each gabion A does not have an integral lid as in the conventional case.

本実施例では、巻取り可能な柔軟性を有する帯状網が蓋
体となり、巻き取った状態で斜面上に運搬、展開し蛇篭
Aの上口に跨がって一体に被覆することができる。
In this embodiment, the strip-shaped net having a windable flexibility serves as a lid body, which can be transported and deployed on the sloped surface in a wound state to be integrally covered over the upper opening of the gabion A.

〈施工方法〉 つぎに前記蛇篭Aを用いた施工方法について説明する。<Construction Method> Next, a construction method using the gabion A will be described.

〈イ〉蛇篭の設置(第1、3図) 整地作業を終えた法面6上に、長辺用側面2が斜面の縦
方向に、短辺用側面3、3が斜面の横方向に位置するよ
うに、斜面の縦横方向に連続性を持たせて敷設し、短辺
用側面3、3を他の蛇篭の短辺用側面3、3を重複させ
ることにより、各蛇篭の滑り落ちを防止しながら、前記
蛇篭Aを組み立て順次設置する。
<a> Installation of gabion (Figs. 1 and 3) On the slope 6 where the ground leveling work has been completed, the side 2 for long side is positioned in the vertical direction of the slope and the side faces 3 and 3 for short side are positioned laterally of the slope. As described above, the slope is laid with continuity in the vertical and horizontal directions, and the side surfaces 3 and 3 for the short side overlap the side surfaces 3 and 3 for the short side of the other gabion to prevent the gabion from slipping off. Meanwhile, the gabion A is assembled and sequentially installed.

すなわち、長辺用側面2と、短辺用側面3、3と仕切網
1を立体的に起こし、各当接部を連結すると共に、各仕
切網4を同様に起こし長辺用側面2との当接部を連結し
て蛇篭Aを立体的に組み立てる。
That is, the side surface 2 for the long side, the side surfaces 3 and 3 for the short side, and the partition net 1 are raised three-dimensionally to connect each abutting portion, and the partition nets 4 are similarly raised to form the side surface 2 for the long side. The contact parts are connected to assemble the gabion A three-dimensionally.

この際、隣り合う蛇篭A、Aを相互に一体構造とするた
めに、蛇篭A、Aの当接部も第2図に示すようなコイル
線5を用いて連結する。
At this time, in order to make the adjacent gabions A, A integral with each other, the contact portions of the gabions A, A are also connected using the coil wire 5 as shown in FIG.

したがって各仕切網4の両端部は、相対向する一対の長
辺用側面2、2で固定されることになる。
Therefore, both ends of each partition net 4 are fixed by the pair of long side surfaces 2 and 2 facing each other.

また各蛇篭A間において一枚の長辺用側面2を相互に共
有することになる。
In addition, one long side surface 2 is shared between the gabions A.

尚、垂れ部7や天端部8にも蛇篭を設置する場合は、第
4、5図に示すような垂れ部用蛇篭Bや天端部用蛇篭C
を設置する。
In addition, when installing a gabion also on the hanging part 7 and the top end part 8, a gabion B for the drooping part and a gabion C for the top part as shown in FIGS.
Set up.

これらの蛇篭B、Cが蛇篭Aと異なる点は、短辺用側面
3が一枚である点と全長が短い点である。
These gabions B and C are different from the gabion A in that there is one side 3 for the short side and that the overall length is short.

蛇篭B、Cの構成において前記蛇篭Aと同一部材は、同
一の符号を付して説明を省略する。
In the configurations of the gabions B and C, the same members as those of the gabion A are given the same reference numerals and the description thereof will be omitted.

〈ロ〉詰石(第6図) つぎに下流側から順次各蛇篭A〜C内に石9を詰めてい
く。
<B> Packing stones (Fig. 6) Next, the stones 9 are packed in the gabions A to C sequentially from the downstream side.

詰石作業はバックホーなどの機械を用いて機械的に行
う。
The packing stone work is performed mechanically using a machine such as a backhoe.

また、蛇篭A〜Cの変形が予想される場合は、詰石作業
に先行して、各蛇篭A〜Cの上面に縦横方向に鋼製パイ
プなどの補強部材を仮設しておくとよい。
When deformation of the gabions A to C is expected, it is advisable to temporarily install reinforcing members such as steel pipes in the vertical and horizontal directions on the upper surfaces of the gabions A to C prior to the filling work.

〈ハ〉蓋網の組み立て(第7図) 各蛇篭A〜Cは、従来の蛇篭のように本体と一体の蓋体
を持たない。
<C> Assembly of lid net (Fig. 7) Each gabion A to C does not have a lid integrated with the main body unlike the conventional gabion.

そこで、本発明の場合は詰石作業を完了した複数組みの
蛇篭A〜Cを被覆可能な寸法の蓋網11を被せる。
Therefore, in the case of the present invention, a lid net 11 having a size capable of covering a plurality of sets of gabions A to C that have completed the filling operation is covered.

蓋網11は、巻き取った状態で斜面の最上部に運搬し、そ
れを下方へ展開することにより蛇篭A〜Cの上面を被覆
する。
The lid net 11 is carried to the uppermost part of the sloped surface in a wound state and unfolded downward to cover the upper surfaces of the gabions A to C.

蓋網11には公知の帯状金網を使用できる。A well-known strip-shaped wire net can be used for the lid net 11.

そして、各組みの蛇篭A〜Cの上縁部と蓋網11との当接
部の適当範囲に亘り、例えば第2図のコイル線5を巻き
付け、蓋網11を蛇篭A〜Cに固定する。
Then, for example, the coil wire 5 of FIG. 2 is wound over the appropriate range of the contact portion between the upper edge of each set of gabions A to C and the lid net 11 to fix the lid net 11 to the gabions A to C. .

これにより、特に石9の重量負担が大きい法面部の蛇篭
Aにおいては、適数設置した仕切網4によって、蛇篭A
の変形を効果的に抑止できる。
As a result, especially in the gabion A on the slope where the weight of the stone 9 is heavy, the gabion A is installed by the appropriate number of partition nets 4.
The deformation of can be effectively suppressed.

〈本発明の効果〉 本発明は以上説明したようになるから次の効果が得られ
る。
<Effects of the Present Invention> Since the present invention is as described above, the following effects can be obtained.

〈イ〉各蛇篭で一枚の長辺用側面を相互に共有し、部材
の節約を実施できる。
<a> Each gabion can share one long side surface with each other to save members.

〈ロ〉各短辺用側面を斜面上に横方向に配置して重複さ
せることにより、上方の蛇篭ユニットが下方の蛇篭ユニ
ットへの滑り落ちを防止できる。
<B> By arranging the short-side side surfaces laterally on the slope and overlapping them, the upper gabion unit can be prevented from sliding down to the lower gabion unit.

〈ハ〉蛇篭ユニットを前後左右に複数隣接させて護岸に
配置するため、護岸構築予定斜面に対する追随性も良好
であり、施工作業も迅速に行うことができる。
<C> Since a plurality of gabion units are arranged adjacent to each other on the front, rear, left, and right sides on the revetment, the ability to follow the slope to construct the revetment is good and the construction work can be performed quickly.

〈ニ〉巻取り可能な柔軟性を有する蓋材を巻き取った状
態で斜面上に運搬し、それを展開して複数の蛇篭上面に
亘って被覆を行うことができるため、蓋材の被覆作業が
簡素化でき、作業時間を大幅に短縮すると共に、各蛇篭
に容易に一体性及びに強度を付与することが可能とな
る。
<D> A cover material that has the flexibility to be wound up can be carried on a slope in a wound state, and it can be unfolded to cover a plurality of gabion top surfaces. Can be simplified, the working time can be significantly shortened, and each gabion can be easily imparted with integrity and strength.

【図面の簡単な説明】[Brief description of drawings]

第1図:蛇篭の配置状態を示す斜視図 第2図:蛇篭の下部の拡大図 第3図:蛇篭の設置時の説明図 第4、5図:垂れ部用と天端部用の蛇篭の平面図 第6図:詰石作業時の説明図 第7図:蓋網の設置時の説明図 Fig. 1: Perspective view showing the arrangement of gabions Fig. 2: Enlarged view of the lower part of gabions Fig. 3: Explanatory drawing of gabion installation Fig. 4, 5: Gabions for hanging and crown Top view Fig. 6: Explanatory diagram for slab work Fig. 7: Explanatory diagram for installation of lid net

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 実開 平2−73432(JP,U) 実公 昭10−2191(JP,Y1) ─────────────────────────────────────────────────── ───Continued from the front page (56) Bibliographic references Kaihei Hei 2-73432 (JP, U) Actual public Sho-10-2191 (JP, Y1)

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】石詰した網製の蛇篭を敷設して護岸する護
岸方法において、 底面と、この底面の各短辺に回動自在に接続した2枚の
短辺用側面と、前記底面の一方の長辺に回動自在に接続
した長辺用側面と、前記底面上に回動自在に接続した仕
切網とよりなる蛇篭ユニットを、 前記長辺用側面が斜面の縦方向に、前記短辺用側面が斜
面の横方向に位置するように、斜面の縦横方向に相互に
連続性を持たせて敷設し、 次に各蛇篭ユニット内に詰石し、 最後にシート状で巻取り可能な柔軟性を有する蓋網を巻
取った状態で斜面上に運搬し、それを各蛇篭ユニットの
上に展開して一体に被覆したことを特徴とする、 護岸の施工方法。
1. A revetment method for laying a stone-filled net gabion to revet a shore, a bottom surface, two short side surfaces rotatably connected to each short side of the bottom surface, and the bottom surface of the bottom surface. A gabion unit comprising a long side laterally rotatably connected to one of the long sides and a partition net rotatably connected to the bottom is arranged such that the long side laterally extends in the vertical direction of the slope. It is possible to lay it so that the side surface for the side is located in the lateral direction of the slope so that there is continuity in the vertical and horizontal directions of the slope, and then lay stones inside each gabion unit, and finally wind up in sheet form. A method of constructing a revetment, characterized in that a flexible lid net is rolled up and carried on a slope, and it is spread on each gabion unit and covered integrally.
JP2033836A 1990-02-16 1990-02-16 Construction method of seawall Expired - Lifetime JPH0733650B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2033836A JPH0733650B2 (en) 1990-02-16 1990-02-16 Construction method of seawall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2033836A JPH0733650B2 (en) 1990-02-16 1990-02-16 Construction method of seawall

Publications (2)

Publication Number Publication Date
JPH03241112A JPH03241112A (en) 1991-10-28
JPH0733650B2 true JPH0733650B2 (en) 1995-04-12

Family

ID=12397574

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2033836A Expired - Lifetime JPH0733650B2 (en) 1990-02-16 1990-02-16 Construction method of seawall

Country Status (1)

Country Link
JP (1) JPH0733650B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612107A (en) * 2015-02-02 2015-05-13 成军 River channel reinforced gabion and water-permeable geotextile composite ecological slope protection retaining wall construction method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103898870B (en) * 2014-03-18 2015-12-02 北京工业大学 A kind of gabion net Ecotypic Stone Mesh-box river course slope protection construction method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0728182Y2 (en) * 1988-11-27 1995-06-28 株式会社ガソン Gabion assembly structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612107A (en) * 2015-02-02 2015-05-13 成军 River channel reinforced gabion and water-permeable geotextile composite ecological slope protection retaining wall construction method

Also Published As

Publication number Publication date
JPH03241112A (en) 1991-10-28

Similar Documents

Publication Publication Date Title
US4117686A (en) Fabric structures for earth retaining walls
WO2007046142A1 (en) Retaining wall banking structure
JP2001064937A (en) Gabion work for civil engineering work, protection work using the same, and filling method for filler
JPH0733650B2 (en) Construction method of seawall
KR20160093294A (en) The traction means having gaebion and its construction methods
JPH02261122A (en) Reinforced soil retaining wall
JP4330504B2 (en) Construction method of the stable soil structure on the slope of the impervious sheet
JP3038565B2 (en) Construction method of revetment
GB2131063A (en) Method of and apparatus for retaining earth formations
KR200375686Y1 (en) Expanded metal Gabion Structure of Retaining wall
JP3031476U (en) Futon basket
JP2963360B2 (en) Wall structure of reinforced soil structure
JPH06313309A (en) Stone cramming basket mat and its construction method
JPH04108914A (en) Structure for reinforced banking body
JP2000328577A (en) Soil retaining cage frame and method of building steep grade banking using the cage frame
JP2579301Y2 (en) Mattress type sandbag, container having a plurality of compartments divided by partitions
JPH0410924B2 (en)
EP0621377A1 (en) Procedure for the creation of mattress type gabions for protective vegetable revetments
JP3076901B2 (en) Soil protection structure and stop pile used for it
JP2834796B2 (en) Embankment slope formation method
JP2003171920A (en) Natural stone fixing unit and multiple nature type construction method using unit
JP2000027150A (en) Pebble-packed basket for engineering works
JPH11200392A (en) Greening block for retaining wall
JPH06228933A (en) Matress-shaped gabion, and erection and laying thereof
JP2881725B2 (en) Wave-breaking laying body and wave-breaking structure using it