JPH0731915U - Temporary rockfall protection fence for small-scale rockfall countermeasures - Google Patents

Temporary rockfall protection fence for small-scale rockfall countermeasures

Info

Publication number
JPH0731915U
JPH0731915U JP6594793U JP6594793U JPH0731915U JP H0731915 U JPH0731915 U JP H0731915U JP 6594793 U JP6594793 U JP 6594793U JP 6594793 U JP6594793 U JP 6594793U JP H0731915 U JPH0731915 U JP H0731915U
Authority
JP
Japan
Prior art keywords
rockfall
vertical
wire mesh
protection fence
temporary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP6594793U
Other languages
Japanese (ja)
Other versions
JPH0754325Y2 (en
Inventor
尚 酒井
克教 本荘
Original Assignee
株式会社ナガワ
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社ナガワ filed Critical 株式会社ナガワ
Priority to JP6594793U priority Critical patent/JPH0754325Y2/en
Publication of JPH0731915U publication Critical patent/JPH0731915U/en
Application granted granted Critical
Publication of JPH0754325Y2 publication Critical patent/JPH0754325Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Fencing (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

(57)【要約】 【目的】 トラックへの積み卸しがスムーズで、設置、
組立に時間がかからないなどの効果を有する小規模落石
対策用の仮設落石防護柵の提供を目的とする。 【構成】 仮設落石防護柵部10と支柱用保管台11と
金網ユニット用保管台12とから構成され、仮設落石防
護柵部10は、左右の支柱2,3と金網ユニット4と下
部ステイ5とから構成されている。
(57) [Summary] [Purpose] Loading and unloading on trucks is smooth, and installation,
The purpose is to provide a temporary rockfall protection fence for small-scale rockfall countermeasures, which has the effect that assembly will not take time. [Structure] The temporary rock fall protection fence section 10, a support storage 11 for columns, and a wire mesh unit storage stand 12 are provided. The temporary rock fall protection fence section 10 includes left and right columns 2, 3, wire mesh units 4, and lower stays 5. It consists of

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

本案は、新規な構成を有する小規模落石対策用の仮設落石防護柵に関するもの である。 This plan relates to a temporary rockfall protection fence with a new structure for small-scale rockfall countermeasures.

【0002】[0002]

【従来の技術】[Prior art]

従来、この種のものにあっては、下記のようなものになっている。 1.支柱の構造が破損時の経費低減を図るべく、組立式になっている。 2.金網は支柱組立後に足場等を使用し、高所作業で全面にわたって網張付け をしている。 Conventionally, this kind of thing is as follows. 1. The strut structure is an assembly type in order to reduce costs in case of damage. 2. The wire mesh is attached to the whole surface by using scaffolds after assembling the columns and working at high places.

【0003】[0003]

【考案が解決しようとする課題】[Problems to be solved by the device]

従来の技術で述べたものにあっては、下記のような問題点を有していた。 1.トラックへの積み込み時にかなりの時間と手間がかかっている。 2.設置、組立に時間がかかっていた。部品点数が多いので、例えば100m 分の設置に1週間程度かかっている。 3.設置後の網張りに時間がかかる。 4.解体および保管に時間がかかる。 5.破損部分を発見するのに時間がかかる。 6.落石及び土圧により防護柵がずれる。 7.高所作業及び吊りっぱなしの作業が発生している。 The conventional techniques described above have the following problems. 1. It takes a lot of time and effort to load the truck. 2. It took time to install and assemble. Due to the large number of parts, it takes about one week to install 100 m 2, for example. 3. It takes time to install the net after installation. 4. It takes time to dismantle and store. 5. It takes time to find the damaged part. 6. The protective fence is displaced due to falling rocks and earth pressure. 7. Work in high places and work without suspension occur.

【0004】 本願は、従来の技術の有するこのような問題点に鑑みなされたものであり、そ の目的とするところは、上述の問題を解決することのできるものを提供しようと するものである。The present application has been made in view of such problems of the conventional technique, and an object thereof is to provide a device capable of solving the above problems. .

【0005】[0005]

【課題を解決するための手段】[Means for Solving the Problems]

上記目的を達成するために、本考案のものは下記のようになるものである。 すなわち本願のものは、仮設落石防護柵部10と支柱用保管台11と、金網ユ ニット用保管台12とから構成され、仮設落石防護柵部10は、左右の支柱2, 3と、金網ユニット4と、下部ステイ5とから構成され、左右の支柱2,3は、 H型鋼でなる垂直部2A1,3A1とこの垂直部の上端に斜め上後方に連設され た傾斜部2A2,3A2とで構成された支柱本体2A,3Aと、この支柱本体2 A,3Aの背面下端に後方に向け水平状態で連設された底部2B,3Bと、支柱 本体2A,3Aにおける垂直部の背面と底部2B,3Bの後端とを連結する控部 2C,3Cと、支柱本体2A,3Aにおける垂直部2A1,3A1の背面に後方 に向け水平状態で連設された上方足場板設置架台2D,3Dと、控部2C,3C の背面に後方に向け水平状態で連設された下方足場板設置架台2E,3Eと、金 網ユニット4は、正面横長の方形に構成された枠4Aと、この枠に張設された金 網4Bとから構成されていると共に、正面平行に起立させた左右の支柱2,3に おける傾斜部2A2,3A2間と、垂直部2A1,3A1間の上方部分に嵌め込 み固定されるよう構成され、下部ステイ5は、等辺山形鋼5Aと、この等辺山形 鋼5Aの両端に溶接取付けされた連結片5Bとから構成され、正面平行に起立さ せた左右の支柱2,3における垂直部2A1,3A1間の上下に嵌め込み固定さ れるよう構成され、支柱用保管台11は、角パイプでなる前後の長パイプと、左 右の短パイプを平面方形に連結してなる基枠に吊り下げ用のフックを設け、この 基枠上に左の支柱と右の支柱とを対向状態で適数個積層する場合、これらの各支 柱が横ずれしないように隅柱などが起立され、金網ユニット用保管台12は、平 面方形に構成された基枠に吊り下げ用のフックを設け、この基枠上に金網ユニッ トを適数枚積層する場合、これらの各金網ユニットが横ずれしないように支持縦 枠などが起立され、かつ、この基枠に下部アングル収納部が併設されている小規 模落石対策用の仮設落石防護柵である。 この場合、支柱本体2A,3Aにおける垂直部2A1,3A1の背面には上下 位置をもって当該垂直部より右方に向け支柱ガイド2F,3Fを突設することが できる。 また、底部2B,3Bの後方に落石時の防護柵ズレ防止用のアンカーアングル を設けることができる。 In order to achieve the above object, the present invention is as follows. That is, the one of the present application is composed of a temporary rockfall protection fence portion 10, a support storage 11 for columns, and a wire mesh unit storage base 12. The temporary rockfall protection fence 10 includes left and right columns 2, 3 and a wire mesh unit. 4 and a lower stay 5, and the left and right struts 2 and 3 are composed of vertical portions 2A1 and 3A1 made of H-shaped steel and inclined portions 2A2 and 3A2 that are connected to the upper end of the vertical portions obliquely upward and rearward. The strut bodies 2A and 3A configured, the bottom portions 2B and 3B continuously connected to the lower rear ends of the strut bodies 2A and 3A in the horizontal direction toward the rear, and the back and bottom portions 2B of the vertical portions of the strut bodies 2A and 3A. , 3B for connecting the rear ends of the scaffolds, 3B, and the upper scaffolding board installation mounts 2D, 3D that are continuously connected to the rear faces of the vertical parts 2A1, 3A1 of the pillar bodies 2A, 3A in a horizontal state toward the rear, Behind the back of the copies 2C and 3C The lower scaffolding plate installation pedestals 2E and 3E, which are continuously installed in a horizontal state, and the wire netting unit 4 are composed of a frame 4A formed in a rectangular shape having a horizontally long front face, and a wire netting 4B stretched over the frame. In addition, the lower stay 5 is configured to be fitted and fixed between the inclined portions 2A2 and 3A2 of the left and right columns 2 and 3 which are erected parallel to the front and between the vertical portions 2A1 and 3A1. , The equilateral angle steel 5A and the connecting pieces 5B welded to both ends of the equilateral angle steel 5A. The vertical parts 2A1 and 3A1 on the left and right struts 2 and 3 standing parallel to the front face It is configured to be fitted and fixed, and the column storage stand 11 is provided with hooks for hanging on a base frame formed by connecting front and rear long pipes made of square pipes and short pipes on the left and right sides in a flat rectangular shape. Left column and right column on the base frame When stacking a suitable number of columns facing each other, corner columns are erected so that each of these columns is not laterally displaced, and the wire mesh unit storage base 12 is used for hanging on a base frame configured in a flat rectangular shape. When a hook is provided and a proper number of wire netting units are stacked on this base frame, a supporting vertical frame is erected so that each of these wire netting units does not laterally shift, and a lower angle storage section is installed side by side with this base frame. It is a small-scale temporary rockfall protection fence for countermeasures against falling rocks. In this case, the column guides 2F, 3F can be provided on the back surface of the vertical portions 2A1, 3A1 of the column main bodies 2A, 3A so as to project rightward from the vertical portions at the upper and lower positions. In addition, an anchor angle can be provided behind the bottom portions 2B and 3B to prevent the displacement of the protective fence when a rock falls.

【0006】[0006]

【実施例】【Example】

実施例について図面を参照して説明する。 1は新規な構成を有する小規模落石対策用の仮設落石防護柵で、仮設落石防護 柵部10と支柱用保管台11と、金網ユニット用保管台12とから構成されてい る。 仮設落石防護柵部10は、左右の支柱2,3と、金網ユニット4と、下部ステ イ5とから構成されている。 Examples will be described with reference to the drawings. 1 is a temporary rockfall protection fence having a new structure for small-scale rockfall countermeasures, and is composed of a temporary rockfall protection fence section 10, a storage base 11 for columns, and a storage base 12 for wire mesh units. The temporary rockfall protection fence section 10 is composed of left and right columns 2, 3, a wire netting unit 4, and a lower stay 5.

【0007】 以下順に説明する。 左右の支柱2,3は、H型鋼でなる垂直部2A1,3A1とこの垂直部の上端 に斜め上後方に連設された傾斜部2A2,3A2とで構成された支柱本体2A, 3Aと、この支柱本体2A,3Aの背面下端に後方に向け水平状態で連設された H型鋼でなる底部2B,3Bと、支柱本体2A,3Aにおける垂直部の背面と底 部2B,3Bの後端とを連結するH型鋼でなる控部2C,3Cと、支柱本体2A ,3Aにおける垂直部2A1,3A1の背面に後方に向け水平状態で連設された 横向きL状の上方足場板設置架台2D,3Dと、控部2C,3Cの背面に後方に 向け水平状態で連設された横向きL状の下方足場板設置架台2E,3Eと、支柱 本体2A,3Aにおける垂直部2A1,3A1の背面には上下位置をもって当該 垂直部より右方に向け突設された支柱ガイド2F,3Fが構成されている。A description will be given below in order. The left and right columns 2, 3 are column bodies 2A1, 3A1 made of H-shaped steel, and column bodies 2A, 3A composed of inclined portions 2A2, 3A2 that are connected to the upper ends of the vertical sections diagonally upward and rearward. The bottoms 2B and 3B made of H-shaped steel, which are continuously connected to the lower ends of the backs of the pillar bodies 2A and 3A in the horizontal direction toward the rear, and the back surfaces of the vertical portions of the pillar bodies 2A and 3A and the rear ends of the bottoms 2B and 3B. Connecting parts 2C and 3C made of H-shaped steel to be connected to each other, and horizontal L-shaped upper scaffolding plate installation pedestals 2D and 3D, which are horizontally connected to the back of the vertical parts 2A1 and 3A1 of the pillar bodies 2A and 3A toward the rear. , The horizontal L-shaped lower scaffolding plate installation bases 2E and 3E that are continuously connected to the rear faces of the backing parts 2C and 3C in the horizontal state, and the vertical positions on the rear faces of the vertical parts 2A1 and 3A1 of the support columns 2A and 3A. To the right of the vertical part Projecting from the support post guide 2F directed, 3F is formed.

【0008】 さらに、底部2B,3Bの後方に等辺山形鋼でなる防護柵ズレ防止用のアンカ ーアングル2G,3Gが水平状態で連設され、また、傾斜部2A2,3A2には 地上で寝かせた状態で組立後、これを起立させるときに使用する起立垂直吊り用 の専用吊りピース2H,3Hが設けられ、さらに、支柱を水平に吊るための吊り 用穴2I,3Iが底部2B,3Bに開設されている。Further, behind the bottoms 2B and 3B, anchor angles 2G and 3G, which are made of equilateral angle steel and are used to prevent displacement of the protective fence, are connected in a horizontal state, and the inclined portions 2A2 and 3A2 are laid on the ground. After assembling with, the special hanging pieces 2H and 3H for standing vertical hanging used when standing it up are provided, and further the hanging holes 2I and 3I for hanging the pillar horizontally are opened in the bottom portions 2B and 3B. ing.

【0009】 金網ユニット4は、アングルをもって正面横長の方形に構成された枠4Aと、 この枠に張設された金網4Bとから構成されている。 そして、この金網ユニット4は、正面平行に起立させた左右の支柱2,3にお ける傾斜部2A2,3A2間と、垂直部2A1,3A1間の上方部分に嵌め込み ボルトBで固定されることになる。 下部ステイ5は、等辺山形鋼5Aと、この等辺山形鋼5Aの両端に溶接取付け された連結片5Bとから構成され、この連結片にはボルト穴が開設されている。 そして、この下部ステイ5は、正面平行に起立させた左右の支柱2,3におけ る垂直部2A1,3A1間の上下に嵌め込みボルトBで固定されることになる。The wire mesh unit 4 is composed of a frame 4A that is formed in a rectangular shape that is long in the front and has an angle, and a wire mesh 4B that is stretched around this frame. The wire netting unit 4 is fitted and fixed to the upper portion between the inclined portions 2A2 and 3A2 of the right and left columns 2 and 3 and the vertical portions 2A1 and 3A1 by the bolts B. Become. The lower stay 5 is composed of an equilateral angle steel 5A and a connecting piece 5B welded to both ends of the equilateral angle steel 5A, and a bolt hole is formed in this connecting piece. Then, the lower stay 5 is fixed by the fitting bolts B above and below between the vertical portions 2A1 and 3A1 on the left and right columns 2 and 3 which are erected parallel to the front.

【0010】 ついで、支柱用保管台11は、角パイプでなる前後の長パイプ11A1,11 A2と、左右の短パイプ11A3,11A4を平面方形に連結してなる基枠11 Aと、この基枠11Aの内側四隅に植設された前方左右の隅柱11B1,11B 2、後方左右の隅柱11B3,11B4と、基枠11A内における中央より少し く左方と右方にずれた位置をもって左右の短パイプと平行に張設された左右の連 結パイプ11C1,11C2と、左の連結パイプ11C1の後方隅に植設された 後方左柱11D1および右の連結パイプ11C2の前方隅に植設された前方右柱 11D2と、左の短パイプ11A3の上面におけるやや後方位置をもって植設さ れた断面L型の左方柱11E1および右の短パイプ11A4の上面におけるやや 前方位置をもって植設された断面L型の右方柱11E2とからなり、かつ、隅柱 11B1,11B2,11B3,11B4の頂面にはピンPが突設され、下面に はピン穴Hが開設され、左右の連結パイプ11C1,11C2には吊り下げ用の フックFが設けられている。Next, the column storage base 11 is composed of front and rear long pipes 11A1 and 11A2 made of square pipes, a base frame 11A formed by connecting left and right short pipes 11A3 and 11A4 in a plane rectangular shape, and this base frame. The left and right front corner pillars 11B1 and 11B2, the rear left and right corner pillars 11B3 and 11B4 that are planted in the four inner corners of 11A, and the left and right corner pillars that are slightly displaced to the left and right from the center in the base frame 11A. The left and right connecting pipes 11C1 and 11C2 stretched in parallel with the short pipe, and the rear left pillar 11D1 and the front corners of the right connecting pipe 11C2 which are planted in the rear corners of the left connecting pipe 11C1 The front right column 11D2 and the left short pipe 11A3 are slightly rearward on the upper faces of the left column 11E1 and the right short pipe 11A4 having an L-shaped cross section, which are planted at a slightly rear position on the upper face. It is composed of a right column 11E2 with an L-shaped cross section that is planted at one side, and a pin P is projected on the top face of the corner columns 11B1, 11B2, 11B3, 11B4, and a pin hole H is opened on the bottom face. The left and right connecting pipes 11C1 and 11C2 are provided with hanging hooks F.

【0011】 そこで、図7を参照して、この支柱用保管台11と支柱2,3の関係を説明す る。 支柱用保管台11の上面に左の支柱2を載置する場合、当該支柱用保管台11 における前方左の隅柱11B1に、左の支柱2における支柱本体2Aと底部2B との連結角部を係止する状態で行う。その状態で左の支柱2を5個積層する。 この場合、上下に位置する左の支柱2は、支柱ガイド2F、左方柱11E1に よって互いに係止する。 支柱用保管台11の上面に右の支柱3を載置する場合、当該支柱用保管台11 における後方右の隅柱11B4に、右の支柱3における支柱本体3Aと底部3B との連結角部を係止する状態で行う。その状態で右の支柱3を5個積層する。 この場合、上下に位置する右の支柱3は、支柱ガイド3F、右方柱11E2に よって互いに係止する。Therefore, with reference to FIG. 7, the relationship between the column storage base 11 and the columns 2 and 3 will be described. When the left column 2 is placed on the upper surface of the column storage base 11, the connecting corner portion between the column main body 2A and the bottom portion 2B of the left column 2 is attached to the front left corner column 11B1 of the column storage base 11. Perform in the locked state. In that state, five left columns 2 are stacked. In this case, the left columns 2 located above and below are locked to each other by the column guides 2F and the left columns 11E1. When the right column 3 is placed on the upper surface of the column storage base 11, the rear right corner column 11B4 of the column storage base 11 is provided with the connecting corner portion between the column body 3A and the bottom portion 3B of the right column 3. Perform in the locked state. In that state, five right columns 3 are stacked. In this case, the right columns 3 located above and below are locked to each other by the column guides 3F and the right columns 11E2.

【0012】 金網ユニット用保管台12は、平面方形に構成された基枠12Aと、この基枠 の四隅に植設された断面L型材による前方左右の支持縦枠12B1,12B2お よび後方左右の支持縦枠12B3,12B4と、基枠12Aの内側に起立させた 前後のコ字型材12Cで構成された下部アングル収納部と、基枠12Aに連設し た突片に上記ピンPに対応するピン穴が開設されている連結部12Dと、基枠1 2Aに設けられた吊り下げ用のフックFとから構成されている。The wire mesh unit storage base 12 includes a base frame 12A having a flat rectangular shape, and support vertical frames 12B1 and 12B2 on the front left and right and rear left and right by the L-shaped section material planted in the four corners of the base frame. The supporting vertical frames 12B3 and 12B4, the lower angle storage portion composed of the front and rear U-shaped members 12C standing upright inside the base frame 12A, and the projecting piece connected to the base frame 12A correspond to the pin P. It is composed of a connecting portion 12D having a pin hole and a hanging hook F provided on the base frame 12A.

【0013】 本考案のものは下記のように組立てる。 1.地面に左右の支柱2,3を底部2B,3Bが起立した状態にして平行に仮 置きし、これら支柱2,3間に金網ユニット4と下部ステイ5とを配置する。 2.これらをボルトによりユニット状に連結組立てたのち、底部2B,3Bを 下面にして全体を起立させる。 すなわち、図では立てた状態で組立てているが、実際は寝かせた状態でワンユ ニット毎に組立て、それを立て吊りして連結していく形である。 3.図3のように、各ユニット毎の連結は互いに当接する支柱2,3を3本の ボルトで連結して行う。The present invention is assembled as follows. 1. The left and right columns 2, 3 are temporarily placed in parallel with the bottoms 2B, 3B standing upright, and the wire mesh unit 4 and the lower stay 5 are arranged between these columns 2, 3. 2. After assembling and assembling these into a unit with bolts, the whole is erected with the bottom portions 2B and 3B as the lower surface. That is, in the figure, they are assembled in a standing state, but in reality, they are assembled in a unit state in a state of being laid down, and then they are suspended and connected. 3. As shown in FIG. 3, the units are connected to each other by connecting the columns 2 and 3 which are in contact with each other with three bolts.

【0014】 4.支柱2,3における垂直部2A1,3A1間の開口部6には、公知の金網 を公知方法で張設する。 また、組立作業や分解作業に際しては、上方足場板設置架台2D,3Dと、下 方足場板設置架台2E,3Eとを利用して足場板7を設置する。 さらに、底部2B,3Bの上面に公知の単管8を載せ、これに砂袋9を載せ安 定を図ることができる。 なお、落石及び土圧による防護柵ズレを防止するためのアンカーを打設し安定 を図る。 全体を起立させる時に垂直に吊れるように、傾斜部2A2,3A2の専用吊り ピースにワイヤーを掛けて行う。4. In the opening 6 between the vertical portions 2A1 and 3A1 of the columns 2 and 3, a known wire net is stretched by a known method. Further, at the time of assembling work or disassembling work, the scaffolding plate 7 is installed by utilizing the upper scaffolding plate installation mounts 2D and 3D and the lower scaffolding plate installation mounts 2E and 3E. Further, a well-known single pipe 8 can be placed on the upper surfaces of the bottom portions 2B and 3B, and a sand bag 9 can be placed on the single tube 8 for stability. In addition, anchors will be installed to prevent slipping of the protective fence due to falling rocks and earth pressure for stability. Wires are hung on the dedicated suspension pieces of the inclined portions 2A2 and 3A2 so that they can be suspended vertically when the whole is erected.

【0015】[0015]

【考案の効果】[Effect of device]

本考案は、上述のとおり構成されているので次の効果を奏する。 1.トラックへの積み卸しがスムーズで時間がかからない。 2.ユニット化により、設置、組立に時間がかからない。すなわち、100m 分の設置を約3日程度で行うことができる。 3.設置、組立に際して、足場などの設置が必要ない。 4.設置後の網張りを最小限にすることができる。 Since the present invention is configured as described above, it has the following effects. 1. Loading and unloading on the truck is smooth and takes no time. 2. Unitization saves time in installation and assembly. That is, the installation for 100 m 2 can be done in about 3 days. 3. No scaffolding is required for installation and assembly. 4. Netting after installation can be minimized.

【0016】 5.支柱用保管台11と、金網ユニット用保管台12を使用することにより、 解体時の収納および管理、保管が簡単にできる。運搬にも便利である。 すなわち、左右の支柱2,3と、金網ユニット4との重ね積みが可能であるた め、保管スペースをとらないと共に、保管、運送時の荷崩れを防止することがで きる。20m毎に保管、管理することができる。 6.支柱用保管台11と、金網ユニット用保管台12を使用することにより、 整頓が整然とできるから破損部分を早期に発見することができる。 7.部品単品の員数を一つずつ数える必要がない。すなわち、支柱用保管台1 1と、金網ユニット用保管台12毎の数量チェックを行えるため、数量確認に時 間をとらない。5. By using the column storage base 11 and the wire mesh unit storage base 12, storage, management, and storage at the time of disassembly can be easily performed. It is also convenient for transportation. That is, since the left and right columns 2, 3 and the wire netting unit 4 can be stacked on top of each other, a storage space can be saved and a collapse of the load during storage and transportation can be prevented. It can be stored and managed every 20 m. 6. By using the column storage base 11 and the wire mesh unit storage base 12, tidyness can be tidied up and a damaged portion can be found early. 7. There is no need to count the number of individual parts one by one. In other words, since the quantity can be checked for each of the support storage 11 for columns and the storage 12 for wire mesh units, it does not take time to confirm the quantity.

【図面の簡単な説明】[Brief description of drawings]

【図1】仮設落石防護柵部の分解した斜視図である。FIG. 1 is an exploded perspective view of a temporary rockfall protection fence portion.

【図2】仮設落石防護柵部の使用状態を示す背面方向か
らの斜視図である。
FIG. 2 is a rear perspective view showing a usage state of a temporary rockfall protection fence.

【図3】A−A線拡大断面図である。FIG. 3 is an enlarged sectional view taken along line AA.

【図4】小規模落石対策用の仮設落石防護柵の分解した
斜視図である。
FIG. 4 is an exploded perspective view of a temporary rockfall protection fence for small-scale rockfall countermeasures.

【図5】小規模落石対策用の仮設落石防護柵の使用状態
の斜視図である。
FIG. 5 is a perspective view of a state of use of a temporary rockfall protection fence for small-scale rockfall countermeasures.

【図6】同上の要部拡大斜視図である。FIG. 6 is an enlarged perspective view of an essential part of the above.

【図7】支柱用保管台と支柱の関係を説明する平面図で
ある。
FIG. 7 is a plan view illustrating a relationship between a support storage for a support and the support.

【図8】図6において支柱ガイドの係合状態を中心に見
た拡大縦断面図である。
FIG. 8 is an enlarged vertical cross-sectional view mainly showing an engaged state of a column guide in FIG.

【図9】図5における要部の拡大縦断面図である。9 is an enlarged vertical cross-sectional view of a main part in FIG.

【符号の説明】[Explanation of symbols]

1 小規模落石対策用の仮設落石防護柵 10 仮設落石防護柵部 2,3 支柱 4 金網ユニット 5 下部ステイ 11 支柱用保管台 12 金網ユニット用保管台 1 Temporary rockfall protection fence for small-scale rockfall countermeasures 10 Temporary rockfall protection fence 2, 3 Pillars 4 Wire mesh unit 5 Lower stay 11 Pillar storage stand 12 Wire mesh unit storage stand

Claims (3)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 仮設落石防護柵部(10)と、支柱用保
管台(11)と、金網ユニット用保管台(12)とから
構成され、仮設落石防護柵部(10)は、左右の支柱
(2,3)と、金網ユニット(4)と、下部ステイ
(5)とから構成され、左右の支柱(2,3)は、H型
鋼でなる垂直部(2A1,3A1)とこの垂直部の上端
に斜め上後方に連設された傾斜部(2A2,3A2)と
で構成された支柱本体(2A,3A)と、この支柱本体
(2A,3A)の背面下端に後方に向け水平状態で連設
された底部(2B,3B)と、支柱本体(2A,3A)
における垂直部の背面と底部(2B,3B)の後端とを
連結する控部(2C,3C)と、支柱本体(2A,3
A)における垂直部(2A1,3A1)の背面に後方に
向け水平状態で連設された上方足場板設置架台(2D,
3D)と、控部(2C,3C)の背面に後方に向け水平
状態で連設された下方足場板設置架台(2E,3E)
と、金網ユニット(4)は、正面横長の方形に構成され
た枠(4A)と、この枠に張設された金網(4B)とか
ら構成されていると共に、正面平行に起立させた左右の
支柱(2,3)における傾斜部(2A2,3A2)間
と、垂直部(2A1,3A1)間の上方部分に嵌め込み
固定されるよう構成され、下部ステイ(5)は、等辺山
形鋼(5A)と、この等辺山形鋼(5A)の両端に溶接
取付けされた連結片(5B)とから構成され、正面平行
に起立させた左右の支柱(2,3)における垂直部(2
A1,3A1)間の上下に嵌め込み固定されるよう構成
され、支柱用保管台(11)は、角パイプでなる前後の
長パイプと、左右の短パイプを平面方形に連結してなる
基枠に吊り下げ用のフックを設け、この基枠上に左の支
柱と右の支柱とを対向状態で適数個積層する場合、これ
らの各支柱が横ずれしないように隅柱などが起立され、
金網ユニット用保管台(12)は、平面方形に構成され
た基枠に吊り下げ用のフックを設け、この基枠上に金網
ユニットを適数枚積層する場合、これらの各金網ユニッ
トが横ずれしないように支持縦枠などが起立され、か
つ、この基枠に下部アングル収納部が併設されているこ
とを特徴とする小規模落石対策用の仮設落石防護柵。
1. A temporary rock fall protection fence section (10), a support storage stand (11), and a wire mesh unit storage stand (12), wherein the temporary rock fall protection protection fence section (10) comprises left and right support posts. (2, 3), a wire mesh unit (4), and a lower stay (5). The left and right struts (2, 3) are vertical sections (2A1, 3A1) made of H-shaped steel and the vertical sections of these vertical sections. A pillar main body (2A, 3A) composed of a slanted portion (2A2, 3A2) continuously provided diagonally upward and rearward at the upper end, and a rear end lower end of the pillar main body (2A, 3A) connected horizontally in the rearward direction. Installed bottom part (2B, 3B) and pillar body (2A, 3A)
Of the vertical portion and the back portion (2C, 3C) connecting the rear end of the vertical portion and the rear end of the bottom portion (2B, 3B), and the pillar body (2A, 3).
The upper scaffolding board installation frame (2D, which is continuously installed in a horizontal state toward the rear on the back surface of the vertical portion (2A1, 3A1) in A)
3D) and the lower scaffolding board installation cradle (2E, 3E) which is continuously installed on the back surface of the backing section (2C, 3C) in a horizontal state facing rearward.
The wire mesh unit (4) is composed of a frame (4A) formed in a horizontally long rectangular shape in the front and a wire mesh (4B) stretched over the frame, and the left and right sides are erected parallel to the front. The pillars (2, 3) are configured to be fitted and fixed between the inclined portions (2A2, 3A2) and between the vertical portions (2A1, 3A1), and the lower stay (5) is equilateral angle steel (5A). And the connecting pieces (5B) welded to both ends of the equilateral angle steel (5A), the vertical parts (2) of the left and right columns (2, 3) standing parallel to the front.
A1, 3A1) are vertically inserted and fixed, and the column storage stand (11) is a base frame formed by connecting front and rear long pipes made of square pipes and left and right short pipes in a planar rectangular shape. A hook for hanging is provided, and when a proper number of left columns and right columns are stacked on this base frame in a state of facing each other, corner columns etc. are erected so that each of these columns does not laterally shift,
The wire mesh unit storage stand (12) is provided with a hanging hook on a base frame configured in a flat rectangular shape, and when a suitable number of wire mesh units are stacked on this base frame, these wire mesh units do not laterally shift. A temporary falling rock protection fence for small-scale rockfall countermeasures, in which a supporting vertical frame is erected like this, and a lower angle storage section is also installed side by side with this base frame.
【請求項2】 支柱本体(2A,3A)における垂直部
(2A1,3A1)の背面には上下位置をもって当該垂
直部より右方に向け支柱ガイド(2F,3F)が突設さ
れた請求項1記載の小規模落石対策用の仮設落石防護
柵。
2. A pillar guide (2F, 3F) is provided on the back surface of the vertical portion (2A1, 3A1) of the pillar body (2A, 3A) so as to extend rightward from the vertical portion at a vertical position. Temporary rockfall protection fence for the listed small-scale rockfall countermeasures.
【請求項3】 底部(2B,3B)の後方に落石時の防
護柵ズレ防止用のアンカーアングルが設けられている請
求項1あるいは請求項2記載の小規模落石対策用の仮設
落石防護柵。
3. A temporary rockfall protection fence for small-scale rockfall prevention according to claim 1 or 2, further comprising an anchor angle provided behind the bottom portions (2B, 3B) for preventing deviation of the protection fence during rockfall.
JP6594793U 1993-11-15 1993-11-15 Temporary rockfall protection fence for small-scale rockfall countermeasures Expired - Lifetime JPH0754325Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6594793U JPH0754325Y2 (en) 1993-11-15 1993-11-15 Temporary rockfall protection fence for small-scale rockfall countermeasures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6594793U JPH0754325Y2 (en) 1993-11-15 1993-11-15 Temporary rockfall protection fence for small-scale rockfall countermeasures

Publications (2)

Publication Number Publication Date
JPH0731915U true JPH0731915U (en) 1995-06-16
JPH0754325Y2 JPH0754325Y2 (en) 1995-12-18

Family

ID=13301684

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6594793U Expired - Lifetime JPH0754325Y2 (en) 1993-11-15 1993-11-15 Temporary rockfall protection fence for small-scale rockfall countermeasures

Country Status (1)

Country Link
JP (1) JPH0754325Y2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017071922A (en) * 2015-10-06 2017-04-13 株式会社ライテク Shed

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017071922A (en) * 2015-10-06 2017-04-13 株式会社ライテク Shed

Also Published As

Publication number Publication date
JPH0754325Y2 (en) 1995-12-18

Similar Documents

Publication Publication Date Title
US10597057B1 (en) Construction safety railing assemblies, components, and methods for storage, transport, and installation
KR102509416B1 (en) Rack structure and construction method thereof
JPH0754325Y2 (en) Temporary rockfall protection fence for small-scale rockfall countermeasures
JPH0754324Y2 (en) Temporary rockfall protection fence for small-scale rockfall countermeasures
JP6630087B2 (en) Soundproof, dustproof, windproof and rainproof panels and work platforms with panels
JP3671061B2 (en) Suspension staircase and its temporary method
JP2000345523A (en) Temporary guard fence and build-up method thereof
JP3751809B2 (en) Folding type shelf structure and its assembly structure
JP3026095U (en) Assembled trolley
JP2001342639A (en) Buried form
JPH0728322Y2 (en) Temporary enclosure unit
JP2024111886A (en) Temporary Stage
JP2011006890A (en) Base and elevating mobile scaffold
JP3227328B2 (en) Partition structure
JP2559232Y2 (en) Fence fall prevention device
JP3527976B2 (en) Construction rain shelter
JPH07122333B2 (en) Assembling method of scaffold and assembly table used for this
JP4001521B2 (en) Simple protective wall and its assembly method
JP2542018Y2 (en) End support frame of stacked temporary support frame
JPH0738566Y2 (en) Temporary handrail
JP3084321B2 (en) Railing frame for scaffolding
JP2024085439A (en) Method for pre-assembling and storing reinforcing bar units
JPH07102829A (en) Expansion type tent
JP5071697B1 (en) Pipe vent structure
JP2013083052A (en) Structure of platform