JPH0728779A - Production simulation system - Google Patents
Production simulation systemInfo
- Publication number
- JPH0728779A JPH0728779A JP16896493A JP16896493A JPH0728779A JP H0728779 A JPH0728779 A JP H0728779A JP 16896493 A JP16896493 A JP 16896493A JP 16896493 A JP16896493 A JP 16896493A JP H0728779 A JPH0728779 A JP H0728779A
- Authority
- JP
- Japan
- Prior art keywords
- simulation
- data
- production
- lot
- master
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、生産現場での生産予測
立案において利用される生産シミュレーションシステム
に関し、特に、シミュレーション上の生産ラインの状況
変動に対応して、ロットの投入計画や優先度等を変更し
評価するのに好適な生産シミュレーションシステムに関
する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a production simulation system used in production prediction planning at a production site, and particularly to a lot input plan, a priority level, etc. in response to a situation change of a production line on a simulation. The present invention relates to a production simulation system suitable for changing and evaluating the.
【0002】[0002]
【従来の技術】従来の生産シミュレーションシステムに
ついて図面を用いて説明する。図6は生産シミュレーシ
ョンシステムの従来例を示すシステム構成図である。こ
の生産シミュレーションシステムは、シミュレーション
の対象となる不図示の対象生産システムを管理する不図
示の生産管理システムから設備台数や稼働率、工程手
順、投入計画、仕掛り等のマスタデータ7を抽出するマ
スタデータ作成手段1と、投入計画変更やロット優先度
変更等のシミュレーションパラメータであるパラメータ
8を設定するシミュレーションパラメータ設定手段2
と、マスタデータ7とパラメータ8とからシミュレーシ
ョンモデルを示すモデルデータ9を作成するモデルデー
タ作成手段3と、モデルデータ9を読み込みシミュレー
ションを実行してシミュレーション結果10を出力する
シミュレーション実行手段4とで構成されている。そし
てこの生産シミュレーションシステムでは、シミュレー
ション開始時にシミュレーション期間内のすべての実行
条件が必要となっている。2. Description of the Related Art A conventional production simulation system will be described with reference to the drawings. FIG. 6 is a system configuration diagram showing a conventional example of a production simulation system. This production simulation system is a master that extracts master data 7 such as the number of equipments, operating rates, process procedures, input plans, and work in progress from a production management system (not shown) that manages a target production system (not shown) that is a simulation target. A data creating means 1 and a simulation parameter setting means 2 for setting a parameter 8 which is a simulation parameter for changing the input plan, changing the lot priority, etc.
And model data creating means 3 for creating model data 9 indicating a simulation model from the master data 7 and the parameters 8, and simulation executing means 4 for reading the model data 9 and executing a simulation to output a simulation result 10. Has been done. In this production simulation system, all the execution conditions within the simulation period are required at the start of the simulation.
【0003】[0003]
【発明が解決しようとする課題】上述した従来の生産シ
ミュレーションシステムでは、シミュレーション開始時
にシミュレーション期間内のすべての実行条件を決定す
るため、シミュレーション実行期間中のある時点での生
産ラインの状況をみて、ロット投入計画、優先度、設備
稼働率等の実行条件を変更し評価することができないと
いう欠点があった。In the conventional production simulation system described above, all the execution conditions within the simulation period are determined at the start of the simulation. Therefore, the situation of the production line at a certain point during the simulation execution period is checked, There is a drawback that it is not possible to change and evaluate the execution conditions such as the lot input plan, the priority, and the equipment operating rate.
【0004】例えば、1ヶ月のうち、20日時点で後ろ
1/4工程に仕掛っているロットに優先をかけ30日ま
で実行したいという場合、シミュレーションスタート時
点では、20日後に後ろ1/4工程に仕掛っているロッ
トはわからないため、そのようなロットに優先をかけて
評価することができなかった。For example, in one month, if it is desired to give priority to a lot that has been processed in the rear ¼ process at 20 days and execute it until 30 days, at the start of the simulation, ¼ process after 20 days is completed. It is impossible to prioritize and evaluate such lots because we do not know the lots in progress.
【0005】本発明は、このような従来のシミュレーシ
ョンにおける問題点を解決し、シミュレーション上の生
産ラインの状況変動に対応して、ロットの投入計画や優
先度等を変更し、継続評価できるようにすることを目的
とする。The present invention solves the above problems in the conventional simulation, changes the lot input plan, the priority, etc. in response to the situation change of the production line in the simulation, and enables continuous evaluation. The purpose is to do.
【0006】[0006]
【課題を解決するための手段】本発明の生産シミュレー
ションシステムは、シミュレーションの対象となる対象
生産システムを管理する生産管理システムから、前記対
象生産システムのマスタデータを抽出するマスタデータ
作成手段と、シミュレーションパラメータを設定するシ
ミュレーションパラメータ設定手段と、前記マスタデー
タ作成手段で抽出された前記マスタデータと前記シミュ
レーションパラメータ設定手段で設定された前記シミュ
レーションパラメータとからシミュレーションモデルデ
ータを作成するモデルデータ作成手段と、前記モデルデ
ータを読み込みシミュレーションを実行するシミュレー
ション実行手段と、前記シミュレーション実行手段によ
り生成されるシミュレーション結果データから、シミュ
レーション期間中の任意時点の仕掛りデータを、前記マ
スタデータ作成手段で抽出された仕掛りデータと同型式
に再構成する仕掛りデータ再構成手段とを備える。The production simulation system of the present invention comprises a master data creating means for extracting master data of the target production system from a production management system for managing the target production system to be simulated, and a simulation. Simulation parameter setting means for setting parameters, model data creating means for creating simulation model data from the master data extracted by the master data creating means and the simulation parameters set by the simulation parameter setting means, and During the simulation period from the simulation execution means for reading the model data and executing the simulation, and the simulation result data generated by the simulation execution means. Work-in-process data of an arbitrary point in time, and a work-in-progress data reconstruction means for reconstructing the in-process data and same type that have been extracted by said master data creation means.
【0007】前記対象生産システムのマスタデータは、
設備台数、稼働率、工程手順、投入計画、仕掛り等にか
かるデータである。The master data of the target production system is
It is data concerning the number of equipment, operating rate, process procedure, input plan, work-in-progress, etc.
【0008】前記シミュレーションパラメータは、投入
計画変更、ロット優先度変更等にかかるパラメータであ
る。The above-mentioned simulation parameters are parameters relating to the change of the input plan, the change of the lot priority, and the like.
【0009】[0009]
【作用】仕掛りデータ再構成手段は、シミュレーション
実行手段により生成されるシミュレーション結果データ
から、シミュレーション期間中の任意時点の仕掛りデー
タを、マスタデータ作成手段で抽出されたマスタデータ
中の仕掛りデータと同型式に再構成する。このため、シ
ミュレーション実行期間中の任意の時点での生産ライン
の状況に応じて実行条件を変更することができる。The in-process data reconstructing means extracts in-process data at an arbitrary point during the simulation period from the simulation result data generated by the simulation executing means, and the in-process data in the master data extracted by the master data creating means. And reconfigure to the same model. Therefore, the execution condition can be changed according to the situation of the production line at any point during the simulation execution period.
【0010】[0010]
【実施例】次に、本発明の実施例について図面を参照し
て説明する。Embodiments of the present invention will now be described with reference to the drawings.
【0011】図1は本発明の生産シミュレーションシス
テムの一実施例を示すシステム構成図である。本実施例
の生産シミュレーションシステムは、図6の生産シミュ
レーションシステムに仕掛りデータ再構成手段5が付加
された構成となっている。仕掛りデータ再構成手段5
は、シミュレーション実行手段4により生成されるシミ
ュレーション結果10から、シミュレーション期間中の
任意時点の仕掛りデータを、マスタデータ作成手段1で
抽出されたマスタデータ7中の仕掛データと同型式に再
構成するものである。FIG. 1 is a system configuration diagram showing an embodiment of the production simulation system of the present invention. The production simulation system of this embodiment has a configuration in which an in-process data reconstructing means 5 is added to the production simulation system of FIG. Work-in-progress data reconstructing means 5
From the simulation result 10 generated by the simulation executing means 4 reconstructs the in-process data at an arbitrary time point during the simulation in the same form as the in-process data in the master data 7 extracted by the master data creating means 1. It is a thing.
【0012】本実施例の動作を説明する。まず、図1に
示すマスタデータ作成手段1において、現場の生産管理
システム6から設備台数や稼動率、工程手順、作業時
間、投入計画、仕掛りロット等のマスタデータ7を抽出
する。The operation of this embodiment will be described. First, in the master data creating means 1 shown in FIG. 1, master data 7 such as the number of equipments, operating rate, process procedure, working time, input plan, and in-process lot is extracted from the production management system 6 on site.
【0013】次に、マスタデータ作成手段1で抽出した
マスタデータ、特に仕掛りデータを検討した上で、シミ
ュレーションパラメータ設定手段2により、投入計画変
更やロットの優先度変更、設備の稼動率等を設定する。
ここでのシミュレーションパラメータ設定は、生産管理
システムでの生産制御指示のかけ方と同様の方式で行う
ことができる。Next, after studying the master data extracted by the master data creating means 1, especially the in-process data, the simulation parameter setting means 2 changes the input plan, the priority of the lot, the operating rate of the equipment, etc. Set.
The simulation parameter setting here can be performed by a method similar to the method of issuing a production control instruction in the production management system.
【0014】そして、マスタデータ7とパラメータ8と
からモデルデータ作成手段3でシミュレータの入力デー
タ仕様に合ったシミュレーションモデルのモデルデータ
9を作成し、シミュレーション実行手段4でモデルデー
タ9を読み込みシミュレーションを実行する。Then, from the master data 7 and the parameters 8, the model data creating means 3 creates the model data 9 of the simulation model that matches the input data specifications of the simulator, and the simulation executing means 4 reads the model data 9 and executes the simulation. To do.
【0015】シミュレーションを実行すると、そのシミ
ュレーション結果10としてシミュレーション期間中の
ロット履歴情報、ロット投入情報、ロット優先情報等が
出力される。ロット履歴情報には図2に示すようにロッ
ト毎に設備名、工程名、設備到着時刻、作業開始時刻、
作業終了時刻等シミュレーション実行中の履歴が書かれ
ている。また、ロット投入情報には図3に示すようにシ
ミュレーション期間中に投入されたロットの投入日時が
書かれ、図4に示すロット優先情報にはシミュレーショ
ン期間中のロットの優先度が書かれている。When the simulation is executed, lot history information, lot input information, lot priority information, etc. during the simulation period are output as the simulation result 10. As shown in FIG. 2, the lot history information includes equipment name, process name, equipment arrival time, work start time,
The history of simulation execution such as the work end time is written. Further, as shown in FIG. 3, the lot introduction information describes the date and time of introduction of the lot introduced during the simulation period, and the lot priority information shown in FIG. 4 describes the priority of the lot during the simulation period. .
【0016】仕掛りデータ再構成手段5で、このロット
履歴情報から、設備到着時刻、作業開始時刻、作業終了
時刻をキーにしてシミュレーション期間中の指定された
日時のラインの仕掛りロットを抽出し、ロット投入情
報、ロット優先情報を参照して、図5に示すようにモデ
ルデータ作成手段3の入力形式(生産管理システムから
抽出した仕掛りファイルの形式)に仕掛りデータが再構
成され、再構成仕掛りデータ11として出力される。The work-in-progress data reconstructing means 5 extracts work-in-process lots on a line at a designated date and time during the simulation period from the lot history information using the equipment arrival time, work start time, and work end time as keys. Referring to the lot input information and the lot priority information, the work-in-progress data is reconstructed in the input format (the format of the work-in-process file extracted from the production management system) of the model data creating means 3 as shown in FIG. The data is output as the in-process data 11.
【0017】そして、再構成仕掛りデータ11とマスタ
データ7を用いて、シミュレーションパラメータ設定手
段2でパラメータの変更を行う。この時、仕掛りデータ
を生産管理システムの仕掛りファイルと同形式に再構築
することにより、生産管理システムでの生産制御のかけ
方と同様な形で仕掛りの検討ができる。Then, the parameters are changed by the simulation parameter setting means 2 using the reconstructed work-in-progress data 11 and the master data 7. At this time, by reconstructing the in-process data in the same format as the in-process file of the production management system, the in-process can be examined in the same manner as the production control method in the production management system.
【0018】そして、新たに設定したシミュレーション
パラメータとマスタデータからモデルデータ作成手段3
でモデルデータ9を作成し、仕掛りデータを再構成する
ときに指定した日時からシミュレーションを再実行す
る。The model data creating means 3 is created from the newly set simulation parameters and master data.
The model data 9 is created by and the simulation is re-executed from the date and time specified when the work-in-progress data is reconstructed.
【0019】[0019]
【発明の効果】以上説明したように本発明は、抽出され
た仕掛りデータと同型式に、シミュレーション期間中の
任意時点の仕掛りデータを再構成することにより、シミ
ュレーション実行期間中の仕掛り状況を生産管理システ
ムから抽出した仕掛りデータと同じフォーマットで見る
ことができるため、仕掛り状況に対応したシミュレーシ
ョン実行条件(生産計画)を設定でき、通常の生産制御
と同様な形でのシミュレーション評価ができる。すなわ
ち、シミュレーション上の生産ラインの状況変動に対応
して、ロットの投入計画や優先度等を変更し、継続評価
できるという効果がある。As described above, according to the present invention, the in-process data during the simulation execution period is reconstructed by reconstructing the in-process data at an arbitrary point during the simulation period in the same format as the extracted in-process data. Can be viewed in the same format as the in-process data extracted from the production management system, so the simulation execution conditions (production plan) corresponding to the in-process situation can be set, and the simulation evaluation in the same form as normal production control can be performed. it can. That is, there is an effect that the lot input plan, the priority, etc. can be changed and the continuous evaluation can be performed in response to the situation change of the production line on the simulation.
【図1】本発明の生産シミュレーションシステムの一実
施例を示すシステム構成図である。FIG. 1 is a system configuration diagram showing an embodiment of a production simulation system of the present invention.
【図2】シミュレーション実行中のロット履歴情報を示
す図である。FIG. 2 is a diagram showing lot history information during simulation execution.
【図3】シミュレーション実行中のロット投入情報を示
す図である。FIG. 3 is a diagram showing lot input information during execution of simulation.
【図4】シミュレーション実行中のロット優先情報を示
す図である。FIG. 4 is a diagram showing lot priority information during execution of simulation.
【図5】仕掛り再構成後の仕掛りロット情報を示す図で
ある。FIG. 5 is a diagram showing in-process lot information after in-process reconfiguration.
【図6】生産シミュレーションシステムの従来例を示す
システム構成図である。FIG. 6 is a system configuration diagram showing a conventional example of a production simulation system.
1 マスタデータ作成手段 2 シミュレーションパラメータ設定手段 3 モデルデータ作成手段 4 シミュレーション実行手段 5 仕掛りデータ再構成手段 6 生産管連シメテム 7 マスタデータ 8 パラメータデータ 9 モデルデータ 10 シミュレーション結果データ 11 再構成仕掛りデータ 1 Master Data Creation Means 2 Simulation Parameter Setting Means 3 Model Data Creation Means 4 Simulation Execution Means 5 Work-in-Progress Data Reconstruction Means 6 Production Pipe Connection System 7 Master Data 8 Parameter Data 9 Model Data 10 Simulation Result Data 11 Reconstruction Work-in-Progress Data
Claims (8)
システムを管理する生産管理システムから、前記対象生
産システムのマスタデータを抽出するマスタデータ作成
手段と、 シミュレーションパラメータを設定するシミュレーショ
ンパラメータ設定手段と、 前記マスタデータ作成手段で抽出された前記マスタデー
タと前記シミュレーションパラメータ設定手段で設定さ
れた前記シミュレーションパラメータとからシミュレー
ションモデルデータを作成するモデルデータ作成手段
と、 前記モデルデータを読み込みシミュレーションを実行す
るシミュレーション実行手段と、 前記シミュレーション実行手段により生成されるシミュ
レーション結果データから、シミュレーション期間中の
任意時点の仕掛りデータを、前記マスタデータ作成手段
で抽出された仕掛りデータと同型式に再構成する仕掛り
データ再構成手段とを備えるシミュレーションシステ
ム。1. A master data creation unit for extracting master data of the target production system from a production management system for managing a target production system to be simulated, a simulation parameter setting unit for setting simulation parameters, and the master. Model data creating means for creating simulation model data from the master data extracted by the data creating means and the simulation parameters set by the simulation parameter setting means, and a simulation executing means for reading the model data and executing a simulation. From the simulation result data generated by the simulation executing means, the in-process data at an arbitrary time point during the simulation period is converted into the master data creating means. Simulation system and a work-in-progress data reconstruction means for reconstructing the extracted-process data of the same type.
設備台数にかかるデータである請求項1記載の生産シミ
ュレーションシステム。2. The production simulation system according to claim 1, wherein the master data of the target production system is data relating to the number of facilities.
稼働率にかかるデータである請求項1記載の生産シミュ
レーションシステム。3. The production simulation system according to claim 1, wherein the master data of the target production system is data relating to an operating rate.
工程手順にかかるデータである請求項1記載の生産シミ
ュレーションシステム。4. The production simulation system according to claim 1, wherein the master data of the target production system is data relating to a process procedure.
投入計画にかかるデータである請求項1記載の生産シミ
ュレーションシステム。5. The production simulation system according to claim 1, wherein the master data of the target production system is data relating to a supply plan.
仕掛りにかかるデータである請求項1記載の生産シミュ
レーションシステム。6. The production simulation system according to claim 1, wherein the master data of the target production system is work-in-process data.
計画変更にかかるパラメータである請求項1記載の生産
シミュレーションシステム。7. The production simulation system according to claim 1, wherein the simulation parameter is a parameter relating to a change in a supply plan.
ト優先度変更にかかるパラメータである請求項1記載の
生産シミュレーションシステム。8. The production simulation system according to claim 1, wherein the simulation parameter is a parameter relating to lot priority change.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP16896493A JP2522167B2 (en) | 1993-07-08 | 1993-07-08 | Production simulation system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP16896493A JP2522167B2 (en) | 1993-07-08 | 1993-07-08 | Production simulation system |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0728779A true JPH0728779A (en) | 1995-01-31 |
JP2522167B2 JP2522167B2 (en) | 1996-08-07 |
Family
ID=15877835
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP16896493A Expired - Lifetime JP2522167B2 (en) | 1993-07-08 | 1993-07-08 | Production simulation system |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2522167B2 (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS55116915A (en) * | 1979-03-05 | 1980-09-08 | Nakatomi Kurimoto | Sand pile preparing apparatus |
JPS5742404U (en) * | 1980-08-20 | 1982-03-08 | ||
JPH03292504A (en) * | 1990-04-11 | 1991-12-24 | Nippon Steel Corp | General-purpose simulator for conversational time area |
-
1993
- 1993-07-08 JP JP16896493A patent/JP2522167B2/en not_active Expired - Lifetime
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS55116915A (en) * | 1979-03-05 | 1980-09-08 | Nakatomi Kurimoto | Sand pile preparing apparatus |
JPS5742404U (en) * | 1980-08-20 | 1982-03-08 | ||
JPH03292504A (en) * | 1990-04-11 | 1991-12-24 | Nippon Steel Corp | General-purpose simulator for conversational time area |
Also Published As
Publication number | Publication date |
---|---|
JP2522167B2 (en) | 1996-08-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6247320B2 (en) | System and method for testing a distributed control system of an industrial plant | |
DE69817581T2 (en) | SYSTEM AND METHOD FOR CONVERTING GRAPHIC PROGRAMS IN HARDWARE IMPLEMENTATIONS | |
DE60115007T2 (en) | IMPROVED PROGRAMMABLE CORE MODEL WITH INTEGRATED GRAPHIC TROUBLESHOOTING FUNCTIONALITY | |
DE60219570T2 (en) | simulation device | |
DE112015006570T5 (en) | Program producing means, program producing method and program producing program | |
JPH02232152A (en) | Production system simulator forming device | |
EP2642359A1 (en) | Device for developing and method for creating a programm for an electronical control unit | |
JP2522167B2 (en) | Production simulation system | |
JP2885406B2 (en) | Production plan creation device | |
EP3291112A1 (en) | Master and slave architecture for co-simulation of control systems | |
JP3304649B2 (en) | Central monitoring device | |
JPH07325803A (en) | Virtual cim system, construction method for the virtual cim system and construction method for cim system | |
JPH07129677A (en) | Production simulation device | |
CN110555218A (en) | Production model update system, apparatus, method, and computer-readable medium | |
JPH02239758A (en) | Communication simulate system | |
JPH08263130A (en) | Simulation system | |
JPH08194634A (en) | Test execution system | |
JPH07271759A (en) | Production simulation system | |
JPH04256557A (en) | Preparation method for simulation model | |
CN114418523A (en) | Flow processing method and device combining RPA and AI | |
JPH11305903A (en) | Data preparing device for process monitoring picture display, process monitoring picture display device and program record medium | |
JP3327363B2 (en) | Method and apparatus for creating simulation program | |
EP4270176A1 (en) | Method for generating source code | |
JPH04177401A (en) | Simulation model production system | |
JPH03167609A (en) | Method of operating plant or process |