JPH07280127A - Gas circuit breaker device - Google Patents

Gas circuit breaker device

Info

Publication number
JPH07280127A
JPH07280127A JP6950294A JP6950294A JPH07280127A JP H07280127 A JPH07280127 A JP H07280127A JP 6950294 A JP6950294 A JP 6950294A JP 6950294 A JP6950294 A JP 6950294A JP H07280127 A JPH07280127 A JP H07280127A
Authority
JP
Japan
Prior art keywords
valve
signal
open
shutoff valve
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP6950294A
Other languages
Japanese (ja)
Other versions
JP3503178B2 (en
Inventor
Junichi Saito
潤一 斉藤
Kazutaka Asano
一高 浅野
Koichi Ueki
浩一 植木
Tadanori Shirasawa
忠徳 白沢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Holdings Corp
Original Assignee
Matsushita Electric Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matsushita Electric Industrial Co Ltd filed Critical Matsushita Electric Industrial Co Ltd
Priority to JP06950294A priority Critical patent/JP3503178B2/en
Publication of JPH07280127A publication Critical patent/JPH07280127A/en
Application granted granted Critical
Publication of JP3503178B2 publication Critical patent/JP3503178B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Magnetically Actuated Valves (AREA)

Abstract

PURPOSE:To reduce a manual inspection work for an isolation valve by automatically opening and closing the valve. CONSTITUTION:This device is equipped with a control section 10 for sending an inspection start signal to a flowrate measurement means 1 for the periodical inspection of an isolation valve 2 using an external signal, as well as a reporting signal when no inspection completion signal is not received within the preset time, together with a valve drive section 3 to open and close the valve 2 upon receipt of a no-gas flow signal from the means 1 and a valve close state detecting section 5 to detect the open/close state of the valve 2 according to a closing signal from the section 3 and to output a reset demand signal when the valve is in close state. Also, the device is equipped with a valve open state detecting section 6 to actuate the section 3 for the opening operation of the valve 2 according to the reset demand signal from the section 5, and to detect the open/close state of the valve 2 according to an open drive signal from the section 3 for sending an inspection completion signal to the control section 10, when the valve 2 is in open state, as well as a reporting means 12 for actuating a reporting device, upon receipt of a reporting signal.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、ガスの事故を未然に防
ぐガス遮断装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a gas shutoff device for preventing gas accidents.

【0002】[0002]

【従来の技術】従来、この種のガス遮断装置は、図3に
おいて2はガスの通路の開閉を行う遮断弁、1は通過ガ
ス流量に対応した流量を測定する流量測定手段、3は遮
断弁2の開閉駆動をする駆動部、4は遮断弁2や流量測
定手段1が取り付けられているガスメータ、12はガス
通路が遮断されたことをガスメータ4の外部に報知する
報知手段と、13はガスメータ4の外部より遮断弁2の
開を指示する外部復帰手段、30は流量測定手段1によ
りガス流量に異常がある場合、弁駆動部3を動作させ遮
断弁2を閉動作し報知手段12で外部に報知するように
指示する制御部30で構成されている。この遮断弁2を
定期的に検査する場合、係員が各家庭をまわりガスが使
用されていないかを確認して、外部遮断手段11により
ガスの通路を遮断させ、また外部復帰手段13により遮
断弁2を復帰させて点検するようになっていた。
2. Description of the Related Art Conventionally, in this type of gas shutoff device, 2 in FIG. 3 is a shutoff valve for opening and closing a gas passage, 1 is a flow rate measuring means for measuring the flow rate corresponding to the flow rate of passing gas, and 3 is a shutoff valve. A drive unit for opening and closing 2 is a gas meter to which the shut-off valve 2 and the flow rate measuring means 1 are attached, 12 is a notifying means for notifying the outside of the gas meter 4 that the gas passage is blocked, and 13 is a gas meter. 4 is an external return means for instructing to open the shut-off valve 2, and 30 is a means for operating the valve drive unit 3 to close the shut-off valve 2 when the flow rate measuring means 1 causes an abnormality in the gas flow rate, and the informing means 12 is an external means. It is configured by the control unit 30 that gives an instruction to notify. When the shutoff valve 2 is to be inspected regularly, a staff member checks each household to see if no gas is used, shuts off the gas passage by the external shutoff means 11, and shuts off the shutoff valve by the external return means 13. It was supposed to return 2 and check.

【0003】[0003]

【発明が解決しようとする課題】しかしながら上記従来
の構成では、係員が各家庭をまわりガスを使用していな
いか確認した上で遮断弁2の開閉検査を行っており、昨
今の人手不足のおりに労力が大きいという課題を有して
いた。
However, in the above-mentioned conventional configuration, the staff members check the opening and closing of the shutoff valve 2 after confirming whether or not the households are using gas, and there is a shortage of manpower these days. However, there was a problem that it was labor intensive.

【0004】本発明は上記課題を解決するために、自動
的に閉弁、開弁を行い人的な遮断弁の点検作業を軽減す
ることを目的とする。
In order to solve the above problems, it is an object of the present invention to automatically close and open the valve to reduce manual inspection work of the shutoff valve.

【0005】[0005]

【課題を解決するための手段】上記目的を達成するため
に本発明のガス遮断装置の第1の手段は、通過ガス流量
の有無を測定する流量測定手段と、ガスの通路の開閉を
行う遮断弁と、外部からの信号により前記遮断弁の定期
検査を行うため前記流量測定手段に検査開始信号を出力
し、その後所定期間内に検査終了信号がなければ報知信
号を出力する制御部と、前記流量測定手段からのガス流
量無し信号を受けて前記遮断弁の開閉駆動をする弁駆動
部と、前記弁駆動部からの閉駆動信号により前記遮断弁
の開閉状態を検出して閉であれば復帰要求信号を出力す
る弁閉状態検出部と、前記弁閉状態検出部からの復帰要
求信号により前記弁駆動部を動作させて前記遮断弁を開
動作させ前記弁駆動部からの開駆動信号により前記遮断
弁の開閉状態を検出して開であれば前記制御部へ検査終
了信号を送る弁開状態検出部と、前記報知信号を受信し
て報知装置を作動させる報知手段とを備えたものであ
る。
In order to achieve the above object, a first means of a gas shutoff device of the present invention is a flow rate measuring means for measuring the presence or absence of a passing gas flow rate, and a shutoff for opening and closing a gas passage. A valve, a control unit that outputs an inspection start signal to the flow rate measuring means for performing a periodic inspection of the shutoff valve by a signal from the outside, and then outputs a notification signal if there is no inspection end signal within a predetermined period, A valve drive unit that opens and closes the shutoff valve in response to a gas flow rate non-existing signal from the flow rate measurement unit, and detects the open / closed state of the shutoff valve by a close drive signal from the valve drive unit and returns if closed. A valve closed state detection unit that outputs a request signal, and the valve drive unit is operated by the return request signal from the valve closed state detection unit to open the shutoff valve, and the open drive signal from the valve drive unit is used to open the shutoff valve. Check the open / closed state of the shutoff valve A valve opening state detection unit to send a test end signal to the controller if open it, in which a notification means for operating the informing device to receive the broadcast signal.

【0006】また、本発明の第2の手段は、上記構成に
加えて、制御部は、外部からの信号に代えて、タイマカ
ウント部でカウントした所定期間毎の検査開始信号によ
り遮断弁の検査を自動で行うよう構成されたものであ
る。
According to a second aspect of the present invention, in addition to the above configuration, the control unit inspects the shutoff valve by an inspection start signal for each predetermined period counted by the timer counting unit instead of an external signal. Is configured to be performed automatically.

【0007】[0007]

【作用】上記第1の手段により、本発明のガス遮断装置
は、外部からの検査を指示する信号により自動で遮断弁
を開閉して人的な遮断弁の定期点検作業の軽減ができ
る。
According to the first means, the gas shutoff device of the present invention can automatically open and close the shutoff valve in response to a signal from the outside to inspect the shutoff valve to reduce the periodical inspection work of the shutoff valve.

【0008】また、第2の手段により、外部からの信号
に代えてタイマカウント部による所定期間毎の定期点検
を自動で行うことにより更に点検作業の軽減をはかるこ
ともできる。
In addition, by the second means, it is possible to further reduce the inspection work by automatically performing the periodic inspection by the timer counting section instead of the signal from the outside by the timer counting unit.

【0009】[0009]

【実施例】以下、本発明の実施例を添付図面に基づいて
説明する。
Embodiments of the present invention will be described below with reference to the accompanying drawings.

【0010】まず第1の実施例のガス遮断装置は、リー
ドSWやMRセンサ等により通過ガス流量の有無を測定
する流量測定手段1と、ガスの通路の開閉を行う遮断弁
2と、外部信号受信手段14が受信した外部からの通信
等による遮断弁2の検査指示信号により、遮断弁2の定
期検査(遮断事象成立時には確実に遮断し、復帰事象成
立時には確実に復帰するよう半年に一度くらいは点検を
行う)を自動で行うため前記流量測定手段1に検査開始
信号を出力し、その後所定期間内に検査終了信号がなけ
れば報知信号を出力する制御部10がある。検査開始信
号を受信した流量測定手段1はガス流量の有無を確認し
てガスが流れていなければガス流量無し信号を出力す
る。また、ガスが流れていれば遮断弁2の検査を中止
し、その情報を燃料用のガスを供給したり遮断弁2の検
査指示信号を出力するセンターである外部に通信で知ら
せる。
First, the gas shutoff device of the first embodiment is a flow rate measuring means 1 for measuring the presence / absence of a passing gas flow rate by a lead SW, an MR sensor, etc., a shutoff valve 2 for opening and closing a gas passage, and an external signal. Periodic inspection of the shutoff valve 2 by the inspection instruction signal of the shutoff valve 2 received by the receiving means 14 from the outside (such as to surely shut off when the shutoff event is established, and to surely return when the restoration event is established about once every six months. There is a control unit 10 that outputs an inspection start signal to the flow rate measuring means 1 in order to automatically perform the inspection) and then outputs a notification signal if there is no inspection end signal within a predetermined period. The flow rate measuring means 1 which has received the inspection start signal confirms the presence or absence of the gas flow rate and outputs a gas flow rate non-existence signal if the gas does not flow. If the gas is flowing, the inspection of the shutoff valve 2 is stopped, and the information is communicated to the outside, which is the center that supplies the gas for fuel and outputs the inspection instruction signal of the shutoff valve 2.

【0011】前記ガス流量無し信号を受信した弁駆動部
3は、遮断弁2と弁閉状態検出部5に閉駆動信号を出力
する。閉駆動信号を受信した遮断弁2は閉動作し、弁閉
状態検出部5は遮断弁2のインダクタンスを測定し、遮
断弁2の開閉状態を検出して閉であれば復帰要求信号を
出力する。弁駆動部3は弁閉状態検出部5からの復帰要
求信号により弁駆動部3を動作させて、今度は遮断弁2
と弁開状態検出部6に開駆動信号を出力し遮断弁2を開
動作させる。開駆動信号を受信した遮断弁2は開駆動
し、弁開状態検出部6は遮断弁2のインダクタンスを測
定し、開閉状態を検出して開であれば制御部10へ検査
終了信号を送る。
Upon receipt of the gas flow rate non-existence signal, the valve drive section 3 outputs a closing drive signal to the shutoff valve 2 and the valve closed state detection section 5. The shutoff valve 2 that has received the closing drive signal closes, the valve closed state detection unit 5 measures the inductance of the shutoff valve 2, detects the open / closed state of the shutoff valve 2, and outputs a return request signal if closed. . The valve drive unit 3 operates the valve drive unit 3 in response to the return request signal from the valve closed state detection unit 5, and this time the shutoff valve 2
Then, an open drive signal is output to the valve open state detector 6 to open the shutoff valve 2. When the shutoff valve 2 receives the open drive signal, the shutoff valve 2 is driven to open, the valve open state detection unit 6 measures the inductance of the shutoff valve 2, detects the open / closed state, and if open, sends an inspection end signal to the control unit 10.

【0012】検査開始信号を出力した制御部10は、所
定期間(例えば10秒以内)までの間に弁開状態検出部
6からの検査終了信号を受信できない場合、報知手段1
2に遮断弁異常信号を出力する。遮断弁異常信号を受信
した報知手段12は通信などによりセンターへ遮断弁2
の異常警告を行う。また、検査開始信号を出力した制御
部10が所定期間(例えば10秒以内)までの間に弁開
状態検出部6からの検査終了信号を受信できた場合、報
知手段12に遮断弁正常信号を出力する。遮断弁正常信
号を受信した報知手段12は通信などによりセンターへ
遮断弁2の動作OK通知を行う。
When the control unit 10 which has output the inspection start signal cannot receive the inspection end signal from the valve open state detection unit 6 within a predetermined period (for example, within 10 seconds), the notification unit 1
The shut-off valve abnormality signal is output to 2. The notifying means 12 that has received the shutoff valve abnormality signal sends the shutoff valve 2 to the center through communication or the like.
Abnormality warning is issued. Further, when the control unit 10 that has output the inspection start signal can receive the inspection end signal from the valve open state detection unit 6 within a predetermined period (for example, within 10 seconds), a normal shutoff valve signal is sent to the notification unit 12. Output. The notification means 12 that has received the shutoff valve normal signal notifies the center of the operation of the shutoff valve 2 by communication or the like.

【0013】また、第2の実施例のガス遮断装置は、図
2に示すように制御部20は、タイマカウント部15を
有し外部からの信号に代えてタイマカウント部15でカ
ウントした所定期間毎(例えば半年に一回)の検査指示
信号により遮断弁2の検査を自動で行うよう構成されて
おり、検査指示信号を受信して検査開始信号出力後の所
定期間までの間に検査終了信号がない場合のみ遮断弁異
常信号を出力し、遮断弁異常信号を受信した報知手段1
2は通信などによりセンターへ遮断弁2の異常警告を行
う。また、検査開始信号を受信した流量測定手段1が流
量無し状態を検出できなかったときは、2,3時間の時
間間隔をおいて流量無し状態を検出しに行き、流量無し
状態を検出したら前記事象をガスメータ4自身で繰り返
す。このため、第1の実施例ではこの流量無し状態では
多数のガスメータ4に対して、センターが何度も通信し
て通話過多による多量の回線数を要する欠点を解除でき
る。
Further, in the gas shutoff device of the second embodiment, as shown in FIG. 2, the control section 20 has a timer counting section 15, and instead of an external signal, a predetermined period counted by the timer counting section 15. It is configured to automatically inspect the shutoff valve 2 by an inspection instruction signal every (for example, once every six months), and an inspection end signal is received within a predetermined period after receiving the inspection instruction signal and outputting the inspection start signal. If there is no shutoff valve abnormality signal, the notification means 1 receives the shutoff valve abnormality signal
2 issues a warning of abnormality of the shutoff valve 2 to the center by communication or the like. Further, when the flow rate measuring means 1 which receives the inspection start signal cannot detect the no flow rate state, it goes to detect the no flow rate state at a time interval of a few hours, and when the no flow rate state is detected, The above event is repeated by the gas meter 4 itself. Therefore, in the first embodiment, it is possible to eliminate the disadvantage that the center repeatedly communicates with a large number of gas meters 4 in the absence of the flow rate and requires a large number of lines due to excessive communication.

【0014】以上のように上記実施例によると、自動的
に閉弁、開弁を行い人的な遮断弁2の点検作業を軽減す
るという効果がある。
As described above, according to the above-mentioned embodiment, there is an effect that the inspection work of the shutoff valve 2 is reduced by automatically closing and opening the valve.

【0015】[0015]

【発明の効果】以上の説明から明らかなように本発明の
ガス遮断装置の請求項1では、外部からの信号により遮
断弁の開閉性能の確認ができるため、各家庭に係員が出
向いて手動で遮断弁の検査を行うという必要がなくなる
ため、遮断弁の点検作業の自動化と遠隔制御ができる。
As is apparent from the above description, according to claim 1 of the gas shutoff device of the present invention, the opening / closing performance of the shutoff valve can be confirmed by a signal from the outside. Since it is not necessary to inspect the shutoff valve, the shutoff valve inspection work can be automated and remotely controlled.

【0016】また、本発明の請求項2では、タイマカウ
ント部による所定期間毎の信号で定期点検をガス遮断装
置自身で自動的に行うことにより更に点検作業の軽減を
はかることもできる。
Further, according to the second aspect of the present invention, the inspection work can be further reduced by automatically performing the periodic inspection by the gas shut-off device itself by the signal of the timer counting section every predetermined period.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例のガス遮断装置を示す制御ブ
ロック図
FIG. 1 is a control block diagram showing a gas shutoff device according to an embodiment of the present invention.

【図2】本発明の他の実施例のガス遮断装置を示す制御
ブロック図
FIG. 2 is a control block diagram showing a gas shutoff device according to another embodiment of the present invention.

【図3】従来のガス遮断装置の制御ブロック図FIG. 3 is a control block diagram of a conventional gas shutoff device.

【符号の説明】[Explanation of symbols]

1 流量測定手段 2 遮断弁 3 弁駆動部 4 ガスメータ 5 弁閉状態検出部 6 弁開状態検出部 10,20 制御部 12 報知手段 15 タイマカウント部 1 flow rate measuring means 2 shutoff valve 3 valve drive section 4 gas meter 5 valve closed state detection section 6 valve open state detection section 10 and 20 control section 12 notification means 15 timer count section

───────────────────────────────────────────────────── フロントページの続き (72)発明者 白沢 忠徳 大阪府門真市大字門真1006番地 松下電器 産業株式会社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Tadanori Shirasawa 1006 Kadoma, Kadoma City, Osaka Prefecture Matsushita Electric Industrial Co., Ltd.

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】通過ガス流量の有無を測定する流量測定手
段と、ガスの通路の開閉を行う遮断弁と、外部からの信
号により前記遮断弁の定期検査を行うため前記流量測定
手段に検査開始信号を出力し、その後所定期間内に検査
終了信号がなければ報知信号を出力する制御部と、前記
流量測定手段からのガス流量無し信号を受けて前記遮断
弁の開閉駆動をする弁駆動部と、前記弁駆動部からの閉
駆動信号により前記遮断弁の開閉状態を検出して閉であ
れば復帰要求信号を出力する弁閉状態検出部と、前記弁
閉状態検出部からの復帰要求信号により前記弁駆動部を
動作させて前記遮断弁を開動作させ前記弁駆動部からの
開駆動信号により前記遮断弁の開閉状態を検出して開で
あれば前記制御部へ前記検査終了信号を送る弁開状態検
出部と、前記報知信号を受信して報知装置を作動させる
報知手段とを備えたガス遮断装置。
1. A flow rate measuring means for measuring the presence or absence of a flow rate of a passing gas, a shutoff valve for opening and closing a gas passage, and a periodical check of the shutoff valve by a signal from the outside. A control unit that outputs a signal and then outputs a notification signal if there is no inspection end signal within a predetermined period, and a valve drive unit that receives and outputs a gas flow rate non-existing signal from the flow rate measuring unit to open and close the shutoff valve. , A valve closing state detection unit that detects the open / closed state of the shutoff valve by a closing drive signal from the valve drive unit and outputs a return request signal if closed, and a return request signal from the valve close state detection unit A valve that sends the inspection end signal to the control unit by operating the valve drive unit to open the shutoff valve, detecting the open / closed state of the shutoff valve based on an open drive signal from the valve drive unit, and opening if detected. Open state detection unit and the notification Gas cutoff apparatus and a notifying means for actuating the alarm device receives the issue.
【請求項2】制御部は、外部からの信号に代えタイマカ
ウント部でカウントした所定期間毎の検査開始信号によ
り遮断弁の検査を自動で行う請求項1記載のガス遮断装
置。
2. The gas shutoff device according to claim 1, wherein the control unit automatically inspects the shutoff valve in response to an inspection start signal counted by the timer counting unit instead of an external signal every predetermined period.
JP06950294A 1994-04-07 1994-04-07 Gas shut-off device Expired - Lifetime JP3503178B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP06950294A JP3503178B2 (en) 1994-04-07 1994-04-07 Gas shut-off device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP06950294A JP3503178B2 (en) 1994-04-07 1994-04-07 Gas shut-off device

Publications (2)

Publication Number Publication Date
JPH07280127A true JPH07280127A (en) 1995-10-27
JP3503178B2 JP3503178B2 (en) 2004-03-02

Family

ID=13404579

Family Applications (1)

Application Number Title Priority Date Filing Date
JP06950294A Expired - Lifetime JP3503178B2 (en) 1994-04-07 1994-04-07 Gas shut-off device

Country Status (1)

Country Link
JP (1) JP3503178B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006038182A (en) * 2004-07-30 2006-02-09 Tokyo Gas Co Ltd Cutoff valve device
JP2008117425A (en) * 2008-01-30 2008-05-22 Matsushita Electric Ind Co Ltd Gas circuit breaker
KR100836072B1 (en) * 2007-05-29 2008-06-09 주식회사 메츠 Digital safety device for a gas valve
CN105605286A (en) * 2016-03-15 2016-05-25 新疆大学 Method for controlling solar wireless intelligent valve and control system for achieving method

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7723303B2 (en) 2000-08-24 2010-05-25 The Regents Of The University Of California Peptides and peptide mimetics to treat pathologies characterized by an inflammatory response
US7199102B2 (en) 2000-08-24 2007-04-03 The Regents Of The University Of California Orally administered peptides synergize statin activity

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006038182A (en) * 2004-07-30 2006-02-09 Tokyo Gas Co Ltd Cutoff valve device
KR100836072B1 (en) * 2007-05-29 2008-06-09 주식회사 메츠 Digital safety device for a gas valve
WO2008147043A1 (en) * 2007-05-29 2008-12-04 Mets Co., Ltd Digital safety device for a gas valve
JP2008117425A (en) * 2008-01-30 2008-05-22 Matsushita Electric Ind Co Ltd Gas circuit breaker
JP4697236B2 (en) * 2008-01-30 2011-06-08 パナソニック株式会社 Gas shut-off device
CN105605286A (en) * 2016-03-15 2016-05-25 新疆大学 Method for controlling solar wireless intelligent valve and control system for achieving method

Also Published As

Publication number Publication date
JP3503178B2 (en) 2004-03-02

Similar Documents

Publication Publication Date Title
US5287884A (en) Water flow monitoring system for determining the presence of leaks and stopping flow in plumbing pipes
JPH07280127A (en) Gas circuit breaker device
US9528904B1 (en) Positive displacement metering system
JP3733646B2 (en) Gas shut-off device
JP3463342B2 (en) Gas shut-off device
JP4952344B2 (en) Gas appliance monitoring device
CA2981257A1 (en) A meter and method for detection of a meter having been tampered with
JP2020045932A (en) Gas shut-off device
JP2009177298A (en) Gas meter system
JP3882581B2 (en) Gas security device
JP2007298393A (en) Gas meter and remote monitoring system
JPH07239099A (en) Gas shutting-off device
JPH0649983Y2 (en) Gas shutoff valve controller
JP3684595B2 (en) Gas shut-off device
JPH0518607Y2 (en)
JP2004192232A (en) Gas alarm device equipped with connection state detecting function
JP2000276672A (en) Alarm adapter
JPH09257625A (en) Method and apparatus for inspecting leakage of gas piping
JP3239331B2 (en) Gas pipe leakage inspection method and apparatus
JP2009168739A (en) Gas meter with self-diagnostic function
JPH07226811A (en) Gas security device
JP2004205333A (en) Gas meter
JPH09229739A (en) Gas meter-controlling apparatus
JP2009251978A (en) Security alarm management system
US20140290342A1 (en) Pressure detecting device and method

Legal Events

Date Code Title Description
A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20031201

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20071219

Year of fee payment: 4

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081219

Year of fee payment: 5

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091219

Year of fee payment: 6

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091219

Year of fee payment: 6

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101219

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101219

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 8

Free format text: PAYMENT UNTIL: 20111219

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111219

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 9

Free format text: PAYMENT UNTIL: 20121219

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131219

Year of fee payment: 10

EXPY Cancellation because of completion of term