JPH07267214A - Bondling apparatus - Google Patents

Bondling apparatus

Info

Publication number
JPH07267214A
JPH07267214A JP6136294A JP6136294A JPH07267214A JP H07267214 A JPH07267214 A JP H07267214A JP 6136294 A JP6136294 A JP 6136294A JP 6136294 A JP6136294 A JP 6136294A JP H07267214 A JPH07267214 A JP H07267214A
Authority
JP
Japan
Prior art keywords
strip
shaped piece
band
binding
guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP6136294A
Other languages
Japanese (ja)
Other versions
JP3346880B2 (en
Inventor
Kazuhiro Suzuki
和博 鈴木
Shigeki Matsuo
繁樹 松尾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tyton Company of Japan Ltd
Original Assignee
Tyton Company of Japan Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tyton Company of Japan Ltd filed Critical Tyton Company of Japan Ltd
Priority to JP06136294A priority Critical patent/JP3346880B2/en
Publication of JPH07267214A publication Critical patent/JPH07267214A/en
Application granted granted Critical
Publication of JP3346880B2 publication Critical patent/JP3346880B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PURPOSE:To bundle a body to be bundled while it is fixed at a specific position. CONSTITUTION:A bundling band 1 passing through a guide path 21 of a base 2 is deformed into a loop by functions of a first guiding body 5 and a second guiding body 6, whereby an object M to be bundled is wound by the bundling band 1. The first guiding body 5 is brought close to the object M fixed at a specific position, and a head 11 of the band 1 is slid with respect to a belt-like piece 12, so that the loop of the band 1 is made smaller. A pulling jig 7 pulls the belt-like piece 12.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、たとえばモータ鉄心か
らループ状に突き出たコイルに結束バンドを巻き付けて
結束するときに用いられる結束装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a binding device used for binding a binding band around a coil protruding from a motor iron core in a loop shape.

【0002】[0002]

【従来の技術】特開平4−102522号公報に従来の
結束装置が記載されており、この結束装置を図22に示
してある。この結束装置においては、基台100に、揺
動可能な第1ガイド体110と、第2ガイド体120
と、揺動可能な引張具130とが取り付けられている。
この結束装置において、図中二点鎖線aで示す位置に第
1ガイド体110が揺動しているときに基台100側か
ら結束バンド(不図示)が給送されると、結束バンドの
ヘッド部が基台100の定位置に位置決めされると共
に、結束バンドの帯状片が第1ガイド体110と第2ガ
イド体120との共働によりループ状に変形されてその
帯状片の先端部が上記ヘッド部に臨み、次に、第1ガイ
ド体110が一点鎖線bで示す位置まで揺動することに
よってその第1ガイド体110が上記帯状片の中間部を
第2ガイド体120側に押してその帯状片を上記ヘッド
部の帯状片挿通孔に挿通させるようになっている。そし
て、ヘッド部に挿通された帯状片の先端部が引張具13
0のチャック機構131により保持されると、その引張
具130が矢印Dのように揺動して帯状片を下方に引っ
張るようになっている。図中、140はチャック解除機
構、150は第1ガイド体110の動作機構である。
2. Description of the Related Art Japanese Patent Application Laid-Open No. 4-102522 discloses a conventional binding device, and this binding device is shown in FIG. In this binding device, the swingable first guide body 110 and the second guide body 120 are mounted on the base 100.
And a swingable tensioning tool 130 are attached.
In this binding device, when the binding band (not shown) is fed from the base 100 side while the first guide body 110 is swinging to the position shown by the chain double-dashed line a in the figure, the head of the binding band. The part is positioned at a fixed position of the base 100, and the band-shaped piece of the binding band is deformed into a loop shape by the cooperation of the first guide body 110 and the second guide body 120, and the tip end part of the band-shaped piece is the above-mentioned. When facing the head portion, the first guide body 110 swings to the position shown by the alternate long and short dash line b, so that the first guide body 110 pushes the intermediate portion of the strip-shaped piece toward the second guide body 120 side and forms the strip-shaped portion. The strip is inserted through the strip strip insertion hole of the head portion. Then, the tip end of the strip-shaped piece inserted into the head portion is pulled by the pulling tool
When held by the zero chuck mechanism 131, the pulling tool 130 swings as shown by an arrow D to pull the strip-shaped piece downward. In the figure, 140 is a chuck release mechanism, and 150 is an operation mechanism of the first guide body 110.

【0003】このような従来の結束装置において、たと
えば電線束などの被結束体Mを第1ガイド体110と第
2ガイド体120と基台100とで囲まれる空間に挿入
しておくと、第1ガイド体110、第2ガイド体12
0、引張具130などによる一連の動作によって被結束
体Mが結束バンドで結束される。
In such a conventional binding device, when a bundled object M such as a wire bundle is inserted into a space surrounded by the first guide body 110, the second guide body 120 and the base 100, 1 guide body 110, 2nd guide body 12
The to-be-bound body M is bound by the binding band by a series of operations by the pulling tool 130 and the like.

【0004】[0004]

【発明が解決しようとする課題】ところで、従来の結束
装置を用いて結束することのできる被結束体Mは、第1
ガイド体110と第2ガイド体120と基台100との
間の空間に自由に出し入れすることのできる形状のもの
に限られる。そのため、たとえば図14に示したような
筒形のモータ鉄心210からループ状に突き出たコイル
220のように、モータ鉄心210がじゃまになって第
2ガイド体120と基台100との間の空間に出し入れ
することができないような被結束体Mに対しては結束工
程を行うことができないという問題があった。
By the way, the to-be-bound object M which can be bound by using the conventional binding device is the first one.
The shape is limited to a shape that can be freely taken in and out of the space between the guide body 110, the second guide body 120, and the base 100. Therefore, for example, like the coil 220 protruding in a loop shape from the cylindrical motor iron core 210 as shown in FIG. 14, the motor iron core 210 interferes with the space between the second guide body 120 and the base 100. There is a problem that the binding process cannot be performed on the objects to be bound M that cannot be put in and taken out from the bundle.

【0005】また、従来の結束装置では、引張具130
が結束バンドの帯状片を引っ張って結束バンドを引き締
めるときに、結束バンドにより引っ張られた被結束体M
が基台100の上に押し付けられることによってはじめ
て弛みのない結束が行われるようになっているので、弛
みのない確実な結束を行うことできる被結束体として
は、第1ガイド体110と第2ガイド体120と基台1
00とで囲まれた空間の中で自由に動き得るものである
ことが要求される。このため、図14のコイル220の
ようにモータ鉄心210がじゃまになって第1ガイド体
110と第2ガイド体120と基台100とで囲まれた
空間の中で自由に動くことのできないような被結束体に
対しては弛みのない結束を行いにくいという問題があっ
た。
In the conventional binding device, the pulling tool 130 is used.
When pulling the band-shaped piece of the binding band to tighten the binding band, the bound object M pulled by the binding band
Since the binding is performed without slack by pressing the sheet onto the base 100, the first guide body 110 and the second guide body 110 can be used as a bound body capable of surely binding without slack. Guide body 120 and base 1
It is required to be able to move freely in the space surrounded by 00 and. Therefore, unlike the coil 220 of FIG. 14, the motor iron core 210 is in the way so that it cannot move freely in the space surrounded by the first guide body 110, the second guide body 120, and the base 100. There has been a problem that it is difficult to perform binding without looseness on such a bound object.

【0006】本発明はこの問題に鑑みてなされたもので
あり、図14のコイル220のように、鉄心210がじ
ゃまになるために従来の結束装置では結束することので
きなかったような被結束体に対しても結束を行うことの
できる結束装置を提供することを目的とする。また、本
発明は、定位置に固定された被結束体に対してその被結
束体の動きを伴わずに結束バンドで弛みのない結束を確
実に行うことのできる結束装置を提供することを目的と
する。
The present invention has been made in view of this problem, and like the coil 220 shown in FIG. 14, since the iron core 210 is a hindrance, it cannot be bound by a conventional binding device. An object of the present invention is to provide a binding device capable of binding even a body. It is another object of the present invention to provide a binding device capable of securely binding a bound object fixed in a fixed position with a binding band without any movement of the bound object. And

【0007】[0007]

【課題を解決するための手段】請求項1記載の発明によ
る結束装置は、ヘッド部とこのヘッド部に挿通されて係
着される帯状片とを備えた結束バンドを給送するための
案内通路を持った基台と、被結束体を定位置に固定する
ための位置決め機構と、結束バンドのヘッド部を収容し
て位置決め状態で保持する溝部とこの溝部に保持された
ヘッド部の帯状片挿通孔に連通する通孔を備えていると
共に、上記溝部を上記基台の案内通路の終部に連続させ
る第1位置とこの第1位置よりも上記位置決め機構に近
い第2位置との間で往復動可能な可動レバー体と、基台
の案内通路を給送されてきた結束バンドのヘッド部が可
動レバー体の溝部に受け入れられるのに伴って上記溝部
の外方へ押し出された結束バンドの帯状片をループ状に
変形させながら定位置に固定された被結束体の周囲に回
し込むための湾曲した案内通路を有する第1ガイド体
と、第1ガイド体によって被結束体の周囲に回し込まれ
た結束バンドの帯状片を、可動レバー体の溝部に保持さ
れているヘッド部の帯状片挿通孔に向けて案内するため
の湾曲した案内通路を有する第2ガイド体と、可動レバ
ー体の溝部に保持されているヘッド部の帯状片挿通孔に
挿通された帯状片の先端部を保持して可動レバー体から
遠ざかる方向に引っ張るための引張具と、を備えるとい
うものである。請求項2記載の結束装置は、請求項1記
載のものにおいて、可動レバー体が第1位置から第2位
置に往動されるタイミングに合わせて引張具により結束
バンドの帯状片が可動レバー体から遠ざかる方向に引っ
張られるようになされているというものである。請求項
3記載の発明による結束装置は、請求項1記載のものに
おいて、第1ガイド体が、その案内通路によって結束バ
ンドの帯状片を被結束体の周囲に回し込ませてその帯状
片の先端部を第2ガイド体を介して可動レバー体の溝部
に保持されているヘッド部の帯状片挿通孔に臨ませる第
1位置と、先端部がヘッド部の帯状片挿通孔に臨まされ
た帯状片の中間部を第2ガイド体側に押してその帯状片
を第2ガイド体を介して上記ヘッド部の帯状片挿通孔に
挿通させる第2位置との間で往復動可能であるというも
のである。請求項4記載の発明による結束装置は、請求
項1記載のものにおいて、可動レバー体に、この可動レ
バー体の通孔に挿通された結束バンドの帯状片をその通
孔の出口側で切断するカッタ機構が設けられているとい
うものである。請求項5記載の発明による結束装置は、
ヘッド部とこのヘッド部に挿通されて係着される帯状片
とを備えた結束バンドを給送するための案内通路を持っ
た基台と、結束バンドのヘッド部を位置決め状態で保持
可能で上記基台の案内通路の終部に連続する収容空間を
備え、被結束体の開口部に挿入されてその被結束体を定
位置に固定するためのアームと、基台の案内通路を給送
されてきた結束バンドのヘッド部がアームの収容空間に
受け入れられるのに伴って上記収容空間の外方へ押し出
された結束バンドの帯状片をループ状に変形させながら
上記被結束体の周囲に回し込むための湾曲した案内通路
を有する第1ガイド体と、第1ガイド体によって被結束
体の周囲に回し込まれた結束バンドの帯状片を、アーム
の収容空間に収容されているヘッド部の帯状片挿通孔に
向けて案内するための湾曲した案内通路を有する第2ガ
イド体と、アームの収容空間に収容されているヘッド部
の帯状片挿通孔に挿通された帯状片の先端部を保持して
その帯状片をアームから遠ざかる方向に引っ張るための
引張具と、を備えるというものである。
According to a first aspect of the present invention, there is provided a bundling device for feeding a bundling band having a head part and a band-shaped piece inserted and fixed to the head part. With a base, a positioning mechanism for fixing the body to be bound at a fixed position, a groove for accommodating the head of the binding band and holding it in a positioned state, and a strip-shaped piece insertion of the head held in this groove. It has a through hole communicating with the hole, and reciprocates between a first position where the groove is continued to the end of the guide passage of the base and a second position closer to the positioning mechanism than the first position. The movable lever body and the band shape of the binding band pushed out of the groove as the head portion of the binding band fed through the guide passage of the base is received in the groove of the movable lever body. Constantly deforming the piece into a loop A first guide body having a curved guide passage for wrapping around a bound body fixed to a table, and a band-shaped piece of a binding band wrapped around the bound body by the first guide body. A second guide body having a curved guide passage for guiding toward the band-shaped piece insertion hole of the head part held in the groove part of the lever body, and a band-shaped piece of the head part held in the groove part of the movable lever body. A pulling tool for holding the tip end of the strip-shaped piece inserted through the insertion hole and pulling the strip-shaped piece in a direction away from the movable lever body. According to a second aspect of the present invention, in the binding device according to the first aspect of the present invention, the band-shaped piece of the binding band is pulled from the movable lever body by a pulling tool at the timing when the movable lever body is moved from the first position to the second position. It is said to be pulled in a direction away from it. The binding device according to a third aspect of the present invention is the binding device according to the first aspect, wherein the first guide body causes the band-shaped piece of the banding band to be wound around the body to be bound by its guide passage. The first position where the portion faces the strip-shaped piece insertion hole of the head portion held in the groove portion of the movable lever body through the second guide body, and the strip-shaped piece whose front end faces the strip-shaped piece insertion hole of the head portion. It is possible to reciprocate between a second position in which the intermediate portion of the above is pushed toward the second guide body and the strip is inserted through the second guide body into the strip insertion hole of the head portion. A binding device according to a fourth aspect of the present invention is the binding device according to the first aspect, wherein the band-shaped piece of the binding band inserted into the through hole of the movable lever body is cut at the outlet side of the through hole. The cutter mechanism is provided. The binding device according to the invention of claim 5 is
A base having a guide passage for feeding a binding band, the head having a head portion and a strip-shaped member inserted through and fixed to the head portion, and the head portion of the binding band can be held in a positioned state. The base is provided with an accommodation space that is continuous at the end of the guide passage, an arm that is inserted into the opening of the bundled body to fix the bundled body in a fixed position, and a guide passage of the base. As the head of the binding band is received in the accommodating space of the arm, the strip of the binding band pushed out of the accommodating space is wound around the bound object while deforming into a loop shape. A first guide body having a curved guide passage for holding, and a band-shaped piece of a binding band that is wound around the body to be bound by the first guide body. Guide to the insertion hole Direction in which the second guide body having the curved guide passage and the end of the strip-shaped piece inserted into the strip-shaped piece insertion hole of the head portion accommodated in the accommodating space of the arm are held and the strip-shaped piece is moved away from the arm. And a pulling tool for pulling to.

【0008】[0008]

【作用】請求項1記載の発明による結束装置において
は、可動レバー体が第1位置に設定されているときに、
結束バンドがヘッド部を後方にして基台の案内通路を給
送されると、結束バンドのヘッド部が基台の案内通路か
らその終部を経て可動レバー体の溝部に受け入れられた
後、この溝部に収容されて位置決め状態で保持される。
また、結束バンドの帯状片は、ヘッド部が可動レバー体
の溝部に受け入れられるのに伴って上記溝部の外方へ押
し出される。そして、溝部から押し出された帯状片が第
1ガイド体の案内通路を通ることによりループ状に変形
し、位置決め機構によって定位置に固定された被結束体
の周囲に回し込まれると共に、第2ガイド体によってヘ
ッド部の帯状片挿通孔に向けて案内され、帯状片挿通孔
に挿通されてその先端部が引張具により保持される。こ
の後、可動レバー体を第1位置から第2位置に向けて往
動させると、この可動レバー体の溝部に保持されている
ヘッド部がその帯状片挿通孔に挿通されている帯状片に
対しスライドして被結束体側に移動する。また、引張具
により帯状片を可動レバー体から遠ざかる方向に引っ張
らせると、帯状片の余剰部分がヘッド部の帯状片挿通孔
を挿通して引き出される。このようなヘッド部を被結束
体側(位置決め機構側)に移動させる可動レバー体によ
る引締め作用と、帯状片の余剰部分をヘッド部から引き
出す引張具による引締め作用とにより、定位置に固定さ
れた被結束体がそのままの位置で結束バンドによって弛
みなく結束される。また、この発明では、被結束体が位
置決め機構により定位置に固定され、そのようにして固
定された被結束体の周囲に第1ガイド体により結束バン
ドの帯状片が回し込まれるようになっているので、図1
4で説明したコイル220のように、鉄心210がじゃ
まになるために従来の結束装置では結束することのでき
なかったような被結束体に対しても結束を行うことがで
きるようになる。
In the binding device according to the present invention, when the movable lever body is set to the first position,
When the binding band is fed through the guide passage of the base with the head part facing backward, the head part of the binding band is received from the guide passage of the base through its end into the groove part of the movable lever body, and It is housed in the groove and held in a positioned state.
Further, the strip-shaped piece of the binding band is pushed out of the groove portion as the head portion is received in the groove portion of the movable lever body. Then, the strip-shaped piece extruded from the groove portion is transformed into a loop shape by passing through the guide passage of the first guide body, and is wound around the bound body fixed at a fixed position by the positioning mechanism, and at the same time, the second guide is formed. The body is guided toward the strip-shaped piece insertion hole of the head portion, inserted into the strip-shaped piece insertion hole, and the tip end portion thereof is held by the pulling tool. Thereafter, when the movable lever body is moved forward from the first position to the second position, the head portion held in the groove portion of the movable lever body is moved with respect to the strip-shaped piece inserted in the strip-shaped piece insertion hole. It slides and moves to the bound object side. Further, when the band-shaped piece is pulled by the pulling tool in the direction away from the movable lever body, the excess part of the band-shaped piece is pulled out through the band-shaped piece insertion hole of the head portion. By the tightening action of the movable lever body that moves the head portion to the bound body side (positioning mechanism side), and the tightening action of the pulling tool that pulls out the excess portion of the strip-shaped piece from the head portion, the object to be fixed in position is fixed. The binding body is bound at the same position by the binding band without slack. Further, according to the present invention, the binding body is fixed at a fixed position by the positioning mechanism, and the band-shaped piece of the binding band is turned around by the first guide body around the binding body fixed in this way. Figure 1
Like the coil 220 described in Section 4, since the iron core 210 is a hindrance, it is possible to bind even a bound object that could not be bound by the conventional binding device.

【0009】請求項2記載の発明による結束装置におい
ては、上述したところの、可動レバー体による引締め作
用と引張具による引締め作用とがタイミングを合わせて
確実に行われ、それだけ結束に要する時間が短縮され
る。
In the binding device according to the second aspect of the present invention, the tightening action by the movable lever body and the tightening action by the pulling tool are surely performed at the same timing as described above, and the time required for the binding is reduced accordingly. To be done.

【0010】請求項3記載の発明による結束装置におい
ては、被結束体の周囲に周り込んだ結束バンドの帯状片
の先端部が可動レバー体の溝部に保持されているヘッド
部の帯状片挿通孔に臨むという帯状片の回り込み動作
と、そのような回り込み動作を行った帯状片の中間部を
押してその帯状片を上記ヘッド部の帯状片挿通孔に挿通
させるという帯状片の挿通動作とが、別々に行われる。
このため、帯状片に回り込み動作を行わせるときの第1
ガイド体の第1位置が第2位置よりも第2ガイド体から
離れた位置になる。したがって、回り込み動作を行うと
きの帯状片の曲り変形量が少なく抑えられ、そのことが
帯状片を被結束体の周囲に無理なく確実に回り込ませる
ことに役立つ。
In the binding device according to the third aspect of the present invention, the band-shaped piece insertion hole of the head portion, in which the tip end of the band-shaped piece of the binding band wrapped around the body to be bound is held in the groove of the movable lever body. The wraparound operation of facing the strip and the inserting operation of the strip that pushes the intermediate portion of the strip subjected to such a wrapping operation to insert the strip into the strip insertion hole of the head section are separated. To be done.
For this reason, when the strip-shaped piece is caused to move around, the first
The first position of the guide body is located farther from the second guide body than the second position. Therefore, the amount of bending deformation of the strip when performing the wrap-around operation can be suppressed to a small amount, which helps to surely wrap the strip around the bound object without difficulty.

【0011】請求項4記載の発明による結束装置におい
ては、ヘッド部に挿通された帯状片の余剰部分がカッタ
機構によって切断除去される。
In the binding device according to the fourth aspect of the invention, the excess portion of the strip-shaped piece inserted into the head portion is cut and removed by the cutter mechanism.

【0012】なお、請求項2または請求項4に記載の発
明によっても、上述した請求項1記載の発明によって奏
される作用と同じ作用が発揮される。また、請求項3記
載の発明においては、帯状片の回り込み動作と挿通動作
とが第1ガイド体の第1位置と第2位置とで別々に行わ
れる以外は、上記した請求項1記載の発明によって奏さ
れる作用と同じ作用が発揮される。
The invention described in claim 2 or 4 also exhibits the same effect as that achieved by the invention described in claim 1. The invention according to claim 3 is the same as the invention according to claim 1, except that the swirling operation and the inserting operation of the strip are separately performed at the first position and the second position of the first guide body. The same effect as that exerted by is exerted.

【0013】請求項5記載の発明による結束装置におい
ては、結束バンドがヘッド部を後方にして基台の案内通
路を給送されると、結束バンドのヘッド部が基台の案内
通路からその終部を経てアームに具備された収容空間に
受け入れられる。また、結束バンドの帯状片は、ヘッド
部が上記収容空間に受け入れられるのに伴って上記収容
空間の外方へ押し出される。そして、収容空間から押し
出された帯状片が第1ガイド体の案内通路を通ることに
よりループ状に変形して被結束体の周囲に回し込まれる
と共に、第2ガイド体によってヘッド部の帯状片挿通孔
に向けて案内され、帯状片挿通孔に挿通されてその先端
部が引張具により保持された後、アームから遠ざかる方
向に引っ張られる。これにより、帯状片の余剰部分がヘ
ッド部の帯状片挿通孔を挿通して引き出され、このよう
な帯状片の余剰部分を引き出す引張具による引締め作用
により、アームによって定位置に固定された被結束体が
そのままの位置で弛みなく結束される。この発明では、
被結束体がアームにより定位置に固定され、そのように
して固定された被結束体の開口部を通して結束バンドの
帯状片が回し込まれるようになっているので、図14で
説明したコイル220のように、鉄心210がじゃまに
なるために従来の結束装置では結束することのできなか
ったような被結束体に対しても結束を行うことができる
ようになる。
In the binding device according to the fifth aspect of the present invention, when the binding band is fed through the guide passage of the base with the head portion facing rearward, the head portion of the binding band is fed from the guide passage of the base to the end thereof. It is received in the accommodating space provided in the arm through the section. The band-shaped piece of the binding band is pushed out of the accommodating space as the head portion is received in the accommodating space. Then, the strip-shaped piece pushed out from the accommodating space passes through the guide passage of the first guide body and is transformed into a loop shape so as to be wound around the bundled body, and the second guide body inserts the strip-shaped piece of the head portion. After being guided toward the hole, inserted into the strip-shaped insertion hole and the tip end thereof being held by the pulling tool, it is pulled in a direction away from the arm. As a result, the excess portion of the strip is inserted and pulled out through the strip insertion hole of the head portion, and the tightening action by the pulling tool that pulls out the excess portion of the strip is bound by the arm in a fixed position. The body is bound in its original position without slack. In this invention,
Since the bound object is fixed at a fixed position by the arm, and the band-shaped piece of the binding band is wound through the opening of the thus-fixed bound object, the coil 220 of FIG. As described above, since the iron core 210 is a hindrance, it is possible to bind even the objects to be bound which cannot be bound by the conventional binding device.

【0014】[0014]

【実施例】図1に請求項1、請求項2、請求項3、請求
項4に記載した発明の実施例による結束装置の一例を概
略的に示し、図2および図3に結束バンド1を示し、図
4および図5にこの結束装置に用いられている可動レバ
ー体3などを示してある。また、図6〜図13に上記結
束装置の作用と要部の構造を説明的に示してある。
1 schematically shows an example of a binding device according to an embodiment of the invention described in claim 1, claim 2, claim 3 and claim 4, and FIG. 2 and FIG. 4 and 5, the movable lever body 3 and the like used in this binding device are shown. 6 to 13 illustrate the operation of the above-mentioned binding device and the structure of the main part.

【0015】図2のように、結束バンド1は、互いに平
行な一対の合成樹脂製の帯状ストリップ18,18を介
し等間隔に連なっており、それぞれの結束バンド1とス
トリップ18,18とは切断箇所となるタブ19,19
を介して連設されている。また、図3のように、結束バ
ンド1はヘッド部11とこのヘッド部11に連なった帯
状片12とを備えている。ヘッド部11には帯状片挿通
孔14とこの挿通孔14内に突出した爪片15が設けら
れているのに対し、帯状片12の片面が鋸歯状の凹凸面
となされており、帯状片12をループ状に変形させてヘ
ッド部11の挿通孔14に挿通させると、上記爪片15
が帯状片12の凹凸面に任意の位置で係合し、その係合
によって帯状片12を挿通孔14から引き抜けなくなる
ようになっている。
As shown in FIG. 2, the binding band 1 is connected at equal intervals through a pair of parallel synthetic resin strips 18 and 18, and the binding band 1 and the strips 18 and 18 are cut. Tabs 19 and 19 that are places
Are serialized through. Further, as shown in FIG. 3, the binding band 1 includes a head portion 11 and a strip-shaped piece 12 connected to the head portion 11. While the head portion 11 is provided with a strip-shaped piece insertion hole 14 and a claw piece 15 protruding into the insertion hole 14, one side of the strip-shaped piece 12 is a serrated surface, and the strip-shaped piece 12 is formed. When it is deformed into a loop shape and is inserted into the insertion hole 14 of the head portion 11,
Engages with the uneven surface of the strip 12 at an arbitrary position, and the engagement prevents the strip 12 from being pulled out from the insertion hole 14.

【0016】図6〜図13に示した結束装置の説明図に
示されているように、基台2には案内通路21が具備さ
れており、この案内通路21に、図2で説明したストリ
ップ18,18から切り離された結束バンド1が一つず
つ送り込まれる。
As shown in the explanatory views of the binding device shown in FIGS. 6 to 13, the base 2 is provided with a guide passage 21, and the guide passage 21 has the strip described in FIG. The binding bands 1 separated from 18, 18 are fed one by one.

【0017】図1や図6〜図13のように、基台2から
は水平にアーム41が突設されており、このアーム41
の基部に垂直に杆体43が突設されている。そして、ア
ーム41には長手方向に延びる凹溝42が備わってい
る。これらのアーム41および杆体43は被結束体Mを
定位置に位置決めするための位置決め機構4を構成して
いる。すなわち、被結束体Mが図14に示したループ状
のコイル220である場合には、図6のように、鉄心2
10からループ状に突き出たコイル220をコイル22
0に形成されている開口部230を利用してアーム41
に挿入し、かつ鉄心210を杆体43に押し付けておく
ことによって、コイル220でなる被結束体Mがアーム
41によって定位置で固定される。
As shown in FIGS. 1 and 6 to 13, an arm 41 is horizontally projected from the base 2, and the arm 41 is provided.
A rod 43 is vertically projected from the base of the rod. The arm 41 is provided with a groove 42 extending in the longitudinal direction. The arm 41 and the rod 43 constitute a positioning mechanism 4 for positioning the body to be bound M at a fixed position. That is, when the bundled object M is the loop-shaped coil 220 shown in FIG. 14, as shown in FIG.
The coil 220 protruding in a loop from the coil 10
The arm 41 using the opening 230 formed in
, And the iron core 210 is pressed against the rod 43, the bundled body M made of the coil 220 is fixed at a fixed position by the arm 41.

【0018】基台2には可動レバー体3が取り付けられ
ている。この可動レバー体3は、図4および図5に説明
的に示した横軸31を介して固定側部材(不図示)に上
下揺動自在に取り付けられており、図示していないエア
シリンダなどの押引機構やリンク機構などの動作を介
し、横軸31の周りで、後述する第1位置と第2位置と
の間で上下に往復揺動できるようになっている。この可
動レバー体3は、溝部32とこの溝部32に設けられた
通孔33とを有している。図4や図5、あるいは図6な
どに示してあるように、溝部32には上り勾配の傾斜面
34が連設されていると共に、溝部32と傾斜面34と
の連設箇所に段付部35,35が設けられている。そし
て、結束バンド1のヘッド部11が溝部32に送り込ま
れたときには、溝部32に収容されたヘッド部11が上
記段付部35,35に当たって位置決め状態で保持さ
れ、しかもヘッド部11の挿通孔14に上記通孔33が
連通されるようになっている。ここで、可動レバー体3
の第1位置は、上記溝部32が基台2の案内通路21の
終部22に連続する位置であり、第1位置にある可動レ
バー体3が図1や図6〜図10などに示されている。ま
た、可動レバー体3の第2位置は、第1位置よりも位置
決め機構4に近い位置であり、第2位置にある可動レバ
ー体3が図11および図12に示されている。
A movable lever body 3 is attached to the base 2. The movable lever body 3 is vertically swingably attached to a fixed-side member (not shown) via a horizontal shaft 31 illustrated in FIGS. 4 and 5, and is used for an air cylinder (not shown) or the like. Through the operation of a push-pull mechanism, a link mechanism, etc., it is possible to reciprocate up and down around a horizontal shaft 31 between a first position and a second position, which will be described later. The movable lever body 3 has a groove 32 and a through hole 33 provided in the groove 32. As shown in FIG. 4, FIG. 5, or FIG. 6 and the like, the groove portion 32 is provided with a sloped surface 34 having an upward slope, and the stepped portion is formed at the connection portion between the groove portion 32 and the sloped surface 34. 35, 35 are provided. When the head portion 11 of the binding band 1 is fed into the groove portion 32, the head portion 11 accommodated in the groove portion 32 hits the stepped portions 35, 35 and is held in a positioned state, and the insertion hole 14 of the head portion 11 is held. The through hole 33 is communicated with. Here, the movable lever body 3
Is a position where the groove 32 is continuous with the end 22 of the guide passage 21 of the base 2, and the movable lever body 3 in the first position is shown in FIGS. 1 and 6 to 10. ing. The second position of the movable lever body 3 is closer to the positioning mechanism 4 than the first position, and the movable lever body 3 in the second position is shown in FIGS. 11 and 12.

【0019】図1のように、基台2から突設されたブラ
ケット23に横軸24により第1ガイド体5が上下揺動
自在に取り付けられている。この第1ガイド体5は湾曲
した案内通路51を有している。また、第1ガイド体5
は図示していないエアシリンダなどの押引機構やリンク
機構などの動作を介して次に説明する第1位置と第2位
置との間で上下に往復揺動できるようになっている。す
なわち、第1位置は図7や図8に示した位置であり、こ
の第1位置では第1ガイド体5が少し立上った状態にな
る。第2位置は図9に示した位置であり、第1位置より
も後述する第2ガイド体6に近寄った位置である。
As shown in FIG. 1, a first guide body 5 is vertically swingably attached to a bracket 23 protruding from the base 2 by a horizontal shaft 24. The first guide body 5 has a curved guide passage 51. In addition, the first guide body 5
Can be reciprocally oscillated up and down between a first position and a second position, which will be described below, through operations of a push-pull mechanism such as an air cylinder and a link mechanism (not shown). That is, the first position is the position shown in FIGS. 7 and 8, and the first guide body 5 is slightly raised at this first position. The second position is the position shown in FIG. 9, which is closer to the second guide body 6 described later than the first position.

【0020】基台2に第2ガイド体6が内蔵されてい
る。この第2ガイド体6は湾曲した案内通路61を有し
ていると共に、エアシリンダ62の押引動作によって出
退される構成になっている。すなわち、第2ガイド体6
は、上記可動レバー体3が第1位置から第2位置に向け
て往動するときにはその往動を阻害しない位置に後退さ
れ、可動レバー体3が第2位置から第1位置に復動した
後には、結束バンド1の帯状片12を案内するという作
用を行い得る位置、すなわち可動レバー体3の上に重な
り合う位置まで前進される。
A second guide body 6 is built in the base 2. The second guide body 6 has a curved guide passage 61 and is configured to be withdrawn and withdrawn by the push-pull operation of the air cylinder 62. That is, the second guide body 6
When the movable lever body 3 moves backward from the first position to the second position, the movable lever body 3 is retracted to a position that does not hinder the forward movement, and after the movable lever body 3 returns from the second position to the first position. Is advanced to a position where it can perform the action of guiding the strip 12 of the binding band 1, that is, a position where it overlaps the movable lever body 3.

【0021】第1ガイド体5と第2ガイド体6とは、第
1ガイド体5が第1位置や第2位置にあるときに相対向
した状態になる。このため、第1ガイド体5が第1位置
にあり、しかも第2ガイド体6が第1位置にある可動レ
バー体3の上に重なり合う位置まで前進されていると、
基台2の案内通路21を給送されてきた結束バンド1の
帯状片12が可動レバー体3の溝部32の外方へ押し出
されてきたときに、第1ガイド体5の案内通路51がそ
の帯状片12をループ状に変形させながらアーム41の
凹溝42に導き、そのアーム41により定位置に固定さ
れている被結束体Mの周囲に帯状片12を回し込んだ
後、その帯状片12の先端部13を第2ガイド体6の案
内通路61を介して可動レバー体3の溝部32に保持さ
れているヘッド部11の挿通孔14に臨ませる(図8参
照)。そして、第1ガイド体5が第1位置から第2位置
に往動すると、帯状片12の中間部が第2ガイド体6側
に押されるので、帯状片12の先端部13は第2ガイド
体6により案内されて可動レバー体3の溝部32に保持
されているヘッド部11の挿通孔14やその溝部32の
通孔33に挿通される(図9参照)。
The first guide body 5 and the second guide body 6 face each other when the first guide body 5 is in the first position or the second position. Therefore, when the first guide body 5 is at the first position and the second guide body 6 is advanced to a position where it overlaps the movable lever body 3 at the first position,
When the strip-shaped piece 12 of the binding band 1 fed through the guide passage 21 of the base 2 is pushed out of the groove 32 of the movable lever body 3, the guide passage 51 of the first guide body 5 is The belt-shaped piece 12 is guided into the groove 42 of the arm 41 while being deformed into a loop shape, and the belt-shaped piece 12 is rotated around the to-be-bound object M fixed in place by the arm 41, and then the belt-shaped piece 12 is moved. The distal end portion 13 of the second guide body 6 is exposed to the insertion hole 14 of the head portion 11 held in the groove portion 32 of the movable lever body 3 through the guide passage 61 of the second guide body 6 (see FIG. 8). Then, when the first guide body 5 moves forward from the first position to the second position, the intermediate portion of the strip-shaped piece 12 is pushed toward the second guide body 6 side, so that the tip end portion 13 of the strip-shaped piece 12 has the second guide body. It is guided by 6 and is inserted into the insertion hole 14 of the head portion 11 held in the groove portion 32 of the movable lever body 3 and the through hole 33 of the groove portion 32 (see FIG. 9).

【0022】基台2には引張具7が設けられている。こ
の引張具7は、横軸71を中心として上下揺動される揺
動アーム72と、この揺動アーム72の先端部に設けら
れたチャック機構73とを備えており、図示していない
エアシリンダやリンク機構の動作によって可動レバー体
3の第1位置に近い帯状片受取位置(図8〜図10の位
置)と、可動レバー体3の第1位置から遠ざかった帯状
片引張位置(図6、図7、図11〜図13の位置)との
間で往復揺動される。なお、チャック機構73は、固定
片74と常時固定片74側にばね付勢された可動片75
とを備えており、固定片74と可動片75との間に結束
バンド1の帯状片12の先端部13が差し込まれると、
自動的にその先端部13を保持する機能を有している。
The base 2 is provided with a pulling tool 7. The pulling tool 7 includes a swing arm 72 that swings up and down about a horizontal axis 71, and a chuck mechanism 73 provided at the tip of the swing arm 72, and is not shown in the drawings. The strip-shaped piece receiving position (the position shown in FIGS. 8 to 10) close to the first position of the movable lever body 3 and the strip-shaped piece pulling position (FIG. 6, which is distant from the first position of the movable lever body 3 due to the operation of the link mechanism). 7 and the positions of FIGS. 11 to 13). The chuck mechanism 73 includes a fixed piece 74 and a movable piece 75 which is constantly biased toward the fixed piece 74 by a spring.
When the tip portion 13 of the strip-shaped piece 12 of the binding band 1 is inserted between the fixed piece 74 and the movable piece 75,
It has a function of automatically holding the tip portion 13.

【0023】図4および図5のように、可動レバー体3
にはカッタ機構8が取り付けられている。このカッタ機
構8は、エアシリンダ81と、エアシリンダ81のロッ
ド82の押引運動を直角方向の押引運動に変換するリン
ク機構83と、このリンク機構83の作用端に連結され
たカッタ84とを備えており、エアシリンダ81の動作
によってカッタ84の刃先85が可動レバー体3の下面
に沿って通孔33の出口側を横切って動くようになって
いる。
As shown in FIGS. 4 and 5, the movable lever body 3
A cutter mechanism 8 is attached to the. The cutter mechanism 8 includes an air cylinder 81, a link mechanism 83 that converts the push-pull movement of the rod 82 of the air cylinder 81 into a push-pull movement in a right angle direction, and a cutter 84 connected to the working end of the link mechanism 83. The blade tip 85 of the cutter 84 moves along the lower surface of the movable lever body 3 across the outlet side of the through hole 33 by the operation of the air cylinder 81.

【0024】以上のように構成された結束装置の作用を
図6〜図13、および図14を参照して説明する。
The operation of the bundling device configured as described above will be described with reference to FIGS. 6 to 13 and 14.

【0025】図14に示した鉄心210からループ状に
突き出たコイル220に具備されている開口部230を
利用して、まず、図6の矢印Bのようにコイル220で
なる被結束体Mをアーム41に挿入して鉄心210を杆
体43に押し付ける。このようにすると、被結束体Mが
アーム41によって吊持状に支持され、同時に定位置に
固定される。この後、図7の矢印X1のように、今まで
待機位置にあった第1ガイド体5が第1位置まで往動す
るとその案内通路51が少し立ち上がる一方、矢印Y1
のように第2ガイド体6が前進するとその第2ガイド体
6が第1位置にある可動レバー体3の上に重ね合わさ
る。次に、図示していない結束バンド給送機構が動作す
ると、基台2の案内通路21に送り込まれている結束バ
ンド1が図8のようにヘッド部11を後方にして案内通
路21を矢印Z1のように送られ、この送りによって、
ヘッド部11が案内通路21の終部22を経て可動レバ
ー体3の溝部32に受け入れられ、それに伴って帯状片
12が可動レバー体3の傾斜面34を経て溝部32の外
方へ押し出される。このようにして帯状片12が溝部3
2の外方へ押し出されてくると、第1ガイド体5の案内
通路51がその帯状片12を無理なくループ状に変形さ
せながらアーム41の凹溝42に導くので、帯状片12
が被結束体Mとしてのコイル220の開口部230に挿
通される。これにより、帯状片12が、アーム41によ
り定位置に固定されている被結束体Mの周囲に回し込ま
れた後、帯状片12の先端部13が第2ガイド体6の案
内通路61に当り、その案内通路61により図中下向き
に案内されて可動レバー体3の溝部32で位置決め状態
で保持されているヘッド部11の挿通孔14に臨まされ
る。次に、図9の矢印X2のように、第1ガイド体5が
第1位置から第2位置に往動すると、第1ガイド体5の
案内通路51に倣っている帯状片12の中間部が第2ガ
イド体6側に押されるので、帯状片12の先端部13は
第2ガイド体6により案内されて可動レバー体3の溝部
32に保持されているヘッド部11の挿通孔14やその
溝部32の通孔33に挿通される。このようにしてヘッ
ド部11に帯状片12が挿通されるときのタイミングに
合わせて、引張具7の揺動アーム7が可動レバー体3の
第1位置に近い帯状片受取位置に移動して待機してい
る。このため、ヘッド部11に挿通された帯状片12の
先端部13は、引張具7のチャック機構73の固定片7
4と可動片75との間に差し込まれてそのチャック機構
73により保持される。この後、第1ガイド体5は図1
0の矢印X3のように第1位置を経て待機位置まで復動
し、また、第2ガイド体6は矢印Y2のように可動レバ
ー体3と重なり合わない位置まで後退する。
Using the opening 230 provided in the coil 220 protruding from the iron core 210 in a loop shape as shown in FIG. 14, first, the bundled body M made of the coil 220 as shown by arrow B in FIG. The iron core 210 is inserted into the arm 41 and pressed against the rod 43. In this way, the bundled body M is supported by the arm 41 in a suspended manner and at the same time is fixed in place. After this, as shown by the arrow X1 in FIG. 7, when the first guide body 5 which has been in the standby position until now moves forward to the first position, the guide passage 51 rises slightly, while the arrow Y1
When the second guide body 6 moves forward as described above, the second guide body 6 is superposed on the movable lever body 3 in the first position. Next, when a binding band feeding mechanism (not shown) is operated, the binding band 1 fed into the guide passage 21 of the base 2 has the head portion 11 rearward as shown in FIG. It is sent like this, and by this sending,
The head portion 11 is received in the groove portion 32 of the movable lever body 3 via the end portion 22 of the guide passage 21, and accordingly the strip-shaped piece 12 is pushed out of the groove portion 32 via the inclined surface 34 of the movable lever body 3. In this way, the strip 12 is formed into the groove 3.
When pushed out to the outside of 2, the guide passage 51 of the first guide body 5 guides the strip-shaped piece 12 into the concave groove 42 of the arm 41 while deforming the strip-shaped piece 12 in a loop shape without difficulty, so that the strip-shaped piece 12
Is inserted into the opening 230 of the coil 220 serving as the bound body M. As a result, the strip-shaped piece 12 is wound around the bundled body M fixed in place by the arm 41, and then the tip end portion 13 of the strip-shaped piece 12 hits the guide passage 61 of the second guide body 6. The guide passage 61 faces the insertion hole 14 of the head portion 11 which is guided downward in the drawing and is held in the groove portion 32 of the movable lever body 3 in a positioned state. Next, as shown by arrow X2 in FIG. 9, when the first guide body 5 moves forward from the first position to the second position, the intermediate portion of the strip 12 following the guide passage 51 of the first guide body 5 is moved. Since it is pushed toward the second guide body 6, the tip end portion 13 of the strip-shaped piece 12 is guided by the second guide body 6 and is held in the groove portion 32 of the movable lever body 3, and the insertion hole 14 of the head portion 11 and the groove portion thereof. It is inserted into the through hole 33 of 32. In this way, the swing arm 7 of the pulling tool 7 moves to the strip receiving position near the first position of the movable lever body 3 and waits at the timing when the strip 12 is inserted into the head portion 11. is doing. For this reason, the tip portion 13 of the strip-shaped piece 12 inserted into the head portion 11 is fixed to the fixing piece 7 of the chuck mechanism 73 of the pulling tool 7.
4 and the movable piece 75, and is held by the chuck mechanism 73. After this, the first guide body 5 is shown in FIG.
As indicated by an arrow X3 of 0, the second guide body 6 is returned to the standby position via the first position, and the second guide body 6 is retracted to a position where it does not overlap the movable lever body 3 as indicated by an arrow Y2.

【0026】この後、図11の矢印L1のように可動レ
バー体3が第1位置から第2位置まで往動し、それとタ
イミングを合わせて引張具7の揺動アーム72が矢印N
1のように帯状片引張位置まで揺動する。このような可
動レバー体3と引張具7との引締め動作により、結束バ
ンド1のヘッド部11とヘッド部11の挿通孔14に挿
通されている帯状片12とが相対的にスライドして被結
束体Mを取り巻いている帯状片12のループの半径が小
さくなり、図11のように被結束体Mが定位置に固定さ
れたまま結束バンド1によって結束される。なお、図1
1では、結束状態の理解を助けるために被結束体Mを結
束バンド1が緩く結束した状態を示してあるけれども、
可動レバー体3の第2位置を図示よりもさらにアーム4
1に近い位置に定めておくことによって、被結束体Mを
結束バンド1で強く締めつけるようにすることが容易に
可能である。
Thereafter, the movable lever body 3 moves forward from the first position to the second position as indicated by arrow L1 in FIG. 11, and the swing arm 72 of the pulling tool 7 is arrowed by arrow N at the same timing.
As shown in 1, rock to the strip tension position. By the tightening operation of the movable lever body 3 and the pulling tool 7 as described above, the head portion 11 of the binding band 1 and the belt-shaped piece 12 inserted into the insertion hole 14 of the head portion 11 relatively slide to be bound. The radius of the loop of the strip 12 surrounding the body M becomes smaller, and the to-be-bound body M is bound by the binding band 1 while being fixed in a fixed position as shown in FIG. Note that FIG.
1 shows a state in which the to-be-bound body M is loosely bound by the binding band 1 in order to help understanding of the bound state.
The second position of the movable lever body 3 is further changed to the arm 4 than shown.
By setting the position to be close to 1, it is possible to easily tighten the binding object M with the binding band 1.

【0027】こうして被結束体Mが結束バンド1で結束
された後、図12のようにカッタ機構8のエアシリンダ
8が動作してカッタ84で帯状片12の余剰部分12a
が切断される。この余剰部分12はその後に引張具7の
チャック機構73から取り外されて回収される。
After the bundles M to be bound are bound by the binding band 1 in this way, the air cylinder 8 of the cutter mechanism 8 operates as shown in FIG. 12 and the excess portion 12a of the strip 12 is cut by the cutter 84.
Is disconnected. The surplus portion 12 is then removed from the chuck mechanism 73 of the pulling tool 7 and collected.

【0028】以上説明した一連の結束工程が終了する
と、図9のように可動レバー体3が第1位置まで復動し
て次回の結束工程に備えられる。
When the series of binding steps described above is completed, the movable lever body 3 is returned to the first position as shown in FIG. 9 to prepare for the next binding step.

【0029】以上説明した実施例においては、第1ガイ
ド体5の第1位置で帯状片12の回り込み動作が行わ
れ、第1ガイド体5の第2位置でヘッド部11の挿通孔
14への帯状片12の挿通動作が行われるようになって
いるけれども、第1ガイド体5を図8の段階で第2位置
まで往動させておくか、あるいは帯状片12の長さを長
くしておくと、上記の回り込み動作と挿通動作とが連続
する一連の動作として行われる。
In the embodiment described above, the strip-shaped piece 12 is turned around at the first position of the first guide body 5, and is inserted into the insertion hole 14 of the head portion 11 at the second position of the first guide body 5. Although the strip 12 is inserted, the first guide body 5 is moved forward to the second position in the stage of FIG. 8 or the strip 12 is lengthened. Then, the wraparound operation and the inserting operation are performed as a series of continuous operations.

【0030】また、上記実施例において、位置決め機構
は図示例のものに限らず、被結束具Mを定位置に固定し
得るものであればたとえばロボットであってもよい。
Further, in the above-mentioned embodiment, the positioning mechanism is not limited to the one shown in the drawing, but may be a robot as long as it can fix the binding tool M at a fixed position.

【0031】図15〜図21は請求項5記載の発明によ
る実施例の結束装置についての作用と要部の概略構成を
説明的に示してある。
FIGS. 15 to 21 are explanatory views showing the operation of the binding apparatus of the embodiment according to the fifth aspect of the present invention and the schematic construction of the essential parts.

【0032】この結束装置において、基台2に案内通路
21が設けられており、この案内通路21に図2で説明
したストリップ18,18から切り離された結束バンド
1が1つずつ送り込まれる。基台2からは水平にアーム
44が突設されており、このアーム44には長手方向に
延びる凹溝45が備わっている。また、アーム44の基
部には上記基台2の案内通路21の終部22に連続する
収容空間46が設けられており、この収容空間46に、
案内通路21を送られてきた結束バンド1のヘッド部1
1が受け入れられるようになっている。上記アーム44
は、被結束体Mを定位置に位置決めして固定することに
役立つ。すなわち、被結束体Mが図14に示したコイル
220である場合には、図15のように、そのコイル2
20の開口部230をアーム44に挿入しておくことに
よって、コイル220でなる被結束体Mがアーム44に
より支持されて定位置に固定される。
In this binding device, a guide passage 21 is provided in the base 2, and the binding bands 1 separated from the strips 18, 18 described in FIG. 2 are fed into the guide passage 21 one by one. An arm 44 is horizontally projected from the base 2, and the arm 44 is provided with a groove 45 extending in the longitudinal direction. A storage space 46 is provided at the base of the arm 44 and is continuous with the end 22 of the guide passage 21 of the base 2. The storage space 46 has a storage space 46.
The head portion 1 of the binding band 1 sent through the guide passage 21.
1 is accepted. The arm 44
Is useful for positioning and fixing the body to be bound M in a fixed position. That is, when the bundled object M is the coil 220 shown in FIG. 14, as shown in FIG.
By inserting the openings 230 of 20 into the arm 44, the bundled body M made of the coil 220 is supported by the arm 44 and fixed in a fixed position.

【0033】第1ガイド体5は第2ガイド体6に横軸5
2を介して上下揺動自在に取り付けられている。第1ガ
イド体5は湾曲した案内通路51を有しており、図示し
ていないエアシリンダなどの押引機構やリンク機構など
の動作を介して次に説明する第1位置と第2位置との間
で上下に往復揺動できるようになっている。すなわち、
第1位置は図15、図16、図21に示した位置であ
り、この第1位置は待機位置に相当する。第2位置は図
17〜図20に示した位置であり、第2位置では第1ガ
イド体5の先端部53がアーム44の凹溝45に近接す
るか、または挿入される。第2ガイド体6は湾曲した案
内通路61を有していると共に、エアシリンダ62の押
引動作によって上記した第1ガイド体5を伴って出退さ
れる構成になっている。エアシリンダ62の押引動作に
よる第1ガイド体5や第2ガイド体6の出退動作は、第
1ガイド体5や第2ガイド体6を結束を適切に行い得る
位置に移動させるための位置調整の役割を持っている。
The first guide body 5 is attached to the second guide body 6 along the horizontal axis 5.
It is attached so that it can swing up and down via 2. The first guide body 5 has a curved guide passage 51, and can move between a first position and a second position, which will be described below, through operations of a push-pull mechanism such as an air cylinder and a link mechanism (not shown). It is possible to swing up and down between them. That is,
The first position is the position shown in FIGS. 15, 16 and 21, and this first position corresponds to the standby position. The second position is the position shown in FIGS. 17 to 20, and in the second position, the tip end portion 53 of the first guide body 5 approaches the groove 45 of the arm 44 or is inserted. The second guide body 6 has a curved guide passage 61, and is configured to be withdrawn and retracted together with the first guide body 5 by the push and pull operation of the air cylinder 62. The withdrawal operation of the first guide body 5 and the second guide body 6 by the push-pull operation of the air cylinder 62 is a position for moving the first guide body 5 and the second guide body 6 to a position where binding can be appropriately performed. Has a coordination role.

【0034】第1ガイド体5と第2ガイド体6とは、第
1ガイド体5が第2位置にあるときに相対向した状態に
なる。このため、第1ガイド体5が第2位置にあるとき
には、基台2の案内通路21を給送されてきた結束バン
ド1の帯状片12が可動レバー体3の収容空間46の外
方へ押し出されてきたときに、第1ガイド体5の案内通
路51がその帯状片12をループ状に変形させながら第
2ガイド体6の案内通路61に導く(図18参照)。
The first guide body 5 and the second guide body 6 face each other when the first guide body 5 is in the second position. Therefore, when the first guide body 5 is in the second position, the strip-shaped piece 12 of the binding band 1 fed through the guide passage 21 of the base 2 is pushed out of the accommodation space 46 of the movable lever body 3. When it comes down, the guide passage 51 of the first guide body 5 guides it into the guide passage 61 of the second guide body 6 while deforming the strip-shaped piece 12 into a loop shape (see FIG. 18).

【0035】基台2には引張具7が設けられている。こ
の引張具7は、結束バンド1の帯状片12を挾み付けて
その帯状片12に送り力を付与する一対のローラ76,
77でなる。これらのローラ76,77はローレット加
工された表面の凹凸が帯状片12の凹凸面と噛み合うよ
うになっている。
The base 2 is provided with a pulling tool 7. The pulling tool 7 includes a pair of rollers 76 for sandwiching the strip 12 of the binding band 1 and applying a feeding force to the strip 12.
It will be 77. These rollers 76 and 77 are configured such that the knurled surface unevenness meshes with the uneven surface of the strip 12.

【0036】この結束装置においても、カッタ機構(不
図示)が設けられており、このカッタ機構のカッタ84
が図15〜図21に示されている。
This binding device also has a cutter mechanism (not shown), and the cutter 84 of this cutter mechanism is provided.
Are shown in FIGS.

【0037】図15〜図21で説明した結束装置の作用
を説明する。
The operation of the binding device described with reference to FIGS. 15 to 21 will be described.

【0038】図14に示した被結束体Mとしてのコイル
220の開口部230を利用して、まず、図15の矢印
Bのように被結束体Mをアーム44に挿入する。このよ
うにすると、被結束体Mがアーム41の上に乗った状態
で支持されて定位置に固定される。この後、図16の矢
印Y5のように、エアシリンダ62を押し出して第1ガ
イド体5や第2ガイド体6の位置を適切な位置に調整す
る。この後、図17の矢印X5のように第1ガイド体5
が第2位置まで往動され、その先端部53がアーム44
の凹溝45に臨まされる。次に、図示していない結束バ
ンド給送機構が動作すると、図18で判るように、基台
2の案内通路21に送り込まれている結束バンド1がヘ
ッド部11を後方にして案内通路21を送られ、この送
りによって、ヘッド部11が案内通路21の終部22を
経てアーム44の収容空間46に受け入れられ、それに
伴って帯状片12が被結束体Mの開口部230を通って
収容空間46の外方に押し出される。こうして開口部2
30に挿通された帯状片12は、第1ガイド体5の案内
通路51によりループ状に変形させられながら第2ガイ
ド体6の案内通路61に至り、さらに、第2ガイド体6
の案内通路61により図中下向きに案内され、収容空間
46で位置決め状態で保持されているヘッド部11の挿
通孔14に挿通される。こうしてヘッド部11に挿通さ
れた帯状片12の先端部13は、引張具7の一対のロー
ラ76,77の間に取り込まれ、それらのローラ76,
77の回転により帯状片12が引っ張られる。これによ
り、被結束体Mを取り巻いている帯状片12のループの
半径が小さくなり、図19のように被結束体Mが定位置
に固定されたまま結束バンド1によって結束される。
Using the opening 230 of the coil 220 as the bound body M shown in FIG. 14, first, the bound body M is inserted into the arm 44 as indicated by arrow B in FIG. In this way, the to-be-bound body M is supported while being mounted on the arm 41, and is fixed at a fixed position. Then, as indicated by arrow Y5 in FIG. 16, the air cylinder 62 is pushed out to adjust the positions of the first guide body 5 and the second guide body 6 to appropriate positions. After this, as shown by the arrow X5 in FIG.
Is moved to the second position, and the tip 53 of the
It faces the groove 45. Next, when a binding band feeding mechanism (not shown) is operated, the binding band 1 fed into the guide passage 21 of the base 2 moves the guide passage 21 with the head portion 11 facing backward, as shown in FIG. The head portion 11 is received in the accommodation space 46 of the arm 44 through the end portion 22 of the guide passage 21 by this feeding, and the strip-shaped piece 12 is accordingly accommodated through the opening 230 of the bundled body M. It is pushed out of 46. Thus opening 2
The strip-shaped piece 12 inserted into 30 reaches the guide passage 61 of the second guide body 6 while being deformed into a loop shape by the guide passage 51 of the first guide body 5, and further, the second guide body 6
It is guided downward in the drawing by the guide passage 61 and is inserted into the insertion hole 14 of the head portion 11 which is held in the accommodating space 46 in a positioned state. The tip portion 13 of the strip-shaped piece 12 thus inserted through the head portion 11 is taken in between the pair of rollers 76 and 77 of the pulling tool 7, and these rollers 76 and
The rotation of 77 pulls the strip 12. As a result, the radius of the loop of the strip-shaped piece 12 surrounding the to-be-bound body M becomes smaller, and the to-be-bound body M is bound by the binding band 1 while being fixed in a fixed position as shown in FIG.

【0039】こうして被結束体Mが結束バンド1で結束
された後、図20の矢印Z5のようにカッタ84で帯状
片12の余剰部分12aが切断される。この余剰部分1
2はその後に回収される。
After the bundle M is bound by the binding band 1 in this way, the excess portion 12a of the strip 12 is cut by the cutter 84 as indicated by arrow Z5 in FIG. This extra part 1
2 is then recovered.

【0040】以上説明した一連の結束工程が終了する
と、図21のようにカッタ84が元一まで復帰して次回
の結束工程に備えられる。
When the series of binding steps described above are completed, the cutter 84 returns to its original state as shown in FIG. 21 to prepare for the next binding step.

【0041】なお、図15〜図21においては、図6〜
図13で説明した部分に相応する部分に同一符号を付し
てある。
In FIGS. 15 to 21, FIGS.
The same reference numerals are given to the portions corresponding to the portions described in FIG.

【0042】[0042]

【発明の効果】請求項1記載の発明による結束装置によ
ると、被結束体を定位置に固定したまま結束バンドで弛
みなく結束することができるので、冒頭で説明した従来
の結束装置よりも結束可能な被結束体の種類が多くな
り、それだけ汎用性が高まるという効果がある。この効
果は、請求項2、請求項3、請求項4、請求項5のいず
れかに記載の発明によっても奏される。
According to the tying device of the first aspect of the present invention, the tying member can be tied without slack with the tying band while fixing the to-be-bound object at a fixed position, so that the tying device can be bound more than the conventional tying device described at the beginning. The number of possible bound objects increases, and the versatility increases accordingly. This effect is also exhibited by the invention according to any one of claims 2, 3, 4, and 5.

【図面の簡単な説明】[Brief description of drawings]

【図1】請求項1、請求項2、請求項3および請求項4
に記載した発明の実施例による結束装置の一例を概略的
に示した斜視図である。
FIG. 1 Claim 1, Claim 2, Claim 3 and Claim 4
FIG. 3 is a perspective view schematically showing an example of the binding device according to the embodiment of the invention described in FIG.

【図2】結束バンドの平面図である。FIG. 2 is a plan view of a binding band.

【図3】結束バンドの断面図である。FIG. 3 is a cross-sectional view of a binding band.

【図4】可動レバー体などを示す平面図である。FIG. 4 is a plan view showing a movable lever body and the like.

【図5】図4のV矢視図である。FIG. 5 is a view on arrow V in FIG.

【図6】結束初期段階で被結束体を定位置に固定した状
態を示す作用説明図である。
FIG. 6 is an operation explanatory view showing a state in which the members to be bound are fixed at a fixed position in the initial stage of binding.

【図7】結束初期段階の作用説明図である。FIG. 7 is an explanatory diagram of the operation in the initial stage of binding.

【図8】結束中間段階の作用説明図である。FIG. 8 is an explanatory view of the operation of the bundling intermediate stage.

【図9】別の結束中間段階の作用説明図である。FIG. 9 is an operation explanatory view of another bundling intermediate stage.

【図10】さらに別の結束中間段階の作用説明図であ
る。
FIG. 10 is an operation explanatory view of yet another bundling intermediate step.

【図11】結束最終段階の作用説明図である。FIG. 11 is an operation explanatory view of the final stage of binding.

【図12】別の結束最終段階の作用説明図である。FIG. 12 is an operation explanatory view of another bundling final stage.

【図13】さらに別の結束最終段階の作用説明図であ
る。
FIG. 13 is an operation explanatory view of still another final stage of binding.

【図14】被結束体としてのコイルを示す説明図であ
る。
FIG. 14 is an explanatory diagram showing a coil as a bound object.

【図15】請求項5に記載した発明の実施例による結束
装置において、結束初期段階で被結束体を定位置に固定
した状態の作用説明図である。
FIG. 15 is an operation explanatory view of the binding device according to the embodiment of the invention as set forth in claim 5 in a state in which a bound object is fixed at a fixed position in an initial stage of binding.

【図16】結束初期段階の作用説明図である。FIG. 16 is an explanatory view of the operation in the initial stage of binding.

【図17】別の結束初期段階の作用説明図である。FIG. 17 is an explanatory view of the operation at another initial stage of binding.

【図18】結束中間段階の作用説明図である。FIG. 18 is an explanatory view of the operation in the bundling intermediate stage.

【図19】別の結束中間段階の作用説明図である。FIG. 19 is an operation explanatory view of another bundling intermediate step.

【図20】結束最終段階の作用説明図である。FIG. 20 is an explanatory view of the operation at the final stage of binding.

【図21】別の結束最終段階の作用説明図である。FIG. 21 is an operation explanatory view of another bundling final step.

【図22】従来の結束装置の概略側面図である。FIG. 22 is a schematic side view of a conventional binding device.

【符号の説明】[Explanation of symbols]

M 被結束体 1 結束バンド 2 基台 3 可動レバー体 4 位置決め機構 5 第1ガイド体 6 第2ガイド体 7 引張具 8 カッタ機構 11 ヘッド部 12 帯状片 13 帯状片の先端部 14 ヘッド部の帯状片挿通孔 21 基台の案内通路 23 案内通路の終部 32 溝部 33 通孔 44 アーム 46 収容空間 51 第1ガイド体の案内通路 61 第2ガイド体の案内通路 230 開口部 M Bundled body 1 Binding band 2 Base 3 Movable lever body 4 Positioning mechanism 5 1st guide body 6 2nd guide body 7 Tensioner 8 Cutter mechanism 11 Head part 12 Band-like piece 13 Band-like tip 14 Band-like shape of head part One-sided insertion hole 21 Guide passage for the base 23 End portion of the guide passage 32 Groove portion 33 Through hole 44 Arm 46 Storage space 51 Guide passage for the first guide body 61 Guide passage for the second guide body 230 Opening

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 ヘッド部とこのヘッド部に挿通されて係
着される帯状片とを備えた結束バンドを給送するための
案内通路を持った基台と、 被結束体を定位置に固定するための位置決め機構と、 結束バンドのヘッド部を収容して位置決め状態で保持す
る溝部とこの溝部に保持されたヘッド部の帯状片挿通孔
に連通する通孔を備えていると共に、上記溝部を上記基
台の案内通路の終部に連続させる第1位置とこの第1位
置よりも上記位置決め機構に近い第2位置との間で往復
動可能な可動レバー体と、 基台の案内通路を給送されてきた結束バンドのヘッド部
が可動レバー体の溝部に受け入れられるのに伴って上記
溝部の外方へ押し出された結束バンドの帯状片をループ
状に変形させながら定位置に固定された被結束体の周囲
に回し込むための湾曲した案内通路を有する第1ガイド
体と、 第1ガイド体によって被結束体の周囲に回し込まれた結
束バンドの帯状片を、可動レバー体の溝部に保持されて
いるヘッド部の帯状片挿通孔に向けて案内するための湾
曲した案内通路を有する第2ガイド体と、 可動レバー体の溝部に保持されているヘッド部の帯状片
挿通孔に挿通された帯状片の先端部を保持して可動レバ
ー体から遠ざかる方向に引っ張るための引張具と、 を備えることを特徴とする結束装置。
1. A base having a guide passage for feeding a binding band, which has a head portion and a strip-shaped piece inserted and fixed to the head portion, and a bundled body fixed in place. And a groove for accommodating the head portion of the binding band and holding it in a positioned state, and a through hole communicating with the strip-shaped insertion hole of the head portion held by this groove portion. A movable lever body that can reciprocate between a first position that is continuous with the end of the guide passage of the base and a second position that is closer to the positioning mechanism than the first position, and the guide passage of the base are provided. As the head portion of the binding band sent in is received in the groove portion of the movable lever body, the band-shaped piece of the binding band pushed out of the groove portion is deformed into a loop shape and fixed to a fixed position. Curved to wrap around the bundle The first guide body having the guide passage and the band-shaped piece of the binding band that is wound around the bound body by the first guide body, and the band-shaped piece insertion hole of the head portion held in the groove of the movable lever body. A second guide body having a curved guide passage for guiding toward and to a movable lever body, and a tip end portion of a strip-shaped piece inserted into a strip-shaped piece insertion hole of a head portion held in a groove portion of the movable lever body. A binding device comprising: a pulling tool for pulling in a direction away from the lever body.
【請求項2】 可動レバー体が第1位置から第2位置に
往動されるタイミングに合わせて引張具により結束バン
ドの帯状片が可動レバー体から遠ざかる方向に引っ張ら
れるようになされている請求項1記載の結束装置。
2. The belt-shaped piece of the binding band is pulled by a pulling tool in a direction away from the movable lever body at a timing when the movable lever body is moved from the first position to the second position. 1. The binding device according to 1.
【請求項3】 第1ガイド体が、その案内通路によって
結束バンドの帯状片を被結束体の周囲に回し込ませてそ
の帯状片の先端部を第2ガイド体を介して可動レバー体
の溝部に保持されているヘッド部の帯状片挿通孔に臨ま
せる第1位置と、先端部がヘッド部の帯状片挿通孔に臨
まされた帯状片の中間部を第2ガイド体側に押してその
帯状片を第2ガイド体を介して上記ヘッド部の帯状片挿
通孔に挿通させる第2位置との間で往復動可能である請
求項1記載の結束装置。
3. The first guide body causes the strip-shaped piece of the binding band to be wound around the bundled body by the guide passage, and the tip end portion of the strip-shaped piece passes through the second guide body to form the groove portion of the movable lever body. 1st position which faces the strip-shaped piece insertion hole of the head part and the middle part of the strip-shaped piece whose front end faced the strip-shaped piece insertion hole of the head part which are held by The binding device according to claim 1, wherein the binding device is capable of reciprocating between a second position in which the belt-shaped piece insertion hole of the head portion is inserted through the second guide body.
【請求項4】 可動レバー体に、この可動レバー体の通
孔に挿通された結束バンドの帯状片をその通孔の出口側
で切断するカッタ機構が設けられている請求項1記載の
結束装置。
4. The binding device according to claim 1, wherein the movable lever body is provided with a cutter mechanism for cutting the band-shaped piece of the binding band inserted into the through hole of the movable lever body at the outlet side of the through hole. .
【請求項5】 ヘッド部とこのヘッド部に挿通されて係
着される帯状片とを備えた結束バンドを給送するための
案内通路を持った基台と、 結束バンドのヘッド部を位置決め状態で保持可能で上記
基台の案内通路の終部に連続する収容空間を備え、被結
束体の開口部に挿入されてその被結束体を定位置に固定
するためのアームと、 基台の案内通路を給送されてきた結束バンドのヘッド部
がアームの収容空間に受け入れられるのに伴って上記収
容空間の外方へ押し出された結束バンドの帯状片をルー
プ状に変形させながら上記被結束体の周囲に回し込むた
めの湾曲した案内通路を有する第1ガイド体と、 第1ガイド体によって被結束体の周囲に回し込まれた結
束バンドの帯状片を、アームの収容空間に収容されてい
るヘッド部の帯状片挿通孔に向けて案内するための湾曲
した案内通路を有する第2ガイド体と、 アームの収容空間に収容されているヘッド部の帯状片挿
通孔に挿通された帯状片の先端部を保持してその帯状片
をアームから遠ざかる方向に引っ張るための引張具と、 を備えることを特徴とする結束装置。
5. A base having a guide passage for feeding a binding band, the head having a head portion and a strip-shaped piece inserted and fixed to the head portion, and the head portion of the binding band being positioned. It has an accommodating space that can be held at the end of the guide passage of the base and is inserted into the opening of the bound object to fix the bound object in a fixed position, and a guide for the base. As the head portion of the binding band that has been fed through the passage is received in the accommodating space of the arm, the banded piece of the binding band pushed out of the accommodating space is deformed into a loop shape to be bound. A first guide body having a curved guide passage for wrapping around the bundle, and a band-shaped piece of a binding band wrapped around the body to be bound by the first guide body are accommodated in the accommodating space of the arm. Suitable for strip-shaped insertion holes on the head And a second guide body having a curved guide passage for guiding and holding the tip end of the strip-shaped piece inserted into the strip-shaped piece insertion hole of the head portion housed in the accommodating space of the arm and holding the strip-shaped piece. A bundling device comprising: a pulling tool for pulling the arm in a direction away from the arm.
JP06136294A 1994-03-30 1994-03-30 Binding device Expired - Fee Related JP3346880B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP06136294A JP3346880B2 (en) 1994-03-30 1994-03-30 Binding device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP06136294A JP3346880B2 (en) 1994-03-30 1994-03-30 Binding device

Publications (2)

Publication Number Publication Date
JPH07267214A true JPH07267214A (en) 1995-10-17
JP3346880B2 JP3346880B2 (en) 2002-11-18

Family

ID=13168988

Family Applications (1)

Application Number Title Priority Date Filing Date
JP06136294A Expired - Fee Related JP3346880B2 (en) 1994-03-30 1994-03-30 Binding device

Country Status (1)

Country Link
JP (1) JP3346880B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102273519B1 (en) * 2020-02-06 2021-07-05 김동철 Apparatus for Transferring Object using Cable Tie
CN114802885A (en) * 2022-04-29 2022-07-29 苏州启航电子有限公司 Structure of automatic binding equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102273519B1 (en) * 2020-02-06 2021-07-05 김동철 Apparatus for Transferring Object using Cable Tie
CN114802885A (en) * 2022-04-29 2022-07-29 苏州启航电子有限公司 Structure of automatic binding equipment

Also Published As

Publication number Publication date
JP3346880B2 (en) 2002-11-18

Similar Documents

Publication Publication Date Title
JP3393684B2 (en) Article binding method and binding apparatus
US4433479A (en) Method of making a wire harness
JP2613114B2 (en) Automatic binding device and binding tie
US3169560A (en) Binder strap tool
US4153499A (en) Slip-feed strapping machine
EP0121878B1 (en) Cable banding machine
JPH0479887B2 (en)
JPH07267214A (en) Bondling apparatus
JP3346879B2 (en) Positioning tool for binding object in binding device
US5873303A (en) Method for binding bundled objects, in particular pieces of cable, as well as an associated apparatus and a binding material
US4093501A (en) Frictional heat weld
US5226461A (en) Strap crimp and crimping tool
JP2005343538A (en) Binding method using pinch type binding unit
JPH0789510A (en) Tying band feeding device for automatic tying machine
JPH10287306A (en) Tying device
JP2001502646A (en) Improvement of tools for ultrasonic bundling
US20130167479A1 (en) Method and apparatus for securing the ends of flexible band with a buckle
JPH11180408A (en) Band clip attaching device
JP2706840B2 (en) Wire binding device
JPS63125113A (en) Manual welding bundling machine
JP3206935B2 (en) Binding device
EP0942868B1 (en) Improved ultrasonic tieing tool
JP2938610B2 (en) Binding device
RU2781589C2 (en) Strapping machine
JPH06156426A (en) Bundling method and device therefor

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees