JPH0723046U - Underground pillar through gutter hardware - Google Patents
Underground pillar through gutter hardwareInfo
- Publication number
- JPH0723046U JPH0723046U JP5304493U JP5304493U JPH0723046U JP H0723046 U JPH0723046 U JP H0723046U JP 5304493 U JP5304493 U JP 5304493U JP 5304493 U JP5304493 U JP 5304493U JP H0723046 U JPH0723046 U JP H0723046U
- Authority
- JP
- Japan
- Prior art keywords
- gutter
- underground
- pillar
- column
- underground pillar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
(57)【要約】
【目的】 地下柱貫通側溝を設けることに伴う柱コンク
リートの補強を不要にする。
【構成】 山形鋼の両フランジの端を細長い鋼板に溶接
し三角柱状とした地下柱貫通側溝用金物。
(57) [Summary] [Purpose] It is not necessary to reinforce the column concrete that accompanies the formation of a gutter through the underground column. [Structure] An underground pillar penetrating gutter metal fitting in which the ends of both flanges of angle steel are welded to an elongated steel plate to form a triangular prism.
Description
【0001】[0001]
本考案は、地下柱貫通側溝用金物の材料と構造に関する。 The present invention relates to the material and structure of a metal article for a gutter through an underground column.
【0002】[0002]
地下階の有る建物では地山に接する壁面は地下水の影響を受け、地下外周壁に 浸透してきた地下水は壁際に設けた側溝によって一箇所に集めポンプで排水する のが一般的である。この際に側溝を柱の地下部分を貫通させることが必要となる 。勿論、柱を貫通させない側溝の設置方法もあるが種々の理由で柱を貫通させる 場合が多い。この柱を貫通させる側溝としては断面円形もしくは半円形のプラス チックパイプが柱内に水平方向に埋設されている。 In a building with a basement floor, the wall surface in contact with the ground is affected by groundwater, and the groundwater that has penetrated into the outer peripheral wall is generally collected in one place by a gutter provided along the wall and drained by a pump. At this time, it is necessary to make the gutter penetrate the underground part of the pillar. Of course, there is a method of installing the gutter which does not penetrate the pillar, but the pillar is often penetrated for various reasons. A plastic pipe with a circular or semi-circular cross section is embedded horizontally in the pillar as a side groove that penetrates the pillar.
【0003】[0003]
従来法のプラスチックパイプを柱内に水平方向に埋設する方法では、埋設箇所 が柱断面欠損となるので構造的検討が必要となり、必要に応じてコンクリート断 面を大きくしたり、プラスチックパイプの周りに補強筋を設けるなどの対策が採 られている。 In the conventional method of horizontally burying a plastic pipe in a column, the burial site causes a column cross-section loss, so structural examination is necessary, and if necessary, increase the concrete cross section and / or around the plastic pipe. Measures such as providing reinforcement bars have been taken.
【0004】[0004]
本考案は、従来法のような特別の補強対策を必要としない柱貫通側溝用金物で ある。即ち、本考案は、山形鋼の両フランジの端を細長い鋼板に溶接し三角柱状 とした地下柱貫通側溝用金物のかかるものである。 The present invention is a post-penetrating groove metal fitting that does not require special reinforcement measures unlike the conventional method. That is, the present invention relates to an underground pillar through-side groove metal fitting which is formed by welding the ends of both flanges of chevron steel to an elongated steel plate to form a triangular prism.
【0005】 本考案の地下柱貫通側溝用金物を柱に水平方向に埋設すると、当然、柱コンク リートには断面欠損が生ずるが、その断面欠損による柱断面機能の低下は埋設さ れた山形鋼と鋼板との補強効果によって十二分に補完される。従って、本考案の 地下柱貫通側溝用金物を使用することによって、従来法のような特別の補強対策 は全く必要でなくなる。When the underground pillar penetrating gutter hardware of the present invention is buried horizontally in a column, naturally, a section defect occurs in the column concrete, but the decrease in the column section function due to the section loss causes the buried angle steel to be buried. It is more than complemented by the reinforcing effect of the steel sheet. Therefore, by using the metal fittings for the through-ditch of the underground column according to the present invention, no special reinforcement measure as in the conventional method is required.
【0006】 そして、本考案の金物は山形鋼と鋼板との溶接で容易に作られ、型枠内への設 置も容易であり、本考案の金物の使用による経済的効果は大きい。Further, the metal fitting of the present invention can be easily made by welding angle iron and a steel plate, and can be easily installed in the mold, and the economic effect of using the metal fitting of the present invention is great.
【0007】[0007]
以下図面を参照しながら本考案を説明する。 The present invention will be described below with reference to the drawings.
【0008】 図1は本考案の地下柱貫通側溝用金物の1例を示し、(a)は立面図、(b) は平面図である。FIG. 1 shows an example of a metal article for a through groove of an underground pillar of the present invention, (a) is an elevation view and (b) is a plan view.
【0009】 図1の地下柱貫通側溝用金物1は地下柱貫通側溝用金物の標準的なものであっ て、山形鋼2の両フランジの端を細長い鋼板3に溶接して一体化して三角柱状と したものであり、三角形の開口が側溝4となる。図1では山形鋼2として等辺の ものを使用したが不等辺のものであっても差し支えはない。The underground pillar penetrating gutter metal 1 of FIG. 1 is a standard one for the underground pillar penetrating gutter metal, and the ends of both flanges of the angle steel 2 are welded to the elongated steel plate 3 to be integrated into a triangular prism shape. The triangular opening serves as the side groove 4. In FIG. 1, angle irons 2 having equilateral sides are used, but unequal sides may be used.
【0010】 図2は本考案の地下柱貫通側溝用金物1を型枠内に設置した状態を示し、(a )は縦断面図、(b)は(a)のA−A矢視図である。2A and 2B show a state in which the metal article 1 for a groove for penetrating an underground pillar of the present invention is installed in a mold, (a) is a longitudinal sectional view, and (b) is a view taken along the line AA of (a). is there.
【0011】 地下外周壁部6と内壁部7の間に地下外周壁部6に沿って設けられる排水用の 側溝4と高さを揃えて鋼板3を下にして地下柱貫通側溝用金物1が設置され、柱 のフープ筋その他の補強筋に結束して固定される。The underground pillar penetrating gutter metal fitting 1 is formed with the steel plate 3 facing down with the drainage gutter 4 provided along the underground outer wall 6 between the underground outer wall 6 and the inner wall 7 in line with the height. It is installed and fixed by binding it to the hoop reinforcements of columns and other reinforcement reinforcements.
【0012】[0012]
本考案の地下柱貫通側溝用金物は山形鋼と鋼板とから容易に製作され、この地 下柱貫通側溝用金物を使用すると側溝貫通部の柱コンクリートの補強は必要でな くなる。 The underground pillar penetrating gutter metal fitting of the present invention is easily manufactured from angle steel and a steel plate. When this underground pillar penetrating groove metal fitting is used, it is not necessary to reinforce the column concrete in the gutter penetrating portion.
【図1】本考案の地下柱貫通側溝用金物の1例を示し、
(a)は立面図、(b)は平面図である。FIG. 1 shows an example of a metal article for a gutter through a basement column of the present invention,
(A) is an elevation view and (b) is a plan view.
【図2】本考案の地下柱貫通側溝用金物を型枠内に設置
した状態を示し、(a)は縦断面図、(b)は(a)の
A−A矢視図である。2A and 2B show a state in which a metal article for a through groove of an underground pillar of the present invention is installed in a mold, FIG. 2A is a vertical sectional view, and FIG.
1・・地下柱貫通側溝用金物、2・・山形鋼、3・・鋼
板、4・・側溝、5・・柱部、6・・地下外周壁部、7
・・内壁部、8・・床部。1 ・ ・ Underground pillar penetrating gutter hardware, 2 ・ ・ Mounted steel, 3 ・ ・ Steel plate, 4 ・ ・ Gutter, 5 ・ ・ Column, 6 ・ ・ Underground outer wall, 7
..Inner wall, 8 ... Floor
Claims (1)
溶接し三角柱状とした地下柱貫通側溝用金物。1. An underground pillar penetrating gutter metal fitting in which triangular flanges are formed by welding the ends of both flanges of chevron steel to an elongated steel plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1993053044U JP2577812Y2 (en) | 1993-09-30 | 1993-09-30 | Underground pillar penetration side metal fittings |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1993053044U JP2577812Y2 (en) | 1993-09-30 | 1993-09-30 | Underground pillar penetration side metal fittings |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0723046U true JPH0723046U (en) | 1995-04-25 |
JP2577812Y2 JP2577812Y2 (en) | 1998-08-06 |
Family
ID=12931888
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP1993053044U Expired - Lifetime JP2577812Y2 (en) | 1993-09-30 | 1993-09-30 | Underground pillar penetration side metal fittings |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2577812Y2 (en) |
-
1993
- 1993-09-30 JP JP1993053044U patent/JP2577812Y2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JP2577812Y2 (en) | 1998-08-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100575420B1 (en) | A shoring structure using concrete member | |
KR102017871B1 (en) | Linear drain apparatus of bridge using cantilever deck and method for constructing this same | |
KR20090000365A (en) | Connecting structure of sump | |
JPH0723046U (en) | Underground pillar through gutter hardware | |
JP3609657B2 (en) | Structural underground wall and its construction method | |
KR20200131800A (en) | Construction of free-flowing concrete in parking lot | |
KR20200122081A (en) | Construction method of free-flowing concrete in parking lot and construction method theerof | |
JPH08193324A (en) | Buckling preventive structure of diagonal beam | |
JP7416438B2 (en) | Flood prevention wall, construction method of flood prevention wall, and precast concrete wall | |
EP1238172B1 (en) | Concrete panel construction system | |
JPH0327126Y2 (en) | ||
JPS61179947A (en) | Steel pipe concrete composite pillar | |
JP3678695B2 (en) | Fixing method of column to concrete foundation | |
JPS6242989Y2 (en) | ||
JPS63300124A (en) | Wall panel of basement and the like | |
JP3350766B2 (en) | Vertical penetration piping beam | |
JPH0131681Y2 (en) | ||
JP2580967Y2 (en) | Hardware for through holes in underground foundation beams | |
JP3656873B2 (en) | Foundation construction method | |
JP3426165B2 (en) | Underground structure construction method | |
KR100281308B1 (en) | A plate for steel pipe plile | |
KR20230144745A (en) | Valve chamber | |
JP2577642B2 (en) | How to build underground structures | |
JPS6059373B2 (en) | Waterproof structure for underground walls of buildings | |
JP3142519B2 (en) | Formwork for building foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 19980414 |