JPH0722438Y2 - Variation prevention device for concrete form spacing controller - Google Patents

Variation prevention device for concrete form spacing controller

Info

Publication number
JPH0722438Y2
JPH0722438Y2 JP1992037494U JP3749492U JPH0722438Y2 JP H0722438 Y2 JPH0722438 Y2 JP H0722438Y2 JP 1992037494 U JP1992037494 U JP 1992037494U JP 3749492 U JP3749492 U JP 3749492U JP H0722438 Y2 JPH0722438 Y2 JP H0722438Y2
Authority
JP
Japan
Prior art keywords
hole
base end
anchor
formwork
screw rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1992037494U
Other languages
Japanese (ja)
Other versions
JPH0583049U (en
Inventor
晃浩 四釜
Original Assignee
株式会社アンカー商事
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社アンカー商事 filed Critical 株式会社アンカー商事
Priority to JP1992037494U priority Critical patent/JPH0722438Y2/en
Publication of JPH0583049U publication Critical patent/JPH0583049U/en
Application granted granted Critical
Publication of JPH0722438Y2 publication Critical patent/JPH0722438Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Retaining Walls (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】この考案は、コンクリートを打設
する場合に、コンクリートの厚さを決める型枠の間隔を
調整した後に、型枠の間隔が変動しないようにした、コ
ンクリート型枠間隔調整器の変動防止装置に関するもの
である。
[Industrial application] This invention is a concrete formwork space adjustment in which, when pouring concrete, after adjusting the formwork space that determines the thickness of the concrete, the space between the formwork does not change. The present invention relates to a fluctuation prevention device for a container.

【0002】[0002]

【従来の技術】コンクリートを打設する場合に、コンク
リートの厚さを決める型枠の間隔を調整した後、その間
隔を保持するために従来から使用されているコンクリー
ト型枠間隔調整器の変動防止装置の一例を、図7の横断
平面図によって説明する。
2. Description of the Related Art When placing concrete, after adjusting the interval of the formwork which determines the thickness of the concrete, the variation of the concrete formwork space adjuster that has been conventionally used to maintain the interval is prevented. An example of the device will be described with reference to the cross-sectional plan view of FIG.

【0003】土木工事現場の土中に間隔をおいて打設し
たH型鋼1には、一方の型枠2が横方向に固定されてい
る。図7には一方の型枠2として横矢板を示している
が、一方の型枠2としては、地崩れを防ぐために予め打
設した山止めコンクリートを一方の型枠2として利用す
ることもある。3はパイプ状のアンカーであって、アン
カー3の先端4に溶接されているプレート5の穴を通し
て釘6を一方の型枠2に打ち込むことにより、アンカー
3は一方の型枠2の表面に直角に固定されるものであ
る。パイプ状のアンカー3の基端7側は小さな直径の形
状になるように縮径されていて、この縮径された基端7
の内面には雌ねじが刻設されていて、ねじ杆8がねじ込
まれるようになっている。ねじ杆8には、アンカー3の
基端7に刻設されている雌ねじに適合する雄ねじが、全
長にわたって刻設されている。
One formwork 2 is laterally fixed to an H-shaped steel 1 that is placed in the soil of a civil engineering work site at intervals. Although a horizontal sheet pile is shown as one formwork 2 in FIG. 7, as one formwork 2, a mountain stop concrete precast in order to prevent landslide may be used as one formwork 2. . Reference numeral 3 is a pipe-shaped anchor, and by driving a nail 6 into one of the molds 2 through a hole of a plate 5 welded to a tip 4 of the anchor 3, the anchor 3 is perpendicular to the surface of the one mold 2. It is fixed to. The proximal end 7 side of the pipe-shaped anchor 3 is reduced in diameter so as to have a shape with a small diameter.
A female screw is engraved on the inner surface of the screw so that the screw rod 8 can be screwed. The screw rod 8 is engraved over its entire length with a male screw adapted to the female screw engraved on the base end 7 of the anchor 3.

【0004】9は円筒状の係止具であって、係止具9の
先端10側には、上述したアンカー3のの縮径されてい
ない部分の外面に密に嵌合する内径の大径孔11が設け
られている。係止具9の基端12側には、大径孔11よ
りも小径で大径孔11に斜めに連通している小径斜孔1
3が設けられている。
Reference numeral 9 denotes a cylindrical locking tool, and the locking tool 9 has a large inner diameter on the distal end 10 side, which is closely fitted to the outer surface of the non-reduced portion of the anchor 3 described above. A hole 11 is provided. A small-diameter oblique hole 1 that is smaller in diameter than the large-diameter hole 11 and communicates obliquely with the large-diameter hole 11 on the proximal end 12 side of the locking tool 9.
3 is provided.

【0005】コンクリート型枠を組付ける際には、アン
カー3を釘6で一方の型枠2に固定し、アンカー3の基
端7にねじ杆8の先端側をねじ込んだ後、係止具9をね
じ杆8の基端側からねじ杆8の外側に嵌め、次にねじ杆
8の基端側に、型枠止め部材14の先端面側に設けてあ
る袋ねじ15を螺合して固定する。そしてねじ杆8をア
ンカー3の中にさらにねじ込んで行って、型枠止め部材
14の基端面16と一方の型枠2の表面との間の距離1
7が、打設しようとするコンクリートの厚さと同じ寸法
になるようにする。この型枠止め部材14の基端面16
の中央には、ボルト18が一体的に突設されている。
When assembling the concrete formwork, the anchor 3 is fixed to one of the formwork 2 with nails 6, the tip end side of the screw rod 8 is screwed into the base end 7 of the anchor 3, and then the locking tool 9 is used. Is fitted from the base end side of the screw rod 8 to the outside of the screw rod 8, and then the base screw side of the screw rod 8 is fixed by screwing the cap screw 15 provided on the front end face side of the formwork fixing member 14. To do. Then, the screw rod 8 is further screwed into the anchor 3 so that the distance 1 between the base end surface 16 of the mold stop member 14 and the surface of one mold 2 is increased.
7 has the same size as the thickness of the concrete to be placed. The base end surface 16 of this formwork stopping member 14
A bolt 18 is integrally projectingly provided at the center of the.

【0006】次に係止具9の先端10側をアンカー3の
基端7側に嵌め、係止具9を基端12側からハンマー等
によって叩き、強い力で係止具9の大径孔11をアンカ
ー3の縮径されていない部分の外面に密に嵌合させる。
これによって大径孔11の中心軸線は、アンカー3の中
心軸線とほぼ一致するようになる。係止具9の基端12
側に設けてある小径斜孔13は、大径孔11よりも小径
で大径孔11に斜めに連通しているので、大径孔11が
アンカー3の縮径されていない部分の外面に密に嵌合し
て大径孔11の中心軸線がアンカー3の中心軸線とほぼ
一致した状態になると、小径斜孔13の基端12側の一
側は、ねじ杆8の外面に食い込んでねじ杆8は回転でき
ないようになる。このため、型枠止め部材14の基端面
16と一方の型枠2の表面との間の距離17は固定され
て、変動しないことになる。
Next, the tip 10 side of the locking tool 9 is fitted to the base end 7 side of the anchor 3, and the locking tool 9 is tapped from the base end 12 side with a hammer or the like, and a large-diameter hole of the locking tool 9 is applied with a strong force. 11 is tightly fitted to the outer surface of the non-reduced portion of the anchor 3.
As a result, the central axis of the large diameter hole 11 substantially coincides with the central axis of the anchor 3. Base end 12 of the locking device 9
Since the small-diameter oblique hole 13 provided on the side is smaller in diameter than the large-diameter hole 11 and communicates obliquely with the large-diameter hole 11, the large-diameter hole 11 is tightly attached to the outer surface of the non-reduced portion of the anchor 3. When the center axis of the large-diameter hole 11 is substantially aligned with the center axis of the anchor 3, one side of the small-diameter slanted hole 13 on the base end 12 side bites into the outer surface of the screw rod 8 and is screwed. 8 can no longer rotate. Therefore, the distance 17 between the base end surface 16 of the mold stop member 14 and the surface of the one mold 2 is fixed and does not change.

【0007】次に他方の型枠19を型枠止め部材14の
ボルト18に嵌めて他方の型枠19の内面を型枠止め部
材14の基端面16に密接させると、他方の型枠19の
内面と一方の型枠2の表面との間隔は、型枠止め部材1
4の基端面16と一方の型枠2の表面との間の距離17
に等しくなり、打設しようとするコンクリートの厚さの
寸法に設定される。次いで他方の型枠19の外面に横パ
イプ材20、縦パイプ材21を十文字に接合し、縦パイ
プ材21に取付けられているホームタイ22の先端を型
枠止め部材14のボルト18に螺合し、縦パイプ材2
1、横パイプ材20を介して他方の型枠19を固定す
る。このようにして、一方の型枠2と他方の型枠19と
の間にコンクリート23を打設すると、コンクリート2
3は正確に距離17の厚さで打設されることになる。
Next, the other formwork 19 is fitted into the bolts 18 of the formwork stop member 14 so that the inner surface of the other formwork 19 is brought into close contact with the base end face 16 of the formwork stop member 14, so that the other formwork 19 is closed. The space between the inner surface and the surface of one of the molds 2 is determined by the mold stop member 1
Distance 17 between the base end face 16 of No. 4 and the surface of one mold 2
Equal to and set to the thickness of the concrete to be placed. Next, the horizontal pipe member 20 and the vertical pipe member 21 are joined to the outer surface of the other formwork 19 in a cross shape, and the tip of the home tie 22 attached to the vertical pipe member 21 is screwed into the bolt 18 of the formwork stop member 14. Vertical pipe material 2
1. The other formwork 19 is fixed via the horizontal pipe member 20. In this way, when the concrete 23 is placed between the one mold 2 and the other mold 19, the concrete 2
3 is to be placed with a thickness of exactly 17 mm.

【0008】[0008]

【考案が解決しようとする課題】ところが上述した従来
の装置において、係止具9の先端10側をアンカー3の
基端7側に嵌め、係止具9を基端12側からハンマー等
によって叩き、強い力で係止具9の大径孔11をアンカ
ー3の縮径されていない部分の外面に密に嵌合させる際
に、ハンマーがねじ杆8に当たらないようにしなければ
ならず、基端12側の小さな面をハンマーで叩くのは作
業がやりにくい欠点があった。
However, in the above-mentioned conventional device, the tip 10 side of the locking tool 9 is fitted to the proximal end 7 side of the anchor 3, and the locking tool 9 is hit from the proximal end 12 side with a hammer or the like. When the large-diameter hole 11 of the locking tool 9 is tightly fitted to the outer surface of the non-reduced portion of the anchor 3 with a strong force, the hammer must be prevented from hitting the screw rod 8. Hitting a small surface on the end 12 side with a hammer had a drawback that the work was difficult to perform.

【0009】また従来の係止具9は、基端12側に設け
てある小径斜孔13が大径孔11に対して斜めに連通し
ている構造となっているので、製作の際の型抜き等に手
間を要して価格が高くなる欠点があった。
Further, since the conventional locking tool 9 has a structure in which the small-diameter oblique hole 13 provided on the base end 12 side communicates with the large-diameter hole 11 obliquely, There is a drawback that the cost becomes high because it requires time and effort to pull out.

【0010】この考案は、このような従来の欠点を改善
し、係止具の先端側の孔をアンカーの縮径されていない
部分の外面に密に嵌合させる際に、ハンマーで叩きやす
くして楽な作業が行えるようにすると共に、斜めの孔を
設けなくてすむようにして、係止具の価格が安価になる
ようにしたコンクリート型枠間隔調整器の変動防止装置
を提供することを目的とするものである。
The present invention solves the above-mentioned conventional drawbacks and makes it easier to hit with a hammer when closely fitting the hole on the distal end side of the anchor to the outer surface of the non-reduced portion of the anchor. It is an object of the present invention to provide a fluctuation preventing device for a concrete form interval controller, which enables easy and easy operation and does not need to provide an oblique hole so that the price of the locking tool is low. To do.

【0011】[0011]

【課題を解決するための手段】この考案のコンクリート
型枠間隔調整器の変動防止装置は、基端側が縮径されて
該基端側の内面に雌ねじが刻設され先端が一方の型枠に
固定されるパイプ状のアンカーと、該アンカーの前記雌
ねじに先端側が螺合されるねじ杆と、前記アンカーの外
面に密に嵌合する第1の孔を先端側に有し該第1の孔よ
り小径で該第1の孔と中心を偏心させて該第1の孔に連
通し前記ねじ杆を挿通し得る第2の孔を基端側に有する
係止具と、該係止具の基端側側方に突設された張出し部
と、前記ねじ杆の基端側に固定される他方の型枠と、を
備えたことを特徴とするものである。
A variation prevention device for a concrete formwork space adjuster according to the present invention has a base end side whose diameter is reduced and a female screw is engraved on the inner surface of the base end side so that the tip end is on one formwork. A pipe-shaped anchor to be fixed, a screw rod whose distal end side is screwed to the female screw of the anchor, and a first hole tightly fitted to the outer surface of the anchor on the distal end side. A locking tool having a smaller diameter and having a second hole on the base end side that is eccentric to the center of the first hole and communicates with the first hole and allows the screw rod to be inserted, and a base of the locking tool. It is characterized in that it is provided with an overhanging portion projecting laterally from the end side and the other formwork fixed to the base end side of the screw rod.

【0012】[0012]

【作用】係上具の先端側の第1の孔をアンカーの縮径さ
れていない部分の外面に密に嵌合させる際には、係止具
の基端側側方に突設された張出し部をハンマーで叩くこ
とができ、第2の孔は第1の孔に対して偏心しているだ
けで斜めになっていないので、係止具の製作が容易にな
る。
When the first hole on the distal end side of the engaging member is tightly fitted to the outer surface of the non-reduced portion of the anchor, the overhang projecting to the side of the proximal end of the locking device is provided. The part can be tapped with a hammer, and the second hole is eccentric with respect to the first hole but is not inclined, which facilitates manufacture of the locking tool.

【0013】[0013]

【実施例】次ぎに、この考案の実施例を説明する。EXAMPLES Next, examples of the present invention will be described.

【0014】図2は係止具30の一実施例を拡大して示
した横断平面図、図3は図2の平面図、図4は図3を上
方から見た背面図であって、図2ないし図4に示すよう
に係止具30の先端31側は円筒状になっており、係止
具30の基端32側の側方には張出し部33が突設され
ていて、張出し部33の基端32側の面は、基端32と
同一平面になっている。
2 is an enlarged cross-sectional plan view showing an embodiment of the locking device 30, FIG. 3 is a plan view of FIG. 2, and FIG. 4 is a rear view of FIG. 3 seen from above. As shown in FIGS. 2 to 4, the distal end 31 side of the locking tool 30 has a cylindrical shape, and an overhanging portion 33 is provided on the lateral side of the locking tool 30 on the proximal end 32 side. The surface of 33 on the base end 32 side is flush with the base end 32.

【0015】係止具30は、金属、ナイロン樹脂等の硬
質合成樹脂で作られていて、先端31側には、図7で説
明したアンカー3の縮径されていない部分の外面に密に
嵌合する内径の第1の孔34が設けられている。第1の
孔34の長さは、係止具30の全長の7〜8割程度の長
さにするのが望ましい。係止具30の基端32側には第
1の孔34よりも小径の第2の孔35が、中心を第1の
孔34の中心と偏心させて第1の孔34に連通するよう
に設けてある。
The engaging member 30 is made of a hard synthetic resin such as metal or nylon resin, and is closely fitted to the outer surface of the non-reduced portion of the anchor 3 described with reference to FIG. A first hole 34 having a matching inner diameter is provided. The length of the first hole 34 is preferably about 70 to 80% of the total length of the locking tool 30. A second hole 35 having a diameter smaller than that of the first hole 34 is provided on the proximal end 32 side of the locking tool 30 so that the center of the second hole 35 is eccentric to the center of the first hole 34 and communicates with the first hole 34. It is provided.

【0016】この係止具30を使用する場合には、従来
と同様に図5に示すように土木工事現場の土中に間隔を
おいて打設したH型鋼1に固定されている横矢板、ある
いは地崩れを防ぐために予め打設した山止めコンクリー
ト等の一方の型枠2にアンカー3を釘6で固定した後、
係止具30の第1の孔34、第2の孔35に従来と同様
のねじ杆8を挿通し、ねじ杆8の基端側には、やはり従
来と同様に型枠止め部材14の先端面側に設けてある袋
ねじ15を螺合して、ねじ杆8の基端側に型枠止め部材
14を固定する。
When this locking tool 30 is used, as shown in FIG. 5, a transverse sheet pile fixed to the H-shaped steel 1 placed at intervals in the soil of a civil engineering site, as in the conventional case, Or, after fixing the anchor 3 with the nail 6 to one formwork 2 such as a mountain stop concrete that has been placed in advance to prevent landslide,
The threaded rod 8 similar to the conventional one is inserted into the first hole 34 and the second hole 35 of the locking tool 30, and the base end side of the screwed rod 8 also has the tip of the form stop member 14 similarly to the conventional one. A form screw fixing member 14 is fixed to the base end side of the screw rod 8 by screwing a cap screw 15 provided on the surface side.

【0017】次ぎに図6に示すようにねじ杆8の先端を
アンカー3の基端7側の内周面に刻設されている雌ねじ
36(図5参照)に螺合し、型枠止め部材14の基端面
16と一方の型枠2の表面との間の距離17が、打設し
ようとするコンクリートの厚さと同じ寸法になるまで、
ねじ杆8をアンカー3の基端7側の中にねじ込んで行
く。
Next, as shown in FIG. 6, the tip of the screw rod 8 is screwed into a female screw 36 (see FIG. 5) engraved on the inner peripheral surface of the anchor 3 on the base end 7 side, and the form stop member is fixed. Until the distance 17 between the base end surface 16 of 14 and the surface of one of the molds 2 becomes the same size as the thickness of the concrete to be placed,
The screw rod 8 is screwed into the base end 7 side of the anchor 3.

【0018】上述のようにねじ杆8に型枠止め部材14
を固定してから、ねじ杆8をアンカー3にねじ込む組立
手順のほかに、従来の技術で説明したように、ねじ杆8
の先端をアンカー3の基端7側の内周面に刻設されてい
る雌ねじ36に螺合した後、係止具30をねじ杆8の基
端側からねじ杆8の外側に嵌め、次ぎにねじ杆8の基端
側に型枠止め部材14の袋ねじ15を螺合してしてねじ
杆8の基端側に型枠止め部材14を固定し、その後ねじ
杆8をアンカー3の基端7側にねじ込んで行って、型枠
止め部材14の基端面16と一方の型枠2の表面との間
の距離17が、打設しょうとするコンクリートの厚さと
同じ寸法になるような組立手順をとることもできる。
As described above, the screw rod 8 is attached to the formwork fixing member 14
After the screw rod 8 is fixed, the screw rod 8 is screwed into the anchor 3 in addition to the assembling procedure.
After screwing the tip of the screw into a female screw 36 engraved on the inner peripheral surface of the anchor 3 on the base end 7 side, the locking tool 30 is fitted from the base end side of the screw rod 8 to the outside of the screw rod 8 and then the To the base end side of the screw rod 8 by screwing the cap screw 15 of the form frame fixing member 14 to fix the form frame fixing member 14 to the base end side of the screw rod 8, and then the screw rod 8 of the anchor 3. Screw it to the base end 7 side so that the distance 17 between the base end face 16 of the form stop member 14 and the surface of one of the forms 2 becomes the same as the thickness of the concrete to be placed. An assembly procedure can also be taken.

【0019】型枠止め部材14の基端面16と一方の型
枠2の表面との間の距離17が打設しようとするコンク
リートの厚さと同じ寸法になった後、係止具30の先端
31側をアンカー3の基端7側に嵌め、係止具30の基
端32側の側方に突設されている張出し部33をハンマ
ー等によって叩き、強い力で係止具30の第1の孔34
をアンカー3の縮径されていない部分の外面に密に嵌合
させる。これによって第1の孔34の中心軸線はアンカ
ー3の中心軸線と一致するようになる傾向が与えられ、
中心を第1の孔34の中心と偏心させて第1の孔34と
連通している第2の孔35は、ねじ杆8の外面に強い力
で接し、ねじ杆8は回転できないようになる。このた
め、型枠止め部材14の基端面16と一方の型枠2の表
面との間の距離17は固定されて、変動しないことにな
る。
After the distance 17 between the base end surface 16 of the formwork stopping member 14 and the surface of one of the formwork 2 becomes the same as the thickness of the concrete to be placed, the tip 31 of the locking tool 30. The side is fitted to the base end 7 side of the anchor 3, and the overhanging portion 33 projecting laterally on the base end 32 side of the locking tool 30 is hit with a hammer or the like, and the first force of the locking tool 30 is struck with a strong force. Hole 34
Is tightly fitted to the outer surface of the non-reduced portion of the anchor 3. This gives a tendency for the central axis of the first hole 34 to coincide with the central axis of the anchor 3,
The second hole 35, which is in communication with the first hole 34 with its center eccentric to the center of the first hole 34, comes into contact with the outer surface of the screw rod 8 with a strong force, and the screw rod 8 cannot rotate. . Therefore, the distance 17 between the base end surface 16 of the mold stop member 14 and the surface of the one mold 2 is fixed and does not change.

【0020】係止具30の基端32側をハンマー等によ
って叩く際には張出し部33を叩くことになるので、叩
くことのできる面が従来よりも広くなり、ねじ杆8に当
たるおそれが少なくなって、楽な作業をすることができ
る。
When hitting the base end 32 side of the locking tool 30 with a hammer or the like, the overhanging portion 33 is hit, so that the hitting surface becomes wider than in the past and the possibility of hitting the screw rod 8 is reduced. You can work easily.

【0021】このように、係止具30の第1の孔34を
アンカー3の縮径されていない部分の外面に密に嵌合さ
せ、型枠止め部材14の基端面16と一方の型枠2の表
面との間の距離17を固定した後は、図1に示すよう
に、他方の型枠19を型枠止め部材14のボルト18に
嵌めて型枠19の内面を型枠止め部材14の基端面16
に密接させると、他方の型枠19の内面と一方の型枠2
の表面との間隔は、型枠止め部材14の基端面16と一
方の型枠2の表面との間の距離17に等しくなり、打設
しようとするコンクリートの厚さの寸法に設定される。
次いで他方の型枠19の外面に横パイプ材20、縦パイ
プ材21を十文字に接合し、縦パイプ材21に取付けら
れているホームタイ22の先端を型枠止め部材14のボ
ルト18に螺合し、縦パイプ材21、横パイプ材20を
介して他方の型枠19を固定する。このようにして、一
方の型枠2と他方の型枠19との間にコンクリート23
を打設すると、コンクリート23は正確に距離17の厚
さで打設されることになる。
In this way, the first hole 34 of the locking tool 30 is closely fitted to the outer surface of the non-reduced portion of the anchor 3, and the base end surface 16 of the mold holding member 14 and one of the molds. After fixing the distance 17 between the surface of the mold 2 and the surface of the mold 2, the other formwork 19 is fitted into the bolt 18 of the formwork stop member 14 to fix the inner surface of the formwork 19 to the form stop member 14 as shown in FIG. Base end face 16
The inner surface of the other mold 19 and the one mold 2
Is equal to the distance 17 between the base end surface 16 of the mold stop member 14 and the surface of one of the molds 2, and is set to the thickness of the concrete to be placed.
Next, the horizontal pipe member 20 and the vertical pipe member 21 are joined to the outer surface of the other mold frame 19 in a cross shape, and the tip of the home tie 22 attached to the vertical pipe member 21 is screwed into the bolt 18 of the mold frame fixing member 14. Then, the other formwork 19 is fixed via the vertical pipe member 21 and the horizontal pipe member 20. In this way, between the formwork 2 on the one hand and the formwork 19 on the other hand, the concrete 23
When the concrete is cast, the concrete 23 is accurately cast with a thickness of the distance 17.

【0022】[0022]

【考案の効果】この考案は、係止具30の基端32側の
側方に張出し部33を突設したので、係止具30の基端
32側をハンマー等によって叩いて係止具30の第1の
孔34をアンカー3の縮径されていない部分の外面に密
に嵌合させる際には、張出し部33を叩くことになって
叩くことのできる面が従来よりも広くなり、ねじ杆8に
当たるおそれが少なくなって、楽な作業でコンクリート
打設厚さを保持するねじ杆8を固定することができる。
According to the present invention, since the projecting portion 33 is provided on the side of the base end 32 side of the locking tool 30, the locking tool 30 is hit by hammering the base end 32 side of the locking tool 30. When the first hole 34 of the anchor 3 is tightly fitted to the outer surface of the non-reduced portion of the anchor 3, the surface that can be hit by hitting the overhanging portion 33 becomes wider than before, The risk of hitting the rod 8 is reduced, and the screw rod 8 that holds the concrete pouring thickness can be fixed by an easy operation.

【0023】また係止具30の第2の孔35は、中心を
第1の孔34の中心と偏心させてあるだけで従来のよう
に斜めにはなっていないので、係止具30の製作に手間
がかからなくなり、係止具30の価格が安価になる効果
がある。
Since the center of the second hole 35 of the locking member 30 is eccentric with the center of the first hole 34 and is not inclined as in the conventional case, the manufacturing of the locking device 30 is performed. This saves time and labor and reduces the cost of the locking device 30.

【図面の簡単な説明】[Brief description of drawings]

【図1】この考案の一実施例の使用状態を示す横断平面
図である。
FIG. 1 is a cross-sectional plan view showing a usage state of an embodiment of the present invention.

【図2】この考案の係止具の一実施例を拡大して示した
横断平面図である。
FIG. 2 is a cross-sectional plan view showing, in an enlarged manner, one embodiment of the locking device of the present invention.

【図3】図2の平面図である。FIG. 3 is a plan view of FIG.

【図4】図3を上方から見た背面図である。FIG. 4 is a rear view of FIG. 3 viewed from above.

【図5】この考案の最初の組付状態を示す横断平面図で
ある。
FIG. 5 is a cross-sectional plan view showing a first assembled state of the present invention.

【図6】図5の次の組付状態を示す横断平面図である。FIG. 6 is a cross-sectional plan view showing the next assembled state of FIG. 5;

【図7】従来装置の一例を示す横断平面図である。FIG. 7 is a cross-sectional plan view showing an example of a conventional device.

【符号の説明】[Explanation of symbols]

2 一方の型枠 3 アンカー 4 先端 7 基端 8 ねじ杆 19 他方の型枠 30 係止具 31 先端 32 基端 33 張出し部 34 第1の孔 35 第2の孔 36 雌ねじ 2 one formwork 3 anchor 4 tip 7 base end 8 screw rod 19 other formwork 30 locking tool 31 tip 32 base end 33 overhang 34 first hole 35 second hole 36 female screw

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 基端側が縮径されて該基端側の内面に雌
ねじが刻設され先端が一方の型枠に固定されるパイプ状
のアンカーと、該アンカーの前記雌ねじに先端側が螺合
されるねじ杆と、前記アンカーの外面に密に嵌合する第
1の孔を先端側に有し該第1の孔より小径で該第1の孔
と中心を偏心させて該第1の孔に連通し前記ねじ杆を挿
通し得る第2の孔を基端側に有する係止具と、該係止具
の基端側側方に突設された張出し部と、前記ねじ杆の基
端側に固定される他方の型枠と、を備えたことを特徴と
するコンクリート型枠間隔調整器の変動防止装置。
1. A pipe-shaped anchor whose diameter is reduced on the base end side and a female screw is engraved on the inner surface of the base end side and whose tip is fixed to one mold, and the tip side is screwed to the female screw of the anchor. Has a threaded rod and a first hole tightly fitted to the outer surface of the anchor on the distal end side, and has a diameter smaller than that of the first hole so that the center of the first hole is eccentric to the first hole. And a locking member having a second hole on the base end side for communicating with the screw rod and allowing the screw rod to be inserted therethrough, an overhanging portion projecting laterally to the base end side of the locking rod, and a base end of the screw rod. The other formwork fixed to the side, and the fluctuation prevention device of the concrete formwork space adjuster characterized by the above-mentioned.
JP1992037494U 1992-04-20 1992-04-20 Variation prevention device for concrete form spacing controller Expired - Lifetime JPH0722438Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1992037494U JPH0722438Y2 (en) 1992-04-20 1992-04-20 Variation prevention device for concrete form spacing controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1992037494U JPH0722438Y2 (en) 1992-04-20 1992-04-20 Variation prevention device for concrete form spacing controller

Publications (2)

Publication Number Publication Date
JPH0583049U JPH0583049U (en) 1993-11-09
JPH0722438Y2 true JPH0722438Y2 (en) 1995-05-24

Family

ID=12499082

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1992037494U Expired - Lifetime JPH0722438Y2 (en) 1992-04-20 1992-04-20 Variation prevention device for concrete form spacing controller

Country Status (1)

Country Link
JP (1) JPH0722438Y2 (en)

Also Published As

Publication number Publication date
JPH0583049U (en) 1993-11-09

Similar Documents

Publication Publication Date Title
JPH0722438Y2 (en) Variation prevention device for concrete form spacing controller
JP2006016952A (en) Anchor, method for temporarily fixing it, and temporary fixing structure using the same
JPH0722439Y2 (en) Fixing device pushing device for concrete form interval controller
JPH076361Y2 (en) Fixing device pushing device for concrete form interval controller
JPH072861Y2 (en) Variation prevention device for concrete form spacing controller
JPH074281Y2 (en) Variation prevention device for concrete form spacing controller
JPH0736006Y2 (en) Interval holding bracket
JP2556623Y2 (en) Connection holding bracket and mounting jig used for it
JP2001159214A (en) Reinforcing bar mounting method for anchor plate
JPS6311255Y2 (en)
JPH0637162Y2 (en) Separator support bracket
JPS6124639Y2 (en)
JP4285712B2 (en) Separator mounting bracket
JPH0618987Y2 (en) Separator fixing device for spacing metal fittings
JP2548953Y2 (en) Connection holding bracket
JPH0637774B2 (en) Column base joining method
JP3506844B2 (en) Concrete formwork holding method
JP3069384U (en) Rebar anchoring structure
JPH0632992Y2 (en) Upset reinforcement hardware
JPH1018797A (en) Deformed bar driving jig
JPH11343735A (en) Interval adjuster, sheet pile hardware and method of use thereof
JP4283526B2 (en) Stud welding bolt with hardware for long screw adjustment
JPH0423154Y2 (en)
JPH076358Y2 (en) Concrete form spacing device
JPH0620838Y2 (en) Side sheet metal stopper

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees