JPH0722115U - Screws for fixing building materials and plate material fixing structure using the same - Google Patents

Screws for fixing building materials and plate material fixing structure using the same

Info

Publication number
JPH0722115U
JPH0722115U JP5650293U JP5650293U JPH0722115U JP H0722115 U JPH0722115 U JP H0722115U JP 5650293 U JP5650293 U JP 5650293U JP 5650293 U JP5650293 U JP 5650293U JP H0722115 U JPH0722115 U JP H0722115U
Authority
JP
Japan
Prior art keywords
screw
fixing
joist
deck
plate material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP5650293U
Other languages
Japanese (ja)
Inventor
雅之 工藤
Original Assignee
ワイケイケイアーキテクチュラルプロダクツ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ワイケイケイアーキテクチュラルプロダクツ株式会社 filed Critical ワイケイケイアーキテクチュラルプロダクツ株式会社
Priority to JP5650293U priority Critical patent/JPH0722115U/en
Publication of JPH0722115U publication Critical patent/JPH0722115U/en
Pending legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

(57)【要約】 【目的】 根太とデッキ材のような異種建材同士を簡易
迅速に固定するための建材固定用のビスとを提供するこ
と。 【構成】 建材固定用のビス6の軸部26が、この軸部
26の先端側部分に形成されたドリル部26aと、デッ
キ材5の上面と一致する頭部16から軸部26のの先端
側に向けてデッキ材5の厚みの距離までの位置を含む軸
部26部分に形成されたねじ部26bとを備えるので、
ドリル部26aによりデッキ材5と根太4とに順次穴を
形成しつつビス6をねじ込むことができるとともに、ね
じ部26bによってデッキ材5と根太4とを相互に密着
させたまま簡易迅速に固定することができる。
(57) [Summary] [Purpose] To provide a building material fixing screw for simply and quickly fixing different kinds of building materials such as joists and deck materials. [Structure] A shaft portion 26 of a screw 6 for fixing a building material has a drill portion 26a formed at a tip side portion of the shaft portion 26, and a head 16 from the head 16 that coincides with the upper surface of the deck material 5 to the tip of the shaft portion 26. With the screw portion 26b formed in the shaft portion 26 portion including the position up to the distance of the thickness of the deck material 5 toward the side,
The screw 6 can be screwed into the deck member 5 and the joist 4 while sequentially forming holes in the deck member 5 and the joist 4, and the screw member 26b allows the deck member 5 and the joist 4 to be fastened simply and quickly while closely contacting each other. be able to.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

本考案は、例えばバルコニー等の根太に木製のデッキ材を固定するため建材固 定用のビス、およびこれを用いた板材の固定構造とに関するものである。 The present invention relates to a building material fixing screw for fixing a wooden deck material to a joist such as a balcony, and a plate material fixing structure using the screw.

【0002】[0002]

【従来の技術】[Prior art]

図4に、バルコニーの床部分の縦断面図を示す。この図を用いて、根太にデッ キプレートを固定するための従来の固定構造とこれに用いる固定用のビスとを説 明する。外壁側の根太掛け32と桁33との間には、根太34が水平に掛け渡さ れており、この根太34の上には、塩ビ製のデッキプレート35が隙間なく敷き 詰められている。デッキプレート35を根太34に取り付ける際は、予めこれら のデッキプレート35および根太34に下穴を開けておき、この下穴にタッピン グビス36をねじ込んで、デッキプレート35を根太34に固定する。このタッ ピングビス36には、それ自身でねじ立てを可能にするねじ部が形成されている 。 FIG. 4 shows a vertical sectional view of the floor portion of the balcony. This figure is used to explain the conventional fixing structure for fixing the deck plate to the joist and the fixing screw used for this. A joist 34 is horizontally laid between the joist hook 32 and the girder 33 on the outer wall side, and a PVC deck plate 35 is laid on the joist 34 without any gap. When attaching the deck plate 35 to the joist 34, a prepared hole is made in advance in the deck plate 35 and joist 34, and a tapping screw 36 is screwed into the prepared hole to fix the deck plate 35 to the joist 34. The tapping screw 36 is formed with a screw portion which enables tapping by itself.

【0003】[0003]

【考案が解決しようとする課題】[Problems to be solved by the device]

しかし、このような従来の板材の固定構造では、その固定または取付手段とし てタッピングビス36を用いているので、デッキプレート35および根太34に 予め下穴を開ける工程が不可欠で、取付作業が複雑なものとなり、その作業に時 間がかかってしまうという問題があった。 However, in such a conventional plate material fixing structure, since tapping screws 36 are used as the fixing or mounting means, the step of pre-drilling the deck plate 35 and joist 34 in advance is indispensable, and the mounting work is complicated. However, there is a problem that the work takes time.

【0004】 本考案は、このような問題点に鑑みてなされたものであり、ねじ込みに際し同 時に下穴の穿孔を可能にする建材固定用のビスと、この建材固定用のビスを用い て構造材に板材を簡易迅速に固定するための固定構造とを提供することをその目 的としている。The present invention has been made in view of such problems, and a screw for fixing a building material that enables a pilot hole to be drilled at the same time when screwed, and a structure using the screw for fixing the building material. The aim is to provide a fixing structure for simply and quickly fixing the plate material to the material.

【0005】[0005]

【課題を解決するための手段】 上記目的を達成すべく本考案に係る建材固定用のビスは、軸部の先端部分に形 成されたドリル部と、当該ドリル部と軸部の頭部側端との間の部分に形成された ねじ部と、を備えることを特徴とするものである。Means for Solving the Problems To achieve the above object, a screw for fixing a building material according to the present invention is a drill portion formed at a tip portion of a shaft portion, and the drill portion and the head side of the shaft portion. And a threaded portion formed in a portion between the end and the end.

【0006】 また、本考案に係る板材の固定構造は、建材固定用のビスを用いて板材を構造 材に固定するものであり、建材固定用のビスの軸部が、この軸部の先端部分に形 成されたドリル部と、建材固定用のビスが固定完了状態までねじ込まれたときに 板材と構造材とに跨るように形成されたねじ部とを備え、ねじ部が、軸部の先端 からその頭部側端に向けて板材の厚みと同一距離までの部分を逃げて形成されて いることを特徴とするものである。Further, the plate material fixing structure according to the present invention is for fixing a plate material to a structural material by using a building material fixing screw, and the shaft portion of the building material fixing screw has a tip portion of this shaft portion. And a screw part formed so as to straddle the plate material and the structural material when the screw for fixing the building material is screwed to the completely fixed state, and the screw part is the tip of the shaft part. It is characterized in that it is formed by escaping a part up to the same distance as the thickness of the plate material toward the head side end thereof.

【0007】[0007]

【作用】[Action]

請求項1に記載の建材固定用のビスによれば、その軸部が、この軸部の先端部 分に形成されたドリル部を備えるので、ビスがねじ込まれる部材に、ビスをドリ ル部からねじ込んでゆくことにより、この部材に順次下穴を形成しつつビス自身 をねじ込でゆくことができる。 According to the building material fixing screw of claim 1, since the shaft portion includes the drill portion formed at the tip portion of the shaft portion, the screw can be screwed to the member into which the screw is screwed from the drill portion. By screwing in, the screw itself can be screwed in while sequentially forming the pilot hole in this member.

【0008】 請求項2に記載の板材の固定構造によれば、建材固定用のビスの軸部が、この 軸部の先端部分に形成されたドリル部と、建材固定用のビスが固定完了状態まで ねじ込まれたときに板材と構造材とに跨るように形成されたねじ部とを備えるの で、板材にビスをドリル部からねじ込んでゆくことにより、板材と構造材とに順 次下穴を形成しつつこのビスを簡単にねじ込むことができる。さらに、本固定構 造によれば、ねじ部が、軸部の先端からその頭部側端に向けて板材の厚みと同一 距離までの部分を逃げて形成されているので、構造材の穴開けの際、ねじ部が板 材中にねじ込まれない。したがって、ねじ部によって板材が構造材から浮き上が ることがなく、かつ板材が浮き上がった状態で構造材に固定されてしまうことを 防止できる。According to the plate material fixing structure of claim 2, the shaft portion of the building material fixing screw has the drill portion formed at the tip portion of the shaft portion and the building material fixing screw in the fixing completed state. Since it has a screw part that is formed so as to straddle the plate material and the structural material when it is screwed up to, by screwing the screw into the plate material from the drill part, a sequential prepared hole is made between the plate material and the structural material. This screw can be easily screwed in while forming. Further, according to the main fixing structure, since the screw portion is formed by escaping from the tip of the shaft portion toward the end on the head side thereof up to the same distance as the thickness of the plate material, the drilling of the structural material is performed. At this time, the screw part is not screwed into the plate. Therefore, it is possible to prevent the plate member from being lifted up from the structural member by the screw portion, and to prevent the plate member from being fixed to the structural member in a lifted state.

【0009】[0009]

【実施例】 以下、添付の図面を参照して、本考案に係る建材固定用のビスとこの建材固定 用のビスを用いた固定構造とをバルコニーの床部分に適用した実施例について説 明する。図1の縦断面図に示すように、外壁W側に固定された根太掛け2と妻梁 (図示せず)に支持された桁3との間には、アルミニウムの押出し形材で形成さ れた根太4が水平に掛け渡されている。この根太4の上には、4枚の木製のデッ キ材5が隙間なく敷き詰められている。各デッキ材5は、以下に詳細に説明する 本考案のビス6によって、図面左右方向の前後2個所で根太4に固定されている 。[Embodiment] An embodiment in which a building material fixing screw and a fixing structure using this building material fixing screw according to the present invention are applied to a floor portion of a balcony will be described below with reference to the accompanying drawings. . As shown in the vertical sectional view of FIG. 1, between the joist 2 fixed to the outer wall W side and the girder 3 supported by a girder (not shown), an extruded aluminum member is formed. A joist 4 is hung horizontally. Four wooden deck materials 5 are spread on the joist 4 without any gap. Each deck member 5 is fixed to the joist 4 by two screws 6 of the present invention, which will be described in detail below, at two front and rear positions in the left-right direction of the drawing.

【0010】 図2は、各デッキ材5を根太4に固定するためのビス6の構造を示した側面図 である。このビス6は、頭部16と軸部26とからなり、頭部16が皿型の、い わゆる皿ねじとなっている。軸部26には、先端部分にドリル部26aが形成さ れ、またこのドリル部26aと頭部16側との中間部分にねじ部26bが形成さ れている。先端部分のドリル部26aには、ドリル刃が形成されており、このド リル部26aにより、デッキ材5および根太4に下穴が形成される。中間部分の ねじ部26bには、ねじ山が形成されており、ビス6が最もねじ込まれた状態で デッキ材5と根太4との境界部分にこのねじ部26bが位置するようになってい る。そして、このねじ部26bにより、デッキ材5および根太4が相互に固定さ れる。FIG. 2 is a side view showing the structure of the screw 6 for fixing each deck member 5 to the joist 4. The screw 6 includes a head portion 16 and a shaft portion 26, and the head portion 16 is a dish-shaped, so-called countersunk screw. A drill portion 26a is formed at the tip portion of the shaft portion 26, and a screw portion 26b is formed at an intermediate portion between the drill portion 26a and the head portion 16 side. A drill blade is formed in the drill portion 26a at the tip end portion, and the drill portion 26a forms a prepared hole in the deck material 5 and the joist 4. A screw thread is formed on the screw portion 26b in the middle portion, and the screw portion 26b is positioned at the boundary portion between the deck material 5 and the joist 4 with the screw 6 being most screwed. Then, the deck member 5 and the joist 4 are fixed to each other by the screw portion 26b.

【0011】 このビス6の具体的寸法は図示のとおりであるが、これはデッキ材5の厚み等 を考慮して定められたものである。要部について説明すると、ねじ部26bは、 頭部16の上端より10mmの位置から35mmの位置までの幅25mmの領域 に亘って形成されている。したがって、ビス6が30mm厚のデッキ材5に最も ねじ込まれた場合、ねじ部26bの上端から幅20mmの部分は、デッキ材5の 穴の内面に形成された雌ねじと螺合し、ねじ部26bの下端から幅5mmの部分 は、デッキ材5の下側に突き抜けて根太4の穴の内面に形成された雌ねじと螺合 する。ただし、ビス6の全長が68mmとなっているため、根太の縦寸法が60 mmであれば根太6全体をビスが突き抜けるおそれはない。なお、ねじ部26b に刻まれているねじ山は、デッキ材5および根太4を固定する前にこれらの建材 に雌ねじを形成する役割も有するため、そのねじ立てを容易にするべく、その高 さが0.355mm程度と比較的低いものとなっている。The concrete size of the screw 6 is as shown in the figure, but it is determined in consideration of the thickness of the deck material 5 and the like. Explaining the main part, the screw part 26b is formed over a region having a width of 25 mm from a position 10 mm to a position 35 mm from the upper end of the head 16. Therefore, when the screw 6 is most screwed into the deck material 5 having a thickness of 30 mm, the portion having a width of 20 mm from the upper end of the screw portion 26b is screwed with the female screw formed on the inner surface of the hole of the deck material 5 to form the screw portion 26b. A portion of the width of 5 mm from the lower end of the is penetrated to the lower side of the deck material 5 and screwed with the female screw formed on the inner surface of the hole of the joist 4. However, since the total length of the screw 6 is 68 mm, if the vertical dimension of the joist is 60 mm, there is no risk of the screw penetrating the entire joist 6. Since the screw thread engraved on the screw portion 26b also has a role of forming a female screw in these building materials before fixing the deck material 5 and the joist 4, the height of the thread is increased to facilitate tapping. Is relatively low at about 0.355 mm.

【0012】 以下、図3を参照しつつ、図2のビス6を用いてデッキ材5を根太4に固定す る施工方法を説明する。Hereinafter, a construction method of fixing the deck material 5 to the joist 4 using the screw 6 of FIG. 2 will be described with reference to FIG.

【0013】 まず、ビス6の先端のドリル部26aをデッキ材5の必要位置に突き立てて回 転させ、木製のデッキ材5に縦方向の穴を開ける(図3(a))。これにより、 デッキ材5に雌ねじ形成用の下穴が形成されることとなる。First, the drill portion 26a at the tip of the screw 6 is pushed to the required position of the deck material 5 and rotated, and a vertical hole is made in the wooden deck material 5 (FIG. 3A). As a result, a prepared hole for forming an internal thread is formed in the deck material 5.

【0014】 続いて、デッキ材5の下側にある根太4にも穴を開ける(図3(b))。これ により、根太4にも雌ねじ形成用の下穴が形成されることとなる。この場合、デ ッキ材5にねじ部26bが未だねじ込まれ始めておらず、アルミニウム製の比較 的硬い根太4への穴開けのために、ビス6がねじ込まれない状態となっても、デ ッキ材5が浮き上がるといった不都合は生じない。Then, a hole is also made in the joist 4 on the lower side of the deck material 5 (FIG. 3B). As a result, a pilot hole for forming an internal thread is also formed in the joist 4. In this case, the screw portion 26b has not yet started to be screwed into the deck member 5, and even if the screw 6 is not screwed in due to the drilling of the relatively hard joist 4 made of aluminum, There is no inconvenience such as the floating of the lumber 5.

【0015】 さらにビス6をねじ込むと、ドリル部26aが根太4の上板を貫通し、同時に ねじ部26bによりデッキ材5の下穴に上部から雌ねじが形成される(図3(c ))。この場合、ビス6自身によって予めデッキ材5および根太4に下穴が開け られており、ビス6のねじ込みに対する抵抗が少なく、デッキ材5の下穴に一旦 形成された雌ねじがその後につぶれるといった不都合は生じない。When the screw 6 is further screwed in, the drill portion 26a penetrates the upper plate of the joist 4, and at the same time, a female screw is formed in the prepared hole of the deck material 5 from the upper portion by the screw portion 26b (FIG. 3 (c)). In this case, the screw 6 itself has pre-drilled a hole in the deck material 5 and the joist 4, and there is little resistance to screwing in the screw 6, and the female screw once formed in the pilot hole of the deck material 5 is crushed after that. Does not occur.

【0016】 さらにビス6をねじ込むと、ねじ部26bにより根太4の下穴にも雌ねじが形 成され、その後、頭部16の上面とデッキ材5の上面とが一致するに至って固定 作業が完了する(図3(d))。この場合、ねじ部26bがデッキ材5の雌ねじ と根太4の雌ねじとの双方に跨って螺合しているので、根太4とデッキ材5が強 固に固定されることとなる。When the screw 6 is further screwed in, a female screw is also formed in the prepared hole of the joist 4 by the screw portion 26b, and thereafter, the upper surface of the head 16 and the upper surface of the deck material 5 are aligned with each other, and the fixing work is completed. (FIG. 3 (d)). In this case, since the screw portion 26b is screwed over both the internal thread of the deck material 5 and the internal thread of the joist 4, the joist 4 and the deck material 5 are firmly fixed.

【0017】 このように、本実施例によれば、軸部26の先端にドリル部26aを備えるの で、このドリル部26aの回転によってデッキ材5と根太4とに下穴を形成しつ つビス6を簡単にねじ込むことができる。また、軸部26が、ドリル部26aと 頭部16側との中間部分にねじ部26bを備えるので、ビス6が最もねじ込まれ た状態で、ねじ部26bがデッキ材5と根太4とを密着させたままで相互に固定 することができる。すなわち、従来のように予め下穴を開けることなく、一度の ねじ込み作業で簡単にデッキ材5と根太4とを密着固定することができる。しか も、ねじ部26bが軸部26の上部に形成されているので、ビス6をねじ込む際 に、デッキ材の浮き上がりを防止することができる。As described above, according to the present embodiment, since the drill portion 26a is provided at the tip of the shaft portion 26, it is possible to form the pilot hole in the deck material 5 and the joist 4 by the rotation of the drill portion 26a. The screw 6 can be easily screwed in. Further, since the shaft portion 26 is provided with the screw portion 26b in the intermediate portion between the drill portion 26a and the head portion 16, the screw portion 26b makes the deck material 5 and the joist 4 closely contact with each other when the screw 6 is most screwed. They can be fixed to each other while they are left alone. That is, it is possible to easily fix the deck material 5 and the joist 4 in close contact with each other by a single screw-in operation without making a preliminary hole in advance as in the conventional case. However, since the screw portion 26b is formed on the upper portion of the shaft portion 26, it is possible to prevent the deck material from rising when the screw 6 is screwed in.

【0018】 なお、本実施例では、バルコニーの根太4にデッキ材5を固定するための固定 構造としたが、同様の固定構造によって各種建材同士を簡易迅速に固定すること ができる。ただし、根太4等の構造材は、デッキ材5等の板材側の下穴に雌ねじ を形成するねじ立て際のねじ込みを容易にするという観点から、中空であること が好ましい。Although the fixing structure for fixing the deck material 5 to the joist 4 of the balcony is used in the present embodiment, various building materials can be easily and quickly fixed to each other by the same fixing structure. However, the structural material such as joists 4 is preferably hollow from the viewpoint of facilitating screwing when tapping to form a female screw in the prepared hole on the plate material side such as the deck material 5.

【0019】 また、ビス6については、ドリル部26aを軸部26の極先端にのみ形成した が、このドリル部26aを軸部26の先端からねじ部26bに隣接する領域まで 形成してもよい。これにより、穴開けに際して削りかすを穴の外に送り出し易く なり、デッキ材5への穴開けが比較的容易となる。Further, with respect to the screw 6, the drill portion 26a is formed only at the extreme tip of the shaft portion 26, but the drill portion 26a may be formed from the tip of the shaft portion 26 to the region adjacent to the screw portion 26b. . As a result, it becomes easier to send the shavings out of the hole when making a hole, and it becomes relatively easy to make a hole in the deck material 5.

【0020】 また、ねじ部26bを形成すべき領域は、ビス6がデッキ材5に最もねじ込ま れた固定完了状態で、ねじ部26bの上部がデッキ材5の雌ねじと螺合し、ねじ 部26bの下部が根太4の雌ねじと螺合する限り、任意のものとすることができ る。ただし、ねじ部26bがデッキ材5および根太4の両雌ねじと螺合する量は 、固定強度を確保する観点からの所定量以上となっている必要がある。Further, in the region where the screw portion 26b is to be formed, the screw 6 is screwed into the deck material 5 most, and the upper portion of the screw portion 26b is screwed into the female screw of the deck material 5 in the fixing completed state. It can be arbitrary as long as the lower part of it is screwed into the female thread of the joist 4. However, the screwing amount of the screw portion 26b with the female screws of the deck member 5 and the joist 4 needs to be a predetermined amount or more from the viewpoint of securing the fixing strength.

【0021】[0021]

【考案の効果】[Effect of device]

以上のように本考案の建材固定用のビスによれば、その軸部が、この軸部の先 端部分に形成されたドリル部と、このドリル部と軸部の頭部側端との間の部分に 形成されたねじ部とを備えるので、ビスがねじ込まれる部材に順次下穴を形成し つつビス自身をねじ込でゆくことができる。したがって、ビス止めの作業を容易 かつ短時間のものとすることができ、施工性の向上を図ることができる。 As described above, according to the building material fixing screw of the present invention, the shaft portion is provided between the drill portion formed at the tip end portion of the shaft portion and the head side end of the shaft portion of the drill portion. Since it is provided with a screw portion formed in the portion, it is possible to screw the screw itself while sequentially forming the prepared hole in the member into which the screw is screwed. Therefore, the screwing work can be performed easily and in a short time, and the workability can be improved.

【0022】 また本考案の板材の固定構造によれば、建材固定用のビスの軸部が、ドリル部 とねじ部とを備えるので、板材にビスをドリル部からねじ込んでゆくことにより 、板材と根太とに順次下穴を形成しつつこのビスを簡単にねじ込むことができる 。さらに、本考案の板材の固定構造によれば、ねじ部が、軸部の先端からその頭 部側端に向けて板材の厚みと同一距離までの部分を逃げて形成されているので、 構造材の穴開けの際、ねじ部が板材中にねじ込まれず、板材が構造材から浮き上 がった状態で構造材に固定されてしまうことを防止できる。したがって、構造材 への板材のビス止めの作業を容易かつ短時間のものとすることができ、施工性の 向上を図ることができる。Further, according to the plate material fixing structure of the present invention, since the shaft portion of the building material fixing screw has the drill portion and the screw portion, by screwing the screw from the drill portion into the plate material, This screw can be easily screwed in while forming a pilot hole in the joist. Further, according to the plate material fixing structure of the present invention, since the screw portion is formed by escaping from the tip of the shaft portion toward the head side end, a portion up to the same distance as the thickness of the plate material. It is possible to prevent that the screw portion is not screwed into the plate material when the hole is drilled and the plate material is lifted from the structure material and fixed to the structure material. Therefore, the work of fixing the plate member to the structural member can be performed easily and in a short time, and the workability can be improved.

【図面の簡単な説明】[Brief description of drawings]

【図1】実施例の板材の固定構造を適用したバルコニー
の縦断面図である。
FIG. 1 is a vertical cross-sectional view of a balcony to which a plate material fixing structure of an embodiment is applied.

【図2】図1の固定構造に用いられている建材固定用の
ビスの構造を示す図である。
FIG. 2 is a view showing a structure of a building material fixing screw used in the fixing structure of FIG.

【図3】図2の建材固定用のビスを用いた板材の固定方
法を示す断面図である。
FIG. 3 is a cross-sectional view showing a method of fixing a plate material using the building material fixing screws of FIG.

【図4】従来の固定構造を適用したバルコニーの縦断面
図である。
FIG. 4 is a vertical cross-sectional view of a balcony to which a conventional fixing structure is applied.

【符号の説明】[Explanation of symbols]

4 構造材 5 板材 6 ビス 16 頭部 26 軸部 26a ドリル部 26b ねじ部 4 Structural Material 5 Plate Material 6 Screw 16 Head 26 Shaft 26a Drill 26b Screw

Claims (2)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 軸部(26)の先端部分に形成されたド
リル部(26a)と、当該ドリル部(26a)と軸部
(26)の頭部(16)側端との間の部分に形成された
ねじ部(26b)と、を備えることを特徴とする建材固
定用のビス。
1. A drill portion (26a) formed at a tip portion of a shaft portion (26) and a portion between the drill portion (26a) and a head (16) side end of the shaft portion (26). A screw for fixing a building material, comprising a formed screw part (26b).
【請求項2】 建材固定用のビス(6)を用いて板材
(5)を構造材(4)に固定する板材の固定構造におい
て、 前記建材固定用のビス(6)の軸部(26)は、この軸
部(26)の先端部分に形成されたドリル部(26a)
と、前記建材固定用のビス(6)が固定完了状態までね
じ込まれたときに、前記板材(5)と前記構造材(4)
とに跨るように形成されたねじ部(26b)とを備え、
前記ねじ部(26b)は、前記軸部(26)の先端から
その頭部(16)側端に向けて板材(5)の厚みと同一
距離までの部分を逃げて形成されていることを特徴とす
る板材の固定構造。
2. A plate material fixing structure for fixing a plate material (5) to a structural material (4) using a building material fixing screw (6), the shaft portion (26) of the building material fixing screw (6). Is a drill part (26a) formed at the tip of this shaft part (26).
And when the building material fixing screw (6) is screwed in to a fixing completed state, the plate material (5) and the structural material (4)
And a screw portion (26b) formed so as to straddle
The threaded portion (26b) is formed by escaping a portion up to the same distance as the thickness of the plate material (5) from the tip of the shaft portion (26) toward the head (16) side end thereof. The fixed structure of the plate material.
JP5650293U 1993-09-24 1993-09-24 Screws for fixing building materials and plate material fixing structure using the same Pending JPH0722115U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5650293U JPH0722115U (en) 1993-09-24 1993-09-24 Screws for fixing building materials and plate material fixing structure using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5650293U JPH0722115U (en) 1993-09-24 1993-09-24 Screws for fixing building materials and plate material fixing structure using the same

Publications (1)

Publication Number Publication Date
JPH0722115U true JPH0722115U (en) 1995-04-21

Family

ID=13028894

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5650293U Pending JPH0722115U (en) 1993-09-24 1993-09-24 Screws for fixing building materials and plate material fixing structure using the same

Country Status (1)

Country Link
JP (1) JPH0722115U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007024209A (en) * 2005-07-19 2007-02-01 Otis:Kk Fixing screw for inorganic building material

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4832535A (en) * 1971-08-27 1973-04-28
JPS5917011A (en) * 1982-07-19 1984-01-28 有限会社新城製作所 Drill screw

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4832535A (en) * 1971-08-27 1973-04-28
JPS5917011A (en) * 1982-07-19 1984-01-28 有限会社新城製作所 Drill screw

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007024209A (en) * 2005-07-19 2007-02-01 Otis:Kk Fixing screw for inorganic building material

Similar Documents

Publication Publication Date Title
US9976298B2 (en) Concealed structural post fastening device and method
CA2509922A1 (en) Double-wing wing nut anchor system and method
AU2016268249A1 (en) Connection of structural components in a building structure
US20110206475A1 (en) Anchoring framing to support structures
JPH0722115U (en) Screws for fixing building materials and plate material fixing structure using the same
KR200459900Y1 (en) a sleeve fixing tool of a mold
JPH0125127Y2 (en)
JPS6243075Y2 (en)
RU216976U1 (en) COMBINED JOINT FOR WOOD CONCRETE FLOOR STRUCTURES
JPH0142595Y2 (en)
JPS6222582Y2 (en)
JPS5845383Y2 (en) Corner drain fixing device
JPS6129850Y2 (en)
JP3982113B2 (en) Method of joining building members and building structure
JPH0125128Y2 (en)
JP3664481B2 (en) Screw for roof construction
JP2000045464A (en) Waterproof sheet fixing hardware
JPS6127370Y2 (en)
JPH049762Y2 (en)
KR200403579Y1 (en) A screw to fix a ceiling
JPH04185845A (en) Mounting tool for panel
JPS6133132Y2 (en)
JPS587779B2 (en) Assembly method for wooden prefabricated buildings
JPS6235106A (en) Screwing method of tapping screw
KR200382529Y1 (en) The fixing screw of ceiling panel for building

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 19980414