JPH0713982U - Connection pipe for scaffolding frame - Google Patents

Connection pipe for scaffolding frame

Info

Publication number
JPH0713982U
JPH0713982U JP4425793U JP4425793U JPH0713982U JP H0713982 U JPH0713982 U JP H0713982U JP 4425793 U JP4425793 U JP 4425793U JP 4425793 U JP4425793 U JP 4425793U JP H0713982 U JPH0713982 U JP H0713982U
Authority
JP
Japan
Prior art keywords
hole
locking pin
spring body
collar
operating rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP4425793U
Other languages
Japanese (ja)
Other versions
JP2595015Y2 (en
Inventor
盛視 梅村
Original Assignee
日工株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日工株式会社 filed Critical 日工株式会社
Priority to JP1993044257U priority Critical patent/JP2595015Y2/en
Publication of JPH0713982U publication Critical patent/JPH0713982U/en
Application granted granted Critical
Publication of JP2595015Y2 publication Critical patent/JP2595015Y2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

(57)【要約】 【目的】 足場枠を上下に連結する連結管に抜け止め機
能を持たす。 【構成】 連結管10内に略く字形状に折曲したバネ体
15の両端部に上部係止ピン16及び下部係止ピン17
を突出させた係止用金具14を内装し、該係止用金具1
4を貫通して回転用レバー22を有する操作杆21を取
り付け、該操作杆21に形成した傾斜した段付き面をバ
ネ体15の上辺部に当接させる。そして回転用レバー2
2を回転操作すれば傾斜した段付き面の先端部がバネ体
15に当接しながら回転してバネ体15を揺動させるこ
とになり、これによって上部係止ピン16は連結管10
の上部係止孔19から出没自在となり、抜け止めの機能
を果たす。
(57) [Summary] [Purpose] The connecting pipe that connects the scaffolding frames vertically has a retaining function. [Structure] An upper locking pin 16 and a lower locking pin 17 are provided at both ends of a spring body 15 bent into a connecting pipe 10 in a substantially V shape.
The locking metal fitting 14 that projects the
An operating rod 21 having a lever 22 for rotation is attached to penetrate 4 and the inclined stepped surface formed on the operating rod 21 is brought into contact with the upper side portion of the spring body 15. And rotation lever 2
When 2 is rotated, the tip end of the inclined stepped surface rotates while abutting the spring body 15 to swing the spring body 15, whereby the upper locking pin 16 causes the upper locking pin 16 to move.
It can be freely retracted from the upper locking hole 19 and serves as a stopper.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

本考案は、建築工事の仮設用足場に使用される足場枠を上下に連結する足場枠 用連結管に関する。 The present invention relates to a scaffolding frame connecting pipe for vertically connecting scaffolding frames used for temporary scaffolding for construction work.

【0002】[0002]

【従来の技術】[Prior art]

建築物の建築工事においては、図6のように建築物の側近に足場枠1を建築物 の高さに応じて何段にも積み上げて仮設足場を形成している。この足場枠1の積 み上げには、足場枠1の建地パイプ径と同一径のカラーを適宜長さの管体の中央 部外周に嵌入固着して構成した連結管2を上下の足場枠1に挿入して連結すると 共に、上下の足場枠1に設けた係止ピンにアームロック3を係止して抜け止めを している。 In the construction work of a building, as shown in Fig. 6, a scaffolding frame 1 is stacked near the building in multiple steps according to the height of the building to form a temporary scaffolding. For stacking the scaffolding frame 1, a connecting pipe 2 formed by fitting and fixing a collar having the same diameter as the building pipe diameter of the scaffolding frame 1 to the outer periphery of the central portion of a pipe body of an appropriate length is used. The arm lock 3 is engaged with the locking pins provided on the upper and lower scaffolding frames 1 to prevent disengagement.

【0003】[0003]

【考案が解決しようとする課題】[Problems to be solved by the device]

しかしながら、足場枠の組み立て、解体時に、アームロックの取り付け、取り 外しが煩わしく手間がかかっている。 However, when assembling and disassembling the scaffolding frame, attachment and detachment of the arm lock is troublesome and time-consuming.

【0004】 本考案は上記の点に鑑み、連結管の構造を工夫して連結管に抜け止め機能を有 するようにしてアームロックを使わずに足場枠を強固に連結することができる足 場枠用連結管を提供することを目的とする。In view of the above points, the present invention devises the structure of the connecting pipe so that the connecting pipe has a retaining function so that the scaffolding frame can be firmly connected without using an arm lock. It is intended to provide a connecting pipe for a frame.

【0005】[0005]

【課題を解決するための手段】[Means for Solving the Problems]

本考案は上記の目的を達成するために、適宜長さの管体の中央部外周にカラー を嵌入固着し、該カラーの側面にカラーと前記管体とを貫通する貫通孔を設ける 一方、略く字形状に折曲したバネ体の上端部に上部係止ピンを、下端部に下部係 止ピンを突出させると共に、略く字形状の上辺部に透孔を穿設して係止用金具を 形成し、更に一端側を略L字形状に折曲して回転用レバーとし、他端側を段付き 状に細くしかつ段付き面を傾斜させたバネ体貫入部とした操作杆を形成し、前記 バネ体を管体内に端部開口より挿入して上部係止ピンを管体上部の上部係止孔に 、下部係止ピンを下部係止孔に出没自在に貫入させると共に、バネ体の透孔を管 体の貫通孔に挿通状に合致させ、前記操作杆をカラー側より前記貫通孔及び透孔 を貫通させて前記上辺部と傾斜させた段付き面とを当接させ、更にカラー側面よ り突出した操作杆のバネ体貫入部の先端に抜け止め手段を設けたものである。 In order to achieve the above-mentioned object, the present invention has a collar fitted and fixed to the outer periphery of the central portion of a tubular body of appropriate length, and a through hole penetrating the collar and the tubular body is provided on the side surface of the collar. An upper locking pin is projected from the upper end of the spring body bent in a V shape, a lower locking pin is projected from the lower end, and a through hole is bored in the upper side of the substantially V shape to lock the metal fitting. Is formed, and one end side is bent into a substantially L-shape to form a lever for rotation, and the other end side is formed into a stepped shape and an operating rod is formed as a spring body penetrating part with an inclined stepped surface. Then, insert the spring body into the tube through the end opening, insert the upper locking pin into the upper locking hole in the upper part of the tube, and the lower locking pin into the lower locking hole so that the spring body can retract. The through hole of the pipe into the through hole of the pipe so that the operating rod is inserted from the collar side through the through hole and the through hole. And a upper portion and the stepped surface is inclined abut, and further provided with anchoring means at the distal end of the spring body penetration portion of the operating rod which projects Ri by color side.

【0006】[0006]

【作用】[Action]

本考案によれば、足場枠に係止して抜け止めの機能を果たす係止ピンを連結管 に出没自在に設けており、下位の足場枠に挿入して取り付けた連結管に足場枠を 積み上げるときには、先ず、連結管に取り付けた操作杆の回転用レバーを回転操 作し、操作杆の傾斜した段付き面をバネ体より成る係止用金具の上辺部に当接さ せながら回転させ、係止用金具の上辺部を押し戻すようにして上部係止ピンを管 体内に没するようにする。 According to the present invention, a locking pin that locks to a scaffolding frame and functions as a retainer is provided in the connecting pipe so that it can be retracted, and the scaffolding frame is stacked on the connecting pipe that is inserted and attached to the lower scaffolding frame. At this time, first, the lever for rotation of the operating rod attached to the connecting pipe is rotationally operated, and the inclined stepped surface of the operating rod is rotated while being brought into contact with the upper side of the locking metal fitting made of the spring body. Push the upper side of the locking metal fitting back so that the upper locking pin is submerged in the tube.

【0007】 次に、上位に積み上げる足場枠を連結管に嵌め込み、嵌め込みが完了すると操 作杆の回転用レバーを回転させて元の位置に戻す。これによってバネ体より成る 係止用金具の復元力によって上部係止ピンが管体より突出するようになり、この 上部係止ピンが足場枠の係止孔に挿入されて抜け止めの機能を果たす。なお、上 部係止ピンの先端上面を先端部へ向けて傾斜させて切り欠いておけば上から足場 枠を嵌め込めばその衝撃により上部係止ピンが後方へ若干逃げるので足場枠をワ ンタッチで装着することもできる。Next, the scaffolding frame to be stacked on top is fitted into the connecting pipe, and when the fitting is completed, the lever for rotation of the operating rod is rotated to return it to the original position. As a result, the restoring force of the locking metal fitting made of a spring body causes the upper locking pin to project from the pipe body, and this upper locking pin is inserted into the locking hole of the scaffolding frame to perform a retaining function. . If the upper surface of the upper locking pin is inclined toward the distal end and cut out so that the scaffolding frame fits in from above, the impact will cause the upper locking pin to escape slightly backward, so the scaffolding frame will be touched. It can also be installed with.

【0008】 また、足場枠の取り外しは前記と同様に回転用レバーを回転させて係止用金具 を押し戻して上部係止ピンを管体より没した状態にし、それから足場枠を持ち上 げると簡単に取り外しができる。In addition, as for the removal of the scaffolding frame, in the same manner as described above, the rotation lever is rotated to push back the locking metal fitting so that the upper locking pin is sunk from the pipe body, and then the scaffolding frame is lifted up. Can be easily removed.

【0009】[0009]

【実施例】【Example】

以下本考案の実施例を図面に基づいて説明する。 An embodiment of the present invention will be described below with reference to the drawings.

【0010】 先ず、図1〜図2に基づいて説明すると、10は足場枠を連結する連結管であ って、足場枠の建地パイプ内径より若干小さい外径を有する適宜長さの管体11 の中央部外周に足場枠の建地パイプ径と同一径のカラー12を嵌入して固着し、 該カラー12の側面にはカラー12と管体11を貫通する貫通孔13を穿設して いる。First, referring to FIGS. 1 and 2, reference numeral 10 denotes a connecting pipe for connecting scaffolding frames, which has a proper length and has an outer diameter slightly smaller than the inner diameter of the building pipe of the scaffolding frame. A collar 12 having the same diameter as the building pipe diameter of the scaffolding frame is fitted and fixed to the outer periphery of the central portion of 11, and a through hole 13 penetrating the collar 12 and the pipe body 11 is formed on the side surface of the collar 12. There is.

【0011】 14は足場枠を係止する係止用金具であって、図1に示すように略く字形状に 折曲したバネ体15の上端部に上部係止ピン16を、下端部に下部係止ピン17 を突出させており、バネ体15の上辺部には前記貫通孔13よりやや小さい透孔 18を穿設している。また、前記管体11には係止用金具14を管体11内に挿 入したときに係止用金具14の上部係止ピン16及び下部係止ピン17を出没さ せる上部係止孔19及び下部係止孔20を穿設している。Reference numeral 14 is a metal fitting for locking the scaffolding frame. As shown in FIG. 1, an upper locking pin 16 is provided at the upper end of a spring body 15 bent in a substantially dogleg shape, and a lower end is provided at the lower end. The lower locking pin 17 is projected, and a through hole 18 slightly smaller than the through hole 13 is formed in the upper side of the spring body 15. In addition, an upper locking hole 19 that allows the upper locking pin 16 and the lower locking pin 17 of the locking metal member 14 to be inserted and retracted when the locking metal member 14 is inserted into the pipe member 11 in the pipe body 11. Also, a lower locking hole 20 is formed.

【0012】 21は係止用金具14を揺動させる操作杆であって、図2に示すように一端部 を略L字形状に折曲して回転するときに掴む回転用レバー22を形成し、他端部 は先端部分の一部を前記バネ体15に穿設した透孔18を貫通する径に細くして 段付きとしてバネ体貫入部23を形成している。この段付き面は前記バネ体15 の上辺部の傾斜角度に合わせて傾斜させている。また、前記バネ体貫入部23の 先端部には抜け止めピン24を取り付ける抜け止めピン取付け孔25を設けてい る。Reference numeral 21 is an operating rod for swinging the locking metal fitting 14, and forms a rotation lever 22 which is bent when one end is bent into a substantially L-shape and is gripped when rotating as shown in FIG. The other end has a stepped portion to form a spring body penetrating portion 23 by thinning a part of the tip portion to a diameter that penetrates the through hole 18 formed in the spring body 15. The stepped surface is inclined according to the inclination angle of the upper side of the spring body 15. Further, a retaining pin attaching hole 25 for attaching the retaining pin 24 is provided at the tip of the spring body penetrating portion 23.

【0013】 そして、前記係止用金具14を管体11の端部開口より管体11内に挿入し、 係止用金具14の上部係止ピン16と下部係止ピン17を管体11の上部係止孔 19及び下部係止孔20に臨ませる。続いてカラー12の側面より操作杆21の バネ体貫入部23を貫通孔13に挿入すると共に、バネ体貫入部23を係止用金 具14のバネ体15の透孔18にも貫通させ、先端部をカラー12の他方側に突 出させる。突出させたバネ体貫入部23の抜け止めピン取付け孔25には抜け止 めピン24を装着して操作杆21が抜け落ちないようにする。Then, the locking metal fitting 14 is inserted into the pipe body 11 through the end opening of the pipe body 11, and the upper locking pin 16 and the lower locking pin 17 of the locking metal fitting 14 are inserted into the pipe body 11. The upper locking hole 19 and the lower locking hole 20 are exposed. Subsequently, the spring body penetration portion 23 of the operating rod 21 is inserted into the through hole 13 from the side surface of the collar 12, and the spring body penetration portion 23 is also penetrated through the through hole 18 of the spring body 15 of the locking metal fitting 14. The tip is projected to the other side of the collar 12. A retaining pin 24 is attached to the retaining pin mounting hole 25 of the protruding spring body penetration portion 23 so that the operating rod 21 does not fall out.

【0014】 次に前記連結管11の使用方法を図3〜図5に基づいて説明すると、足場枠1 を積み上げていくときには、図3に示すように下段の足場枠1の建地1aに連結 管10の管体11を挿入して連結管10を取り付けておく。このとき連結管10 の下部係止ピン17を指等で管体11内に押し込みながら管体11を建地1aに 嵌め込んで下部係止ピン17を建地1a上部に穿設した係止孔26より突出させ て連結管10を建地1a上部に係止固定する。Next, a method of using the connecting pipe 11 will be described with reference to FIGS. 3 to 5. When the scaffolding frames 1 are piled up, as shown in FIG. 3, they are connected to the building site 1 a of the scaffolding frame 1 in the lower stage. The pipe body 11 of the pipe 10 is inserted and the connecting pipe 10 is attached. At this time, the lower locking pin 17 of the connecting pipe 10 is pushed into the tubular body 11 with a finger or the like to fit the tubular body 11 into the building 1a, and the lower locking pin 17 is bored in the upper portion of the building 1a. The connecting pipe 10 is projected from 26 and locked and fixed to the upper part of the building 1a.

【0015】 次に、連結管10に取り付けた操作杆21の回転用レバー22を回転させて回 転用レバー22を下向きにする。操作杆21の傾斜した段付き面がバネ体15の 上辺部に当接しながら回転して段付き面の先端部がバネ体15の上辺部を押し戻 すようになる。バネ体15の上辺部が後退することによってバネ体15上端部の 上部係止ピン16が図3に示すように管体11内に没した状態となる。Next, the rotation lever 22 of the operating rod 21 attached to the connecting pipe 10 is rotated to make the rotation lever 22 face downward. The inclined stepped surface of the operating rod 21 rotates while contacting the upper side portion of the spring body 15, and the tip end of the stepped surface pushes back the upper side portion of the spring body 15. When the upper side of the spring body 15 is retracted, the upper locking pin 16 at the upper end of the spring body 15 is set in the pipe body 11 as shown in FIG.

【0016】 この状態で上段に積み上げる足場枠1の建地1aを図3に示すように上から挿 入する。この足場枠1の建地1aの下部には連結管10の上部係止孔19と挿通 状に一致する係止孔27を穿設してあり、挿入した足場枠1の建地1aの係止孔 27と連結管の上部係止孔19とを一致させる。In this state, the building 1a of the scaffolding frame 1 to be stacked on the upper stage is inserted from above as shown in FIG. In the lower part of the building 1a of the scaffolding frame 1, a locking hole 27 which is inserted in the upper locking hole 19 of the connecting pipe 10 is formed. The locking hole 27 of the inserted scaffolding frame 1 is locked in the building 1a. The hole 27 and the upper locking hole 19 of the connecting pipe are aligned with each other.

【0017】 次に、回転用レバー22を回転させて元の位置に戻すと、押圧されたバネ体1 5の復元力によって上部係止ピン16は図4のように管体11の上部係止孔19 及び建地1aの係止孔27より突出して足場枠1の建地1aが係止固定される。 また、図5は連結管10に上段の足場枠をワンタッチで装着する様子を示した もので、連結管10の上部係止ピン16の先端上面部を切り欠いて傾斜部を形成 している。そして足場枠1の建地1aを上から挿入して落とし込めば、建地1a の下端部が上部係止ピン16の傾斜部に当接してその衝撃力により上部係止ピン 16を後方へ若干押しやりながら足場枠を装着できる。足場枠を装着すると建地 1aの係止孔27と連結杆10の係止孔19が挿通状に一致し、バネ体15の復 元力により上部係止ピン16が建地1aの係止孔27と連結杆10の係止孔19 に入り込んで係止され、ワンタッチで装着することができる。Next, when the rotation lever 22 is rotated back to the original position, the upper locking pin 16 is locked by the restoring force of the pressed spring body 15 as shown in FIG. The building 1a of the scaffolding frame 1 is locked and fixed by projecting from the hole 19 and the locking hole 27 of the building 1a. Further, FIG. 5 shows a state in which the upper stage scaffolding frame is attached to the connecting pipe 10 with one touch, and the upper end of the upper locking pin 16 of the connecting pipe 10 is cut out to form an inclined portion. Then, if the building 1a of the scaffolding frame 1 is inserted from above and dropped in, the lower end of the building 1a comes into contact with the inclined portion of the upper locking pin 16 and the impact force causes the upper locking pin 16 to move slightly backward. You can attach scaffolding frame while pushing. When the scaffolding frame is attached, the locking hole 27 of the building 1a and the locking hole 19 of the connecting rod 10 coincide with each other in an insertion shape, and the restoring force of the spring body 15 causes the upper locking pin 16 to move into the locking hole of the building 1a. 27 and the locking hole 19 of the connecting rod 10 are inserted and locked, and can be mounted with one touch.

【0018】 なお、足場枠1を取り外すときは、図3に示すと同様に連結管10の回転用レ バー22を回転させて上部係止ピン16を後退させた状態に保持する。そしてこ の状態で足場枠を持ち上げれば簡単に取り外すことができる。When the scaffolding frame 1 is removed, the rotation lever 22 of the connecting pipe 10 is rotated to hold the upper locking pin 16 in the retracted state, as shown in FIG. Then you can easily remove it by lifting the scaffolding frame in this state.

【0019】[0019]

【考案の効果】[Effect of device]

以上のように本考案によれば、連結管10内に略く字形状に折曲したバネ体1 5の両端部に上部係止ピン16及び下部係止ピン17を突出させた係止用金具1 4を内装し、該係止用金具14を貫通して回転用レバー22を有する操作杆21 を取り付け、該操作杆21に形成した傾斜した段付き面を係止用金具14のバネ 体15の上辺部に当接させ、回転用レバー22の回転操作によってバネ体15を 揺動させて上部係止ピン16を連結管10の上部係止孔19から出没自在に構成 し、連結管10に抜け止めの機能を持たせたので、従来のアームロックも不要と なって部品点数も少なくなり、仮設足場の組み上げ、解体が容易に、かつ迅速に 行なえて作業効率を向上させることができる。 As described above, according to the present invention, the metal fitting for locking in which the upper locking pin 16 and the lower locking pin 17 are projected at both ends of the spring body 15 bent in the connecting pipe 10 in a substantially V shape. 14 is mounted inside, an operating rod 21 having a rotation lever 22 is attached through the locking metal fitting 14, and the inclined stepped surface formed on the operating rod 21 is attached to the spring body 15 of the locking metal fitting 14. The upper locking pin 16 is configured to be retractable from the upper locking hole 19 of the connecting pipe 10 by contacting the upper side portion and swinging the spring body 15 by rotating the rotating lever 22. Since it has a retaining function, the conventional arm lock is not required, the number of parts is reduced, and the temporary scaffold can be assembled and disassembled easily and quickly to improve work efficiency.

【図面の簡単な説明】[Brief description of drawings]

【図1】本考案の一実施例を示す斜視図である。FIG. 1 is a perspective view showing an embodiment of the present invention.

【図2】同上の一部切り欠き正面図である。FIG. 2 is a partially cutaway front view of the above.

【図3】本考案の連結管の取付け状態を説明する一部切
り欠き正面図である。
FIG. 3 is a partially cutaway front view illustrating a mounting state of the connecting pipe of the present invention.

【図4】本考案の連結管の取付け状態を説明する一部切
り欠き正面図である。
FIG. 4 is a partially cutaway front view illustrating a mounting state of the connecting pipe of the present invention.

【図5】本考案の連結管の取付け状態を説明する一部切
り欠き正面図である。
FIG. 5 is a partially cutaway front view illustrating a mounting state of the connecting pipe of the present invention.

【図6】仮設足場の斜視図である。FIG. 6 is a perspective view of a temporary scaffold.

【符号の説明】[Explanation of symbols]

1…足場枠 1a…足場枠の建地 10…連結管 11…管体 12…カラー 13…貫通孔 14…係止用金具 15…バネ体 16…上部係止ピン 17…下部係止ピン 18…透孔 19…上部係止孔 20…下部係止孔 21…操作杆 22…回転用レバー 23…バネ体貫入部 24…抜け止めピン(抜け止め手段) 1 ... Scaffolding frame 1a ... Building of scaffolding frame 10 ... Connection pipe 11 ... Pipe body 12 ... Collar 13 ... Through hole 14 ... Locking metal fitting 15 ... Spring body 16 ... Upper locking pin 17 ... Lower locking pin 18 ... Through hole 19 ... Upper locking hole 20 ... Lower locking hole 21 ... Operating rod 22 ... Rotating lever 23 ... Spring body penetration part 24 ... Prevention pin (prevention means)

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】適宜長さの管体の中央部外周にカラーを嵌
入固着し、該カラーの側面にカラーと前記管体とを貫通
する貫通孔を設ける一方、略く字形状に折曲したバネ体
の上端部に上部係止ピンを、下端部に下部係止ピンを突
出させると共に、略く字形状の上辺部に透孔を穿設して
係止用金具を形成し、更に一端側を略L字形状に折曲し
て回転用レバーとし、他端側を段付き状に細くしかつ段
付き面を傾斜させたバネ体貫入部とした操作杆を形成
し、前記バネ体を管体内に端部開口より挿入して上部係
止ピンを管体上部の上部係止孔に、下部係止ピンを下部
係止孔に出没自在に貫入させると共に、バネ体の透孔を
管体の貫通孔に挿通状に合致させ、前記操作杆をカラー
側より前記貫通孔及び透孔を貫通させて前記上辺部と傾
斜させた段付き面とを当接させ、更にカラー側面より突
出した操作杆のバネ体貫入部の先端に抜け止め手段を設
けたことを特徴とする足場枠用連結管。
1. A collar having a proper length is fitted and fixed to the outer periphery of the central portion of the tubular body, and a through hole penetrating the collar and the tubular body is provided on a side surface of the collar, and the collar is bent into a substantially V shape. The upper locking pin is projected on the upper end of the spring body, the lower locking pin is projected on the lower end, and a through hole is formed in the upper side of the generally dogleg shape to form a locking metal fitting. Is bent into a substantially L shape to form a lever for rotation, and the other end side is formed into a stepped shape and a stepped surface is formed into a spring body penetrating portion to form an operating rod. Insert the upper locking pin into the upper locking hole in the upper part of the pipe body, insert the lower locking pin into the lower locking hole so that it can be retracted, and insert the through hole of the spring into the body. A stepped surface which is fitted in a through hole, and the operating rod is made to penetrate the through hole and the through hole from the collar side and is inclined with respect to the upper side portion. Brought into contact, further scaffolding frame for connection pipe, characterized in that a anchoring means to the distal end of the spring body penetration portion of the operating rod projecting from the color aspect.
JP1993044257U 1993-08-12 1993-08-12 Connecting pipe for scaffolding frame Expired - Fee Related JP2595015Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1993044257U JP2595015Y2 (en) 1993-08-12 1993-08-12 Connecting pipe for scaffolding frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1993044257U JP2595015Y2 (en) 1993-08-12 1993-08-12 Connecting pipe for scaffolding frame

Publications (2)

Publication Number Publication Date
JPH0713982U true JPH0713982U (en) 1995-03-10
JP2595015Y2 JP2595015Y2 (en) 1999-05-24

Family

ID=12686473

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1993044257U Expired - Fee Related JP2595015Y2 (en) 1993-08-12 1993-08-12 Connecting pipe for scaffolding frame

Country Status (1)

Country Link
JP (1) JP2595015Y2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5439146U (en) * 1977-08-22 1979-03-15

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5439146U (en) * 1977-08-22 1979-03-15

Also Published As

Publication number Publication date
JP2595015Y2 (en) 1999-05-24

Similar Documents

Publication Publication Date Title
JPH0713982U (en) Connection pipe for scaffolding frame
JP2599732Y2 (en) Releaseable clip
JP2595014Y2 (en) Connecting pipe for scaffolding frame
JP2581271Y2 (en) Connecting pipe for scaffolding frame
JP2602694Y2 (en) Connecting pipe for scaffolding frame
US4527768A (en) Tie rod with self-securing end
JPH07286438A (en) Pipe joint
JP4022317B2 (en) Bracket for temporary scaffold
JP2552020Y2 (en) Plastic clip
JP3965065B2 (en) Temporary element coupling bracket and temporary element coupling method
JP4684252B2 (en) Coupling device and rotating metal fitting used in the coupling device
JP3950944B2 (en) Soundproof door lock
JP2541349Y2 (en) Lock pins for scaffolding members
JPH0715873Y2 (en) H-shaped steel pile holding device
JPH0913661A (en) Pipe joint
CN213476857U (en) Quick connection pile tip
JP3032615U (en) Non-rotating pin member and hammer grab crown using the same
JP2533377B2 (en) Structural member temporary fixing nail
JP3034251U (en) Scaffolding connecting pin
JPH0533619Y2 (en)
JP3642592B2 (en) Connecting pin for scaffolding frame
JP2540790Y2 (en) Steel pipe pile connecting device of steel pipe pile construction machine
JPS6013978Y2 (en) Connection part of latch member for opening/closing door
JP3640306B2 (en) Locking gutter support
JP3636630B2 (en) Hanging device

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees