JPH07118820A JP5266809A JP26680993A JPH07118820A JP H07118820 A JPH07118820 A JP H07118820A JP 5266809 A JP5266809 A JP 5266809A JP 26680993 A JP26680993 A JP 26680993A JP H07118820 A JPH07118820 A JP H07118820A
Authority
JP
Japan
Prior art keywords
steel sheet
plating
line
hot
cold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP5266809A
Other languages
Japanese (ja)
Other versions
JP3258786B2 (en
Inventor
Ichiro Asahi
一郎 旭
Sadao Ebata
貞夫 江端
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Original Assignee
Kawasaki Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kawasaki Steel Corp filed Critical Kawasaki Steel Corp
Priority to JP26680993A priority Critical patent/JP3258786B2/en
Publication of JPH07118820A publication Critical patent/JPH07118820A/en
Application granted granted Critical
Publication of JP3258786B2 publication Critical patent/JP3258786B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PURPOSE:To quickly change over a carrying course of steel sheet in a shared manufacturing facility, in which a hot-dip coated steel sheet and a cold-rolled steel sheet can be manufactured in the same facility. CONSTITUTION:In the case of manufacturing the hot-dip coated steel sheet 1, a plating vessel 2 is risen to the plating position by using an elevating device 10 and a fixedly arranged sink roll 3 is dipped into a plating bath 2a, and also, a deflector roll 11 is retracted to the position outside a line, and the steel sheet 1 is wound on the sink roll 3 and carried. In the case of manufacturing the cold-rolled steel sheet, after retracting the plating vessel 2 downward by the elevating device 10, the deflector roll 11 is advanced to the position inside the line by using a device 12 for forward/backward movement and the steel sheet is wound on the deflector roll 11 and carried, thereby the carrying course is changed over.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、溶融めっき鋼板および
冷延鋼板を同一の設備により製造することができる兼用
製造設備の鋼板搬送経路切り替え方法および装置に関す
るものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and apparatus for switching a steel sheet conveying path in a combined manufacturing facility capable of manufacturing hot dip plated steel sheet and cold rolled steel sheet with the same equipment.

【0002】[0002]

【従来の技術】従来、溶融亜鉛めっき設備のライン上に
配置されためっき装置部では、図5に示すようにめっき
槽2内のめっき浴2a中にシンクロール3および浴中サ
ポートロール8a、8b等の浴中機器を配置し、前処理
設備である熱処理炉5から進入する溶融めっき用の鋼板
1を酸化雰囲気から隔離するためのスナウト6を介して
めっき槽2内のめっき浴2a中に導くようになってい
る。
2. Description of the Related Art Conventionally, as shown in FIG. 5, in a plating apparatus section arranged on a hot-dip galvanizing equipment line, a sink roll 3 and in-bath support rolls 8a, 8b are placed in a plating bath 2a in a plating tank 2. And other equipment in the bath are arranged, and the steel sheet 1 for hot dip coating that enters from the heat treatment furnace 5 that is a pretreatment facility is introduced into the plating bath 2a in the plating tank 2 through a snout 6 for isolating it from the oxidizing atmosphere. It is like this.

【0003】このようにしてめっき浴2a中に浸漬され
た鋼板1は溶融亜鉛めっきされながらシンクロール3を
介してその進行方向を上方に変え、さらに対向して配置
された一対の浴中サポートロール8a、8bで支持して
垂直方向に引き上げ、めっき浴2aから引き出して一対
のガスワイピングノズル4a、4bから噴射するガスジ
ェットにより余剰な溶融亜鉛を払拭して所定の亜鉛付着
量にしている。さらにめっき槽2のかなり上方にはめっ
きされた鋼板1を水平方向に変更するトップロール9が
設けてある。
The steel sheet 1 thus dipped in the plating bath 2a is hot dip galvanized while changing its direction of travel upward through the sink roll 3, and a pair of in-bath support rolls arranged opposite each other. It is supported by 8a and 8b, pulled up in the vertical direction, pulled out from the plating bath 2a, and wiped off excess molten zinc by a gas jet ejected from a pair of gas wiping nozzles 4a and 4b, so that a predetermined zinc adhesion amount is obtained. Further, a top roll 9 for horizontally changing the plated steel plate 1 is provided above the plating tank 2.

【0004】このようなめっき処理を必要とする溶融亜
鉛めっき鋼板製造ラインを冷延鋼板製造設備として使用
するためには鋼板搬送経路を切り替えることによりめっ
き槽のめっき浴中に鋼板が進入しないようにしなければ
ならない。これまでは、鋼板搬送経路を切り替えるた
め、めっき装置部の近傍で鋼板を切断してめっき槽の上
方あるいはその近辺に設置した搬送ロールを使用してめ
っき浴中に浸漬させずに鋼板を搬送する、いわゆるパス
替えが行われている。
In order to use a hot-dip galvanized steel sheet production line requiring such a plating treatment as a cold-rolled steel sheet production facility, the steel sheet conveyance route is switched so that the steel sheet does not enter the plating bath of the plating tank. There must be. Until now, to switch the steel sheet transportation path, the steel sheet is cut near the plating equipment and the steel sheet is transported without being immersed in the plating bath using the transportation roll installed above or near the plating tank. , So-called pass change is being performed.

【0005】このパス替えのためには、前述のように鋼
板の切断、搬送ロールへの搬送経路変更作業および鋼板
の接続等が必要となるため、長時間にわたるラインの停
止ならびにパス切り替えに伴う作業を行わなければなら
ないので生産性が低下するばかりでなく、保全作業の増
加を招くという問題点があった。このような問題を解決
するため特開平2−34762 号公報には、溶融めっき鋼板
製造時には、めっき槽内のめっき浴中に浸漬されるシン
クロールを使用する一方、冷延鋼板製造時には前記シン
クロールを昇降装置を用いてめっき浴から上方に引き上
げ、しかる後、上昇した位置でシンクロールをデフレク
ターロールとして使用するものが提案されている。
To change the path, it is necessary to cut the steel plate, change the transfer route to the transfer roll, connect the steel plate, etc., as described above. Therefore, there is a problem in that not only the productivity is lowered, but also maintenance work is increased because the maintenance work has to be performed. In order to solve such a problem, Japanese Patent Laid-Open No. 2-34762 uses a sink roll immersed in a plating bath in a plating tank at the time of producing a hot dip plated steel sheet, while the sink roll at a time of producing a cold rolled steel sheet. It has been proposed to use a sink roll as a deflector roll at the elevated position after pulling it up from the plating bath using an elevating device.

【0006】しかしながら、冷延鋼板製造時に、めっき
浴中に浸漬して使用したシンクロールを引き上げただけ
でそのままデフレクターロールとして使用するのは甚だ
困難である。たとえば冷延鋼板が接触するシンクロール
の胴部にはめっき金属が巻き付いて付着しているので、
これを完全に除去しない限り、冷延鋼板に疵を発生させ
るという問題点がある。さらにシンクロールの軸受に
は、その軸受内にめっき金属が入り込んだ状態であり、
シンクロールをめっき浴から上方に引き上げた時に、め
っき金属が凝固して軸受として使用できなくなるという
問題点がある。
[0006] However, it is very difficult to use the sink roll as it is by just pulling up the sink roll used by immersing it in the plating bath during the production of the cold rolled steel sheet. For example, since the plating metal is wrapped around and adheres to the body of the sink roll that the cold-rolled steel sheet contacts,
Unless this is completely removed, there is a problem in that the cold-rolled steel sheet is flawed. In addition, the sink roll bearing is in a state where plated metal has entered the bearing,
When the sink roll is pulled upward from the plating bath, the plating metal solidifies and cannot be used as a bearing.

【0007】一方、連続溶融亜鉛めっきラインでのめっ
き処理は種々の寸法の鋼板を組合わせてめっき作業を連
続化しているため、めっき処理条件を各々のめっき鋼板
のめっき条件に合わせる必要がある。そこで種々のめっ
き鋼板をそのめっき条件(たとえば、前処理条件、めっ
き浴条件、鋼板走行条件等)が急変しないように処理順
序を予め決めてめっき処理している。しかしながら需要
が多様化している現状ではこのような対応のみではめっ
き処理条件を十分満足することが困難な状況である。そ
こでめっき条件を整えるためのダミー材(以下、通板材
という)を適宜挿入して連続めっき処理を行っているの
が実状である。また、保全作業等で製造設備を停止させ
るときおよび再稼働させるときにもめっき条件を整える
ために通板材を用いている。しかもこれらの通板材は製
品として出荷する工程材と同様にめっきされてしまうこ
とから一度使用した通板材の再使用は不可能であり、コ
ストアップになるという問題点がある。
On the other hand, in the plating treatment in the continuous hot-dip galvanizing line, since the plating work is made continuous by combining steel sheets of various sizes, it is necessary to adjust the plating treatment conditions to the plating conditions of each plated steel sheet. Therefore, various plated steel sheets are subjected to plating treatment by predetermining the treatment order so that the plating conditions (for example, pretreatment conditions, plating bath conditions, steel plate running conditions, etc.) do not change suddenly. However, in the present situation where demand is diversifying, it is difficult to sufficiently satisfy the plating treatment conditions only by such measures. Therefore, in reality, a dummy material (hereinafter referred to as a plate material) for adjusting plating conditions is appropriately inserted to perform continuous plating. Further, a plate material is used to adjust the plating conditions when the manufacturing equipment is stopped or restarted for maintenance work or the like. Moreover, since these strips are plated in the same manner as the process strips shipped as products, it is impossible to reuse the strips that have been used once, resulting in an increase in cost.

【0008】[0008]

【発明が解決しようとする課題】溶融めっき鋼板製造設
備を冷延鋼板製造設備として兼用可能とするにはめっき
装置部でのストリップの搬送経路を短時間でかつ容易に
切り換えることが必要であるが、溶融めっき鋼板製造時
に使用したシンクロールをめっき浴上方に引き上げたの
みではロール胴部への溶融金属の巻き付きに起因したス
トリップへの疵の発生および軸受への溶融金属の付着・
凝固等による前記シンクロールの不回転が生じることに
よるスリ疵の発生等品質低下を招き、冷延鋼板製造時に
そのままシンクロールを利用することは極めて困難であ
る。
In order to make it possible to use the hot-dip galvanized steel sheet manufacturing equipment as the cold-rolled steel sheet manufacturing equipment, it is necessary to easily switch the strip conveying path in the plating equipment part in a short time. However, if the sink roll used during hot-dip galvanized steel sheet production is simply pulled up above the plating bath, flaws will occur in the strip due to the wrapping of the molten metal around the roll body and adhesion of the molten metal to the bearing.
Since the non-rotation of the sink roll due to solidification or the like causes deterioration of quality such as generation of scratches, it is extremely difficult to use the sink roll as it is when manufacturing the cold-rolled steel sheet.

【0009】本発明は上記問題点を解決し、溶融めっき
鋼板設備から冷延鋼板製造設備へ、あるいは冷延鋼板製
造設備から溶融めっき鋼板製造設備への切り換えが可及
的速やかにかつ容易にできる溶融めっき鋼板、冷延鋼板
兼用製造設備の鋼板搬送経路切り替え方法および装置を
提供しようとするものである。また、溶融めっき設備と
して使用時、処理するストリップの寸法が大きく変化し
たとき、あるいは保全作業等で製造設備の停止および再
稼働させるときに必要であった通板材をめっき浴に浸漬
させずに通板可能とし、処理条件が整った時点でめっき
パスへのパス替えが迅速かつ容易にできるパス替えるこ
とができる鋼板搬送経路切り替え方法および装置を提供
するものである。
The present invention solves the above problems, and can switch from hot-dip steel sheet equipment to cold-rolled steel sheet production equipment, or from cold-rolled steel sheet production equipment to hot-dip steel sheet production equipment as quickly and easily as possible. An object of the present invention is to provide a method and an apparatus for switching a steel sheet conveying path of a hot-dip galvanized steel sheet / cold-rolled steel sheet production facility. Also, when used as hot dip plating equipment, when the dimensions of the strip to be processed change significantly, or when the production equipment is stopped and restarted for maintenance work, etc. (EN) Provided are a steel sheet transport path switching method and device capable of plate switching and capable of performing a path switching to a plating path quickly and easily when processing conditions are satisfied.

【0010】[0010]

【課題を解決するための手段】請求項1記載の本発明
は、溶融めっき鋼板および冷延鋼板を同一の設備により
製造することができる兼用製造設備の鋼板搬送経路切り
替え方法において、シンクロールを固定して配置し、め
っき浴の入っためっき槽をめっき位置と下方の退避位置
との間で昇降自在に配置すると共に、前記めっき位置と
下方の退避位置との間においてデフレクターロールをラ
イン側方の退避位置とライン内位置との間で水平に進退
自在に配置し、溶融めっき鋼板を製造する場合には、昇
降装置を用いてめっき槽をめっき位置まで上昇し、固定
して配置したシンクロールをめっき浴に浸漬すると共に
デフレクターロールをライン側方に退避させた状態とし
て溶融めっき鋼板をシンクロールに巻き付けて上方に搬
送する一方、冷延鋼板を製造する場合には、めっき槽を
固定配置したシンクロール下方の退避位置まで下降する
と共に、前後進移動装置を用いてデフレクターロールを
ライン側方の退避位置よりライン内位置に移動させた状
態として、冷延鋼板をデフレクターロールに巻き付けて
上方に搬送することを特徴とする溶融めっき鋼板、冷延
鋼板の搬送経路切り替え方法である。
According to a first aspect of the present invention, a sink roll is fixed in a method for switching a steel sheet conveying path of a combined manufacturing facility capable of manufacturing a hot dip plated steel sheet and a cold rolled steel sheet by the same equipment. The plating tank containing the plating bath is vertically movable between the plating position and the lower retreat position, and the deflector roll is provided on the side of the line between the plating position and the lower retreat position. When manufacturing hot-dip galvanized steel sheets horizontally arranged between the retracted position and the in-line position, use a lifting device to raise the plating tank to the plating position, and place the sink roll fixed in place. While being immersed in the plating bath and with the deflector roll retracted to the side of the line, the hot dip plated steel sheet is wound around a sink roll and conveyed upward, while cold rolled steel In the case of manufacturing, the state where the deflector roll is moved from the retracted position on the side of the line to the in-line position by using the forward / backward movement device while descending to the retracted position below the sink roll in which the plating tank is fixedly arranged. A method for switching a hot-dip galvanized steel sheet and cold-rolled steel sheet conveyance path is characterized in that the cold-rolled steel sheet is wound around a deflector roll and conveyed upward.

【0011】また請求項2記載の本発明は、溶融めっき
鋼板および冷延鋼板を同一設備により製造することがで
きる兼用製造設備の鋼板搬送経路切り替え装置におい
て、めっき位置に固定して配置されたシンクロールと、
めっき位置と下方の退避位置との間で昇降自在に配置さ
れためっき槽と、めっき槽を下部から支持してめっき位
置と下方の退避位置との間を昇降させる昇降装置と、前
記めっき位置と下方のめっき槽退避位置との間において
ライン側方の退避位置とライン内位置との間で水平に進
退自在に配置されたデフレクターロールと、デフレクタ
ーロールをライン側方の退避位置とライン内位置との間
に進退させる前後進移動装置とを具備したことを特徴と
する溶融めっき鋼板、冷延鋼板の搬送経路切り替え装置
である。
Further, the present invention according to claim 2 is a sink which is fixed at a plating position in a steel plate transport path switching device of a combined manufacturing facility capable of manufacturing hot dip plated steel sheet and cold rolled steel sheet by the same equipment. A roll,
A plating tank that is vertically movable between a plating position and a lower withdrawal position; an elevating device that supports the plating tank from below and elevates and lowers between the plating position and the lower withdrawal position; A deflector roll horizontally arranged between the retracted position on the side of the line and a position in the line between the lower position of the plating tank and the retracted position on the line, And a forward-backward moving device for moving the steel plate between the two.

【0012】[0012]

【作用】溶融めっき鋼板を製造する場合には、めっき槽
をめっき位置まで上昇してシンクロールをめっき浴に浸
漬した状態で、溶融めっき鋼板をシンクロールに巻き付
けて上方に搬送させ、また冷延鋼板を製造する場合に
は、めっき槽を下方の退避位置まで下降させ、めっき位
置のシンクロールと退避位置のめっき槽との中間でデフ
レクターロールをライン側方からライン内位置に移動さ
せ、冷延鋼板をデフレクターロールに巻き付けて上方に
搬送するように切り替えるものである。
[Function] When manufacturing a hot-dip steel sheet, the hot-dip steel sheet is wound around the sink roll and conveyed upward while the plating tank is elevated to the plating position and the sink roll is immersed in the plating bath. When manufacturing steel sheets, lower the plating tank to the retreat position below, move the deflector roll from the side of the line to the in-line position between the sink roll at the plating position and the plating tank at the retreat position, and perform cold rolling. The steel sheet is wound around a deflector roll and conveyed upward.

【0013】したがって従来のようにシンクロールをデ
フレクターロールとして使用する場合と異なり、めっき
金属のシンクロールへの付着・凝固による冷延鋼板の疵
発生やシンクロールの不回転などのトラブル発生を防止
できるばかりでなく、溶融めっき鋼板と冷延鋼板の切り
替え時間の短縮が達成される。
Therefore, unlike the conventional case where a sink roll is used as a deflector roll, it is possible to prevent the occurrence of defects such as flaws in the cold-rolled steel sheet and non-rotation of the sink roll due to adhesion and solidification of plated metal to the sink roll. Not only that, the time required for switching between the hot dip plated steel sheet and the cold rolled steel sheet is shortened.

【0014】[0014]

【実施例】以下、本発明の実施例を図面に基いて説明す
る。図3に示す本発明の溶融めっき鋼板製造設備では連
続熱処理炉5から送りだされた鋼板1のパスラインに合
せてめっき槽2が配置されている。めっき槽2の入り側
には鋼板1をめっき浴2aに浸漬させるための搬送ロー
ル7が配置され、めっき槽2中のめっき浴2aに進入し
てきた鋼板1の走行方向を変え、上方に引き上げるため
のシンクロール3等が取り付けられている。さらにめっ
きされた鋼板1をめっき浴2から引き上げると共にその
走行方向を水平方向に変更するトップロール9がめっき
浴2のかなり上方に設けられている。
Embodiments of the present invention will be described below with reference to the drawings. In the hot-dip galvanized steel sheet manufacturing equipment of the present invention shown in FIG. 3, a plating tank 2 is arranged in accordance with the pass line of the steel sheet 1 sent from the continuous heat treatment furnace 5. A conveying roll 7 for immersing the steel sheet 1 in the plating bath 2a is arranged on the entrance side of the plating tank 2 to change the traveling direction of the steel sheet 1 entering the plating bath 2a in the plating tank 2 and pull it upward. The sink roll 3 and the like are attached. Further, a top roll 9 for pulling up the plated steel sheet 1 from the plating bath 2 and changing its running direction to a horizontal direction is provided above the plating bath 2.

【0015】このような溶融めっき鋼板の製造工程にお
いて、めっき槽2内のめっき浴2a内にシンクロール3
等の浴中機器を浸漬配置して鋼板1がめっき浴2内を通
過する搬送経路を形成し、めっき浴2内から引出される
鋼板1に付着するめっき液をめっき浴2直上に設置した
ワイピングノズル4a、4bによって払拭することによ
り所定のめっき厚みに制御するのは図5に示す従来例の
場合と同様である。
In the manufacturing process of such a hot dip plated steel sheet, the sink roll 3 is placed in the plating bath 2a in the plating tank 2.
Wiping in which equipment such as a bath is placed in a bath to form a transport path through which the steel plate 1 passes through the plating bath 2, and a plating solution attached to the steel plate 1 that is drawn out from the plating bath 2 is placed directly on the plating bath 2. Controlling to a predetermined plating thickness by wiping with the nozzles 4a and 4b is similar to the case of the conventional example shown in FIG.

【0016】本発明では、シンクロール3および浴中サ
ポートロール8a、8bなどの浴中機器を固定して配置
する一方、めっき浴2aの入っためっき槽2の下部は昇
降装置10(たとえばスクリュージャッキ機構を用いる)
によって昇降自在に支持されており、図1および図3に
示すようにめっき槽2を上昇させてシンクロール3等の
浴中機器を浸漬させた状態とするめっき位置と、図2お
よび図4に示すように固定配置されたシンクロール3の
下方に下降させる退避位置との間を昇降装置10を用いて
昇降することができる。
In the present invention, the sink roll 3 and the in-bath support rolls 8a, 8b and other in-bath equipment are fixedly arranged, while the lower part of the plating tank 2 containing the plating bath 2a is provided with a lifting device 10 (for example, a screw jack). Use mechanism)
1 and 2, the plating position is such that the plating tank 2 is raised to immerse the sink equipment such as the sink roll 3 in the bath as shown in FIGS. 1 and 3, and FIG. As shown in the figure, the elevator 10 can be used to move up and down between the sink roll 3 fixedly arranged and the retracted position.

【0017】図1および図2に示すようにめっき槽3の
めっき位置と下方の退避位置との中間にはデフレクター
ロール11がライン側方の退避位置とライン内位置との間
を前後進移動装置12を用いて進退できるように配置して
ある。前後進移動装置12のスライドフレーム13は、スラ
イドベース15上を水平移動する構造になっており、この
スライドフレーム13の一端部に取り付けられたナット部
材16にはネジ軸17がねじ込まれており、このネジ軸17の
基端部は軸受15aに回転自在に支持されており、また軸
継手19を介してモータ18に連結してある。モータ18を正
転または逆転するとネジ軸17が回転するのに連れてナッ
ト部材16がスライドフレーム13と一体的に矢印Aで示す
方向にのみ前進または後退するようになっている。
As shown in FIGS. 1 and 2, a deflector roll 11 is provided between the plating position of the plating tank 3 and the retreat position below and a forward / backward moving device between the retreat position on the side of the line and the in-line position. It is arranged so that you can move forward and backward using 12. The slide frame 13 of the forward / backward moving device 12 has a structure that horizontally moves on the slide base 15, and a screw shaft 17 is screwed into a nut member 16 attached to one end of the slide frame 13. The base end of the screw shaft 17 is rotatably supported by a bearing 15a, and is connected to a motor 18 via a shaft joint 19. When the motor 18 is normally or reversely rotated, the nut member 16 integrally moves with the slide frame 13 only in the direction shown by the arrow A as the screw shaft 17 rotates.

【0018】このスライドフレーム13上に取り付けた軸
受14にはデフレクターロール11の支持軸11aが支持され
ており、支持軸11aの基端部は軸継手21を介してモータ
20に連結してあり、モータ20を回転することによりデフ
レクターロール11が回転される。次に本発明の作用につ
いて説明する。溶融めっき鋼板を製造する場合には、図
1に示すようにデフレクターロール11はライン外に退避
させておく一方、昇降装置10によりめっき槽2をめっき
位置まで上昇してシンクロール3および浴中サポートロ
ール4a、4b等の浴中機器はめっき浴2a中に浸漬し
てあり、前述のようにして鋼板1はめっき浴2a中のシ
ンクロール3によって搬送しながら溶融亜鉛めっきが施
される。
A bearing 14 mounted on the slide frame 13 supports a support shaft 11a of the deflector roll 11, and the base end of the support shaft 11a is connected via a shaft joint 21 to a motor.
The deflector roll 11 is connected to the deflector roll 11 by rotating the motor 20. Next, the operation of the present invention will be described. When manufacturing a hot dip plated steel sheet, the deflector roll 11 is retracted out of the line as shown in FIG. 1, while the elevating device 10 raises the plating tank 2 to the plating position and the sink roll 3 and the bath support. In-bath equipment such as rolls 4a and 4b is immersed in the plating bath 2a, and as described above, the steel sheet 1 is subjected to hot dip galvanizing while being conveyed by the sink roll 3 in the plating bath 2a.

【0019】この溶融めっき鋼板製造工程から冷延鋼板
製造工程への切り替える場合には、図2および図4に示
すように昇降装置10を使ってめっき槽2をめっき位置か
ら下方の退避位置まで下降させる。次にシンクロール3
に巻き付いている鋼板1に加えていた張力を弛めてシン
クロール3と退避位置にあるめっき槽2との間に鋼板1
のたるみを作った状態とする。
When switching from the hot-dip galvanized steel plate manufacturing process to the cold-rolled steel plate manufacturing process, the plating tank 2 is lowered from the plating position to the retreat position below by using the elevating device 10 as shown in FIGS. 2 and 4. Let Next is Syncroll 3
The tension applied to the steel plate 1 wound around the steel plate 1 is relaxed and the steel plate 1 is placed between the sink roll 3 and the plating tank 2 in the retracted position.
The slack is made.

【0020】次に移動装置12のモータ18をたとえば正回
転することによりネジ軸17を回転させ、これによってナ
ット部材16を介してスライドフレーム13を前進させる。
このようにして、スライドフレーム13上に搭載したデフ
レクターロール11をライン側方の退避位置からライン内
位置に前進移動させると、シンクロール3とめっき槽12
との間にたるんだ状態にある鋼板1のループ内にデフレ
クターロール11が挿入されることになる。その後、鋼板
1に張力を加えてデフレクターロール11に巻き付け、図
2および図4に示すような冷延鋼板製造の搬送経路に切
り替えるものである。切り替え後は、モータ20を回転駆
動してデフレクターロール11を回転し、鋼板1を搬送す
る。
Next, the screw shaft 17 is rotated by, for example, rotating the motor 18 of the moving device 12 in the forward direction, whereby the slide frame 13 is moved forward via the nut member 16.
In this way, when the deflector roll 11 mounted on the slide frame 13 is moved forward from the retracted position on the side of the line to the position inside the line, the sink roll 3 and the plating tank 12 are moved.
The deflector roll 11 is inserted into the loop of the steel sheet 1 which is in a slack state between and. Thereafter, tension is applied to the steel plate 1 and the steel plate 1 is wound around the deflector roll 11 and switched to the transport route for cold-rolled steel plate production as shown in FIGS. 2 and 4. After the switching, the motor 20 is rotationally driven to rotate the deflector roll 11 to convey the steel plate 1.

【0021】切り替え時には、浴中サポートロール8
a、8bおよびワイピングノズル4a、4bは開の状態
にしておくのが好ましく、さらにシンクロール3および
浴中サポートロール8a、8bなどの浴中機器にはめっ
き金属が付着しているのでこれを取り除いておくのが望
ましい。冷延鋼板製造工程から溶融めっき鋼板製造工程
への切り替えは溶融めっき鋼板製造工程から冷延鋼板製
造工程への切り替えと逆の操作を行えばよいため詳細な
説明は省略する。
When switching, the support roll 8 in the bath
It is preferable to leave a, 8b and the wiping nozzles 4a, 4b in an open state, and further remove the plating metal adhered to the equipment in the bath such as the sink roll 3 and the in-bath support rolls 8a, 8b. It is desirable to keep it. The switching from the cold-rolled steel sheet manufacturing process to the hot dip plated steel sheet manufacturing process may be performed by performing the reverse operation to the switching from the hot dip steel sheet manufacturing process to the cold rolled steel plate manufacturing process, and thus detailed description thereof will be omitted.

【0022】さらに溶融めっき鋼板製造工程で多く用い
られている通板材の使用時にめっき浴中に浸漬させない
方法は前記溶融めっき鋼板製造工程から冷延鋼板製造工
程への切り替えおよび冷延鋼板製造工程から溶融めっき
鋼板製造工程への切り替えと同じことを実施すればよい
ことは前述の通り明らかであり、詳細な説明は省略す
る。
Further, the method of not immersing the strip material, which is often used in the hot-dip galvanized steel sheet manufacturing process, in the plating bath is to switch from the hot-dip galvanized steel sheet manufacturing step to the cold-rolled steel sheet manufacturing step and from the cold-rolled steel sheet manufacturing step. It is clear that the same thing as the switching to the hot-dip galvanized steel sheet manufacturing process may be carried out as described above, and detailed description thereof will be omitted.

【0023】本例ではデフレクターロール11の支持を片
側のみから支持する方式での具体例を示したがデフレク
ターロール11をライン内に挿入後、反挿入側でもデフレ
クターロール11を支持する両側支持方式にすることも可
能である。
In this example, a specific example is shown in which the deflector roll 11 is supported from only one side. However, after the deflector roll 11 is inserted into the line, the deflector roll 11 is supported on both sides even on the non-insertion side. It is also possible to do so.

【0024】[0024]

【発明の効果】以上説明したように本発明によれば次の
効果を得ることができる。 冷延鋼板と溶融めっき鋼板の製造を可及的速やか
に、かつ容易に切り換えることが可能となり、よって製
造設備の稼働率を大幅に向上させることができる。 溶融めっき鋼板製造時において処理するストリップ
の寸法が大きく変化したとき、あるいは保全作業等で製
造設備が停止した後稼働させるときに必要であった通板
材をめっき浴に浸漬させなくて良いため、再使用が可能
となり生産コストを安価にすることができる。 冷延鋼板製造時にシンクロール等の溶融めっき鋼板
製造時に使用したシンクロール等の浴中機器を使用しな
いで専用のデフレクターロールを用いることから鋼板に
押し疵、スリ疵等を発生させることもなく高品質な製品
を安定して確実に製造することが可能となる。
As described above, according to the present invention, the following effects can be obtained. It is possible to switch production between the cold-rolled steel sheet and the hot-dip plated steel sheet as quickly and easily as possible, and thus it is possible to greatly improve the operating rate of the production equipment. When the size of the strip to be processed during the hot dip galvanized steel sheet production changes significantly, or when the stripping material needed to operate after the production facility is stopped for maintenance work etc. is not required to be immersed in the plating bath, It can be used and the production cost can be reduced. Since a dedicated deflector roll is used without using bath equipment such as sink rolls used during hot-dip galvanized steel plate manufacturing during cold-rolled steel plate manufacturing, it does not cause scratches or scratches on the steel plate and is high. It is possible to manufacture quality products in a stable and reliable manner.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の溶融めっき鋼板製造時のめっき槽およ
びデフレクターロール配置を示す正面図である。
FIG. 1 is a front view showing an arrangement of a plating tank and a deflector roll at the time of manufacturing a hot dip plated steel sheet of the present invention.

【図2】本発明の冷延鋼板製造時のめっき槽およびデフ
レクターロール配置を示す正面図である。
FIG. 2 is a front view showing the arrangement of a plating tank and deflector rolls when manufacturing the cold-rolled steel sheet of the present invention.

【図3】本発明の溶融めっき鋼板製造時の装置配置を示
す側面図である。
FIG. 3 is a side view showing an apparatus arrangement during production of the hot dip plated steel sheet of the present invention.

【図4】本発明の冷延鋼板製造時の装置配置を示す側面
図である。
FIG. 4 is a side view showing an apparatus arrangement during production of the cold-rolled steel sheet of the present invention.

【図5】従来例の溶融めっき製造時の装置配置を示す側
面図である。
FIG. 5 is a side view showing an apparatus arrangement during hot-dip galvanizing production of a conventional example.

【符号の説明】[Explanation of symbols]

1 鋼板 2 めっき浴 3 シンクロール 4 ガスワイピングノズル 5 熱処理炉 6 スナウト 7 搬送ロール 8 浴中サポートロール 9 トップロール 10 昇降装置 11 デフレクターロール 12 前後進移動装置 13 スライドフレーム 14 軸受 15 スライドベース 16 ナット部材 17 ネジ軸 18 モータ 19 軸継手 20 モータ 21 軸継手 1 Steel Plate 2 Plating Bath 3 Sink Roll 4 Gas Wiping Nozzle 5 Heat Treatment Furnace 6 Snout 7 Transport Roll 8 Support Roll in Bath 9 Top Roll 10 Lifting Device 11 Deflector Roll 12 Forward and Backward Moving Device 13 Slide Frame 14 Bearing 15 Slide Base 16 Nut Member 17 Screw shaft 18 Motor 19 Shaft coupling 20 Motor 21 Shaft coupling

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 溶融めっき鋼板および冷延鋼板を同一の
設備により製造することができる兼用製造設備の鋼板搬
送経路切り替え方法において、シンクロールを固定して
配置し、めっき浴の入っためっき槽をめっき位置と下方
の退避位置との間で昇降自在に配置すると共に、前記め
っき位置と下方の退避位置との間においてデフレクター
ロールをライン側方の退避位置とライン内位置との間で
水平に進退自在に配置し、溶融めっき鋼板を製造する場
合には、昇降装置を用いてめっき槽をめっき位置まで上
昇し、固定して配置したシンクロールをめっき浴に浸漬
すると共にデフレクターロールをライン側方に退避させ
た状態として溶融めっき鋼板をシンクロールに巻き付け
て上方に搬送する一方、冷延鋼板を製造する場合には、
めっき槽を固定配置したシンクロール下方の退避位置ま
で下降すると共に、前後進移動装置を用いてデフレクタ
ーロールをライン側方の退避位置よりライン内位置に移
動させた状態として、冷延鋼板をデフレクターロールに
巻き付けて上方に搬送することを特徴とする溶融めっき
鋼板、冷延鋼板の搬送経路切り替え方法。
1. A method for switching a steel sheet transport path of a combined manufacturing facility capable of manufacturing hot dip plated steel sheet and cold rolled steel sheet with the same equipment, wherein a sink roll is fixedly arranged and a plating tank containing a plating bath is provided. It is arranged so that it can be moved up and down between the plating position and the lower withdrawal position, and the deflector roll is horizontally advanced and retracted between the withdrawal position on the side of the line and the in-line position between the plating position and the lower withdrawal position. When manufacturing hot-dip galvanized steel sheets freely arranged, the elevating device is used to raise the plating tank to the plating position, the fixed sink roll is immersed in the plating bath, and the deflector roll is placed on the side of the line. While the hot dip plated steel sheet is wound around the sink roll and conveyed upward in the retracted state, when manufacturing a cold rolled steel sheet,
The cold-rolled steel sheet is deflected from the retracted position on the side of the line to the in-line position by using the forward / backward movement device while lowering the plating tank to the retracted position below the sink roll. A hot-dip plated steel sheet and a cold-rolled steel sheet transfer path switching method, which is wound around a sheet and conveyed upward.
【請求項2】 溶融めっき鋼板および冷延鋼板を同一設
備により製造することができる兼用製造設備の鋼板搬送
経路切り替え装置において、めっき位置に固定して配置
されたシンクロールと、めっき位置と下方の退避位置と
の間で昇降自在に配置されためっき槽と、めっき槽を下
部から支持してめっき位置と下方の退避位置との間を昇
降させる昇降装置と、前記めっき位置と下方のめっき槽
退避位置との間においてライン側方の退避位置とライン
内位置との間で水平に進退自在に配置されたデフレクタ
ーロールと、デフレクターロールをライン側方の退避位
置とライン内位置との間に進退させる前後進移動装置と
を具備したことを特徴とする溶融めっき鋼板、冷延鋼板
の搬送経路切り替え装置。
2. A steel plate transport path switching device of a combined manufacturing facility capable of manufacturing a hot dip plated steel sheet and a cold rolled steel sheet by the same equipment, a sink roll fixedly arranged at the plating position, A plating tank that is vertically movable between an evacuation position, an elevating device that supports the plating tank from below and elevates between the plating position and a lower evacuation position, and the plating position and the lower evacuation tank evacuation The deflector roll is arranged horizontally between the retracted position on the side of the line and the in-line position, and the deflector roll is retracted between the retracted position on the side of the line and the in-line position. A transport path switching device for a hot dip plated steel sheet or a cold rolled steel sheet, comprising a forward and backward moving device.
JP26680993A 1993-10-26 1993-10-26 Transfer route switching method and apparatus for hot-dip coated steel sheet and cold-rolled steel sheet Expired - Fee Related JP3258786B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP26680993A JP3258786B2 (en) 1993-10-26 1993-10-26 Transfer route switching method and apparatus for hot-dip coated steel sheet and cold-rolled steel sheet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP26680993A JP3258786B2 (en) 1993-10-26 1993-10-26 Transfer route switching method and apparatus for hot-dip coated steel sheet and cold-rolled steel sheet

Publications (2)

Publication Number Publication Date
JPH07118820A true JPH07118820A (en) 1995-05-09
JP3258786B2 JP3258786B2 (en) 2002-02-18

Family

ID=17435981

Family Applications (1)

Application Number Title Priority Date Filing Date
JP26680993A Expired - Fee Related JP3258786B2 (en) 1993-10-26 1993-10-26 Transfer route switching method and apparatus for hot-dip coated steel sheet and cold-rolled steel sheet

Country Status (1)

Country Link
JP (1) JP3258786B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101394445B1 (en) * 2012-10-05 2014-05-30 주식회사 포스코 Hot dip galvanizing apparatus and method for hot dip galvanization
EP3181708A4 (en) * 2014-08-11 2018-01-03 JFE Steel Corporation Steel-strip production method, and steel strip
EP3181709A4 (en) * 2014-08-11 2018-04-04 JFE Steel Corporation Steel-strip production apparatus

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101394445B1 (en) * 2012-10-05 2014-05-30 주식회사 포스코 Hot dip galvanizing apparatus and method for hot dip galvanization
EP3181708A4 (en) * 2014-08-11 2018-01-03 JFE Steel Corporation Steel-strip production method, and steel strip
EP3181709A4 (en) * 2014-08-11 2018-04-04 JFE Steel Corporation Steel-strip production apparatus
US10273557B2 (en) 2014-08-11 2019-04-30 Jfe Steel Corporation Steel-strip production apparatus
CN114507774A (en) * 2014-08-11 2022-05-17 杰富意钢铁株式会社 Steel strip manufacturing device

Also Published As

Publication number Publication date
JP3258786B2 (en) 2002-02-18

Similar Documents

Publication Publication Date Title
KR100502816B1 (en) Production method of hot-dip metal strip and device therefor
JP6450109B2 (en) Steel strip manufacturing equipment
RU2237743C2 (en) Method for processing of surface of elongated article, line and apparatus for effectuating the same
CN112840060A (en) Cooling device for hot-dip plated steel sheet
JP4427527B2 (en) Surface-treated steel sheet manufacturing equipment
CN1267573C (en) Guide roller scraper device of continuous molten metal electroplating equipment and method for preventing indentation
JP3258786B2 (en) Transfer route switching method and apparatus for hot-dip coated steel sheet and cold-rolled steel sheet
JP3258787B2 (en) Transfer route switching method and apparatus for hot-dip coated steel sheet and cold-rolled steel sheet
EP3181708B1 (en) Steel-strip production method
JP2003301251A (en) Device for removing stuck dross from roll in hot dip metal plating bath
US4323604A (en) Continuous dip-plating process on one-side of steel strip
JPH0810819A (en) Method and device for changing carrying course of steel strip in production line used to hot-dipping steel plate and also, cold drawn steel plate
KR102181733B1 (en) Apparatus for controlling of staying lenghth of strip in pickling tank
JP5539704B2 (en) Plating metal strip manufacturing apparatus and manufacturing method thereof
JP3508538B2 (en) Manufacturing equipment for hot-dip coated steel sheets
JP2000087201A (en) Production device of hot dip metal plated steel sheet
JP3889942B2 (en) Cold-rolled steel sheet and hot-dip steel sheet
JPH0266145A (en) Dewaving device of production equipment commonly used for plated steel sheet and cold rolled steel sheet
US4364328A (en) Apparatus for continuous dip-plating on one-side of steel strip
JP3302280B2 (en) Hot-dip metal plating apparatus and hot-dip metal plating method
JP2000008150A (en) Apparatus for producing hot dip metal coated steel sheet
JPH01136955A (en) Combined use manufacturing equipment for cold-rolled steel sheet and hot dip steel sheet
JPH09131554A (en) High-speed continuous coating equipment and high-speed continuous coating method for band-shaped body
JPH06336663A (en) Continuous hot dip metal coating method of band steel
JPH08269658A (en) Hot dip metal coating device

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees