JPH07103572B2 - How to lay a block mat - Google Patents
How to lay a block matInfo
- Publication number
- JPH07103572B2 JPH07103572B2 JP26484887A JP26484887A JPH07103572B2 JP H07103572 B2 JPH07103572 B2 JP H07103572B2 JP 26484887 A JP26484887 A JP 26484887A JP 26484887 A JP26484887 A JP 26484887A JP H07103572 B2 JPH07103572 B2 JP H07103572B2
- Authority
- JP
- Japan
- Prior art keywords
- block
- mat
- laying
- block mat
- slope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
- Revetment (AREA)
Description
【発明の詳細な説明】 〔産業上の利用分野〕 この発明は法面保護用等に用いるブロックマットの敷設
方法、より詳細には長い法面への敷設方法に関する。Description: TECHNICAL FIELD The present invention relates to a method of laying a block mat used for slope protection, and more particularly to a method of laying a long slope.
従来、ブロックマットを敷設して保護する際に法面等が
上下方向に長い場合、ブロックマットも縦方向に長いも
のをつくり、これを敷設しなければならなかった。しか
し輸送上、施工上ブロックマットの長さには限界があ
り、法面が非常に長い場合には、それに対応することが
できなかった。Conventionally, when laying and protecting a block mat, if the slope etc. is long in the vertical direction, it was necessary to make a block mat long in the vertical direction and lay it. However, in terms of transportation and construction, there is a limit to the length of the block mat, and if the slope is very long, it was not possible to handle it.
この発明はこの問題点の解消を図ったものである。その
目的は上下方向が20〜30m程度の長い法面であっても、
5〜10m程度の短いブロックマットを継いで敷設して長
大法面のブロックマットによる保護工の施工を可能とす
るブロックマットの敷設方法を提案するにある。The present invention is intended to solve this problem. Even if the purpose is a long slope with a vertical direction of 20 to 30 m,
It proposes a method of laying block mats that enables construction of protection works using block mats with long slopes by successively laying short block mats of about 5 to 10 m.
このブロックマットの敷設方法は、合成繊維からなるフ
ィルタークロスの表面にコンクリートブロックを固着
し、その長さ方向両端部にブロックを固着しない余端部
を有するブロックマットを法面に敷設する方法におい
て、法面下部から上方向に複数のブロックマットの長さ
方向に配向し、直列をなし順次敷設し、既敷設の下方ブ
ロックマットの上端余端部上にその上方に敷設する上方
ブロックマットの下端部を重ね、上方ブロックマットの
下端余端部を切断し、上方ブロックマットの下端ブロッ
クを下方ブロックマットの上端ブロックに突合わせ配設
することを特徴とする。The method of laying this block mat is such that a concrete block is fixed to the surface of a filter cloth made of synthetic fiber, and a block mat having extra ends that do not fix the block at both ends in its length direction is laid on the slope. The lower part of the upper block mat, which is orientated in the length direction of the block mats from the lower part of the slope to the upper part of the upper part of the upper part of the existing lower block mat, is installed in series and is laid in sequence. Are stacked, the lower end surplus portion of the upper block mat is cut, and the lower end block of the upper block mat is abutted against the upper end block of the lower block mat.
請求項2の敷設方法は、各コンクリートブロックの中央
に竪方向の透孔を設け、前記の敷設方法で突合わせ配設
した上下ブロックマットの2つのブロックの前記透孔に
またがり、U形のアンカーを打込むことを特徴とする。3. The laying method according to claim 2, wherein a vertical through hole is provided at the center of each concrete block, and the U-shaped anchor extends over the through holes of the two blocks of the upper and lower block mats that are abutted by the above laying method. It is characterized by hitting.
以下、図示する実施例により説明する。第1図はこの敷
設方法で用いるブロックマット1であり、合成繊維の織
物あるいは不織布からなるフィルタークロス2の表面に
略直方体形のコンクリートブロック3を隙間がないよう
に突合わせ配置し接着剤で固着し構成されている。ブロ
ックマットは通常、長さ200〜900cm、幅150〜200cmであ
り長さ方向両端部および片側縁にそれぞれブロックマッ
トが固着していない余端部6を有する。長さ方向余端部
は長さ40〜60cm、側縁余端部は幅10〜30cm程度の範囲で
ある。第1図のブロックマットに固着したコンクリート
ブロック3は寸法が20×20×10cm(高さ)で、中央に竪
方向の透孔4、四側面に断面半円形の切欠部5が設けて
ある。コンクリートブロック3はこのほか様々な態様の
ものがある。第3図は寸法が30×20×15.5cm(高さ)で
四側面に断面半円形の切欠部5があるブロック3をフィ
ルタークロス2の表面に敷並べ固着してなったブロック
マット1である。Hereinafter, description will be made with reference to the illustrated embodiment. FIG. 1 shows a block mat 1 used in this laying method, in which a substantially rectangular parallelepiped concrete block 3 is butted and affixed with an adhesive on the surface of a filter cloth 2 made of synthetic fiber woven fabric or non-woven fabric. Is configured. The block mat usually has a length of 200 to 900 cm and a width of 150 to 200 cm, and has an extra end portion 6 to which the block mat is not fixed, at both longitudinal end portions and one side edge. The lengthwise margin is 40 to 60 cm, and the side margin margin is about 10 to 30 cm in width. The concrete block 3 fixed to the block mat shown in FIG. 1 has a size of 20 × 20 × 10 cm (height), a through hole 4 in the vertical direction at the center, and a notch 5 with a semicircular cross section on the four side faces. The concrete block 3 has various other forms. FIG. 3 shows a block mat 1 in which a block 3 having dimensions of 30 × 20 × 15.5 cm (height) and having semicircular cutouts 5 on four sides is laid and fixed on the surface of a filter cloth 2. .
このブロックマットを長大な法面に敷設して法面保護工
を形成するには、第2図に示すごとく、法面7の下部か
ら上方向に、法面上下方向に沿いブロックマット1を長
さ方向に配向せしめて直列状に順次敷設する((a)図
参照)。この際に、既に敷設した下方マット1−1の上
端余端部6−1上に次に敷設する上方1−2の下端部を
重ね((b)図参照)、そのマット1−2の下端余端部
6−2を下方マット1−1の上端ブロック3の上側面に
沿い折曲げ、ブロック3の上面高さで切断し((c)図
参照)、下方マット1−1の上端ブロック3と上方ブロ
ック1−2の下端ブロック3とを、切り残した余端部6
を間に介し突合わせ配設する。さらに必要に応じ、突合
わせ配設した2つのブロック3,3の透孔4,4にまたがり、
U形のアンカー8を打込む((d)図参照)、あるいは
2つのブロック3,3の断面半円形の切欠部5,5にまたがり
U形アンカー8を打込み固定する((e)図参照)。In order to form a slope protection work by laying this block mat on a long slope, as shown in FIG. 2, lengthen the block mat 1 from the lower part of the slope 7 to the upper direction and along the vertical direction of the slope. They are orientated in the vertical direction and are laid one after another in series (see Fig. (A)). At this time, the lower end portion of the upper mat 1-2 to be laid next is overlapped on the upper end surplus portion 6-1 of the lower mat 1-1 that has already been laid (see (b) figure). The surplus end portion 6-2 is bent along the upper surface of the upper end block 3 of the lower mat 1-1, cut at the height of the upper surface of the block 3 (see (c) figure), and the upper end block 3 of the lower mat 1-1 is cut. And a lower end block 3 of the upper block 1-2, a surplus end portion 6 left uncut.
Are arranged in abutment with a gap between them. Further, if necessary, the two blocks 3 and 3 arranged in abutment straddle the through holes 4 and 4,
Drive the U-shaped anchor 8 (see Figure (d)), or drive the U-shaped anchor 8 over the notches 5 and 5 of the two blocks 3 and 3 having a semicircular cross section to fix it (see Figure (e)). .
なお、前記実施例では上方マット1−2の下端余端部6
−2はブロック3上面高さ位置で切断したが、上方マッ
ト1−2の下端ブロックの下端縁に沿い切断してもよ
い。In the above embodiment, the lower end surplus portion 6 of the upper mat 1-2 is
-2 was cut at the height position of the upper surface of the block 3, but may be cut along the lower edge of the lower block of the upper mat 1-2.
このブロックマットの敷設方法は以上の構成からなり、
複数のブロックマットを用い、順次敷設して法面保護工
を形成することができる。敷設した上下のブロックマッ
トは、下方マットの上端余端部でオーバーラップし、上
下マットの上下ブロックは突合わされ配置してあるの
で、連続した一枚のマットのごとき挙動をなし敷設安定
性が高く、ブロックマット本来の法面保護機能を発揮で
きる。This block mat laying method consists of the above configuration,
A plurality of block mats can be used and sequentially laid to form a slope protection work. The upper and lower block mats that have been laid overlap with each other at the upper end of the lower mat, and the upper and lower blocks of the upper and lower mats are arranged in abutting relation, so that they behave like a single continuous mat and the laying stability is high. , The original mat protection function of the block mat can be demonstrated.
なお、上下マット間の突合わせ配設したブロックにU形
アンカーを打込み連結固定するならば敷設安定性を一層
高めることができる。In addition, if a U-shaped anchor is driven into a block provided in abutment between the upper and lower mats and connected and fixed, the laying stability can be further enhanced.
このブロックマットの敷設方法は、取扱性がよく、施工
性が優れた短いブロックマットを用いて長い法面に保護
工を形成することを可能とする。This block mat laying method makes it possible to form a protective work on a long slope by using a short block mat that is easy to handle and has excellent workability.
第1図はブロックマットの平面図、第2図(a),
(b),(c),(d),(e)は実施例のブロックマ
ットの敷設方法を工程順に示す縦断面図、第3図は他の
態様例のブロックマットの平面図である。 1……ブロックマット、2……フィルタークロス、3…
…コンクリートブロック、4……透孔、5……切欠部、
6……余端部、7……法面、8……アンカー。FIG. 1 is a plan view of the block mat, FIG. 2 (a),
(B), (c), (d) and (e) are longitudinal sectional views showing a method of laying the block mat of the embodiment in the order of steps, and FIG. 3 is a plan view of the block mat of another embodiment. 1 ... Block mat, 2 ... Filter cloth, 3 ...
… Concrete blocks, 4 …… Through holes, 5 …… Notches,
6 ... surplus part, 7 ... slope, 8 ... anchor.
Claims (2)
にコンクリートブロックを固着し、その長さ方向両端部
にブロックを固着しない余端部を有するブロックマット
を法面に敷設する方法において、法面下部から上方向に
複数のブロックマットを長さ方向に配向し、直列をなし
順次敷設し、既敷設の下方ブロックマットの上端余端部
上にその上方に敷設する上方ブロックマットの下端部を
重ね、上方ブロックマットの下端余端部を切断し、上方
ブロックマットの下端ブロックを下方ブロックマットの
上端ブロックに突合わせ配設することを特徴とするブロ
ックマットの敷設方法。1. A method of laying on a slope a block mat having a concrete block fixed to the surface of a filter cloth made of synthetic fiber and having an extra end not fixing the block at both ends in the length direction, the lower part of the slope From the above, a plurality of block mats are orientated in the length direction in the upward direction, laid in series and sequentially laid, and the lower end portion of the upper block mat laid above the upper end surplus portion of the existing lower block mat is overlaid, A method of laying a block mat, comprising cutting an excess lower end portion of an upper block mat and arranging a lower end block of the upper block mat to abut an upper end block of a lower block mat.
透孔を設け、突合わせ配設した上下ブロックマットの2
つのブロックの前記透孔にまたがり、U形のアンカーを
打ち込むことを特徴とする特許請求の範囲第1項記載の
ブロックマットの敷設方法。2. The upper and lower block mats 2 provided with a through hole in the vertical direction at the center of each concrete block and arranged in abutment with each other.
The method for laying a block mat according to claim 1, wherein a U-shaped anchor is driven so as to straddle the through holes of one block.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP26484887A JPH07103572B2 (en) | 1987-10-20 | 1987-10-20 | How to lay a block mat |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP26484887A JPH07103572B2 (en) | 1987-10-20 | 1987-10-20 | How to lay a block mat |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH01105820A JPH01105820A (en) | 1989-04-24 |
JPH07103572B2 true JPH07103572B2 (en) | 1995-11-08 |
Family
ID=17409055
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP26484887A Expired - Lifetime JPH07103572B2 (en) | 1987-10-20 | 1987-10-20 | How to lay a block mat |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH07103572B2 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5236572B2 (en) * | 2009-05-14 | 2013-07-17 | 東京インキ株式会社 | Slope protection structure and construction method of slope protection structure |
JP5638352B2 (en) * | 2010-11-12 | 2014-12-10 | 熊谷 和 | Mat with stepped concrete block |
-
1987
- 1987-10-20 JP JP26484887A patent/JPH07103572B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPH01105820A (en) | 1989-04-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5342141A (en) | Movable surface paving apparatus and method for using the same | |
JPH07103572B2 (en) | How to lay a block mat | |
US2227614A (en) | Expansion joint | |
KR101160293B1 (en) | Weeds growth control apparatus installed on roadsid | |
JPH0548819B2 (en) | ||
JP2603293B2 (en) | Block mat for soil protection | |
JPH08170311A (en) | Floor slab with ct type steel | |
JP2625614B2 (en) | Drain material placement method | |
JPS6241822A (en) | Light-weight filling structure | |
JP2774066B2 (en) | Floor slab made of PC version | |
JPH06240769A (en) | Structure of induced joint portion of concrete slab | |
JP3784957B2 (en) | Foundation formation method to build buildings such as houses | |
JPH0732712Y2 (en) | Jig for rebar positioning | |
JP2717515B2 (en) | Landslide prevention wire mesh | |
JP2578929B2 (en) | Slope protection method | |
JPH0455092Y2 (en) | ||
JP3072371B2 (en) | Reinforcing bars for building structure slabs | |
JPH05311601A (en) | Metallic material for laying rail | |
JPH01290821A (en) | Soil protecting block mat | |
JPH0637071Y2 (en) | Slope protection structure | |
JPH10238104A (en) | Scaffold for building unit | |
CA1114633A (en) | Device for use in building | |
JPS63241202A (en) | Method for casting concrete floor panel | |
JP2769438B2 (en) | Aggregate for slope protection construction | |
JPH08184056A (en) | Construction method for slope of land and anchor used therefor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313113 |
|
R360 | Written notification for declining of transfer of rights |
Free format text: JAPANESE INTERMEDIATE CODE: R360 |
|
R370 | Written measure of declining of transfer procedure |
Free format text: JAPANESE INTERMEDIATE CODE: R370 |
|
S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313113 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313113 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
EXPY | Cancellation because of completion of term |