JPH069173A - Upper art template device for installing elevator - Google Patents
Upper art template device for installing elevatorInfo
- Publication number
- JPH069173A JPH069173A JP19027892A JP19027892A JPH069173A JP H069173 A JPH069173 A JP H069173A JP 19027892 A JP19027892 A JP 19027892A JP 19027892 A JP19027892 A JP 19027892A JP H069173 A JPH069173 A JP H069173A
- Authority
- JP
- Japan
- Prior art keywords
- ruler
- centering
- main
- ruler material
- main ruler
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B19/00—Mining-hoist operation
- B66B19/002—Mining-hoist operation installing or exchanging guide rails
Landscapes
- Movable Scaffolding (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】この発明は、エレベーターの据付
作業に使用する上部型板装置の改良に関するものであ
る。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an improvement of an upper template device used for elevator installation work.
【0002】[0002]
【従来の技術】図3は従来の上部型板装置の配置例を示
すエレベーター昇降路の縦断面図、図4は同上部型板装
置を上方から見た昇降路平面図、図5は実開昭54−2
2323号公報に示された芯出し装置における上部型板
装置の昇降路平面図である。図3において、(1)は昇降
路、(2)は昇降路内壁、(3)は昇降路天井、(4)は昇降路
内壁(2)の上方に対向して設置された受台でアンカー(5)
で固定される。(6)は上記受台(4)に架設固定される渡し
材、(7)はこの渡し材(6)上に架設固定される各種の定規
材でそれぞれエレベーターの乗場敷居、カゴレールおよ
びカウンター若しくは油圧ジャッキのガイドレールの芯
出し設定を行うためのものである。(8)は型板(7)から懸
垂される芯出し用下げ振り線、(9)はこの下げ振り線の
下端に吊るされるおもりである。2. Description of the Related Art FIG. 3 is a vertical cross-sectional view of an elevator hoistway showing an arrangement example of a conventional upper template device, FIG. 4 is a plan view of the upper template device seen from above, and FIG. 54-2
It is a hoistway top view of the upper template device in the centering device shown in Japanese Patent No. 2323. In FIG. 3, (1) is the hoistway, (2) is the hoistway inner wall, (3) is the hoistway ceiling, and (4) is a pedestal installed facing above the hoistway inner wall (2). (Five)
Fixed by. (6) is a transfer material that is erected and fixed on the pedestal (4), and (7) is various ruler materials that are erected and fixed on the transfer material (6) .Elevator sill, cage rail and counter, or hydraulic pressure, respectively. This is for centering the guide rails of the jack. (8) is a centering plumb line suspended from the template (7), and (9) is a weight suspended at the lower end of this plumb line.
【0003】図4において、(7a)は乗場敷居芯出し設定
用の定規材、(7b)はカゴレール芯出し設定用の定規材、
(7c)はカウンター若しくは油圧ジャッキガイドレール芯
出し設定用の定規材である。(10a)(10b)(10c)(10d)(10
e)(10f)はそれぞれの寸法間隔芯出し用下げ振り線を懸
垂する貫通孔、(11)はカゴレール、(12)はカウンター若
しくは油圧ジャッキガイドレールである。In FIG. 4, (7a) is a ruler material for setting the center of a landing threshold, (7b) is a ruler material for setting the center of a basket rail,
(7c) is a ruler for setting the center of the counter or the hydraulic jack guide rail. (10a) (10b) (10c) (10d) (10
e) (10f) is a through hole for suspending the down-swing line for centering the respective size intervals, (11) is a basket rail, and (12) is a counter or a hydraulic jack guide rail.
【0004】図5において、(13)は乗場敷居用定規材で
下げ振り線を位置決め懸垂するノッチ(17a)(17b)を有し
ている。(14a)(14b)は一対の渡し材を兼ねた定規材でそ
れぞれカゴレール用下げ振り位置決めノッチ(17c)(17d)
およびカウンター若しくは油圧ジャッキガイドレール用
下げ振り位置決めノッチ(17e)(17f)を有している。(15
a)は上記定規材(13)と(14a)とを連結する副定規材、(15
b)は上記定規材(13)と(14b)とを連結する副定規材で、
これらの副定規材は上記ノッチ(17a)〜(17f)の相対距離
位置を決めるはたらきをする。上記各部材の連結にあた
っては、連結軸部材としての枢支ピン(18)が用いられて
いる。In FIG. 5, (13) is a hall sill ruler and has notches (17a) (17b) for positioning and suspending a plumb line. (14a) and (14b) are ruler materials that also serve as a pair of bridge materials.
And counters or hydraulic jack guide rail downswing positioning notches (17e) (17f). (15
(a) is a sub-rule material that connects the ruler materials (13) and (14a), and (15)
b) is a sub-rule material that connects the above-mentioned ruler materials (13) and (14b),
These sub ruler members serve to determine the relative distance positions of the notches (17a) to (17f). A pivot pin (18) as a connecting shaft member is used for connecting the above-mentioned members.
【0005】次に図4の従来例についてその取扱い方法
を説明する。まず乗場敷居用定規材(7a)をその貫通孔(1
0a)(10b)に下げ振り線(8)を懸垂して渡し材(6)上に仮固
定した後、乗場に設けられた図示されない建築基準墨を
もとに貫通孔(10a)(10b)の下げ振り線(8)が所定の位置
にくるよう定規材(7a)を調整固定する。次に、カゴレー
ル用定規材(7b)を渡し材(6)上に仮固定し、下げ振り線
(8)用の貫通孔(10a)と(10c)、(10b)と(10d)および(10b)
と(10c)若しくは(10a)と(10d)の相対距離位置が所定に
なるように、定規材(7b)を位置調整して渡し材(6)上に
固定する。次にカウンターまたは油圧ジャッキガイドレ
ール用定規材(7c)についても貫通孔(10c)と(10e)、(10
d)と(10f)および(10d)と(10e)若しくは(10c)と(10f)の
相対距離位置が所定になるよう位置調整して渡し材(6)
上に固定する。Next, a method of handling the conventional example shown in FIG. 4 will be described. First, attach the ruler material (7a) for the hall to the through hole (1
After suspending the plumb line (8) on (0a) (10b) and temporarily fixing it on the crossing material (6), through holes (10a) (10b) based on the building standard ink not shown provided at the landing Adjust and fix the ruler material (7a) so that the plumb bob line (8) comes to a predetermined position. Next, temporarily fix the ruler material (7b) for the basket rail on the passing material (6),
Through holes for (8) (10a) and (10c), (10b) and (10d) and (10b)
The ruler material (7b) is position-adjusted and fixed on the transfer material (6) so that the relative distance positions of (10c) and (10c) or (10a) and (10d) become predetermined. Next, for the ruler material (7c) for the counter or hydraulic jack guide rail, also through holes (10c), (10e), (10
Adjusting the relative distance between (d) and (10f) and (10d) and (10e) or (10c) and (10f) to a predetermined position, and then handing over (6)
Fix on top.
【0006】次に図5の従来例についてその取扱い方法
を説明する。乗場敷居用定規材(13)はノッチ(17a)(17b)
に下げ振り線をかけて懸垂し、図4の従来例と同様に乗
場建築墨により位置決めし、図示されない受台に固定す
る。次に定規材(14a)(14b)を型板(13)と枢支ピン(18)で
連結し、相対する図示されない受台に仮置きして、副定
規材(15a)(15b)で相互の定規材とノッチが所定の相対距
離位置になるよう連結した後、定規材(14a)(14b)を上記
受台に本固定する。Next, a method of handling the conventional example shown in FIG. 5 will be described. The ruler material (13) for hall sill is notch (17a) (17b)
It is suspended with a plumb bob, and it is positioned by the landing construction black as in the conventional example of FIG. 4 and fixed to a pedestal not shown. Next, the ruler materials (14a) and (14b) are connected to the template (13) by the pivot pin (18), temporarily placed on the opposite pedestal (not shown), and the sub ruler materials (15a) and (15b) are used for mutual support. After the ruler material and the notch are connected to each other at a predetermined relative distance position, the ruler materials (14a) and (14b) are permanently fixed to the pedestal.
【0007】[0007]
【発明が解決しようとする課題】従来の上部型板装置は
以上のように構成されているので、図4の従来例では、
下げ振り線用貫通孔(10c)(10d)(10e)および(10f)の位置
決めは、相対する片方の位置決めができても、反対側の
位置決め時に容易に狂いが生じるため、最終的な位置決
めまでに相当の調整時間を要する。図5の従来例では、
下げ振り線用ノッチ(17c)と(17e)および(17d)と(17f)の
χ方向の位置寸法が固定されるため、特定のエレベータ
ーサイズレイアウトにしか対応できず、そのため型板装
置の種類が増加するという問題点があった。また下げ振
り線の相対距離位置関係が組立後しか確認できない問題
点があった。Since the conventional upper die plate apparatus is constructed as described above, in the conventional example shown in FIG.
The positioning of the through-holes (10c), (10d), (10e), and (10f) for the plumbing line is easy even if the opposite one can be positioned. Requires a considerable amount of adjustment time. In the conventional example of FIG. 5,
Since the position dimensions in the χ direction of the plumb bob notches (17c) and (17e) and (17d) and (17f) are fixed, they can only be applied to specific elevator size layouts, so the type of template equipment There was a problem that it would increase. Further, there is a problem that the relative distance positional relationship of the plumb bob cannot be confirmed only after assembly.
【0008】この発明は、上記のような問題点に鑑みて
なされたもので、下げ振り線位置決めを短時間で行うこ
とができると共に、複数のエレベーターサイズレイアウ
トに容易に対応でき、しかも位置を設定しながら直接各
下げ振り線の相対距離位置を確認できるエレベーターの
据付用上部型板装置を得ることを目的とする。The present invention has been made in view of the above problems, and can perform downswing line positioning in a short time, easily support a plurality of elevator size layouts, and set the position. However, it is an object of the present invention to obtain an elevator upper template device that can directly confirm the relative distance position of each plumb line.
【0009】[0009]
【課題を解決するための手段】請求項1の発明に係るエ
レベーターの据付用上部型板装置は、3種の主定規材を
所定の位置に配設し、隣接する2つの定規材との間で四
辺形とその対角線を構成する如く副定規材をこれに連結
するものであって、各連結部は、上記主定規材と上記副
定規材の嵌合孔を挿嵌し、中心に下げ振り線を貫通懸垂
する軸心孔を有する連結軸部材からなり、各定規材を一
体に固定することを主要な構成とする。According to a first aspect of the present invention, there is provided an elevator upper template device for installing elevators, in which three types of main ruler members are arranged at predetermined positions and between two adjacent ruler members. The sub ruler material is connected to it so as to form a quadrangle and its diagonal line, and each connecting part is inserted into the fitting hole of the main ruler material and the sub ruler material, and is oscillated to the center. It is composed of a connecting shaft member having an axial center hole penetrating and suspending a wire, and the main constitution is to integrally fix each ruler member.
【0010】請求項2の発明に係るエレベーターの据付
用上部型板装置は、3種の主定規材を所定の位置に配設
し、各種機器寸法に対応する芯出し下げ振り線を貫通懸
垂する軸心孔を有する連結軸部材の嵌合孔を少なくとも
上記主定規材の長手方向に沿って複数設け隣接する上記
主定規材の下げ振り線間に架設した相互距離間隔を設定
する副定規材の両端の嵌合孔を上記主定規材の嵌合孔と
共に上記連結軸部材に嵌合し、各定規材を一体に固定す
ることを主要な構成とする。In the elevator upper template device according to the second aspect of the present invention, three types of main ruler members are arranged at predetermined positions, and centering downward swing lines corresponding to various equipment dimensions are suspended. A plurality of fitting holes of a connecting shaft member having a shaft center hole are provided along at least the longitudinal direction of the main ruler member and a sub-ruler member for setting a mutual distance interval installed between the plumbing lines of the adjacent main ruler members. The main configuration is to fit the fitting holes at both ends together with the fitting holes of the main ruler member to the connecting shaft member to integrally fix each ruler member.
【0011】[0011]
【作用】この発明による上部型板装置は、3種の主定規
材を所定の位置に配設し、隣接する2つの定規材との間
で四辺形とその対角線を構成する如く副定規材を連結
し、連結部は下げ振り線を貫通懸垂する軸心孔を有する
連結軸部材から成っていることにより、組立てと同時に
正確な芯出しが行われ、微調整を要しない。In the upper template apparatus according to the present invention, three types of main ruler members are arranged at predetermined positions, and a sub-rule member is formed so as to form a quadrangle and its diagonal line between two adjacent ruler members. By connecting, the connecting portion is made of a connecting shaft member having an axial hole through which the plumb line is suspended, so that accurate centering is performed at the same time as assembly, and fine adjustment is not required.
【0012】また各主定規材の長手方向に沿って、各種
機器寸法に対応する芯出し下げ振り線を貫通懸垂する軸
心孔を有する連結軸部材の嵌合孔を複数設けたことによ
り、エレベーター機器の寸法間隔サイズレイアウトの変
化にも対応できる。Further, by providing a plurality of fitting holes for connecting shaft members having shaft center holes penetrating and suspending centering downswing lines corresponding to various equipment dimensions along the longitudinal direction of each main ruler member, the elevator It is also possible to cope with changes in equipment size and size layout.
【0013】[0013]
実施例1.以下、この発明の一実施例を図について説明
する。従来例と同一部分には同一符号を付し説明を省略
する。図1において、(15a)(15c)は乗場敷居芯出し設定
用の主定規材(7a)とカゴレール芯出し設定用の主定規材
(7b)との間で台形のような四辺形を形成する副定規材、
(15b)はその対角線を形成する副定規材、(15d)(15f)は
カゴレール芯出し設定用の主定規材(7b)とカウンター若
しくは油圧ジャッキのガイドレールの芯出し設定用の主
定規材(7c)との間で台形のような四辺形を形成する副定
規材、(15e)はその対角線を形成する副定規材、(19a)(1
9b)(19c)(19d)(19e)(19f)はそれぞれ連結軸部材で上記
主定規材嵌合孔(21)と副定規材の嵌合孔(22)に挿嵌され
ている。Example 1. An embodiment of the present invention will be described below with reference to the drawings. The same parts as those of the conventional example are designated by the same reference numerals and the description thereof will be omitted. In Fig. 1, (15a) and (15c) are the main ruler material (7a) for setting the hall threshold and the main ruler material for setting the cage rail.
Sub ruler material that forms a trapezoidal quadrangle with (7b),
(15b) is a sub-ruler material that forms the diagonal line, (15d) and (15f) is a main ruler material (7b) for setting the center of the basket rail and the main ruler material for setting the center of the guide rail of the counter or hydraulic jack ( 7c) is a trapezoid-shaped quadrangle, (15e) is a diagonal ruler, and (19a) (1
9b), (19c), (19d), (19e), and (19f) are connecting shaft members, which are inserted into the fitting holes (21) of the main ruler material and the fitting holes (22) of the sub ruler material.
【0014】図2は図1のII−II線断面詳細図で、上記
連結部の構造が拡大して示されている。連結軸部材(19
c)は中央に円柱状の嵌合部を有し、各部材の嵌合孔(21)
(22)と接合している。連結軸部材(19c)の軸心には下げ
振り線(8)を貫通懸垂する軸心孔(20)が形成されてい
る。連結軸部材(19c)の上下両端には螺子が切られ、座
金(23)、ナット(24)で緊締される。FIG. 2 is a detailed sectional view taken along the line II-II of FIG. 1, in which the structure of the connecting portion is shown enlarged. Connecting shaft member (19
c) has a cylindrical fitting part in the center, and the fitting hole (21) of each member
It is joined with (22). A shaft center hole (20) is formed in the shaft center of the connecting shaft member (19c) so as to suspend and suspend the plumb bob (8). Screws are cut on the upper and lower ends of the connecting shaft member (19c), and tightened with washers (23) and nuts (24).
【0015】以上の構成からなる上記実施例の作用につ
き説明する。受台(4)および渡し材(6)を従来例の如く設
置した後、乗場敷居芯出し用主定規材(7a)を渡し材(6)
上に仮固定し、芯出し下げ振り線(8)を主定規材(7a)の
両端の連結軸部材(19a)(19b)の軸心孔(20)(20)に通して
懸垂し、建築の基準墨をもとに、下げ振り線(8)が所定
位置に来るよう主定規材(7a)を位置決めし、固定する。The operation of the above embodiment having the above structure will be described. After installing the pedestal (4) and the transfer material (6) as in the conventional example, the main ruler material (7a) for centering the landing sill is transferred as the transfer material (6).
Temporarily fixed on top, suspend the centering downswing line (8) through the shaft center holes (20) (20) of the connecting shaft members (19a) (19b) at both ends of the main ruler material (7a), Based on the reference black ink, the main ruler material (7a) is positioned and fixed so that the plumb bob (8) comes to a predetermined position.
【0016】次にカゴレール用主定規材(7b)を渡し材
(6)上に仮固定し、その右端の連結軸部材(19c)と上記主
定規材(7a)の連結軸部材(19a)とに、予め所定の距離位
置に備えた副定規材(15a)の嵌合孔(22)(22)を嵌合させ
る。同時に連結軸部材(19c)と(19b)とに、予め所定の距
離位置に備えた副定規材(15b)の嵌合孔(22)(22)を嵌合
させる。次いで反対側に位置する連結軸部材(19d)と(19
b)とに、予め所定の距離位置に備えた副定規材(15c)の
嵌合孔(22)(22)を嵌合させる。上記の嵌合後ナット(24)
を緊締する。このようにすれば副定規材(15a)と(15c)と
で四辺形の2辺、副定規材(15b)で対角線を構成するた
め、これらの各定規材の位置は不動のものとなり、連結
軸部材(19c)と(19d)の位置決めが完了する。従ってその
軸心を通る芯出し下げ振り線(8)(8)の位置は確定する。
同様にカウンター若しくは油圧ジャッキガイドレール用
主定規材(7c)についても、連結軸部材(19e)と(19c)との
間に副定規材(15d)、連結軸部材(19e)と(19d)間に副定
規材(15e)および連結軸部材(19f)と(19d)間に副定規材
(15f)をそれぞれ配設することにより上記連結軸部材(19
e)と(19f)との位置決めが行われ、従ってその軸心を通
る芯出し下げ振り線(8)(8)の位置は確定する。[0016] Next, the main ruler material (7b) for the cage rail is handed over.
(6) Temporarily fixed on the connecting shaft member (19c) of the right end and the connecting shaft member (19a) of the main ruler member (7a), a sub-rule member (15a) provided in advance at a predetermined distance position. The fitting holes (22) and (22) are fitted. At the same time, the connecting shaft members (19c) and (19b) are fitted with the fitting holes (22) and (22) of the auxiliary ruler material (15b) provided at predetermined distance positions in advance. Next, connecting shaft members (19d) and (19d) located on the opposite side are
The fitting holes (22) and (22) of the auxiliary ruler material (15c) provided in advance at a predetermined distance position are fitted into b). After mating nut above (24)
Tighten. In this way, the two sides of the quadrilateral are composed of the sub-regular materials (15a) and (15c), and the diagonal line is composed of the sub-regular material (15b). The positioning of the shaft members (19c) and (19d) is completed. Therefore, the position of the centering downward swing line (8) (8) passing through the axis is fixed.
Similarly, for the main ruler material (7c) for the counter or hydraulic jack guide rail, between the connecting shaft members (19e) and (19c), the sub-rule material (15d), between the connecting shaft members (19e) and (19d). The sub-rule material (15e) and the sub-rule material between the connecting shaft members (19f) and (19d)
By disposing (15f) respectively, the connecting shaft member (19
Positioning of (e) and (19f) is performed, and therefore, the positions of the centering downswing lines (8) and (8) passing through the axes thereof are determined.
【0017】以上の位置決め後、主定規材(7b)(7c)を適
当な手段で渡し材(6)上に固定する。万一副定規材(15a)
〜(15f)がレール(11)(12)等と干渉するようなことがあ
れば、主定規材(7b)(7c)の位置固定後干渉する副定規材
を取外すことも可能である。また主定規材(7b)の位置決
めが終了した段階でこれを渡し材(6)上に固定すれば、
副定規材(15a)(15b)および(15c)を取外して、副定規材
(15d)(15e)および(15f)を主定規材(7b)(7c)間に架設し
たときの傾きを最小限度に抑えて精度を確保することも
可能となる。After the above positioning, the main ruler materials (7b) and (7c) are fixed on the transfer material (6) by an appropriate means. Shoulder ruler material (15a)
If (~ 15f) may interfere with the rails (11), (12), etc., it is possible to remove the interfering sub-rule material after fixing the positions of the main rule materials (7b), (7c). If the main ruler material (7b) is positioned on the handing material (6) when it is positioned,
Remove the sub ruler materials (15a), (15b) and (15c)
It is also possible to minimize the inclination when the (15d), (15e) and (15f) are installed between the main ruler members (7b) and (7c) to ensure accuracy.
【0018】実施例2.また上記実施例では、連結軸部
材の嵌合する嵌合孔は予め設置するエレベーター機種に
合わせて各定規材の両端に1個ずつ設けたものを示した
が、エレベーター機種の寸法間隔サイズレイアウトに合
わせて、連結軸部材(19a)〜(19f)を主定規材(7a)(7b)(7
c)の所定間隔位置に配設できるよう嵌合孔(21)を長手方
向に沿って複数個設けてもよい。さらにまた、これに対
応して副定規材(15a)〜(15f)にも各連結軸部材(19a)〜
(19f)を所定間隔位置に保持できるよう嵌合孔(22)を長
手方向に沿って複数個設けてもよい。このようにするこ
とにより、芯出しする機器の寸法間隔サイズレイアウト
に合わせて、連結軸部材(19a)〜(19f)を対応する孔(21)
に移し変え、副定規材(15a)〜(15f)の対応する孔(22)に
よって、これらの型板、下げ振り線を所定の相対距離位
置に配置構成することができる。Example 2. Further, in the above-mentioned embodiment, the fitting hole into which the connecting shaft member is fitted is provided one at each end of each ruler material in accordance with the elevator model to be installed in advance. In addition, connect the connecting shaft members (19a) to (19f) to the main ruler materials (7a) (7b) (7
A plurality of fitting holes (21) may be provided along the longitudinal direction so that the fitting holes (21) can be arranged at predetermined intervals in c). Correspondingly, each of the connecting shaft members (19a)-(15a)-(15f)-
A plurality of fitting holes (22) may be provided along the longitudinal direction so that the (19f) can be held at predetermined intervals. By doing so, the connecting shaft members (19a) to (19f) are provided with corresponding holes (21) in accordance with the size interval size layout of the centering device.
Then, these template plates and plumb lines can be arranged at predetermined relative distance positions by the corresponding holes (22) of the sub-regular members (15a) to (15f).
【0019】[0019]
【発明の効果】以上のようにこの発明によれば、3種の
主定規材を所定の位置に配設し、隣接する2つの定規材
との間で四辺形とその対角線を構成する如く副定規材を
連結し、各連結部は上記主定規材と副定規材の嵌合孔を
挿嵌し、下げ振り線を貫通懸垂する軸心孔を有する連結
軸部材から成っているので、連結部の組立てと同時に位
置決めされ、正確な芯出しが行われ微調整を要しないた
め、作業工数を低減できる効果がある。As described above, according to the present invention, three kinds of main ruler members are arranged at predetermined positions, and a quadrangle and its diagonal line are formed between two adjacent ruler members. Since the ruler members are connected, and each connecting part is formed of a connecting shaft member having a shaft hole through which the fitting holes for the main ruler member and the sub ruler member are inserted and which suspends the plumbing line, Since it is positioned at the same time as the assembling, accurate centering is performed and fine adjustment is not required, there is an effect that the number of working steps can be reduced.
【0020】またこの発明によれば、各主定規材の長手
方向に沿って、各種機器寸法に対応する芯出し下げ振り
線を貫通懸垂する軸心孔を有する連結軸部材の嵌合孔を
少なくとも上記主定規材の長手方向に沿って複数設け、
隣接する主定規材の下げ振り線間に架設した相互距離間
隔を設定する副定規材の両端の嵌合孔を上記連結軸部材
に嵌合し、各定規材を一体に固定するから、多種の定規
材を必要とせずエレベーター機器のサイズレイアウトの
変化に容易に対応し、短時間で設定でき、しかも設定し
ながら寸法確認を行うことができる効果がある。Further, according to the present invention, at least the fitting hole of the connecting shaft member having the shaft center hole penetrating and suspending the centering downward swing line corresponding to various equipment dimensions is provided along the longitudinal direction of each main ruler member. Providing a plurality along the longitudinal direction of the main ruler material,
Since the fitting holes at both ends of the sub ruler material that set the mutual distance interval installed between the plumbing lines of the adjacent main ruler materials are fitted to the connecting shaft member and each ruler material is integrally fixed, There is an effect that it is possible to easily respond to changes in the size layout of elevator equipment without using a ruler, set in a short time, and confirm dimensions while setting.
【図1】この発明の一実施例による上部型板装置を示す
平面図。FIG. 1 is a plan view showing an upper template device according to an embodiment of the present invention.
【図2】図1のII−II線断面詳細図。FIG. 2 is a detailed sectional view taken along line II-II of FIG.
【図3】従来の上部型板装置の配置例を示すエレベータ
ー昇降路縦断面図。FIG. 3 is a vertical cross-sectional view of an elevator hoistway showing an arrangement example of a conventional upper template device.
【図4】図3の上部型板装置を上方から見た平面図。4 is a plan view of the upper template device of FIG. 3 viewed from above.
【図5】実開昭54−22323号公報の上部型板装置
を示す平面図。FIG. 5 is a plan view showing the upper template device of Japanese Utility Model Publication No. 54-22323.
7a 乗場敷居用主定規材 7b カゴレール用主定規材 7c カウンター若しくは油圧ジャッキガイ
ドレール用主定規材 8 下げ振り線 15a〜15f 副定規材 19a〜19f 連結軸部材 20 軸心孔 21 嵌合孔 22 嵌合孔7a Main ruler material for landing sill 7b Main ruler material for basket rail 7c Main ruler material for counter or hydraulic jack guide rail 8 Down line 15a-15f Sub ruler material 19a-19f Connecting shaft member 20 Shaft core hole 21 Fitting hole 22 Fitting Pour hole
Claims (2)
レール芯出し設定用の主定規材およびカウンター若しく
は油圧ジャッキのガイドレールの芯出し設定用の主定規
材をそれぞれ所定の位置に配設し、隣接する2つの定規
材との間で四辺形とその対角線を構成する如く副定規材
をこれに連結するものであって、各連結部は、上記主定
規材と上記副定規材の嵌合孔を挿嵌し、下げ振り線を貫
通懸垂する軸心孔を有する連結軸部材からなり、各定規
材を一体に固定することを特徴とするエレベーターの据
付用上部型板装置。1. A main ruler material for centering setting of a landing threshold, a main ruler material for setting centering of a basket rail, and a main ruler material for setting centering of a guide rail of a counter or a hydraulic jack are arranged at respective predetermined positions. However, the secondary ruler material is connected to the two adjacent ruler materials so as to form a quadrangle and a diagonal line between the adjacent ruler materials, and each connecting portion is a fitting of the main ruler material and the sub ruler material. An upper mold plate device for elevator installation, comprising a connecting shaft member having a shaft hole through which a dowel hole is inserted and a penetrating suspension line is suspended, and each ruler member is integrally fixed.
レール芯出し設定用の主定規材およびカウンター若しく
は油圧ジャッキのガイドレールの芯出し設定用の主定規
材をそれぞれ所定の位置に配設し、各種機器寸法に対応
する芯出し下げ振り線を貫通懸垂する軸心孔を有する連
結軸部材の嵌合孔を少なくとも上記主定規材の長手方向
に沿って複数設け、隣接する上記主定規材の下げ振り線
間に架設した相互距離間隔を設定する副定規材の両端の
嵌合孔を上記主定規材の嵌合孔と共に上記連結軸部材に
嵌合し、各定規材を一体に固定することを特徴とするエ
レベーターの据付用上部型板装置。2. A main ruler material for centering setting of a landing threshold, a main ruler material for setting centering of a basket rail, and a main ruler material for setting centering of a guide rail of a counter or a hydraulic jack are arranged at respective predetermined positions. However, a plurality of fitting holes of a connecting shaft member having an axial center hole penetrating and suspending a centering downswing line corresponding to various equipment dimensions are provided at least along the longitudinal direction of the main ruler member, and the adjacent main ruler member is provided. Set the mutual distance interval installed between the plumbing lines of the sub ruler material by fitting the fitting holes at both ends of the sub ruler material together with the fitting holes of the main ruler material into the connecting shaft member, and fixing each ruler material together. The upper template device for elevator installation, which is characterized in that
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP4190278A JP2606052B2 (en) | 1992-06-25 | 1992-06-25 | Upper die plate device for elevator installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP4190278A JP2606052B2 (en) | 1992-06-25 | 1992-06-25 | Upper die plate device for elevator installation |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH069173A true JPH069173A (en) | 1994-01-18 |
JP2606052B2 JP2606052B2 (en) | 1997-04-30 |
Family
ID=16255507
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP4190278A Expired - Lifetime JP2606052B2 (en) | 1992-06-25 | 1992-06-25 | Upper die plate device for elevator installation |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2606052B2 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU725005B2 (en) * | 1997-03-07 | 2000-10-05 | Kone Corporation | Procedure and apparatus for the installation of an elevator |
JP2002060158A (en) * | 2000-08-22 | 2002-02-26 | Mitsubishi Electric Corp | Installation method for elevator |
CN108423517A (en) * | 2017-02-14 | 2018-08-21 | 株式会社日立大厦系统 | The guide rail to core apparatus and elevator of the guide rail of elevator to core method |
-
1992
- 1992-06-25 JP JP4190278A patent/JP2606052B2/en not_active Expired - Lifetime
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU725005B2 (en) * | 1997-03-07 | 2000-10-05 | Kone Corporation | Procedure and apparatus for the installation of an elevator |
US6422352B1 (en) | 1997-03-07 | 2002-07-23 | Kone Corporation | Procedure and apparatus for the installation of an elevator |
CN1102909C (en) * | 1997-03-07 | 2003-03-12 | 通力股份公司 | Procedure and apparatus for installation of an elevator |
US7137485B2 (en) | 1997-03-07 | 2006-11-21 | Kone Corporation | Procedure and apparatus for the installation of an elevator |
JP2002060158A (en) * | 2000-08-22 | 2002-02-26 | Mitsubishi Electric Corp | Installation method for elevator |
CN108423517A (en) * | 2017-02-14 | 2018-08-21 | 株式会社日立大厦系统 | The guide rail to core apparatus and elevator of the guide rail of elevator to core method |
JP2018131279A (en) * | 2017-02-14 | 2018-08-23 | 株式会社日立ビルシステム | Elevator guide rail centering device and elevator guide rail centering method using the same |
Also Published As
Publication number | Publication date |
---|---|
JP2606052B2 (en) | 1997-04-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH07292971A (en) | Forming method of ceiling and ceiling form | |
JPH069173A (en) | Upper art template device for installing elevator | |
CN110271949B (en) | Ring beam and ring rail installation process of nuclear island ring crane | |
JP2999706B2 (en) | Elevator car frame | |
CN211036707U (en) | Device for accurately adjusting verticality of prefabricated stand column | |
JPH04354782A (en) | Coupling structure for elevator guide rail and method of laying guide rail | |
JPH0672659A (en) | Upper part templet device for installing elevator | |
JP2000191254A (en) | Elevator installing method | |
JP7118252B2 (en) | passenger conveyor truss | |
JPH11335032A (en) | Coupling structure for elevator guide rail and installation method therefor | |
JPH04327484A (en) | Method of installing elevator | |
CN213417544U (en) | Prefabricated assembled passenger footbridge | |
JPH11210089A (en) | Lift-up method unnecessary for temporary frame | |
JPH11278769A (en) | Counter rail centering device for elevator | |
JPH05246650A (en) | Shock absorber board connecting device for elevator | |
JP2839978B2 (en) | Elevator guidance device | |
JP2000118910A (en) | Positioning jig | |
JPH06102511B2 (en) | Elevator guide rail centering method | |
JPH07215626A (en) | Form plate for elevator | |
JP4052754B2 (en) | Anchor bolt installation jig and foundation construction method | |
JPH0450295Y2 (en) | ||
JPS63282083A (en) | Method of isolation installation construction at every stair of elevator | |
JPH04118435A (en) | Joint structure of girder | |
JPH11301947A (en) | Installation device for elevator car | |
CN116927495A (en) | Sectional beam column pouring construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080213 Year of fee payment: 11 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 12 Free format text: PAYMENT UNTIL: 20090213 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100213 Year of fee payment: 13 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100213 Year of fee payment: 13 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110213 Year of fee payment: 14 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120213 Year of fee payment: 15 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 16 Free format text: PAYMENT UNTIL: 20130213 |
|
EXPY | Cancellation because of completion of term | ||
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130213 Year of fee payment: 16 |