JPH0665812B2 - Positioning structure of foundation and wall installed on the foundation - Google Patents

Positioning structure of foundation and wall installed on the foundation

Info

Publication number
JPH0665812B2
JPH0665812B2 JP26370990A JP26370990A JPH0665812B2 JP H0665812 B2 JPH0665812 B2 JP H0665812B2 JP 26370990 A JP26370990 A JP 26370990A JP 26370990 A JP26370990 A JP 26370990A JP H0665812 B2 JPH0665812 B2 JP H0665812B2
Authority
JP
Japan
Prior art keywords
foundation
wall
wall element
guide pin
center guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP26370990A
Other languages
Japanese (ja)
Other versions
JPH04143321A (en
Inventor
一雄 後藤
国蔵 曽原
Original Assignee
一雄 後藤
国蔵 曽原
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 一雄 後藤, 国蔵 曽原 filed Critical 一雄 後藤
Priority to JP26370990A priority Critical patent/JPH0665812B2/en
Publication of JPH04143321A publication Critical patent/JPH04143321A/en
Publication of JPH0665812B2 publication Critical patent/JPH0665812B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は建築構造における基礎と同基礎上に設置される
壁の位置決め構造に係るものである。
TECHNICAL FIELD The present invention relates to a foundation in a building structure and a wall positioning structure installed on the foundation.

(従来の技術) 建築の現場において、基礎上に壁構成材を設置するのに
当り、従来は基礎または壁構成材に罫書きを行ない、或
いは目見当で壁構成材が置かれていた。
(Prior Art) When installing a wall constituent material on a foundation at a construction site, conventionally, the foundation or the wall constituent material was marked, or the wall constituent material was placed as a sight.

従って正確に壁を罫書きの位置に設置することは困難で
ある。特に壁をプレフアブ化されたパネルより構成した
場合等は、パネルの長さが製作上の誤差を有し、パネル
間に誤差吸収用間隙を設けることは困難で、このため、
多大の手間がかかる。特に重量の大きいコンクリート壁
のような場合には、その位置合わせは容易でない。
Therefore, it is difficult to accurately install the wall at the marking position. Especially when the wall is composed of prefabricated panels, the length of the panel has a manufacturing error, and it is difficult to provide an error absorbing gap between the panels.
It takes a lot of work. Especially in the case of a heavy concrete wall, its alignment is not easy.

このため、基礎(a)と壁とを結合するアンカー(b)が壁構
成材(C)と取合う部分には、同部材(C)と基礎(a)との製
作誤差施工誤差が吸収されるように、壁構成部材(C)に
大径のアンカー貫通孔(d)が穿設される。
Therefore, a manufacturing error between the member (C) and the foundation (a) is absorbed in the part where the anchor (b) that connects the foundation (a) and the wall engages with the wall component (C). Thus, a large-diameter anchor through hole (d) is bored in the wall component (C).

(発明が解決しようとする課題) 従って、壁の設定位置はかえって定まらず、アンカーは
必らずしも壁構成材の貫通孔のセンターに位置していな
いので、横力が伝達されるのに当って、アンカーは同時
に一様に働かず、各個まちまちに働き、基礎から壁に伝
達される地震力等の横力も安定せず、いずれかに集中す
る危険がある。
(Problems to be solved by the invention) Therefore, the setting position of the wall is not fixed, and the anchor is not necessarily located at the center of the through hole of the wall component, so that the lateral force is transmitted. At this time, the anchors do not work uniformly at the same time, but they work individually, and the lateral force such as seismic force transmitted from the foundation to the wall is not stable, and there is a risk of concentration on either side.

これを解消しようとしてしばしばモルタルあるいはプラ
ステイツクスを間隙にグラウトする試みがなされている
が、多大の手間を要するのみならず、現状ではグラウト
材の質を必要に応じて微妙に調整させること等によっ
て、そのベアリング降伏耐力を正確に設計することは至
難の事柄である。
In order to eliminate this, it is often attempted to grout mortar or plastics in the gap, but it not only requires a lot of work, but at present, by adjusting the quality of the grout material as necessary, It is a difficult matter to design the bearing yield strength accurately.

本発明は前記従来技術の有する問題点に鑑みて提案され
たもので、その目的とする処は、施工上からも構造上か
らも信頼度の高い基礎と同基礎上に設置される壁の位置
決め構造を提供する点にある。
The present invention has been proposed in view of the above problems of the prior art, and the object thereof is to position a wall that is installed on the foundation and a foundation that is highly reliable both in terms of construction and structure. The point is to provide the structure.

(課題を解決するための手段) 前記の目的を達成するため、本発明に係る基礎と同基礎
上に設置される位置決め構造は、壁要素の中心、及び基
礎における同壁要素の中心に対応する部位に予め設けら
れた各ピン孔に亘って、前記壁要素及び基礎と独立して
設けられた同両者間の応力の伝達及び位置決めを兼ねる
センター案内ピンを嵌装してなり、前記壁要素における
センター案内ピン取付部が、地震時において作用する一
定限以上の水平力に対して降伏し、地震入力を制限する
ように構成されている。
(Means for Solving the Problems) In order to achieve the above object, the foundation according to the present invention and the positioning structure installed on the foundation correspond to the center of the wall element and the center of the same wall element in the foundation. A center guide pin, which is provided independently of the wall element and the foundation and also serves to transmit and position the stress between the wall element and the foundation, is fitted over each of the pin holes previously provided in the part, The center guide pin attachment portion is configured to yield against a horizontal force above a certain limit that acts during an earthquake and limit the earthquake input.

(作用) 本発明によれば前記したように、壁要素の中心、及び基
礎における同壁要素の中心に対応する部位に予め設けら
れた各ピン孔に亘ってセンター案内ピンを嵌装したこと
によって、壁要素は基礎上の所定位置に正確に設置され
るとともに、基礎と壁との間の横力の伝達が明確にな
る。
(Operation) As described above, according to the present invention, the center guide pin is fitted over the center of the wall element and the respective pin holes provided in advance in the portion of the foundation corresponding to the center of the wall element. , The wall element is accurately installed at the predetermined position on the foundation, and the transmission of lateral force between the foundation and the wall becomes clear.

また本発明によれば前記壁要素におけるセンター案内ピ
ン取付部が、地震時において作用する一定限以上の水平
力に対して降伏するように構成されているので、地震エ
ネルギーが吸収され、あるいは基礎からのエネルギーの
遮断が行なわれることによって、地震入力が制限され、
設計値以上の水平力を壁に発生させることがない。
Further, according to the present invention, since the center guide pin attachment portion of the wall element is configured to yield against a horizontal force of a certain limit or more that acts at the time of an earthquake, seismic energy is absorbed or the foundation is removed from the foundation. Seismic input is restricted due to the energy cutoff of
The horizontal force above the design value will not be generated on the wall.

更に前記センター案内ピンは、前記壁要素及び基礎と独
立して設けられた雇い実状部材として構成されているの
で、前記壁要素及び基礎から常時突出している場合のよ
うに、予測以外の外力でセンター案内ピンが形成或いは
破損したり、尖端で他を毀傷したりすることがない。
Further, since the center guide pin is configured as a hired actual member provided independently of the wall element and the foundation, the center guide pin cannot be centered by an external force other than the prediction as in the case where the center guide pin always projects from the wall element and the foundation. The guide pin will not be formed or damaged, and the tip will not damage others.

(実施例) 以下本発明を図示の実施例について説明する。(Examples) The present invention will be described below with reference to illustrated examples.

(A)はセンター案内ピンで、上下両端部が円錐状に形成
された円筒体の中心外周にピアノ線(1)を嵌装して構成
されている。(第2図及び第3図参照) (B)は木製の壁要素で、中心部にピン孔(2)が穿設され、
同壁要素(B)の下面に同ピン孔(2)に一致する透孔(3)を
有するステンレス鋼製のセンター案内ピン取付板(4)が
木造壁パネルの場合にはその木造フレームに釘(5)で固
着されている。(第4図及び第5図参照) (C)は基礎で、現場打コンクリートの場合には前記壁要
素(A)の中心ピン孔(2)に対応する部位にコンクリートド
リルで削孔し、同削孔部(6)にステンレス鋼製パイプ(7)
を嵌装し、同パイプ(7)と削孔部(6)内周面との間にエポ
キシ樹脂(8)を充填して前記パイプ(7)を固定する。(第
6図及び第7図参照) 図中(8)は鉄筋である。
(A) is a center guide pin, which is constructed by fitting a piano wire (1) around the center outer circumference of a cylindrical body whose upper and lower ends are conical. (See FIGS. 2 and 3) (B) is a wooden wall element with a pin hole (2) in the center,
When the stainless steel center guide pin mounting plate (4) having a through hole (3) matching the pin hole (2) on the lower surface of the wall element (B) is a wooden wall panel, nail it to the wooden frame. It is fixed in (5). (See FIGS. 4 and 5) (C) is a foundation, and in the case of cast-in-place concrete, a portion corresponding to the center pin hole (2) of the wall element (A) is drilled with a concrete drill, Stainless steel pipe (7) in the drilled area (6)
Is fitted, and the epoxy resin (8) is filled between the pipe (7) and the inner peripheral surface of the drilled portion (6) to fix the pipe (7). (See FIG. 6 and FIG. 7) In the figure, (8) is a reinforcing bar.

而して前記基礎(C)のパイプ(7)と、壁要素(B)のピン孔
(2)との間に亘って前記センター案内ピン(A)を嵌装する
ことによって、壁要素(B)を正確に所定位置に設置す
る。(第1図参照)この際前記ピアノ線(1)がセンター
案内ピン(A)の上下方向の位置決めの用を果す。
Thus, the pipe (7) of the foundation (C) and the pin hole of the wall element (B)
By fitting the center guide pin (A) between the wall element (B) and (2), the wall element (B) is accurately installed at a predetermined position. At this time, the piano wire (1) serves to position the center guide pin (A) in the vertical direction.

この際センター案内ピン(A)、透孔(3)の直径をD、セン
ター案内ピン取付板(4)の厚さをt、設計水平力をH、
支圧強度をfea、ピンの剪断許容応力度をfsとすると、 となるように構成する。
At this time, the diameter of the center guide pin (A) and the through hole (3) is D, the thickness of the center guide pin mounting plate (4) is t, the design horizontal force is H,
If the bearing strength is fea and the allowable shear stress of the pin is fs, It is configured so that

なお設計水平力Hは風圧に対して行ない、応答震度がこ
れを超えると前記センター案内ピン取付板(4)が降伏し
て、壁のスライドを許容し、地震入力が制限される。
The design horizontal force H is applied to the wind pressure, and when the response seismic intensity exceeds this, the center guide pin mounting plate (4) yields, allowing the wall to slide and limiting the seismic input.

なお前記基礎がプレートコンクリート基礎或いは鉄骨基
礎の場合には部材製作時に所定位置に前記パイプ(7)を
取付ける。(第8図及び第9図参照) (発明の効果) 本発明によれば前記したように、壁要素の中心及び基礎
における同壁要素の中心に対応する部位に予め設けられ
た各ピン孔に亘って、センター案内ピンを嵌装したこと
によって、壁を基礎上の正確に所定位置に設置すること
ができるとともに、壁と基礎との横力伝達が明確にな
る。また必要以上の横力に対して前記壁要素におけるセ
ンター案内ピン取付部が降伏することによって、地震エ
ネルギーの吸収、基礎からのエネルギー遮断が行なわ
れ、設計以上の水平応力を壁に発生させることがなく、
優れた耐震性能が発揮される。
When the foundation is a plate concrete foundation or a steel foundation, the pipe (7) is attached at a predetermined position when manufacturing the member. (Refer to FIG. 8 and FIG. 9) (Effects of the Invention) According to the present invention, as described above, the pin holes provided in advance in the center of the wall element and the portion of the foundation corresponding to the center of the wall element are provided. By fitting the center guide pin over the wall, the wall can be installed at a predetermined position on the foundation and the lateral force transmission between the wall and the foundation becomes clear. Further, the center guide pin mounting portion of the wall element yields against an excessive lateral force, whereby seismic energy is absorbed and energy is cut off from the foundation, and horizontal stress exceeding the design can be generated in the wall. Without
Excellent seismic performance is demonstrated.

更にまた前記センター案内ピンは基礎及び壁要素から独
立した雇い実状に構成されているので、同センター案内
ピンが基礎あるいは壁要素より常時突出していることに
よって、予想以外の外力で変形或いは破損したり、ピン
尖端で他を毀傷するようなことはない。
Furthermore, since the center guide pin is constructed in a practical form independent of the foundation and the wall element, the center guide pin constantly protruding from the foundation or the wall element may be deformed or damaged by an unexpected external force. , The tip of the pin does not hurt others.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明に係る基礎と同基礎上に設置される壁の
位置決め構造の一実施例を示す正面図、第2図はセンタ
ー案内ピンの正面図、第3図はその平面図、第4図は壁
要素におけるセンター案内ピン取付部を示す縦断面図、
第5図はその平面図、第6図は現場打ちコンクリート基
礎のセンター案内ピン取付部を示す縦断面図、第7図は
その平面図、第8図はプレキヤストコンクリート基礎の
センター案内ピン取付部を示す縦断面図、第9図はその
平面図、第10図は従来構造を示す縦断面図である。 (A)……センター案内ピン、(B)……壁要素、 (C)……基礎、(2)……ピン孔、 (3)……透孔、 (4)……センター案内ピン取付板。
FIG. 1 is a front view showing an embodiment of a wall positioning structure installed on the foundation according to the present invention, FIG. 2 is a front view of a center guide pin, FIG. 3 is its plan view, FIG. 4 is a vertical cross-sectional view showing the center guide pin mounting portion of the wall element,
FIG. 5 is a plan view thereof, FIG. 6 is a vertical sectional view showing a center guide pin mounting portion of a cast-in-place concrete foundation, FIG. 7 is a plan view thereof, and FIG. 8 is a center guide pin mounting portion of a precast concrete foundation. FIG. 9 is a plan view of the same, and FIG. 10 is a plan view of a conventional structure. (A) …… Center guide pin, (B) …… Wall element, (C) …… Foundation, (2) …… Pin hole, (3) …… Through hole, (4) …… Center guide pin mounting plate .

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】壁要素の中心、及び基礎における同壁要素
の中心に対応する部位に予め設けられた各ピン孔に亘っ
て、前記壁要素及び基礎と独立して設けられた同両者間
の応力伝達及び位置決めを兼ねるセンター案内ピンを嵌
装してなり、前記壁要素におけるセンター案内ピン取付
部が、地震時において作用する一定限以上の水平力に対
して降伏し、地震入力を制限するように構成されてなる
ことを特徴とする基礎と同基礎上に設置される壁の位置
決め構造。
1. A wall element and a foundation provided independently of the wall element and the foundation over a pin hole provided in advance in a portion of the foundation corresponding to the center of the wall element. A center guide pin that also serves as stress transmission and positioning is fitted, and the center guide pin mounting portion of the wall element yields against a horizontal force above a certain limit that acts during an earthquake and limits the earthquake input. A structure for positioning a wall installed on the foundation and the foundation characterized by being configured as follows.
JP26370990A 1990-10-03 1990-10-03 Positioning structure of foundation and wall installed on the foundation Expired - Lifetime JPH0665812B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP26370990A JPH0665812B2 (en) 1990-10-03 1990-10-03 Positioning structure of foundation and wall installed on the foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP26370990A JPH0665812B2 (en) 1990-10-03 1990-10-03 Positioning structure of foundation and wall installed on the foundation

Publications (2)

Publication Number Publication Date
JPH04143321A JPH04143321A (en) 1992-05-18
JPH0665812B2 true JPH0665812B2 (en) 1994-08-24

Family

ID=17393233

Family Applications (1)

Application Number Title Priority Date Filing Date
JP26370990A Expired - Lifetime JPH0665812B2 (en) 1990-10-03 1990-10-03 Positioning structure of foundation and wall installed on the foundation

Country Status (1)

Country Link
JP (1) JPH0665812B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011053091A2 (en) 2009-11-02 2011-05-05 Lg Electronics Inc. Washing machine
US9080274B2 (en) 2009-12-23 2015-07-14 Lg Electronics Inc. Washing method and washing machine

Also Published As

Publication number Publication date
JPH04143321A (en) 1992-05-18

Similar Documents

Publication Publication Date Title
US5371986A (en) Pole repair and reinforcing system and method for installing the same
US10221558B1 (en) Foundation connection device for use during construction of concrete wall panels
JP4284056B2 (en) Non-embedded column base construction method and non-embedded column base structure
CN110145024A (en) A kind of prefabricated assembled bean column node using pressure-bearing steel plate
JPH0665812B2 (en) Positioning structure of foundation and wall installed on the foundation
JP2009161976A (en) Method of mounting seismically reinforcing precast concrete member
JPH10121576A (en) Fixing structure of pedestal
JPH07252891A (en) Junction structure of steel member and concrete member
JP2943812B2 (en) Pillar structure
JP5028323B2 (en) Ground anchor method
JP3002859B2 (en) Handrail mounting method
JP2527359B2 (en) Edge fixing device for PC steel in PC structure
JP2000240196A (en) Method for mounting tie-bar of steel-sheet concrete structure, and tie-bar
JP5680305B2 (en) Column vertical position adjustment method
JP2001032530A (en) Reinforcing device and method for concrete columnar structure
JP2021085270A (en) Construction method of wall panel
JP3233260B2 (en) Anchoring structure of anchor material on steel column base
JPH10131397A (en) Anchor structure of shear reinforcing bar and anchor plate used for the same structure
JPH1143941A (en) Anchor fixture part structure
JP3338387B2 (en) Joint of foundation pile
JPH0328535B2 (en)
KR100352983B1 (en) Picket Head Reinforcement Unit of H beam
JPH07247557A (en) Foundation, column mold, and underground beam made of precast reinforced concrete
JP2000319989A (en) Installing structure of exposed column base and execution work method
JPS602464B2 (en) shear wall