JPH0665501U - Concrete beam - Google Patents

Concrete beam

Info

Publication number
JPH0665501U
JPH0665501U JP1293192U JP1293192U JPH0665501U JP H0665501 U JPH0665501 U JP H0665501U JP 1293192 U JP1293192 U JP 1293192U JP 1293192 U JP1293192 U JP 1293192U JP H0665501 U JPH0665501 U JP H0665501U
Authority
JP
Japan
Prior art keywords
metal frame
concrete
frame
concrete beam
deck plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP1293192U
Other languages
Japanese (ja)
Inventor
弘 近藤
Original Assignee
弘 近藤
株式会社アルテス
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 弘 近藤, 株式会社アルテス filed Critical 弘 近藤
Priority to JP1293192U priority Critical patent/JPH0665501U/en
Publication of JPH0665501U publication Critical patent/JPH0665501U/en
Pending legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

(57)【要約】 (修正有) 【目的】 枠を解体することなくコンクリート梁を構築
することを目的とする。 【構成】 梁の外形寸法に対応した断面U字状の金属枠
1を配設し、該金属枠の上縁にデッキプレート3の端部
を支承し、前記金属枠1内にコンクリートを打設して、
コンクリート梁Aを構成している。金属枠1は解体され
ずにコンクリート6と一体になって梁を構成するので、
枠の解体が不要である。
(57) [Summary] (Corrected) [Purpose] The purpose is to construct concrete beams without dismantling the frame. [Structure] A metal frame 1 having a U-shaped cross section corresponding to the outer dimensions of the beam is arranged, the end of the deck plate 3 is supported on the upper edge of the metal frame, and concrete is poured into the metal frame 1. do it,
It constitutes a concrete beam A. Since the metal frame 1 is not disassembled and is integrated with the concrete 6 to form a beam,
There is no need to dismantle the frame.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

この考案はコンクリート建造物における梁の構造に関するものである。 This invention relates to the structure of a beam in a concrete structure.

【0002】[0002]

【従来の技術】[Prior art]

従来、コンクリート梁を造る場合、図5に示すように仮設支持台21の上にベ ニヤで枠22を組み立て、デッキプレート23の端部を枠22の上縁に係止支持 させた後、前記枠22内及びデッキプレート23の上方にコンクリートを打設し ている。そして、コンクリートが固まった後に前記枠22を解体している。 Conventionally, when building a concrete beam, as shown in FIG. 5, a frame 22 is assembled on a temporary support base 21 with a veneer, and the end portion of the deck plate 23 is locked and supported on the upper edge of the frame 22. Concrete is placed in the frame 22 and above the deck plate 23. Then, the frame 22 is disassembled after the concrete hardens.

【0003】[0003]

【考案で解決しようとする課題】[Problems to be solved by devising]

上記従来の技術においては、現場で枠22を組み立てなければならず、専門の 型枠職人が必要であり、また枠の組み立てに時間も必要であった。更に、枠22 は解体しなければならず、作業性が悪い。 In the above-mentioned conventional technique, the frame 22 must be assembled on site, a specialized mold craftsman is required, and time is also required for the frame assembly. Further, the frame 22 has to be disassembled, and workability is poor.

【0004】[0004]

【課題を解決するための手段】[Means for Solving the Problems]

この考案は、型枠を金属製とすることにより上記問題点を解決したものである 。すなわち、この考案のコンクリート梁は、梁の外形寸法に対応した断面U字状 に形成された金属枠が配設され、該金属枠の上縁にデッキプレートの端部が支承 され、前記金属枠の内部にコンクリートが打設された構造としてある。前記金属 枠の両側壁にはセパレータ挿通用兼水抜き用の透孔を設けるとよい(請求項2) 。また、前記金属枠の両側壁上縁間には間隔規制用の枠体を装着すると金属枠の 開口部が広がるおそれがない(請求項3)。更に、大型の梁又は幅広の梁の場合 には、前記金属枠をL字状部材を2つ組合せた構成とすれば運搬が容易である( 請求項4)。 The present invention solves the above-mentioned problems by making the form of metal. That is, in the concrete beam of the present invention, a metal frame having a U-shaped cross-section corresponding to the external dimensions of the beam is arranged, and the end of the deck plate is supported on the upper edge of the metal frame. It has a structure with concrete placed inside. A through hole for inserting a separator and for draining water may be provided on both side walls of the metal frame (claim 2). Further, if a frame body for spacing control is attached between the upper edges of both side walls of the metal frame, there is no fear that the opening of the metal frame widens (claim 3). Further, in the case of a large beam or a wide beam, if the metal frame is configured by combining two L-shaped members, it is easy to carry (claim 4).

【0005】[0005]

【実施例】【Example】

図1において、断面U字状の金属枠1の上縁にライナー2が装着してあり、該 ライナー2にデッキプレート3の端部が係止支持されている。前記金属枠1の内 側には主筋4及びフープ筋5が配設してあり、金属枠1の内側及びデッキプレー ト3の上方にコンクリート6が打設されて、コンクリート梁Aが構成してある。 In FIG. 1, a liner 2 is attached to an upper edge of a metal frame 1 having a U-shaped cross section, and an end portion of a deck plate 3 is locked and supported by the liner 2. A main bar 4 and a hoop bar 5 are arranged on the inner side of the metal frame 1, and concrete 6 is placed inside the metal frame 1 and above the deck plate 3 to form a concrete beam A. is there.

【0006】 前記金属枠1は、角波状に凹凸加工を施した鉄板を屈曲したものであり、その 大きさはコンクリート梁Aの外形寸法に合わせてある。そして、両側板1aの上 下には所定間隔で透孔7が形成してある。これらの透孔はセパレータ8の挿通及 び水抜きに使用されるものである。また、底板1bにも所定間隔で透孔9が設け てある。この透孔9は角材(大引)10への固定用釘11を打込むためのもので ある。The metal frame 1 is formed by bending an iron plate that is corrugated in the shape of a square wave, and its size is adjusted to the external dimensions of the concrete beam A. Through holes 7 are formed at a predetermined interval above and below the side plates 1a. These through holes are used for inserting the separator 8 and draining water. In addition, through holes 9 are also provided in the bottom plate 1b at predetermined intervals. This through hole 9 is for driving a fixing nail 11 into a square bar (large pull) 10.

【0007】 前記金属枠1の両側壁1aの上縁間には必要により間隔保持部材12を適宜間 隔で装着する。該間隔保持部材12は、1枚の帯状鉄板の両端部を屈曲させて係 止片12a、12bを形成したものであり、両側の係止片12a、12b間をラ イナー2に嵌装して装着してある。該間隔保持部材12及び前記セパレータ8に よりコンクリート打設時に金属枠1が外側に開くことが防止される。A space holding member 12 is mounted between the upper edges of both side walls 1a of the metal frame 1 at appropriate intervals, if necessary. The spacing member 12 is one in which both ends of a strip-shaped iron plate are bent to form locking pieces 12a and 12b, and the locking pieces 12a and 12b on both sides are fitted to the liner 2. It is installed. The spacing member 12 and the separator 8 prevent the metal frame 1 from opening outward during concrete pouring.

【0008】 次に上記実施例のコンクリート梁Aの構築方法を説明する。 従来と同様に支持台13を仮設し、角材10(パイプでもよい)上に工場で生 産された金属枠1を載置し、金属枠1の底板1bと角材10とを釘11で固定す る。次いで透孔7、7間にセパレータ8を挿通固定すると共に、金属枠1の上縁 にライナー2を嵌装し、ライナー2、2間に間隔保持部材12装着する。その後 、隣接する金属枠1、1間にデッキプレート3を掛け渡し、金属枠内に主筋4、 フープ筋5を配設し、次いでコンクリート6を打設する。コンクリート硬化後サ ポート13を取外せば、この考案のコンクリート梁Aが得られる。金属枠1は取 外さず、コンクリートと一体化される。Next, a method of constructing the concrete beam A of the above embodiment will be described. As in the conventional method, the support base 13 is temporarily installed, the metal frame 1 produced in the factory is placed on the square bar 10 (which may be a pipe), and the bottom plate 1b of the metal frame 1 and the square bar 10 are fixed with the nails 11. It Next, the separator 8 is inserted and fixed between the through holes 7, 7, the liner 2 is fitted on the upper edge of the metal frame 1, and the spacing member 12 is mounted between the liners 2, 2. After that, the deck plate 3 is bridged between the adjacent metal frames 1 and 1, main bars 4 and hoop bars 5 are arranged in the metal frame, and then concrete 6 is poured. The concrete beam A of this invention can be obtained by removing the support 13 after hardening the concrete. The metal frame 1 is not removed and is integrated with concrete.

【0009】 上記において、デッキプレート3は金属枠1で支承されるので、ベニヤで支承 する従来の技術に比べてデッキプレート3は安定して支承される。尚、デッキプ レート3は図面ではトラスを有する構造のものを示しているが、フラットデッキ でもよく、デッキプレートの構造は問わない。 また、上記実施例においては金属枠1の側壁1aに透孔7を設けてセパレータ 8を挿通したので、コンクリート打設時における金属枠1の拡開が防止されるが 、セパレータ8は必ずしも必要ではない。In the above description, since the deck plate 3 is supported by the metal frame 1, the deck plate 3 is supported more stably as compared with the conventional technique of supporting the veneer. Although the deck plate 3 has a structure having a truss in the drawing, it may be a flat deck and the structure of the deck plate does not matter. Further, in the above-described embodiment, since the through hole 7 is provided in the side wall 1a of the metal frame 1 and the separator 8 is inserted therethrough, the expansion of the metal frame 1 at the time of placing concrete is prevented, but the separator 8 is not always necessary. Absent.

【0010】 次に、図4は平鉄板をL字状に屈曲して形成した一対の枠部材14、14を組 合せて金属枠1を構成したものであり、その他の構造は上記実施例と同様である 。 ここで、二つの枠部材14、14の底板端部は重ね合わせてあり、重なり部分に おいて釘11で角材10に固定してある。 この実施例によれば、L字状の枠部材14を組合せて金属枠1を構成している ので、金属枠の運搬、保管に便利であり、特に大型の梁又は幅広の梁に適してい る。Next, FIG. 4 shows a metal frame 1 constructed by combining a pair of frame members 14, 14 formed by bending a flat iron plate into an L shape. It is the same. Here, the bottom plate end portions of the two frame members 14 and 14 are overlapped with each other, and fixed to the square bar 10 with nails 11 at the overlapping portion. According to this embodiment, since the metal frame 1 is configured by combining the L-shaped frame members 14, it is convenient for transportation and storage of the metal frame, and is particularly suitable for a large beam or a wide beam. .

【0011】[0011]

【考案の効果】[Effect of device]

この考案によれば、U字状をなす金属枠の内部にコンクリートを打設してコン クリート梁を構成したので、仮設サポート上に金属枠を設置するのみで型枠工事 が完了し、従来必要とされた型枠工は不要である。また、金属枠はコンクリート と一体化されて梁を構成するので、解体は不要であり、作業工程が減少し作業性 が向上する。 また、従来のベニヤ型枠よりも強度が有るので、デッキプレートの支持が安定 する。 According to this invention, concrete is placed inside a U-shaped metal frame to form a concrete beam. Therefore, the formwork work is completed only by installing the metal frame on the temporary support, which is conventionally required. The required formworker is unnecessary. Moreover, since the metal frame is integrated with concrete to form a beam, disassembling is not necessary, and the work process is reduced and workability is improved. Also, since it is stronger than the conventional veneer formwork, the support of the deck plate is stable.

【図面の簡単な説明】[Brief description of drawings]

【図1】 この考案実施例の断面図である。FIG. 1 is a sectional view of an embodiment of the present invention.

【図2】 同じく金属枠の拡大斜視図である。FIG. 2 is likewise an enlarged perspective view of a metal frame.

【図3】 同じく間隔保持部材の拡大斜視図である。FIG. 3 is also an enlarged perspective view of the spacing member.

【図4】 この考案の別の実施例における構築過程にお
ける断面図である。
FIG. 4 is a cross-sectional view showing a construction process according to another embodiment of the present invention.

【図5】 従来例の断面図である。FIG. 5 is a sectional view of a conventional example.

【符号の説明】[Explanation of symbols]

1 金属枠 2 ランナー 3 デッキプレート 4 主筋 6 コンクリート 7 透孔 8 セパレータ 9 透孔 12 間隔保持部材 A コンクリート梁 1 Metal Frame 2 Runner 3 Deck Plate 4 Main Bar 6 Concrete 7 Through Hole 8 Separator 9 Through Hole 12 Interval Holding Member A Concrete Beam

Claims (4)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 梁の外形寸法に対応した断面U字状に形
成された金属枠が配設され、該金属枠の上縁にデッキプ
レートの端部が支承され、前記金属枠の内部にコンクリ
ートが打設された、コンクリート梁
1. A metal frame having a U-shaped cross section corresponding to the outer dimensions of a beam is arranged, an end of a deck plate is supported on an upper edge of the metal frame, and concrete is provided inside the metal frame. Concrete beam
【請求項2】 金属枠の両側壁にはセパレータ挿通用兼
水抜き用の透孔が設けられた、請求項1記載のコンクリ
ート梁
2. The concrete beam according to claim 1, wherein through holes for inserting a separator and for draining water are provided on both side walls of the metal frame.
【請求項3】 金属枠の両側壁上縁間には間隔規制用の
枠体が装着された、請求項1記載のコンクリート梁
3. The concrete beam according to claim 1, wherein a frame body for spacing control is mounted between the upper edges of both side walls of the metal frame.
【請求項4】 金属枠は、L字状部材を2つ組合せて構
成された、請求項1記載のコンクリート梁
4. The concrete beam according to claim 1, wherein the metal frame is configured by combining two L-shaped members.
JP1293192U 1992-02-06 1992-02-06 Concrete beam Pending JPH0665501U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1293192U JPH0665501U (en) 1992-02-06 1992-02-06 Concrete beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1293192U JPH0665501U (en) 1992-02-06 1992-02-06 Concrete beam

Publications (1)

Publication Number Publication Date
JPH0665501U true JPH0665501U (en) 1994-09-16

Family

ID=11819048

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1293192U Pending JPH0665501U (en) 1992-02-06 1992-02-06 Concrete beam

Country Status (1)

Country Link
JP (1) JPH0665501U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100775359B1 (en) * 2006-05-03 2007-11-09 (주)엠씨에스공법 Concrete-mold assembly and construction method using the same
KR100789319B1 (en) * 2005-05-12 2007-12-28 (주)엠씨에스공법 Carbon-glass fiber composite concrete mold and construction method using the same
KR102214526B1 (en) * 2020-06-11 2021-02-15 (주)유송엔지니어링 Hybrid beam

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5390612A (en) * 1977-01-20 1978-08-09 Kajima Corp Building frame construction

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5390612A (en) * 1977-01-20 1978-08-09 Kajima Corp Building frame construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100789319B1 (en) * 2005-05-12 2007-12-28 (주)엠씨에스공법 Carbon-glass fiber composite concrete mold and construction method using the same
KR100775359B1 (en) * 2006-05-03 2007-11-09 (주)엠씨에스공법 Concrete-mold assembly and construction method using the same
KR102214526B1 (en) * 2020-06-11 2021-02-15 (주)유송엔지니어링 Hybrid beam

Similar Documents

Publication Publication Date Title
US6658810B2 (en) Tilt-up concrete wall panel form and method of fabricating same
JPH0665501U (en) Concrete beam
KR200357642Y1 (en) Reinforcement structure of inconner panel
JP6401883B1 (en) Deck plate and deck plate fixing bracket used for it
JP3878546B2 (en) Construction method of cross girder integrated concrete slab
KR102620108B1 (en) Manufacture and assembly saparated permanent beam form construction method
KR102696028B1 (en) How to install formwork for concrete pouring
KR0145358B1 (en) Method of building slabs
KR200277906Y1 (en) A form for carrying out a corner of construction
JP7265909B2 (en) Construction methods for deck plate units, joint members and floor slabs
KR20180079748A (en) Combination structure of permanent concrete form and prefabricated reinforced concrete column assembly
JPH11117525A (en) Src-beam form and constructing method of src-beam
JPH06272378A (en) Supporting structure for precast concrete form
JPH0235168A (en) Form for panel zone
JP2002206238A (en) Coupling tool for strut in strut earth-retaining method
JPS6229544Y2 (en)
JP2000352192A (en) Driving form
JPH06185108A (en) Constructing method for beam
KR200172618Y1 (en) Panel brazing bracket for supporting bar constructing ceiling using concrete construction
JP792H (en) Construction method of reinforced concrete structure
JPH04247127A (en) Outer wall construction works for underground floor
JPH03271465A (en) Method of construction for placing slab with manhole
JPH0420639A (en) Pc small beam
JPH0617482A (en) Permanent form made of steel plate for construction
JPS59187923A (en) Construction of retaining wall