JPH0665458B2 JP6561386A JP6561386A JPH0665458B2 JP H0665458 B2 JPH0665458 B2 JP H0665458B2 JP 6561386 A JP6561386 A JP 6561386A JP 6561386 A JP6561386 A JP 6561386A JP H0665458 B2 JPH0665458 B2 JP H0665458B2
Authority
JP
Japan
Prior art keywords
product
progress
data
production
display
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP6561386A
Other languages
Japanese (ja)
Other versions
JPS62224562A (en
Inventor
敏明 竹内
和彦 前田
貞夫 下社
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP6561386A priority Critical patent/JPH0665458B2/en
Publication of JPS62224562A publication Critical patent/JPS62224562A/en
Publication of JPH0665458B2 publication Critical patent/JPH0665458B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、生産現場における、日程計画や作業実績の表
示装置に係り、特に計算機端末を利用した工程管理にお
いて迅速にしかも正確に状況を把握するのに好適な工程
管理データ表示装置に関する。
TECHNICAL FIELD The present invention relates to a display device for a schedule plan or a work record at a production site, and in particular, in process control using a computer terminal, the situation can be grasped quickly and accurately. The present invention relates to a process control data display device suitable for performing.

〔従来の技術〕[Conventional technology]

従来、特開昭58−154012号公報記載のように生産の工程
管理異常を検出する方法として、計画と実績を比較しな
がら表示内容を段階的に変え、異常原因を誘導してゆく
ものが提案されている。
Conventionally, as described in Japanese Patent Laid-Open No. 58-154012, as a method for detecting abnormalities in production process control, a method is proposed in which the contents of the display are changed step by step while comparing planned and actual results to guide the cause of the abnormality. Has been done.

しかし、生産における、計画データや実績データでも、
そのデータを扱う人にとって同じデータでも意味や価値
が異なるものである。上記発明は、工程管理業務におい
て異常の原因を究明する目的には有効でも、その他の目
的には有効とはいえない。
However, even with plan data and actual data in production,
The same data has different meanings and values for the person who handles the data. The above invention is effective for the purpose of investigating the cause of abnormality in the process control work, but is not effective for other purposes.

〔発明が解決しようとする問題点〕[Problems to be solved by the invention]

上記従来技術は、データの価値を1つの側面からのみ把
えて利用していた為、同じデータを種々の目的に使える
にもかかわらず用いてない点に、問題があった。
The above-mentioned conventional technique has a problem in that the value of data is used only by grasping it from one aspect, and therefore the same data is not used although it can be used for various purposes.

本発明の目的は、工程管理として、いつ作業を開始すべ
きかという作業の日程計画や、いつ作業が完了するかと
いう完成予測、そして、いつ作業が完成したかという実
績管理あるいは履歴管理をできるようにする工程管理デ
ータ表示装置を提供することにある。
The object of the present invention is to enable, as process management, work schedule planning when work should be started, completion prediction when work is completed, and performance management or history management when work is completed. Another object is to provide a process control data display device.

〔問題点を解決するための手段〕[Means for solving problems]

上記目的は、工程管理の基本となる生産の計画データと
実績データの表示を、生産の対象となる製品全体の納期
に対する完成進度状況を表現する製品完成進度分布図の
編集手段と、各製品毎の生産の推多を表現する製品別生
産進度図の編集手段と、個々の製品配下の部品毎に生産
の推多を表現する部品別生産進度図の編集手段、および
上記の製品完成進度分布図、製品生産進度図、部品生産
進度図を対話形式で段階的に選択表示する手段とを設け
ることにより達成される。
The above purpose is to display the production plan data and the actual result data, which is the basis of process control, and to edit the product completion progress distribution map that expresses the completion progress status for the delivery date of the entire product that is the production target, and for each product. Of the production progress chart by product that expresses the estimation of production of the product, the editing means of the production progress chart by component that expresses the estimation of production for each part under the individual product, and the above-mentioned product completion progress distribution map , A product production progress chart, and a part production progress chart in a stepwise interactive manner.

〔作用〕[Action]

本発明において、製品完成進度分布図の編集手段は、生
産対象の全製品に関して個々の製品毎の納期と完成予定
日により、納期に対する完成予定日のずれを算出し、そ
の納期に対する完成予定日のずれにもとづいて製品件数
をヒストグラムとして表現する図を画面表示する為にデ
ータを編集する。それにより、生産対象製品全体が納期
に対していつ完成するかの傾向が分かるので、計画全体
の良し悪しを評価できる。
In the present invention, the means for editing the product completion progress distribution map calculates the deviation of the scheduled completion date with respect to the delivery date from the delivery date and the scheduled completion date of each product with respect to all the products to be produced, and the scheduled completion date for the delivery date. Edit the data to display on the screen a diagram that expresses the number of products as a histogram based on the deviation. As a result, the tendency of when the whole production target product is completed with respect to the delivery date can be known, so that the quality of the entire plan can be evaluated.

製品別生産進度図の編集手段は、生産対象の全製品に関
して個々の製品毎の着手予定日、完成予定日、納期、着
手から完成までの予定総作業工数、および完了分のみの
実績完了作業工数より、日付の目盛りに合わせて各製品
の着手予定日、完成予定日、納期を、例えばガントチャ
ートの形式で表示し、また完成に至るまでに何割完成し
ているかも合わせて表わす図を表示する為にデータを編
集する。それにより、生産対象の個々の製品がいつ着手
し完成するか、あるいはどの程度完成しているのかが分
るので、個々の製品の計画や進度を評価できる。
The means of editing the production progress chart for each product is the planned start date, the planned completion date, the delivery date, the planned total work man-hours from the start to the completion, and the actual completed work man-hours for all products to be produced. The scheduled start date, scheduled completion date, and delivery date of each product will be displayed according to the scale of the date, for example, in the form of a Gantt chart, and a diagram will be displayed that also shows the percentage of completion by the time of completion. Edit the data to do so. As a result, it is possible to know when the individual products to be produced have started and are completed, or to what extent they are completed, so that the plans and progress of the individual products can be evaluated.

部品別生産進度図の編集手段は、個々の製品毎に当該製
品を構成する部品毎の、初工程から最終工程までの各工
程の着手予定日時、完成予定日時、作業工数、および完
了分のみの実績完了作業工数より、日付の目盛りに合わ
せて各部品、各工程の着手予定日時、完成予定日時を、
例えばガントチャートの形式で表示し、また完成分も合
わせて表わす図を表示する為にデータを編集する。それ
により、該当製品の着手から完成に至るまでの内訳とし
て、当該製品を構成する個々の部品が、初工程から際数
工程まで、どのように生産されてゆくか、あるいはどの
部分まで完成しているかがわかるので、当該製品を生産
してゆく上でどの部品がネックになるか、どの工程がネ
ックになるかが判別でき、当該製品を納期通り完成させ
るべく対策を事前に打つことができる。
The means for editing the production progress chart for each part is for each product, for each part that composes the product, including the scheduled start date and time of each process from the initial process to the final process, the scheduled completion date and time, the number of work steps, and the completed amount From the actual completion work man-hours, according to the scale of the date, the scheduled start date and time of each part, each process, the scheduled completion date and time,
For example, the data is edited in order to display it in the form of a Gantt chart and also to display a diagram showing the completed parts. As a result, as a breakdown from the start to completion of the relevant product, how the individual parts that make up the product are manufactured, from the initial process to the few processes, or to what part Since it is possible to determine which part is a bottleneck and which process is a bottleneck in manufacturing the product, it is possible to take measures in advance to complete the product on time.

〔実施例〕〔Example〕

以下、本発明の一実施例を図に従って、説明する。 An embodiment of the present invention will be described below with reference to the drawings.

第1図は、本発明の機能ブロック図であり、第2図は第
1図の動作手順を示すフローチャートである。第3図は
工程管理データのファイル構造図である。第4図〜第7
図は夫々表示画面の実施例を示す図である。
FIG. 1 is a functional block diagram of the present invention, and FIG. 2 is a flowchart showing the operation procedure of FIG. FIG. 3 is a file structure diagram of process control data. 4 to 7
Each of the figures is a diagram showing an example of a display screen.

まず、第1図に示すように、全体の機能は8つの機能11
〜18より構成される。計画データ入力手段11は、例えば
キーボードより入力される工程管理に係る計画データを
入力処理する部分である。ここで計画データとは、生産
対象の製品別の部品構成データ、各部品毎の製造手順デ
ータ(作業手順、使用工程、予定作業工数)、及び日程
情報(納期、着手予定日時、完了予定日時等)のデータ
より構成される。
First, as shown in Fig. 1, the overall function is eight functions.
Composed of ~ 18. The plan data input means 11 is a part that inputs and processes plan data relating to process management, which is input from a keyboard, for example. Here, the plan data includes parts configuration data for each product to be produced, manufacturing procedure data (work procedure, use process, planned work man-hour) for each part, and schedule information (delivery date, scheduled start date and time, scheduled completion date and time, etc.). ) Data.

実績データ入力手段(12)は、各部品が各工程で作業着
手や作業完了する都度、その実績として着手日時、完了
日時、予定作業工数、使用機械、担当作業者等のデータ
を入力処理する手段である。
The result data input means (12) is a means for inputting data such as start date and time, completion date and time, planned work man-hours, machine used, and worker in charge each time each part starts work or completes work in each process. Is.

データ記憶手段13は、上記の入力処理において入力され
た工程管理に係る計画データ、実績データを記憶するメ
モリである。
The data storage means 13 is a memory that stores the plan data and the actual result data relating to the process management input in the above input processing.

データ表示要求受付手段14は、操作する人の意図に従っ
て表示要求を入力装置により受付け、各表示データの編
集手段15,16,17にその要求を渡す部分である。
The data display request reception means 14 is a part that receives a display request by the input device according to the intention of the operator and passes the request to the display data editing means 15, 16 and 17.

表示データ編集手段は、3つに分類できる。この3つの
編集手段15〜17は上記データ表示要求受付手段14で受付
けられた要求に従い、予め定められた様式に従って表示
データを編集処理する部分である。ここでデータ編集と
は、下記の3種類の画面を出力するためのデータ編集
と、各画面表示における表示内容の拡大表示、縮小表
示、上下左右スクロール表示、詳細情報の付加表示のこ
とである。
The display data editing means can be classified into three types. The three editing means 15 to 17 are portions that edit the display data according to a predetermined format in accordance with the request received by the data display request receiving means 14. Here, the data editing means data editing for outputting the following three types of screens, and enlarged display, reduced display, up / down / left / right scroll display of detailed display information, and additional display of detailed information.

(1)製品全体の納期に対する完成進度状況を表現する
製品完成進度分布図 (2)各製品毎の生産の推多を表現する製品別生産進度
図 (3)個々の製品を構成する部品毎の生産の推移を表現
する部品別生産進度図 データ表示手段18は、上記データ表示要求に従い、編集
されたデータをディスプレイ画面上に表示処理する部分
である。
(1) Product completion progress distribution chart that represents the completion progress status with respect to the delivery date of the entire product (2) Production progress chart for each product that expresses the estimated production of each product (3) For each part that constitutes an individual product The part-by-part production progress diagram data display means 18 expressing the transition of production is a part for displaying the edited data on the display screen in accordance with the data display request.

第2図は、工程管理に係るデータを基にして、製品完成
進度分布図、製品別生産進度図、部品別生産進度図の3
種類の画面を表示する為の動作手順を示すフローチャー
トである。
FIG. 2 is a 3 diagram of a product completion progress distribution diagram, a product production progress diagram, and a component production progress map based on the process management data.
It is a flowchart which shows the operation procedure for displaying the screen of a kind.

本発明は、パーソナルコンピュータ等を用いて対話形式
で実現されるが、以下、第2図のフローチャートに従っ
てその処理を説明する。
The present invention is realized interactively by using a personal computer or the like, and the processing will be described below with reference to the flowchart of FIG.

処理が開始されると同時に、製品完成進度分布図がディ
スプレイ画面上に表示される(ステップ101)。本画面
に対して、終了、表示内容の左右スクロール表示、次画
面として本図の内訳を示す製品別生産進度図の表示のい
ずれかの要求が受付けられる(103)。操作者からの表
示要求に従い、処理は終了するか(105)、表示内容を
左右どちらかスクロールするか(107,109)、製品別生
産進度図の表示を行うかのいずれかに分岐する(11
1)。
Simultaneously with the start of the process, a product completion progress distribution map is displayed on the display screen (step 101). On this screen, a request for termination, display of left and right scrolls of display contents, or display of a production progress chart for each product showing a breakdown of this drawing as the next screen is accepted (103). According to the display request from the operator, the process is terminated (105), the display content is scrolled to the left or right (107, 109), or the product progress chart for each product is displayed (11).
1).

操作者が、製品別生産進度図の表示を選択し要求する
と、ディスプレイ画面上に、製品別生産進度図が表示さ
れる(113)。本画面に対して、終了、表示内容の左右
/上下スクロール表示、画面の1部分の拡大表示、縮小
表示、次画面として、本図の個々の製品別の内訳を示す
部品別生産進度図の表示のいずれかの要求が受けつけら
れる(115)。操作者からの表示要求に従い、処理は終
了、即ち本画面の表示を終了し、製品完成進度分布図の
表示に戻るか(117)、表示内容を左右上下いずれか要
求に応じてスクロールするか′(119,121)、表示内容
を1部分の拡大(123,121)、縮小表示を行うか(125,1
21)操作者指定の製品に関して部品別生産進度図の表示
を行うかのいずれかに分岐する(127)。
When the operator selects and requests the display of the production progress chart for each product, the production progress chart for each product is displayed on the display screen (113). End of this screen, left / right / up / down scrolling of display contents, enlarged / reduced display of a part of the screen, and display of a production progress chart for each part showing the breakdown of each product in this figure as the next screen Any of the above requests can be accepted (115). According to the display request from the operator, the process is terminated, that is, the display of this screen is ended and the display of the product completion progress distribution map is returned (117), or the display content is scrolled to the left, right, up, or down according to the request. (119,121), whether the display contents are enlarged by one part (123,121) or reduced (125,1)
21) Branch to one of displaying the production progress chart for each part for the product specified by the operator (127).

操作者が、部品別生産進度図の表示を選択し要求する
と、ディスプレイ画面上、部品別生産進度図が表示され
る(129)。本画面に対して、終了、表示内容の左右/
上下スクロール表示、表示内容の1部分の拡大表示、縮
小表示、あるいは詳細情報として工程コード、実績着手
日時、実績完了日時、使用機械、担当作業者などを付加
表示するかのいずれかの要求が受付けられる(131)。
操作者からの要求に従い、処理は終了、即ち本画面の表
示を終了し、製品別生産進度図の表示に戻るか(13
3)、表示内容を左右上下いずれか要求に応じてスクロ
ールするか(135,137)、表示内容の1部分の拡大、縮
小表示を行うか(139,141,137)、操作者指定の要求に
応じて、詳細情報として工程コードや、完了済みの作業
工程に対して実績着手日時、実績完了日時、使用機械、
担当作業者などを同一画面上に付加表示するかの処理を
行う(143,137)。以上のような動作手順で、本発明の
処理動作は実現される。
When the operator selects and requests the display of the production progress chart for each part, the production progress chart for each part is displayed on the display screen (129). End, left / right of display contents /
Accepts any request to scroll up / down, enlarge / reduce one part of the displayed contents, or additionally display detailed information such as process code, date / time of actual start, date / time of actual result, machine used, worker in charge, etc. (131).
According to the request from the operator, the process ends, that is, the display of this screen is ended and the display of the production progress chart for each product is returned (13
3), whether to scroll the display contents left, right, up, or down according to the request (135, 137), whether to enlarge or reduce one part of the display contents (139, 141, 137), as detailed information according to the operator's request Actual start date / time, actual completion date / time, machine used, etc. for process code and completed work process
Processing is performed to additionally display a worker in charge on the same screen (143, 137). The processing operation of the present invention is realized by the above operation procedure.

第3図は、以上の動作手順において、画面表示の為の基
本データとなるファイル構造図である。全体は、3つの
ファイル20,30,40より構成され、第1図における入力手
段11,12に従ってデータ記憶手段13に格納される。製品
ファイル20は、製品に関するデータを格納するもので製
品名21、着手予定日(年月日)22、完成予定日(年月
日)23、納期(年月日)24、予定総作業工数25、実績完
成作業工数26、部品ファイル先頭ポインタ27、部品数28
より構成される。ここで、予定総作業工数25とは、当該
製品の製作開始から完成に至るまでに所要されると予定
される総作業工数(単位は例えば分数)であり、実績完
成作業工数26とは、当該製品が既に製作が完了している
分の作業工数である。初期値は0に入っている。部品フ
ァイル先頭ポインタ27は、当該製品を構成する部品に関
して、そのデータが格納されている部品ファイル30の先
頭のアドレスを表わす。当該製品を構成する部品が複数
件ある場合は、その部品に関するデータは、部品ファイ
ル先頭ポインタの示すアドレスより、部品数分だけ連続
して格納されている。
FIG. 3 is a file structure diagram which is basic data for screen display in the above operation procedure. The whole is composed of three files 20, 30, 40, and is stored in the data storage means 13 according to the input means 11, 12 in FIG. The product file 20 stores data related to the product. The product name 21, planned start date (date) 22, planned completion date (date) 23, delivery date (date) 24, planned total work time 25 , Track record completion work man-hours 26, parts file top pointer 27, parts number 28
It is composed of Here, the planned total work man-hour 25 is the total work man-hour (unit is, for example, a fraction) expected to be required from the production start to the completion of the product, and the actual completed work man-hour 26 is This is the number of man-hours required for production of a product. The initial value is 0. The parts file head pointer 27 indicates the head address of the parts file 30 in which the data of the parts constituting the product is stored. When there are a plurality of parts that make up the product, the data related to the parts are continuously stored by the number of parts from the address indicated by the part file head pointer.

部品ファイル30は、部品に関するデータを格納するもの
で、部品名31、工程ファイル先頭ポインタ32、工程数33
より構成される。ここで部品名とは部品を表わすコード
であり、工程ファイル先頭ポインタとは、当該部品を製
作してゆく手順として、工程情報を格納する工程ファイ
ル40の先頭のアドレスを表わす。当該部品が複数件の工
程を経て製作される場合は、その工程に関するデータ
は、工程フアイル先頭ポインタの示すアドレスにより、
工程数分だけ連続して格納されている。
The parts file 30 stores data about parts, and includes a parts name 31, process file start pointer 32, and process number 33.
It is composed of Here, the part name is a code representing the part, and the process file head pointer represents the head address of the process file 40 that stores the process information as a procedure for manufacturing the part. If the part is manufactured through multiple processes, the data related to that process is based on the address indicated by the process file start pointer.
It is stored continuously for the number of processes.

工程ファイル40は、部品を製造する上での手順として工
程単位にそのデータを格納するもので、工程コード41、
予定着手日時(年月日時分)42、実績着手日時(年月日
時分)43、予定完了日時(年月日時分)44、実績完了日
時(年月日時分)45、予定作業工数46、実績完了工数4
7、使用機械48、担当作業者49より構成される。予定着
手日時42と予定完了日時44は計画として、当該工程の作
業をいつ開始し、完了するかを年月日時分で記憶するも
のである。実績着手日時43は、既に当該工程の作業が着
手されている場合に、実績としての着手年月日時分が格
納される。実績完了日時45は、既に当該工程の作業が完
了している場合に、実績としての完了年月日時分が格納
される。予定作業工数46とは、当該工程の製造に必要な
予定作業工数で、実績完了作業工数47とは、既に製造が
完了している分の実績としての作業工数である。使用機
械48、担当作業者49は作業の履歴として、どの機械で、
誰が行ったかを格納するものである。
The process file 40 stores the data on a process-by-process basis as a procedure for manufacturing a part.
Scheduled start date / time (year / month / day / minute) 42, actual start date / time (year / month / day / minute) 43, scheduled completion date / time (year / month / day / minute) 44, actual completion date / time (year / month / day / minute) 45, planned work man-hours 46, actual Completion time 4
It consists of 7, the used machine 48, and the worker 49 in charge. The scheduled start date / time 42 and the scheduled completion date / time 44 are used as a plan to store the date and time when the work of the process is started and completed. The actual start date / time 43 stores the actual start date / time when the work of the process is already started. In the actual result completion date / time 45, when the work of the relevant process is already completed, the actual completion date / time is stored. The planned work man-hour 46 is a planned work man-hour required for manufacturing the process, and the actual work completion man-hour 47 is a work man-hour as a result of the already completed manufacturing. The machine 48 used and the worker 49 in charge are
It stores who went.

第4図は、製品完成進度分布図を、ディスプレイ画面上
に表示した1実施例で、第1図の編集手段15と表示手段
18により横軸に製品の完成予定日(第3図における23)
と納期(同じく24)の差をとり、縦軸に製品の完了予定
日と納期との差別に製品の件数(図では作番数)棒グラ
フで表示し、ヒストグラムの形で表示したものである。
FIG. 4 is an embodiment in which a product completion progress distribution map is displayed on the display screen. The editing means 15 and the display means of FIG.
Planned date of product completion on the horizontal axis according to 18 (23 in Fig. 3)
And the delivery time (also 24), and the vertical axis shows the number of products (number of products in the figure) bar graph on the basis of the difference between the planned completion date of the product and the delivery date, and is displayed in the form of a histogram.

また、図中、棒グラフの高さを累積した、達成曲線を合
わせて表示してある。また、データ表示要求のメニュー
内容として左スクロール、右スクロール、終了を下段に
表示してある。
In addition, in the figure, the achievement curves obtained by accumulating the heights of the bar graphs are also displayed. Further, as the menu contents of the data display request, left scroll, right scroll, and end are displayed in the lower row.

第5図は、製品別生産進度図をディスプレイ画面上に表
示した1実施例で、第1図の編集手段16と表示手段18に
より横軸に日付、縦軸に製品名をとり、着手予定日(第
3図の22)と、完成予定日(第3図の24)とからガント
チャートの形で表示したものである。横軸方向に伸びる
棒状のものが各製品の作業着手から作業完了に至るまで
の期間を表わしている。図中△印は納期で、ガントチャ
ート中斜線部分は、既に作業の完了している分、即ち予
定総作業工数中の完了している分の作業工数の占める比
率を表わしている。また、データ表示要求のメニュー内
容として、終了、左右上下スクロールを下段に表示し、
また各製品の部品別生産進度図を表示要求する為の製品
名の左横に数字を表示してある。
FIG. 5 is an embodiment in which a production progress chart for each product is displayed on the display screen. The editing means 16 and the display means 18 shown in FIG. 1 indicate the date on the horizontal axis and the product name on the vertical axis. It is displayed in the form of a Gantt chart from (22 in Fig. 3) and the planned completion date (24 in Fig. 3). A bar-shaped object extending in the horizontal axis represents the period from the start of work of each product to the completion of work. In the figure, the mark Δ indicates the delivery date, and the shaded portion in the Gantt chart represents the ratio of the work man-hours that has already been completed, that is, the completed man-hours in the planned total work man-hours. Also, as the menu contents of the data display request, the end, left and right, up and down scroll are displayed in the lower row,
A number is displayed on the left side of the product name for requesting the display of the production progress chart for each product.

第6図は、部品別生産進度図をディスプレイ画面上に表
示した1実施例で、第1図の編集手段17と表示手段18に
より操作者により指定された製品に関して、その製品を
構成する部品の生産推多、即ち、いつ着手し完成する予
定(第3図における42,44)かを、横軸に日付、縦軸に
部品名をとり、ガントチャートの形で表示したものであ
る。図中、△印は製品納期より逆展開した個々の部品の
納期で、ガントチャート中斜線部分は作業の完了分、即
ち完成進度を表わしている。
FIG. 6 is an embodiment in which a production progress chart for each part is displayed on the display screen. Regarding the product designated by the operator by the editing means 17 and the display means 18 of FIG. 1, the parts constituting the product are shown. This is a Gantt chart in which the horizontal axis is the date and the vertical axis is the part name, which shows the estimated production, that is, when to start and complete the production (42, 44 in FIG. 3). In the figure, the symbol Δ indicates the delivery date of each component that is reversely developed from the product delivery date, and the shaded portion in the Gantt chart indicates the completed amount of work, that is, the completion progress.

〔発明の効果〕〔The invention's effect〕

本発明によれば、工程管理に関するデータに基づき編集
された製品完成進度分布図、製品別生産進度図、部品別
生産進度図の3種類の図だけで工程管理業務、即ち、生
産計画全体の良し悪しや能力対策の必要の有無等の全体
的な意志決定、さらに製品個々の生産進度のフォローア
ップや、部品個々のフォローアップ、あるいは、ネック
部品の発見や対策など多岐にわたる業務を的確にしかも
正確に遂行することができる。
According to the present invention, the process management work, that is, the goodness of the entire production plan, is performed only by the three types of diagrams, that is, the product completion progress distribution map, the product production progress map, and the component production progress map edited based on the process management data. Accurately and accurately perform a wide range of tasks such as overall decision-making regarding badness and necessity of ability measures, follow-up of production progress of individual products, follow-up of individual parts, and detection and countermeasure of neck parts Can be carried out.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明の1実施例の機能ブロック図、第2図は
第1図の動作手順を示すフローチャート、第3図は工程
管理データのファイル構造図、第4図は製品完成進度分
布図の1例を示す図、第5図は製品別生産進度図の1例
を示す図、第6図は部品別生産進度図の1例を示す図で
ある。 11……計画データ入力手段,12……実績データ入力手段,
13……データ記憶手段,14……データ表示要求受付手段,
15……製品完成進度分布図編集手段,16……製品別生産
進度図編集手段,17……部品別生産進度図編集手段,18…
…データ表示手段,20……製品ファイル,30……部品ファ
イル,40……工程ファイル。
FIG. 1 is a functional block diagram of one embodiment of the present invention, FIG. 2 is a flowchart showing the operation procedure of FIG. 1, FIG. 3 is a file structure diagram of process control data, and FIG. 4 is a product completion progress distribution diagram. FIG. 5 is a diagram showing an example of a production progress chart by product, and FIG. 6 is a diagram showing an example of a production progress chart by part. 11 …… Plan data input means, 12 …… Actual data input means,
13 ... Data storage means, 14 ... Data display request reception means,
15 …… Product completion progress distribution map editing means, 16 …… Product production progress diagram editing means, 17 …… Parts production progress diagram editing means, 18…
… Data display means, 20 …… Product file, 30 …… Parts file, 40 …… Process file.

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 昭61−25756(JP,A) 特開 昭58−154012(JP,A) 日立評論、65〔12〕(1983)武田、下 社、三留 P.11〜16 ─────────────────────────────────────────────────── ─── Continuation of the front page (56) References JP 61-25756 (JP, A) JP 58-154012 (JP, A) Hitachi Review, 65 [12] (1983) Takeda, Shimosha, San P. 11 ~ 16

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】1つの製品が1つ以上の部品より構成され
ており、1つの部品が1つ以上の工程で加工が施され部
品として完成していく生産現場を対象として、 生産現場における工程管理データ(製品別および部品別
の日程計画と納期と進度実績)を入力する為の入力手段
と、当該データを記憶する為の記憶手段と、当該データ
を画面表示する為のデータ表示手段より構成される工程
管理データ表示装置において、 記憶手段が保持している情報から生産対象の製品全体の
納期と日程計画上の差にあたる製品完成進度の分布図を
生成・表示・スクロールする製品完成進度分布図編集手
段と、 記憶手段が保持している情報から各製品毎の納期と日程
計画と進度実績を同時に表示した製品別生産進度図を生
成・表示・スクロールする製品別生産進度図編集手段
と、 記憶手段が保持している情報から個々の製品を構成する
部品毎の納期と日程計画と進度実績を同時に表示した部
品別生産進度図を生成・表示・スクロールする部品別生
産進度図編集手段、 および上記製品完成進度分布図、製品別生産進度図、部
品別生産進度図を順次表示しうるよう要求を受付ける為
のデータ表示要求受付手段とを設け、 データ表示要求受付手段で受付けた図を生成・表示する
ために各々の編集手段を利用して作られた画面をデータ
表示手段で工程管理データ表示装置上に表示することを
特徴とする工程管理データ表示装置。
1. A process in a production site for a production site where one product is composed of one or more parts, and one part is processed in one or more steps to be completed as a part. Consists of input means for inputting management data (schedule plan, delivery date and progress record for each product and part), storage means for storing the data, and data display means for displaying the data on the screen. In the process control data display device that is used, the distribution map of product completion progress is generated, displayed and scrolled from the information stored in the storage means to create, display and scroll the distribution map of product completion progress, which is the difference in the delivery date and schedule of the entire product to be produced. Production progress by product that displays, scrolls, and produces a production progress chart by product that simultaneously displays the delivery date, schedule, and progress results for each product from the information stored in the editing means and storage means. A production progress chart for each component that creates, displays, and scrolls a production progress chart for each component that simultaneously displays the delivery date, schedule, and progress record for each component that constitutes an individual product from the information stored in the editing means and storage means An edit means and a data display request acceptance means for accepting a request to sequentially display the product completion progress distribution chart, product production progress chart, and component production progress chart are provided, and the data display request acceptance means is used. A process control data display device characterized in that a screen created by using each editing means for generating and displaying a figure is displayed on the process control data display device by the data display means.
JP6561386A 1986-03-26 1986-03-26 Process control data display device Expired - Lifetime JPH0665458B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6561386A JPH0665458B2 (en) 1986-03-26 1986-03-26 Process control data display device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6561386A JPH0665458B2 (en) 1986-03-26 1986-03-26 Process control data display device

Publications (2)

Publication Number Publication Date
JPS62224562A JPS62224562A (en) 1987-10-02
JPH0665458B2 true JPH0665458B2 (en) 1994-08-24

Family

ID=13292046

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6561386A Expired - Lifetime JPH0665458B2 (en) 1986-03-26 1986-03-26 Process control data display device

Country Status (1)

Country Link
JP (1) JPH0665458B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114881618A (en) * 2022-07-06 2022-08-09 小米汽车科技有限公司 Vehicle production data processing method and device and storage medium

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01304502A (en) * 1988-06-01 1989-12-08 Fujitsu Ltd Process control system
JPH0748227B2 (en) * 1989-03-10 1995-05-24 清水建設株式会社 Construction process planning and process management system
JPH02310703A (en) * 1989-05-26 1990-12-26 Chugoku Nippon Denki Software Kk Process managing device
JPH0333049U (en) * 1989-08-11 1991-04-02
JPH03126549U (en) * 1990-04-06 1991-12-19
JPH0435854A (en) * 1990-05-30 1992-02-06 Sekisui Chem Co Ltd Production control system
JP3027420B2 (en) * 1990-12-27 2000-04-04 富士通株式会社 Project management equipment
JPH05174027A (en) * 1991-12-24 1993-07-13 Matsushita Electric Ind Co Ltd Project plan back-up device
JP2884955B2 (en) * 1992-11-16 1999-04-19 日産自動車株式会社 Delivery date management assistance device for the final vehicle production process
JP5787733B2 (en) * 2011-12-02 2015-09-30 三菱重工業株式会社 Work status management server, work status management system, work status management method, and work status management program

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6125756A (en) * 1984-07-17 1986-02-04 Hitachi Ltd Non-massproduction proceeding delay detection

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
日立評論、65〔12〕(1983)武田、下社、三留P.11〜16

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114881618A (en) * 2022-07-06 2022-08-09 小米汽车科技有限公司 Vehicle production data processing method and device and storage medium

Also Published As

Publication number Publication date
JPS62224562A (en) 1987-10-02

Similar Documents

Publication Publication Date Title
US7042468B2 (en) Text overlay for multi-dimensional construction project models
US5414843A (en) Method and system for generating a project schedule using weighted work processes
US5563994A (en) System for graphically generating the sequence and temporal relationship between tasks in a project
US5918219A (en) System and method for estimating construction project costs and schedules based on historical data
US7552062B2 (en) Method and system for clinical process analysis
JPH0665458B2 (en) Process control data display device
JP2008299762A (en) Production management program
US20090118854A1 (en) Production planning support method and its system
CN102113010A (en) Method for supporting selection of subject for restriction countermeasure and system in same
JPS6226510A (en) Process plan information processor
US6839722B2 (en) Method for referencing time-related entries in different files in a planning program
JPH05204991A (en) Time series data retrieving method and retrieving system using the same
US8290608B2 (en) Manufacturing instruction equipment, program, manufacturing instruction system, and manufacturing instruction method
JP2000024850A (en) Manual assembly line efficiency evaluation device
US20010046068A1 (en) Print schedule planning method, print schedule planning system and print schedule planning program storage medium
JPH09101947A (en) Time series forcasting method
JP2796409B2 (en) Schedule management method and device
CN114462951A (en) Data visualization method, device, equipment and medium
JP2006351003A (en) Production simulation device and method
US6430546B1 (en) Data analysis method for clarification of perceptions
JP5563848B2 (en) Inventory management device
JPH0814826B2 (en) Project execution plan creation processor
JPH10240800A (en) Automobile presentation system under consideration of history and budget or the like
JPH0748227B2 (en) Construction process planning and process management system
JP2612732B2 (en) Schedule planning support method and device