JPH0653627U - Obi work block - Google Patents

Obi work block

Info

Publication number
JPH0653627U
JPH0653627U JP8626292U JP8626292U JPH0653627U JP H0653627 U JPH0653627 U JP H0653627U JP 8626292 U JP8626292 U JP 8626292U JP 8626292 U JP8626292 U JP 8626292U JP H0653627 U JPH0653627 U JP H0653627U
Authority
JP
Japan
Prior art keywords
river
stone
natural
band
belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP8626292U
Other languages
Japanese (ja)
Other versions
JP2600542Y2 (en
Inventor
道男 龍嶋
正人 佐藤
Original Assignee
株式会社宮田環境石材
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社宮田環境石材 filed Critical 株式会社宮田環境石材
Priority to JP1992086262U priority Critical patent/JP2600542Y2/en
Publication of JPH0653627U publication Critical patent/JPH0653627U/en
Application granted granted Critical
Publication of JP2600542Y2 publication Critical patent/JP2600542Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Abstract

(57)【要約】 [目的] 従来の河川帯工は、河床全体をコンクリート
で覆う必要性から、施工コストが嵩み、河川の自然バラ
ンスに好ましくない影響を与える。そこで本考案は帯工
(落差工)本来の目的を達成する際に、自然生態への影
響を解消し、またコストを最小限に抑えることを目的と
する。 [構成] 帯工石材に小径貫通孔を穿設し、各石に穿設
した貫通孔を揃えつつ複数帯工石をアーチ状に湾曲させ
て並べる一方、該貫通孔に可撓性の索条手段を挿通さ
せ、該索条手段の両端部を帯工石材に固定させる。この
帯工ブロックは、全体の重量が増して洗掘に抗し、アー
チ状に連結させたため構造強度が向上する。また河川が
泡立って酸素を導入撹拌し、自然環境に近い流れを作り
上げる。コンクリート打設に較べコストも低減する。
(57) [Summary] [Purpose] The conventional river belt construction requires the entire riverbed to be covered with concrete, which increases construction costs and adversely affects the natural balance of the river. Therefore, the purpose of the present invention is to eliminate the effect on the natural ecology and to minimize the cost when achieving the original purpose of the belt construction (head construction). [Structure] A small-diameter through hole is bored in a band masonry material, and a plurality of band masonry are curved and arranged in an arch shape while aligning the through holes bored in each stone, while a flexible cord is provided in the through hole. The means is inserted, and both ends of the cord means are fixed to the band masonry. This belt work block has an increased overall weight and resists scour, and since it is connected in an arch shape, the structural strength is improved. Also, the river foams and introduces oxygen to stir, creating a flow close to the natural environment. The cost is also reduced compared to concrete pouring.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

本考案は河床に施す帯工石材に係り、特に河川環境を良好に維持できる帯工ブ ロックに関する。 The present invention relates to a slab stone material applied to a river bed, and particularly to a slab block that can maintain a good river environment.

【0002】[0002]

【従来の技術】[Prior art]

河川の勾配が急な箇所は、そのまま放置すると河床が洗掘あるいは侵食され、 生態系が崩れたり有効な河川利用が困難になる場合がある。そこで河床勾配が急 な箇所には、従来より帯工や落差工を施し、流勢調節を図っている。 If the area where the river is steep is left as it is, the riverbed may be scoured or eroded, destroying the ecosystem and making effective use of the river difficult. Therefore, in areas where the riverbed slope is steep, belt work and head drop work have been performed to control the flow force.

【0003】 帯工や落差工は、その施工目的や経済条件によって各種のタイプがあるが、基 本的には何らかの人工物を河床に配し、せき上げ又は段差を設ける。具体的には 図5に示すように、河川1の流れに対して直角方向に帯工(落差工)2を施すの が一般であって、その構成は同図(a)に示すように、コンクリート帯3を配設 するもの、或いは同図(b)のようにコンクリート打ちした基礎4に自然石5を 埋設するもの、同図(c)のように落差の上下部分をコンクリート6で固めたも の等がある。There are various types of belt work and head drop work depending on the purpose of construction and economic conditions, but basically, some artificial material is placed on the river bed to raise or step. Specifically, as shown in FIG. 5, it is general to apply a belt work (falling work) 2 at a right angle to the flow of the river 1, and the structure is as shown in FIG. A concrete strip 3 is arranged, or a natural stone 5 is buried in a foundation 4 which is concrete-cast as shown in FIG. 2B, and the upper and lower parts of the head are fixed with concrete 6 as shown in FIG. There are things such as things.

【0004】[0004]

【考案が解決しようとする課題】[Problems to be solved by the device]

ところで、このようなコンクリート帯工は、河床全体をコンクリートで覆う必 要性から、第一に施工コストが嵩み、第二に河川の自然バランスに好ましくない 影響を与える。 By the way, such a concrete strip construction requires the whole river bed to be covered with concrete, which increases the construction cost, and secondly, has an unfavorable effect on the natural balance of the river.

【0005】 まずコストの点についていうと、コンクリート帯工は設計計算が煩雑であるう え、型枠組みなど煩雑な作業を要するため作業人員も多数必要で、工期も延びる など諸種の問題が複合する結果として現れる。First, in terms of cost, concrete belt work requires complicated work such as design calculation, requires complicated work such as formwork, and requires a large number of workers. Appears as a result.

【0006】 他方、コンクリート帯工(落差工)による自然への影響は、概略次の通りであ る。第一に、コンクリートからは石灰分など生態系に好ましくないアクが滲み出 ることが知られているが、従来の帯工(落差工)では河川水とコンクリートとの 接触面積が大きく、比較的短期のうちに多くの不良成分が河川に流れ出ることに なって生態系のバランスが壊れ易い。第二に、従来の河川工は単純にコンクリー トを配するため表面が平坦となる。ところが河川は単なる水路ではなく、自然の 自浄作用を営む。自然の自浄作用は、淵のくぼみや小石の凹凸による水流の泡立 ちにより空気中から酸素を導入することによって達成されるが、平坦なコンクリ ート表面では河川流水が泡立つこともなく、流勢も単調となって酸素の取り入れ や十分な撹拌作用が営まれず、河川の自浄作用が弱められ、自然のバランスが歪 められる。尚、落差工では酸素の導入はできるが、遡上する魚の進路が遮られ、 生態エリアが狭められる等の問題を抱える。On the other hand, the effect of nature on the concrete strip work (head construction) is roughly as follows. First, it is known that lime and other unfavorable acres in the ecosystem ooze out from concrete, but in conventional belt construction (head construction), the contact area between river water and concrete is large, and In the short term, many bad components will flow into the river and the balance of the ecosystem will be easily destroyed. Secondly, the conventional river works simply arrange concrete and the surface is flat. However, the river is not just a waterway but a natural self-cleaning action. The natural self-cleaning action is achieved by introducing oxygen from the air due to the bubbling of the water flow due to the depressions and pebbles in the pebble, but the river water does not bubble on the flat concrete surface, Momentum becomes monotonous and oxygen intake and sufficient agitation cannot be performed, weakening the self-cleaning action of the river and distorting the natural balance. Oxygen can be introduced in the head drop construction, but there are problems such as the path of fish going up is blocked and the ecological area is narrowed.

【0007】 そこで本考案の目的は帯工(落差工)本来の目的を達成する際に、自然生態へ の影響を解消し、またコストを最小限に抑える点にある。Therefore, an object of the present invention is to eliminate the influence on the natural ecology and to minimize the cost when the original purpose of the belt construction (head construction) is achieved.

【0008】[0008]

【課題を解決するための手段】[Means for Solving the Problems]

前記目的を達成して課題を達成するため本考案に係る帯工ブロックは、帯工石 材に小径貫通孔を穿設し、各石に穿設した貫通孔を揃えつつ複数帯工石をアーチ 状に湾曲させて並べる一方、該貫通孔に可撓性の索条手段を挿通させ、該索条手 段の両端部を帯工石材に固定させた。 In order to achieve the above object and to achieve the object, a belt work block according to the present invention has a small diameter through hole formed in a stone work material, and arches a plurality of belt work stones while aligning the through holes formed in each stone. The cords were arranged in a curved shape and arranged on the one hand, while the flexible cord means were inserted into the through holes to fix both ends of the cord means to the band stone.

【0009】[0009]

【作用】[Action]

本考案に係る帯工ブロックは、所定重量を有する多数の帯工石材をアーチ状に 並列させ、穿設孔にワイヤロープ等の索条手段を通して堅縛し、相互に連結させ る。石材の形状は任意であり隣合う石材同士の間に隙間が生じても構わない。 In the band work block according to the present invention, a large number of band work stone materials having a predetermined weight are arranged in an arch shape, and tightly bound to the drilled holes through a rope means such as a wire rope and connected to each other. The shape of the stone material is arbitrary, and a gap may occur between adjacent stone materials.

【0010】 かかる帯工ブロックは、湾曲させた突出頂点を流れに対向させて配置する。こ のブロックは、それぞれの石材を単独で配設した場合に較べて全体の重量が増す から洗掘や流勢に対してより強く対抗することが可能となるとともに、アーチ状 に連結させたため構造強度が向上し、強い流勢に対しても強く対抗することが可 能となる。またブロックには各石の間に隙間が生ずるが、この部分には流れてき た砂利や砂が入り込み、自然に強度が向上する。また、隙間があることによって 流れに従順となり、また遡上した魚に対して進路を与えることが出来る。また自 然の場合と同様、河川水が泡立って大気中の酸素を河川に導入し、流水を適度に 撹拌して自然に近い流れを作り上げる。In such a belt block, the curved projecting vertices are arranged so as to face the flow. Since this block increases the overall weight compared to the case where each stone material is arranged alone, it is possible to more strongly resist scouring and flow forces, and since it is connected in an arch shape, it has a structure. Strength is improved and it becomes possible to strongly oppose strong currents. In addition, a gap is created between each stone in the block, but the gravel and sand that has flowed into this block will naturally improve the strength. In addition, the presence of the gap makes the flow compliant, and it can give a course to the fish that has run up. In addition, as in the natural case, the river water bubbles to introduce atmospheric oxygen into the river, and the water stream is agitated appropriately to create a natural flow.

【0011】[0011]

【実施例】【Example】

以下、添付図面に基づいて本考案の実施例を説明する。 図1〜図4は、本考案に係る帯工ブロックの一例を示すものである。この帯工 ブロック10は、複数の自然石11に小径の貫通孔12を穿設し、各貫通孔が一 列に揃うように自然石11をアーチ状に湾曲させつつ整列させ、貫通孔12にワ イヤロープ14を通して各自然石11の連結強度を高める一方、座金15を介し てクリップ16によりワイヤロープ14の両端を自然石11に固定した。尚、図 2において符号Gは堤部、Rは河川、Qは河床である。ワイヤロープ14によっ て連結させたブロック10は、アーチ突出側を上流に向け、流れに抗するように 配置する。 Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings. 1 to 4 show an example of a belt work block according to the present invention. In this belt work block 10, small-diameter through holes 12 are bored in a plurality of natural stones 11, and the natural stones 11 are arched and aligned so that the through holes are aligned in a line. While the connection strength of each natural stone 11 was increased through the wire rope 14, both ends of the wire rope 14 were fixed to the natural stone 11 by the clips 16 through the washers 15. In FIG. 2, reference character G is a bank, R is a river, and Q is a river bed. The blocks 10 connected by the wire ropes 14 are arranged so that the arch protruding side faces the upstream side and resists the flow.

【0012】 自然石11の大きさは河川流量に応じて自由に変更出来るが、一般河川の氾濫 時の流量からいえば1〜5トン程度の重量をもつ河床自然石を用いるのが望まし い。また連結させるべき自然石11の個数は、河川流量、配設箇所の河川形状、 使用する自然石11の大きさ等によって適宜設定できるが、通常の場合には約5 〜10個程度である。この連結が長ければ長いほど、ブロック全体の重量が増す ため強い流勢に抗することが可能となるが、それに比して作業が煩雑化し、維持 管理も煩雑となるため適当な個数で区切りをつけ一つのブロック単位とする。ま た、このとき左右両端の自然石11R,11Lを他の石より大きなものにすると 流勢に対する安定性がさらに向上する。Although the size of the natural stone 11 can be freely changed according to the river flow rate, it is desirable to use the river bed natural stone having a weight of about 1 to 5 tons in terms of the flow rate at the time of flooding of a general river. . The number of natural stones 11 to be connected can be appropriately set depending on the flow rate of the river, the shape of the river at the location where the natural stones 11 are used, the size of the natural stones 11 to be used, etc., but is usually about 5 to 10 pieces. The longer this connection is, the more weight of the whole block increases, which makes it possible to withstand a strong flow.However, the work becomes complicated and the maintenance becomes complicated. Use one block as a unit. At this time, if the natural stones 11R and 11L at the left and right ends are made larger than other stones, the stability against the flow force is further improved.

【0013】 自然石11は、特ににその外観形状を揃える必要はない。このため、また全体 をアーチ状に整列させるため、隣合う自然石11同士の間には一定の隙間Sが生 ずるが、この部分には必要に応じて間詰め石18を配する。この間詰め石18に よりブロック10全体の強度が増し、より強く流勢や洗掘に対抗することが可能 となる。但し、このブロック10はアーチ状突出面を上流に向けているため、上 流側の隙間Sには間詰め石18を設けなくとも河川によって流されてきた砂利や 砂が自然に詰まり、時間経過に伴って自然に剛性が増す場合が少なくない。また ブロック10の一部に隙間Sがあることによって、遡上する魚に進路を提供する という効用もあるため、必ずしも間詰め石18をすべての隙間Sに配する必要は ない。The natural stones 11 do not need to have the same outer shape. For this reason, and because the whole is aligned in an arch shape, a certain gap S is created between the adjacent natural stones 11, but a padding stone 18 is arranged in this portion as necessary. During this time, the strength of the block 10 as a whole is increased by the stuffing stones 18, and it becomes possible to more strongly counter the flow and scour. However, since this block 10 has an arch-shaped projecting surface facing upstream, the gravel and sand that have been washed away by the river will naturally be clogged in the gap S on the upstream side even if the filling stone 18 is not provided. There are many cases in which the rigidity naturally increases as a result. Moreover, since the gap S is provided in a part of the block 10 has the advantage of providing a course for fish going up, it is not always necessary to arrange the filling stones 18 in all the gaps S.

【0014】 自然石11に穿設する貫通孔12は、その口径を約5cm程度に設定する。勿 論この数値は、挿入するワイヤロープ14の外径によって適宜設定変更すること が出来るが、約1〜5トンの自然石11を20〜40個程度連結させて堅縛する ときには、挿通させる索条径は最低16mm程度を要するため貫通孔12の内径 は前記数値となる場合が多い。各石11に対する孔穿設はドリルその他適宜手段 によって行う。尚、当然であるが貫通孔12の形状は問わない。また孔12の穿 設位置は、当該自然石11の重心位置付近に設定するのが望ましい。The diameter of the through hole 12 formed in the natural stone 11 is set to about 5 cm. Of course, this value can be changed as appropriate depending on the outer diameter of the wire rope 14 to be inserted, but when connecting about 20 to 40 natural stones 11 of about 1 to 5 tons and binding them together, the rope to be inserted is to be inserted. Since the line diameter requires at least about 16 mm, the inner diameter of the through hole 12 is often the above value. Drilling holes for each stone 11 is performed by a drill or other appropriate means. Of course, the shape of the through hole 12 does not matter. Moreover, it is desirable that the drilling position of the hole 12 is set near the center of gravity of the natural stone 11.

【0015】 ワイヤロープ14はブロック10全体を堅縛する必要からクリップ16により 両端で固定するが、固定方式はクリップ16等の部材に限らず、河川の流勢がさ ほど強くない箇所に配置する場合には人力等で固結びにより端末固定させても構 わない。勿論、ワイヤ端部を石11に巻き付けても良い。尚、ここで用いるクリ ップとは、ワイヤ端末を結んで貫通孔12からの脱落解除を防止できる各種部材 を総称する。貫通孔12の内径よりも大きな径を有する部材である限りその形状 や構成を問わない。The wire rope 14 is fixed at both ends by the clips 16 because it is necessary to fasten the entire block 10, but the fixing method is not limited to the members such as the clips 16 and is arranged at a place where the flow force of the river is not so strong. In this case, the terminal may be fixed by human knotting with a knot. Of course, the wire end may be wound around the stone 11. The clip used here is a generic name for various members that connect the wire ends and can prevent the release of the fall from the through hole 12. As long as the member has a diameter larger than the inner diameter of the through hole 12, its shape or configuration does not matter.

【0016】 かかる帯工ブロック10によれば、数トン級の自重を有する自然石11をアー チ状に組んで連結させ、突出側を上流に向けて配するから、アーチ形状による構 造強度が増し、川の流れに対してより強くブロック10が耐える。またブロック 全体の重量があるため洗掘にも耐え、洪水時にもブロック10は流失することが ない。また自然石11の形状は流勢に対して最小の抵抗であるから、流勢が激し ても洗掘等による破壊が生じ難くく、さらに地盤の変化が見られる場合でもブロ ックは地盤の変化に応じて自在に変形し、施工部分が破壊に至ることは極めて少 ない。According to the belt work block 10, since the natural stones 11 having a weight of several tons are assembled in an arch shape and connected, and the projecting side is arranged upstream, the structure strength due to the arch shape is improved. In addition, the block 10 withstands the flow of the river more strongly. In addition, the weight of the entire block allows it to withstand scouring, and the block 10 will not be washed away even during a flood. Moreover, since the shape of the natural stone 11 has the least resistance to the flow force, it is hard to be destroyed by scouring even if the flow force is intense, and the block is ground even if the ground changes. It is extremely unlikely that the construction part will be destroyed as it deforms freely according to changes in

【0017】 また自然石の形状により、各石の間には適度な隙間Sが生ずるが、これらブロ ック形状により河川水を泡だたせ、酸素を取り込み撹拌し、魚介や藻類などの生 物群に対し良好な環境を作り出す。また酸素の導入により河川の自浄作用も促進 され、流域環境も良好となる。Further, due to the shape of the natural stone, an appropriate gap S is generated between the stones, but due to the block shape, the river water is bubbled, oxygen is taken in, and the mixture is agitated to produce a product such as seafood or algae. Creates a good environment for the flock. In addition, the introduction of oxygen also promotes the self-cleaning action of the river, improving the basin environment.

【0018】 またこの実施例に係る帯工ブロックでは、自然石11を用いてブロックを構成 するため、コンクリートを使用した場合に較べ河川水に対するマイナス影響が全 くない。自然石11からは不良な成分(石灰成分等)が滲み出すことがないから である。また自然石を用いた場合は、従来の帯工コストよりも格段に経費(材料 コスト、作業コスト)を削減することが出来る。Further, in the belt work block according to this embodiment, since the block is formed by using the natural stone 11, the negative influence on the river water is less than that when concrete is used. This is because a bad component (lime component, etc.) does not exude from the natural stone 11. When natural stone is used, the cost (material cost, work cost) can be significantly reduced compared to the conventional belt construction cost.

【0019】 尚、本考案に係る帯工ブロックは必ずしもコンクリート石材の使用を除外する ものではない。ブロック単位の石材としてコンクリートを使用する場合は、河床 全体をコンクリートで覆う場合に較べ、水との接触面積も少なく、またコンクリ ート使用量も少ないから、不良成分の滲出しは従来の帯工よりも格段に減少させ ることが出来、またコスト的にも有利である。The strip work block according to the present invention does not always exclude the use of concrete stone. When concrete is used as block stone, the area of contact with water is smaller and the amount of concrete used is smaller than when covering the entire riverbed with concrete. Can be significantly reduced, and it is also advantageous in cost.

【0020】 ブロック全体を連結させる索条手段はワイヤーロープに限らない。引っ張りに 強く可撓性のある他の素材、例えば繊維強化樹脂その他の素材で編んだ各種ロー プ、樹脂系素材による管状の部材等で代替させても良い。またコンクリート石材 を使用する場合は、出来るだけ形状を自然石に近づけ、適当な隙間や流勢に対す る抵抗箇所を設けておくのが望ましい。The rope means for connecting the entire blocks is not limited to the wire rope. It may be replaced by another material that is strong against pulling and flexible, such as various ropes knitted with a fiber reinforced resin or other material, or a tubular member made of a resin material. Also, when using concrete stone, it is desirable to make the shape as close as possible to natural stone and to provide appropriate gaps and resistance points against the flow force.

【0021】 石材に穿設する貫通孔の数は一つに限定されない。より大きな石材を連結させ る場合等、必要に応じて複数本の貫通孔を穿設し、それに対応した本数の索条を 用いることも可能である。また石材形状を整える必要がある場合、少なくとも流 勢に面する箇所(特に表面側)には適当な凹凸を設け、自然の流れを失わないよ うにさせるのが望ましい。The number of through holes formed in the stone material is not limited to one. When connecting larger stones, it is possible to drill a plurality of through-holes and use the corresponding number of ropes if necessary. In addition, when it is necessary to arrange the stone shape, it is desirable that at least the part facing the flow (especially the surface side) is provided with appropriate irregularities so that the natural flow is not lost.

【0022】 またこのブロックは、河床に一列配置するだけでなく、上流から下流にかけて 平面的に多段階配設しても良く、また流勢によっては複数段に積み重ねて立体的 な構成としても良い。Further, the blocks are not only arranged in a row on the riverbed, but may be arranged in multiple stages in a planar manner from the upstream to the downstream, and may be stacked in a plurality of stages depending on the flow to form a three-dimensional structure. .

【0023】[0023]

【考案の効果】[Effect of device]

以上説明したように本考案に係る帯工ブロックは、帯工石材に小径貫通孔を穿 設し、貫通孔を揃えつつ帯工石アーチ状に並べて連結させたから、強度を十分に 保証し、自然の河川状態を長期に保つ帯工を提供できる。 As described above, in the belt work block according to the present invention, small-diameter through holes are formed in the belt work stone material, and since the through holes are aligned and connected in an arched stone work line, the strength is sufficiently ensured and natural. It is possible to provide a belt work that keeps the river condition in the long term.

【図面の簡単な説明】[Brief description of drawings]

【図1】本考案に係る帯工ブロックの一例を示す平面図
である。
FIG. 1 is a plan view showing an example of a band work block according to the present invention.

【図2】図1に示す帯工ブロックのII矢視図である。FIG. 2 is a II arrow view of the belt work block shown in FIG.

【図3】図1に示す帯工ブロックの配設例を示す断面図
である。
FIG. 3 is a cross-sectional view showing an arrangement example of the band work block shown in FIG.

【図4】本考案の実施例に係る自然石を例示する図であ
る。
FIG. 4 is a diagram illustrating a natural stone according to an embodiment of the present invention.

【図5】従来における帯工(落差工)を例示する図であ
る。
FIG. 5 is a diagram illustrating a conventional band work (drop work).

【符号の説明】[Explanation of symbols]

10 帯工ブロック 11 自然石 12 貫通孔 14 ワイヤロープ 15 座金 16 クリップ 18 間詰め石 Q 河床 S 隙間 R 河川(水面) G 堤部 10 Belt work block 11 Natural stone 12 Through hole 14 Wire rope 15 Washer 16 Clip 18 Filling stone Q Riverbed S Gap R River (water surface) G Bank part

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】帯工石材に小径貫通孔を穿設し、各石に穿
設した貫通孔の開口点を揃えつつ複数帯工石をアーチ状
に湾曲させて並べる一方、該貫通孔に可撓性の索条手段
を挿通させ、該索条手段の両端部を帯工石材に固定させ
たことを特徴とする帯工ブロック。
1. A small-diameter through hole is bored in a band masonry material, and while a plurality of band masonry stones are curved and arranged in an arch-like shape while aligning the opening points of the through holes bored in each stone, the through-bore can be inserted into the through hole. A banding block characterized in that a flexible stringing means is inserted and both ends of the stringing means are fixed to a bandwork stone material.
JP1992086262U 1992-11-20 1992-11-20 River zoning block structure Expired - Lifetime JP2600542Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1992086262U JP2600542Y2 (en) 1992-11-20 1992-11-20 River zoning block structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1992086262U JP2600542Y2 (en) 1992-11-20 1992-11-20 River zoning block structure

Publications (2)

Publication Number Publication Date
JPH0653627U true JPH0653627U (en) 1994-07-22
JP2600542Y2 JP2600542Y2 (en) 1999-10-12

Family

ID=13881910

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1992086262U Expired - Lifetime JP2600542Y2 (en) 1992-11-20 1992-11-20 River zoning block structure

Country Status (1)

Country Link
JP (1) JP2600542Y2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005155005A (en) * 2003-09-18 2005-06-16 Chichibu Taiheiyo Cement Kk River structure suitable for growth of river organism
JP2013221376A (en) * 2012-04-19 2013-10-28 Kazutaka Sugimura Method for stabilizing riverbed of river

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52113030A (en) * 1976-03-17 1977-09-21 Masato Oshikawa Method of preventing slope of riprap foundation
JPH02176008A (en) * 1988-12-27 1990-07-09 Doumon Kensetsu:Kk Construction of revetment
JPH06146239A (en) * 1992-11-02 1994-05-27 Risutoro:Kk Erosion preventing mat

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52113030A (en) * 1976-03-17 1977-09-21 Masato Oshikawa Method of preventing slope of riprap foundation
JPH02176008A (en) * 1988-12-27 1990-07-09 Doumon Kensetsu:Kk Construction of revetment
JPH06146239A (en) * 1992-11-02 1994-05-27 Risutoro:Kk Erosion preventing mat

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005155005A (en) * 2003-09-18 2005-06-16 Chichibu Taiheiyo Cement Kk River structure suitable for growth of river organism
JP4501131B2 (en) * 2003-09-18 2010-07-14 秩父太平洋セメント株式会社 Formation method of river structure suitable for the growth of river organisms
JP2013221376A (en) * 2012-04-19 2013-10-28 Kazutaka Sugimura Method for stabilizing riverbed of river

Also Published As

Publication number Publication date
JP2600542Y2 (en) 1999-10-12

Similar Documents

Publication Publication Date Title
JPH0653627U (en) Obi work block
JP3458275B2 (en) Embankment stabilization method on soft ground
JP2002201627A (en) Method for soil-erosion control works or shore protection works, and structure for soil-erosion control or shore protection
KR102057674B1 (en) Stone net structure
JP2764553B2 (en) Purification block and protective floor structure using the same
JP2002180438A (en) Precast concrete armour units, revetment structure, and method of manufacturing precast concrete armour units
JP3728725B2 (en) River bed structure and river bed protection method
KR100737109B1 (en) Interlinkage erosion shield system of block which has space and the mobile passage of fish
JP3396802B2 (en) Chained mat that combines natural stone and concrete block
CN108166451B (en) Soil-imitating blanket type three-dimensional energy dissipation slope protection for river side bank
JPH0653629U (en) Revetment reinforcement block
JP3984427B2 (en) River dam and river system using the same
JPH11286919A (en) Bed protecting member and bed protecting structure
JPH0712519U (en) Revetment reinforcement block
JP2574590Y2 (en) Leaf block
KR200408157Y1 (en) fish inhabitation block fo rivers
JP4006756B2 (en) Masonry block
JP2000087337A (en) Civil engineering structure formed of connected stone
JPH0756331Y2 (en) Natural stone joint block
JP2003064634A (en) Flag stone and dam structure for river
JP3041920U (en) Wave-dissipating block combined with natural stone
JP2840061B2 (en) Natural stone wire mesh for ecosystem protection
JPS5883716A (en) Mat for shore protection pavement and grid block used therein
JPH08333736A (en) Surfaced boulder unit and revetting construction method therewith
JPS6088726A (en) Slope protection work

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19990706

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R323113

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080813

Year of fee payment: 9

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080813

Year of fee payment: 9