JPH0644610Y2 - Draw hammer - Google Patents

Draw hammer

Info

Publication number
JPH0644610Y2
JPH0644610Y2 JP4245090U JP4245090U JPH0644610Y2 JP H0644610 Y2 JPH0644610 Y2 JP H0644610Y2 JP 4245090 U JP4245090 U JP 4245090U JP 4245090 U JP4245090 U JP 4245090U JP H0644610 Y2 JPH0644610 Y2 JP H0644610Y2
Authority
JP
Japan
Prior art keywords
hammer
rod
shaped body
girder
pulling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP4245090U
Other languages
Japanese (ja)
Other versions
JPH042571U (en
Inventor
三男 渡辺
Original Assignee
三男 渡辺
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三男 渡辺 filed Critical 三男 渡辺
Priority to JP4245090U priority Critical patent/JPH0644610Y2/en
Publication of JPH042571U publication Critical patent/JPH042571U/ja
Application granted granted Critical
Publication of JPH0644610Y2 publication Critical patent/JPH0644610Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Percussive Tools And Related Accessories (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【考案の詳細な説明】 〔産業上の利用分野〕 この考案は引きハンマー、特に木造建築の上棟時に使用
する引きハンマーに関するものである。
[Detailed Description of the Invention] [Industrial field of application] The present invention relates to a pulling hammer, and more particularly to a pulling hammer used at the time of building a wooden building.

〔従来の技術〕[Conventional technology]

従来、この種の装置として第10図に示すものが知られて
いる。
A device shown in FIG. 10 is conventionally known as this type of device.

1は引きハンマーの本体、2はこの本体1の棒状体、3
はこの棒状体2の先端部2aに取り付けたハンマー、4は
この先端部2aに固定した振れ止め、5は前記棒状体2の
下部の手持部、6は前記枠棒状体2を摺動可能に嵌装し
た管状体、7はこの管状体6に固定した掛け金で、この
掛け金7を桁8などに引っ掛けることによって、管状体
6を吊り下げるようになっている。9は前記管状体6の
外壁に設けた輪、この輪9内に前記振れ止め4を通して
ある。
1 is a body of a pulling hammer, 2 is a rod-shaped body of the body 1, 3
Is a hammer attached to the tip portion 2a of the rod-shaped body 2, 4 is a steady rest fixed to the tip portion 2a, 5 is a hand-holding portion at the lower portion of the rod-shaped body 2, and 6 is slidable on the frame rod-shaped body 2. The fitted tubular body 7 is a latch fixed to the tubular body 6, and the tubular body 6 is hung by hooking the latch 7 on a girder 8 or the like. Reference numeral 9 is a ring provided on the outer wall of the tubular body 6, and the steady rest 4 is passed through the ring 9.

使用時、手持部5によりハンマー3を取り付けた棒状体
2を下げると、輪9により振れ止め4が案内され、棒状
体2が、管状体6内を下方に摺動するようになってい
る。10はコンクリートによりつくった基礎部、11はこの
基礎部10上に載置した土台、11aはこの土台11に設けた
土台穴、12は柱、12a,12bはそれぞれ柱12の上部,下部
に設けたほぞである。8aは前記桁8に設けた桁穴であ
り、この桁穴8aには柱12のほぞ12aを、土台穴11aには柱
12のほぞ12bをそれぞれ嵌入する。
When the rod-shaped body 2 to which the hammer 3 is attached is lowered by the hand-held portion 5 during use, the steady rest 4 is guided by the ring 9 and the rod-shaped body 2 slides downward in the tubular body 6. 10 is a foundation made of concrete, 11 is a foundation placed on this foundation 10, 11a is a foundation hole provided in this foundation 11, 12 is a pillar, 12a and 12b are provided above and below the pillar 12, respectively It is a tenon. 8a is a girder hole provided in the girder 8. The tenon 12a of the pillar 12 is in the girder hole 8a, and the pillar is in the base hole 11a.
Insert 12 tenons 12b respectively.

使用にあっては、たとえば、まず手により棒状体2を上
方に移動し、第10図に示したように、掛け金7を桁8に
引っ掛け、棒状体2を手から放すと、ハンマー3部が桁
8に当接することにより、引きハンマーを吊り下げる。
In use, for example, first move the rod-shaped body 2 upward by hand, hook the latch 7 on the girder 8 and release the rod-shaped body 2 from the hand as shown in FIG. The pull hammer is suspended by contacting the beam 8.

作業時、手持部5を持って引きハンマーを上方に上げ、
つぎに、棒状体2を下方に引き放し、ハンマー3を下方
に落下することにより、桁8に衝撃を与える。
When working, hold the hand holding part 5 and raise the pulling hammer upward,
Next, the rod-shaped body 2 is released downward, and the hammer 3 is dropped downward, thereby giving an impact to the girder 8.

上記の作業を繰り返すことにより、打ち込み作業を行
う。この例の引きハンマーにおいては、掛け金7を設け
たため、かなり重い引きハンマーにあっても、手作業に
より桁8に容易に引っ掛けでき、また、振れ止め4に沿
って棒状体2を案内し、輪9内に摺動するため下方に引
くだけで、引きハンマー3に作用する重力の作用も加わ
り、簡単な操作で容易に作業できるように構成されてい
た。
The driving work is performed by repeating the above work. In the pulling hammer of this example, since the latch 7 is provided, even a considerably heavy pulling hammer can be easily hooked on the girder 8 by hand, and the rod-shaped body 2 can be guided along the steady rest 4 by Since it slides inside 9, the pulling hammer 3 is simply pulled downward, and the action of gravity acting on the pulling hammer 3 is added, so that the work can be easily performed by a simple operation.

〔考案が解決しようとする課題〕[Problems to be solved by the device]

しかしながら、従来の引きハンマーにあっては、 イ)作業時、手により、重いハンマー3を先端部2aに取
り付けた棒状体2を持ち上げ、桁穴8aに柱12のほぞ12a
を入れようとするとき、ハンマー3を効果的に打ち込め
る位置にセットしにくく、再度セットしなおすと首部が
つかれやすいという難点があった。
However, in the case of the conventional pulling hammer, a) during work, the rod-shaped body 2 with the heavy hammer 3 attached to the tip 2a is lifted by hand, and the tenon 12a of the column 12 is inserted into the girder hole 8a.
When inserting the hammer, it is difficult to set the hammer 3 at a position where it can be effectively driven, and if the hammer 3 is reset again, there is a problem that the neck portion is easily squeezed.

ロ)また、2階の部分が図示されない胴差しを、柱12上
において、接継時、胴差しをクレーンでつり上げ、打ち
込み作業を行いやすい姿勢になるように、胴差しを柱12
に対してセットするには、熟練を要し、短時間では簡単
にはできにくいという問題があった。
B) On the pillar 12, mount the unillustrated girder on the second floor so that the girder can be lifted up by a crane when connecting, so that the girder will be in a position that facilitates the driving work.
However, there was a problem that it took a lot of skill to set it, and it was difficult to do it easily in a short time.

ハ)さらに、胴差し同志をつなげる作業においては、重
ね部をほぼ水平にセットし、しかも、上棟時、限定され
た時間内で完了することが要求されるものであるが、実
行は困難であることがあった。
C) Furthermore, in the work of connecting the girders to each other, it is required to set the overlapping part almost horizontally and to complete it within a limited time when the ridge is built, but this is difficult to carry out. There was an occasion.

この考案は、このような問題点を解決するためになされ
たもので、棒状体の先端部に取り付けたハンマーの上部
には、こじりとすべり止めを突設し、側部にはガイド部
とロープゆるめを設け、棒状体につぎ足し棒を着脱でき
るように構成したことにより、上棟時などの各打ち込み
作業を正しく、容易、安全に短時間に完了できる引きハ
ンマーを提供することを目的としている。
The present invention has been made to solve such a problem, and a hammer attached to the tip of a rod-shaped body has a prying and non-slip protrusion projecting on the top, and a guide and a rope on the side. An object of the present invention is to provide a pulling hammer that can be properly and easily and safely completed in a short time by slackening it so that the rod can be added to and removed from the rod-shaped body to attach and detach the rod.

〔課題を解決するための手段〕[Means for Solving the Problems]

このため、この考案の引きハンマーにおいては、棒状体
の先端部に取り付けたハンマーの上部にはこじりとすべ
り止めを突設し、側部にはガイド部とロープゆるめを設
け、前記棒状体にはつぎ足し棒を着脱できるように構成
したものである。
For this reason, in the pulling hammer of the present invention, the hammer attached to the tip of the rod-shaped body is provided with a prying and anti-slip projection at the upper part, and a guide portion and a rope loosening are provided on the side portion, and the rod-shaped body has It is configured so that the next addition bar can be attached and detached.

〔作用〕[Action]

上記構成において、ハンマーの上部にはこじりとすべり
止めを突設したので、対象物を打ち込み易い位置にこじ
り,すべることなく保持でき、また、側部にはガイド部
とロープゆるめを設けたことにより、作業の対象物をセ
ットし易く、下からの打ち込みを正しく行えるように働
く。
In the above structure, the hammer is provided with a prying and anti-slip protrusion so that the object can be plucked at a position where it can be easily driven and can be held without slipping. , Easy to set the work object, and work so that the driving from below can be performed correctly.

さらに、棒状体につぎ足し棒を着脱できるように構成し
たことにより、2階など高所の胴差しのほぞを柱の等ほ
ぞ穴に打ち込みやすい姿勢で作業でき、胴差し同志をつ
なげる作業では、重ね部をほぼ水平にセットし、打ち込
み作業を上棟時、限定された時間内に安全に、かつ容易
にできるように働く。
Furthermore, by adding the rod to the rod-shaped body so that the rod can be attached and detached, it is possible to work with the tenon at the high place such as the second floor in a position where it is easy to drive the tenon into the equal tenon of the pillar. The part is set almost horizontally, and work is done so that the driving work can be done safely and easily within the limited time when it is on the upper ridge.

〔実施例〕〔Example〕

以下に、この考案の一実施例の引きハンマーについて図
に基づいて説明する。第1図はこの考案の一実施例の引
きハンマーを示す正面図、第2図は同側面図、第3図は
桁を柱上にセットした状態を示す説明図、第4図ないし
第7図は引きハンマーの使用例を示す説明図、第8図お
よび第9図はつぎ足し棒を取り付けた状態を示す説明図
である。
A pull hammer according to an embodiment of the present invention will be described below with reference to the drawings. FIG. 1 is a front view showing a pulling hammer of an embodiment of the present invention, FIG. 2 is a side view of the same, FIG. 3 is an explanatory view showing a state in which a girder is set on a pillar, and FIGS. 4 to 7 Fig. 8 is an explanatory view showing an example of use of a pull hammer, and Figs. 8 and 9 are explanatory views showing a state in which a replenishment bar is attached.

前出従来例第10図におけると、同一部分または相当部分
は同一符号を用い、説明の重複をさける。
In the above-mentioned conventional example shown in FIG. 10, the same parts or corresponding parts are designated by the same reference numerals to avoid duplication of description.

図において13はハンマー3の上部、14はこの上部13に突
設したこじり、このこじり14は桁8をこじることによ
り、柱12上に作業し易く位置させるためのものであり、
15はこのこじり14とともに、ハンマー3の上部13に突設
したすべり止め、このすべり止め15は、桁8などの作業
対象物を作業し易い姿勢ですべらないようにセットする
ためのものである。
In the figure, 13 is an upper part of the hammer 3, 14 is a prying protrusion projecting on the upper part 13, and this prying 14 is for prying the girder 8 so that it can be easily positioned on the pillar 12,
The anti-slip 15 is provided together with the prying 14 on the upper portion 13 of the hammer 3, and the anti-slip 15 is for setting the work object such as the girder 8 so as not to slip in a posture that facilitates the work.

16はハンマー3の側部、17,17aは、それぞれこの側部16
に設けたガイド部とロープゆるめで、このガイド部17に
より、桁8などの作業対象物を打撃し易いように、ハン
マー3の底部3aの近くに案内するようになっており、ロ
ープゆるめ17aは、後出のワイヤロープ20をほどくため
のものである。
16 is the side part of the hammer 3, 17 and 17a are the side parts 16 respectively.
The guide portion and the rope loosening provided on the guide guide the work object such as the girder 8 near the bottom portion 3a of the hammer 3 by the guide portion 17 so that the rope loosening 17a , For unwinding the wire rope 20 described later.

この一実施例では、ガイド部17をロープゆるめ17aと一
体に側部16に設けた場合について説明する。
In this embodiment, the case where the guide portion 17 is provided on the side portion 16 integrally with the rope loosening 17a will be described.

18は棒状体2の下部である手持部5につぎ足すためのつ
ぎ足し棒、19は手持部5の内部に嵌着しためねじ、19a
はつぎ足し棒18内に嵌着したおねじであり、このおねじ
19aを前記めねじ19にねじ込むことにより、つぎ足し棒1
8をつぎ足すようになっている。
Reference numeral 18 is an additional rod for adding to the hand-holding portion 5 which is the lower portion of the rod-shaped body 2, 19 is a screw for fitting inside the hand-holding portion 5, 19a
Is a male screw fitted in the additional rod 18, and this male screw
By screwing 19a into the female screw 19 described above, the addition rod 1
It is designed to add 8 more.

前記のように構成されているので、使用にあたっては、
たとえば第3図に示すように手により棒状体2を上方に
動かし、つぎに下方に引き、桁8に衝撃を与える作業を
繰り返ことにより打ち込みを行い、桁穴8aには柱12のほ
ぞ12aを、土台穴11aには柱のほぞ12bを、それぞれ嵌入
する。
Since it is configured as described above, when using it,
For example, as shown in FIG. 3, the rod-shaped body 2 is moved upward by hand, then pulled downward, and impacting the girder 8 is repeated to perform driving, and the tenon 12a of the column 12 is inserted into the girder hole 8a. , And the tenon 12b of the pillar is inserted into the base hole 11a.

この打ち込み作業を行う前に、桁8などの作業の対象物
を作業し易いようにセットする例を、第4図ないし第7
図について説明する。
An example in which an object to be worked such as a girder 8 is set so as to be easy to work before performing the driving operation is described in FIGS.
The figure will be described.

第4図は、図示されないクレーンを用い、桁8にワイヤ
ロープ20を巻いて吊り、柱12上にセットしたのち、高所
にあるワイヤロープ20の結びをゆるめるためにロープゆ
るめ17aの先端を用いている状態を示したものである。
In FIG. 4, a crane (not shown) is used to wind and suspend the wire rope 20 around the girder 8 and set it on the pillar 12, and then the tip of the rope loosening 17a is used to loosen the knot of the wire rope 20 at a high place. It shows the state of being.

第5図は胴差し21の両端に設けたほぞの一方のほぞ21a
を、柱12の柱穴22に嵌入するために、胴差し21を引きハ
ンマーを用いてセットしたのち、ハンマー3によりはた
き入れる状態を示したもので、これによりほぞ21aを柱
穴22に容易に正しく嵌入できる。
FIG. 5 shows one of the tenons 21a provided at both ends of the barrel 21.
In order to fit into the column hole 22 of the column 12, after pulling the barrel 21 and setting it with a hammer, the hammer 3 is shown to be knocked in, whereby the tenon 21a can be easily inserted into the column hole 22. Can be inserted correctly.

第6図は桁8を柱12に対して支えるために、ハンマー3
の上部13により上方に押し上げている状態を示したもの
である。
FIG. 6 shows a hammer 3 for supporting the girder 8 against the column 12.
The upper part 13 of FIG.

第7図は一方の桁8を、他の桁8に接続するためにセッ
トする例の説明図であり、一方の桁8をこじり14でこじ
り、すべり止め15により、すべらないように迅速に容易
にセットすることができる。
FIG. 7 is an explanatory view of an example in which one girder 8 is set to be connected to another girder 8. One girder 8 is pryed by prying 14 and non-slip 15 makes it quick and easy not to slip. Can be set to.

この考案の一実施例の引きハンマーによれば、棒状体2
の先端部2aに取り付けたハンマー3の上部13には、こじ
り14とすべり止め15を突設したため、打ち込み作業の対
象物をこじり14にこじり、すべり止め15によりすべるこ
となくセットでき、打ち込み作業を正しく行うことがで
き、また、ハンマー3の側部16には、ロープゆるめ17a
と一体にガイド部17を設けたことにより、ワイヤロープ
20の結びをゆるめることができ、柱12などの対象物をハ
ンマー3の底部3a近くに容易に案内でき、迅速に打ち込
み作業を正しくでき、そして、前記棒状体2の手持部5
には、つぎ足し棒18を着脱できるように構成したので、
高所での打ち込み作業を行い易い姿勢ででき、胴差し同
志の重ね作業を短時間,安全しかも容易にできる効果が
ある。
According to the pulling hammer of one embodiment of the present invention, the rod-shaped body 2
The upper part 13 of the hammer 3 attached to the tip portion 2a of the hammer 3 is provided with a prying 14 and a non-slip 15, so that the object to be driven can be prying on the prying 14 and set without slipping by the anti-slip 15 It can be done correctly and there is a rope loosening 17a on the side 16 of the hammer 3.
By providing the guide part 17 integrally with the wire rope
The knot of 20 can be loosened, the object such as the pillar 12 can be easily guided near the bottom 3a of the hammer 3, the hammering operation can be performed quickly, and the hand-holding portion 5 of the rod-shaped body 2
Since it is configured so that the next addition bar 18 can be attached and detached,
It has the effect of making it possible to perform driving work in high places in an easy posture, and it is possible to perform stacking work for both toes in a short time, safely and easily.

〔考案の効果〕[Effect of device]

以上に説明してきたように、この考案の引きハンマーに
よれば、棒状体の先端部に取り付けたハンマーの上部に
は、こじりとすべり止めを突設したことにより、打ち込
み作業の対象物をこじりとすべり止めによりすべること
なくセットでき、下方からの打ち込み作業を確実にで
き、また、側部にはガイド部とロープゆるめを設けたた
め、柱などの対象物をハンマーの底部に容易に案内で
き、迅速に下からの打ち込み作業を正しく行え、ワイヤ
ロープの結びをゆるめることができ、さらに、棒状体に
つぎ足し棒を着脱できるように構成したので、高所での
打ち込み作業をし易い姿勢ででき、胴差し同志の重ね作
業を短時間,安全かつ容易にできる引きハンマーを提供
できるという効果を奏する。
As described above, according to the pulling hammer of the present invention, the hammer attached to the tip end of the rod-shaped body is provided with a prying and a slip stopper so that the object to be hammered in can be prune. It can be set without slipping due to non-slip, and the driving work from below can be surely done.Because the guide part and the rope loosening are provided on the side part, it is possible to easily guide the object such as a pillar to the bottom of the hammer, and it is quick. In addition, it is possible to perform the driving work correctly from below, loosen the knot of the wire rope, and to add and remove the rod by adding it to the rod-shaped body, so it is possible to do the driving work in high places with It is possible to provide a pulling hammer that can easily and safely carry out the overlapping work of the other people in a short time.

【図面の簡単な説明】[Brief description of drawings]

第1図はこの考案の一実施例に係る引きハンマーを示す
正面図、第2図は同側面図、第3図は桁を柱上にセット
した状態を示す説明図、第4図ないし第7図は引きハン
マーの使用例を示す説明図、第8図および第9図はつぎ
足し棒を取り付けた状態を示す説明図、第10図は従来の
引きハンマーを示す斜視図である。 1……本体 2……棒状体 2a……先端部 3……ハンマー 13……上部 14……こじり 15……すべり止め 16……側部 17……ガイド部 17a……ロープゆるめ 18……つぎ足し棒 各図中、同一符号は同一部分または相当部分を示す。
FIG. 1 is a front view showing a pull hammer according to an embodiment of the present invention, FIG. 2 is a side view of the same, FIG. 3 is an explanatory view showing a state in which a girder is set on a pillar, and FIGS. FIG. 8 is an explanatory view showing an example of use of a pulling hammer, FIGS. 8 and 9 are explanatory views showing a state in which a adding rod is attached, and FIG. 10 is a perspective view showing a conventional pulling hammer. 1 …… Main body 2 …… Stick 2a …… Tip 3 …… Hammer 13 …… Top 14 …… Prying 15 …… Slip prevention 16 …… Side 17 …… Guide 17a …… Rope loosening 18 …… Addition In each figure, the same reference numerals indicate the same or corresponding parts.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】棒状体の先端部にハンマーを取り付けてな
る引きハンマーであって、前記ハンマーの上部にはこじ
りとすべり止めを突設し、側部にはガイド部とロープゆ
るめを設け、前記棒状体にはつぎ足し棒を着脱できるよ
うに構成したことを特徴とする引きハンマー。
1. A pulling hammer comprising a rod-shaped body and a hammer attached to the tip of the rod-shaped body, wherein the hammer has an upper portion provided with prying and non-slip projections, and a side portion provided with a guide portion and a rope loosening member. A pulling hammer characterized in that a stick is attached to and detached from the rod-shaped body.
JP4245090U 1990-04-23 1990-04-23 Draw hammer Expired - Lifetime JPH0644610Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4245090U JPH0644610Y2 (en) 1990-04-23 1990-04-23 Draw hammer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4245090U JPH0644610Y2 (en) 1990-04-23 1990-04-23 Draw hammer

Publications (2)

Publication Number Publication Date
JPH042571U JPH042571U (en) 1992-01-10
JPH0644610Y2 true JPH0644610Y2 (en) 1994-11-16

Family

ID=31554008

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4245090U Expired - Lifetime JPH0644610Y2 (en) 1990-04-23 1990-04-23 Draw hammer

Country Status (1)

Country Link
JP (1) JPH0644610Y2 (en)

Also Published As

Publication number Publication date
JPH042571U (en) 1992-01-10

Similar Documents

Publication Publication Date Title
JPS6370774A (en) Molded body for holding anchor at time of concrete casting of building material made of concrete
US5052659A (en) Stake puller
JPH0644610Y2 (en) Draw hammer
US3867733A (en) Stake puller
CN208668904U (en) A kind of steel pipe support support construction
KR200297467Y1 (en) Portable Nail Remover Tool
US1587238A (en) Movable bracket for flying scaffolding
JPS6016299Y2 (en) Tree raising device
JP5730435B1 (en) Flag display jig
JPH048148Y2 (en)
US1684797A (en) Wire puller and twister for concrete framework
US20040026045A1 (en) Floor covering removal tool
JP3045667B2 (en) Flooring for scaffolding
KR200281428Y1 (en) Concrete form fixing tool for underground breast wall
JPH0633148Y2 (en) Peg remover
JPH0643361Y2 (en) Lifting jig
JPS6016300Y2 (en) Tree raising device
KR200250576Y1 (en) Multipurpose pole device for constructure
JP2005082209A (en) Opening fastening tool for surplus soil storing bag
JPH0416856Y2 (en)
JP5618201B2 (en) Lifting method of prefabricated manhole using lifting jig for prefabricated manhole
JP3027295U (en) Nail puller with adjuster with claw
JPH0667730U (en) Peg with hook for tent construction
KR960002480Y1 (en) Wedge of device for lifting a slab form
JPH09287134A (en) Pile