JPH06346694A - Structure of joint for concrete segment - Google Patents

Structure of joint for concrete segment

Info

Publication number
JPH06346694A
JPH06346694A JP5137176A JP13717693A JPH06346694A JP H06346694 A JPH06346694 A JP H06346694A JP 5137176 A JP5137176 A JP 5137176A JP 13717693 A JP13717693 A JP 13717693A JP H06346694 A JPH06346694 A JP H06346694A
Authority
JP
Japan
Prior art keywords
concrete
segment
concrete segment
push
segments
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP5137176A
Other languages
Japanese (ja)
Inventor
Kentaro Fujii
健太郎 藤井
Keiichi Watanabe
敬一 渡辺
Yutaka Fujino
豊 藤野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIO STAR KK
Original Assignee
JIO STAR KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIO STAR KK filed Critical JIO STAR KK
Priority to JP5137176A priority Critical patent/JPH06346694A/en
Publication of JPH06346694A publication Critical patent/JPH06346694A/en
Pending legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

PURPOSE:To make works easy for connecting concrete segments together even in the case of automatic erection, and to shorten the time required for execution of work. CONSTITUTION:While connection in the tunnel-wise direction is made by generally-practiced chuck-in method, connection in the ring-wise direction is made by connection of projectile push-out pins 5 provided to the inside of a concrete segment 2 on one side and chucks 4 provided to the concrete segment 2 on the other side for thrusting-in by oil pressure of the push-out pins 5 therein. In the tunnel-wise direction, fixing pins 3 are inserted into the chucks 4 and are thrust therein by jacking thrust for erection, and in the ring-wise direction, the push-out pins 5 are thrust by means of oil pressure or the like into the chucks 4 buried in an adjoining segment for connection. Thereby, erection can be executed easily and certainly even in the case of automatic erection without hindrance by connecting pins.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、シールドトンネルに
おいて、各コンクリートセグメントを自動組立てにより
接合する時に用いる、コンクリートセグメントの継手構
造に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a joint structure for concrete segments used in a shield tunnel for joining each concrete segment by automatic assembly.

【0002】[0002]

【従来の技術およびこの発明が解決しようとする課題】
従来、この種のコンクリートセグメントの継手構造とし
ては、各コンクリートセグメントにおけるセグメントリ
ング間の締結を、連結端面に突出して固定されているチ
ャックピンによって行うものが、既に実用化されてい
る。
Prior Art and Problems to be Solved by the Invention
Conventionally, as a joint structure of this type of concrete segment, a structure in which the segment rings in each concrete segment are fastened by a chuck pin projecting and fixed to a connecting end face has been already put into practical use.

【0003】しかし、このチャックピンを、セグメント
継手や通称ピース間継手に用いると、自動組立での、各
セグメントのリング方向およびトンネル方向への組立て
時に、邪魔になって施工することができなかった。
However, when this chuck pin is used for a segment joint or a so-called piece-to-piece joint, it cannot be installed because it interferes with the assembly of each segment in the ring direction and the tunnel direction in automatic assembly. .

【0004】即ち、図2に示すように、締結用のチャッ
クピンであるRとPのピンは、各セグメントの連結端面
におけるリング方向およびトンネル方向へと、互いに90
°の角度をなして突きだしている。そのため、どちらか
のピンが邪魔となって、リング方向またはトンネル方向
への組立てが行えなくなる。
That is, as shown in FIG. 2, the chucking pins R and P, which are chuck pins for fastening, are 90 degrees apart from each other in the ring direction and the tunnel direction on the connecting end face of each segment.
It sticks out at an angle of °. Therefore, either of the pins interferes with the assembly in the ring direction or the tunnel direction.

【0005】従って、従来では、各セグメントのトンネ
ル方向への締結、即ち、セグメントリングとセグメント
リングとの締結をチャックピンで行い、また、各セグメ
ントのリング方向への締結を曲がりボルトによって締め
付けることで行っていた。
Therefore, conventionally, the fastening of each segment in the tunnel direction, that is, the fastening of the segment ring and the segment ring is performed by the chuck pin, and the fastening of each segment in the ring direction is performed by bending bolts. I was going.

【0006】この考案は前述した事情に鑑みて創案され
たもので、その目的は連結すべき両コンクリートセグメ
ント同士の連結作業を、自動組立てにおいても容易に行
えることができ、連結作業時間を短縮することのできる
コンクリートセグメントの継手構造を提供することにあ
る。
The present invention was devised in view of the above-mentioned circumstances, and the purpose thereof is to easily perform the work of connecting both concrete segments to be connected to each other even in the automatic assembly, thereby shortening the connecting work time. An object of the present invention is to provide a joint structure for a concrete segment that can be used.

【0007】[0007]

【課題を解決するための手段】この発明によれば、各コ
ンクリートセグメントにおけるトンネル方向への接合を
一般のチャックピン方式で行うと共に、各コンクリート
セグメントにおけるリング方向への接合を、一方のコン
クリートセグメント内に設けた突出自在な押出し式ピン
と、この押出し式ピンを油圧などによって突出させて圧
入できるように、コンクリートセグメントにおける他方
のコンクリートセグメントに設けたチャック部とによっ
て行うようにする。
According to the present invention, each concrete segment is joined in the tunnel direction by a general chuck pin method, and each concrete segment is joined in the ring direction in one concrete segment. And a chuck portion provided on the other concrete segment of the concrete segment so that the push-out pin can be protruded and press-fitted by hydraulic pressure or the like.

【0008】そして、この構成から、トンネル方向では
固定ピンを、セグメント組立て時にチャック部へ挿入し
てジャッキ推力で押し込むことにより、また、リング方
向では押出し式ピンを、隣接したセグメントに埋設して
あるチャック部に油圧などの装置によって圧入すること
により、接合できるようにして、接合用各ピンが邪魔に
ならず、自動組立てでも容易かつ確実に組立て施工が行
えるようする。
According to this structure, the fixed pin is inserted into the chuck portion in the tunnel direction in the tunnel direction and pushed by the jack thrust, and the push-out pin is embedded in the adjacent segment in the ring direction. By press-fitting into the chuck portion with a device such as hydraulic pressure, it is possible to perform the joining so that the joining pins do not get in the way and the assembling work can be performed easily and surely even in the automatic assembling.

【0009】[0009]

【実施例】以下、この発明のコンクリートセグメントの
継手構造を、図示する実施例によって説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The concrete segment joint structure of the present invention will be described below with reference to the illustrated embodiments.

【0010】連結すべき両コンクリートセグメント2の
連結端面部に埋設されて、両コンクリートセグメント2
を連結するために構成される継手構造1(図1参照)
は、連結すべき両コンクリートセグメント2における一
方のコンクリートセグメント2に設けた固定ピン3と、
この固定ピン3をジャッキ推力で押し込むことによって
挿入できるように、連結すべき両コンクリートセグメン
ト2における他方のコンクリートセグメント2に設けた
チャック部4とによって、各コンクリートセグメント2
におけるリング方向への接合を行うように構成されてい
る。
Both concrete segments 2 are buried in the connecting end face portions of both concrete segments 2 to be connected.
Coupling structure 1 configured to connect to each other (see FIG. 1)
Is a fixing pin 3 provided on one of the concrete segments 2 to be connected,
Each of the concrete segments 2 is joined by the chuck portion 4 provided on the other concrete segment 2 of the two concrete segments 2 to be connected so that the fixing pin 3 can be inserted by pushing with a jack thrust.
In the ring direction.

【0011】また、連結すべき両コンクリートセグメン
ト2における一方のコンクリートセグメント2内に設け
た突出自在な押出し式ピン5と、この押出し式ピン5を
油圧などによって突出させて圧入できるように、連結す
べき両コンクリートセグメント2における他方のコンク
リートセグメント2に設けたチャック部4とによって、
各コンクリートセグメント2におけるトンネル方向への
接合を行うように構成されている。
In addition, in both concrete segments 2 to be connected, a projecting push-out pin 5 provided in one concrete segment 2 and a push-out pin 5 are connected so that the push-out pin 5 can be projected by a hydraulic pressure or the like and press-fitted. By the chuck portion 4 provided on the other concrete segment 2 in both concrete segments 2 to be
It is configured to join in the tunnel direction in each concrete segment 2.

【0012】そして、この実施例での固定ピン3および
チャック部4には、その後方にコンクリートセグメント
2内となるアンカー筋6が一本設けられている。また、
押出し式ピン5は、油圧などの装置によって突出させる
ことができるように、収納ボックス7内にスライド自在
に設けられている。なお、ここでの収納ボックス7に
は、アンカー筋6が二本設けられている。
The fixing pin 3 and the chuck portion 4 in this embodiment are provided with one anchor bar 6 which is located inside the concrete segment 2 behind them. Also,
The push-out pin 5 is slidably provided in the storage box 7 so that it can be projected by a device such as hydraulic pressure. Note that the storage box 7 here is provided with two anchor bars 6.

【0013】このような構成からなるコンクリートセグ
メントの継手構造1を採用して、例えば、シールド工法
において各コンクリートセグメント2の接合を行うに
は、次に述べるようにして行う。
When the concrete segment joint structure 1 having the above-mentioned structure is adopted and the respective concrete segments 2 are joined in the shield construction method, for example, the following is performed.

【0014】先ず、各コンクリートセグメント2のトン
ネル方向への接合は、固定ピン3をセグメント組立て時
にチャック部4へ挿入して、ジャッキ推力で押し込むこ
とにより行う。
First, the joining of each concrete segment 2 in the tunnel direction is performed by inserting the fixing pin 3 into the chuck portion 4 when assembling the segment and pushing it in with the jack thrust.

【0015】次に、各コンクリートセグメント2のリン
グ方向への接合は、押出し式ピン5を隣接したセグメン
トに埋設してあるチャック部4に、油圧装置等(図示せ
ず)によって圧入する。
Next, when joining each concrete segment 2 in the ring direction, a push-out pin 5 is press-fitted into a chuck portion 4 embedded in an adjacent segment by a hydraulic device or the like (not shown).

【0016】このことにより、各コンクリートセグメン
ト2のリング方向およびトンネル方向への接合を、自動
組立てで実施しても各接合用ピンが邪魔にならずに、容
易かつ確実に行うことができる。
As a result, even if the concrete segments 2 are joined in the ring direction and the tunnel direction by automatic assembly, the joining pins do not get in the way and can be joined easily and reliably.

【0017】なお、前述した実施例では、既存のチャッ
クピン式継手により本発明を説明したが、本発明では、
チャックピンの替わりに鋼板を用いた構造でも、同様に
実施することができる。
Although the present invention has been described with reference to the existing chuck pin type joint in the above-mentioned embodiment, the present invention
A structure using a steel plate instead of the chuck pin can be similarly implemented.

【0018】[0018]

【発明の効果】この発明によれば、自動組立てを実施す
るピン接合の各ピンを、固定ピンと押出し式ピンとで構
成したことにより、リング継手も、セグメント継手もチ
ャックを押し込む操作のみで組み立てることができる。
According to the present invention, since each pin of the pin joint for performing automatic assembly is composed of the fixed pin and the push-out type pin, both the ring joint and the segment joint can be assembled only by pushing the chuck. it can.

【0019】そのため、本発明のコンクリートセグメン
トの継手構造は、自動組立に適していると共に、シール
ド機の装置もボルト締結方式と比較して経済的とするこ
とができる。
Therefore, the joint structure of the concrete segment of the present invention is suitable for automatic assembly, and the device of the shield machine can be made economical as compared with the bolt fastening system.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明のコンクリートセグメントの継手構造
を示す概略図である。
FIG. 1 is a schematic view showing a joint structure of a concrete segment of the present invention.

【図2】従来のコンクリートセグメントの継手構造を示
す概略図である。
FIG. 2 is a schematic view showing a conventional joint structure of a concrete segment.

【符号の説明】[Explanation of symbols]

1…継手構造、2…コンクリートセグメント、3…固定
ピン、4…チャック部、5…押出し式ピン、6…アンカ
ー筋。
DESCRIPTION OF SYMBOLS 1 ... Joint structure, 2 ... Concrete segment, 3 ... Fixed pin, 4 ... Chuck part, 5 ... Extruding pin, 6 ... Anchor bar.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 連結すべき両コンクリートセグメントの
連結端面部に埋設されて、前記両コンクリートセグメン
トを連結するために構成される継手構造であり、 前記連結すべき両コンクリートセグメントにおける一方
のコンクリートセグメントに設けた固定ピンと、この固
定ピンをジャッキ推力で押し込むことによって挿入でき
るように、前記連結すべき両コンクリートセグメントに
おける他方のコンクリートセグメントに設けたチャック
部とによって、前記各コンクリートセグメントにおける
リング方向への接合を行うように構成されていると共
に、 前記連結すべき両コンクリートセグメントにおける一方
のコンクリートセグメント内に設けた突出自在な押出し
式ピンと、この押出し式ピンを油圧などによって突出さ
せて圧入できるように、前記連結すべき両コンクリート
セグメントにおける他方のコンクリートセグメントに設
けたチャック部とによって、前記各コンクリートセグメ
ントにおけるトンネル方向への接合を行うように構成さ
れていることを特徴とするコンクリートセグメントの継
手構造。
1. A joint structure, which is embedded in the connection end surface portions of both concrete segments to be connected and is configured to connect the both concrete segments, wherein one concrete segment of the both concrete segments to be connected is Joining in the ring direction of each concrete segment by a fixed pin provided and a chuck part provided on the other concrete segment of both concrete segments to be connected so that the fixed pin can be inserted by pushing with a jack thrust. And a projecting push-out pin provided in one concrete segment in both concrete segments to be connected, and this push-out pin can be pushed in by projecting by hydraulic pressure or the like. Joint structure of concrete segments, characterized in that the chuck portion provided in the other of the concrete segment in both the concrete segment to be the coupling is configured to perform bonding to the tunnel direction in the respective concrete segments.
JP5137176A 1993-06-08 1993-06-08 Structure of joint for concrete segment Pending JPH06346694A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5137176A JPH06346694A (en) 1993-06-08 1993-06-08 Structure of joint for concrete segment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5137176A JPH06346694A (en) 1993-06-08 1993-06-08 Structure of joint for concrete segment

Publications (1)

Publication Number Publication Date
JPH06346694A true JPH06346694A (en) 1994-12-20

Family

ID=15192594

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5137176A Pending JPH06346694A (en) 1993-06-08 1993-06-08 Structure of joint for concrete segment

Country Status (1)

Country Link
JP (1) JPH06346694A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006316590A (en) * 2005-05-16 2006-11-24 Kumagai Gumi Co Ltd Segment and joint structure of segments

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006316590A (en) * 2005-05-16 2006-11-24 Kumagai Gumi Co Ltd Segment and joint structure of segments
JP4494285B2 (en) * 2005-05-16 2010-06-30 株式会社熊谷組 Segment and segment joint structure

Similar Documents

Publication Publication Date Title
US4558970A (en) Tunnel shield structure
JPH06346694A (en) Structure of joint for concrete segment
JP3302925B2 (en) Boltless segment
JP3615833B2 (en) Segment joint structure
JPH08326484A (en) Joint structure of precast concrete body and the precast concrete body
JP3148465B2 (en) Concrete segment
JPH0455599A (en) Concrete segment and connecting structure thereof
JP2904366B2 (en) Steel segment joint device and steel segment used for the joint device
JP2843889B2 (en) Concrete segment and joint structure of concrete segment
JP2022094129A (en) Sliding lock-type joint of precast member that includes rc segment, and precast member that includes rc segment provided with the same
JPH08326487A (en) Assembling method for segment and the segment
JP3253755B2 (en) Segment joint structure
JP2601086B2 (en) segment
JPH0821195A (en) Tenoned segment with horizontal cotter
JPH09177495A (en) Joint structure of segment
JP3887455B2 (en) Segment fitting
JPH09158691A (en) Steel segment
JPH11350886A (en) Side face sealing type joint structure and segment
JPH0417676Y2 (en)
JPH08232590A (en) Joint structure for steel-made segment
JP3363047B2 (en) Joint structure of tunnel segment
JP3024699B2 (en) Tunnel liner and closing method thereof
JPH10299392A (en) Joint for segment
JPH11125096A (en) Tunnel liner and assembling method thereof
JPH08326486A (en) Joint structure of precast concrete body and the precast concrete body