JPH06346422A - Automatic dirt remover - Google Patents

Automatic dirt remover

Info

Publication number
JPH06346422A
JPH06346422A JP13496993A JP13496993A JPH06346422A JP H06346422 A JPH06346422 A JP H06346422A JP 13496993 A JP13496993 A JP 13496993A JP 13496993 A JP13496993 A JP 13496993A JP H06346422 A JPH06346422 A JP H06346422A
Authority
JP
Japan
Prior art keywords
rake
guide rail
screen
sub
cam guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP13496993A
Other languages
Japanese (ja)
Inventor
Minoru Tejima
実 手嶋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Heavy Industries Ltd
Original Assignee
Sumitomo Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Heavy Industries Ltd filed Critical Sumitomo Heavy Industries Ltd
Priority to JP13496993A priority Critical patent/JPH06346422A/en
Publication of JPH06346422A publication Critical patent/JPH06346422A/en
Withdrawn legal-status Critical Current

Links

Abstract

PURPOSE:To allow a starting position of raking by a rake to come close to the bed surface of a water way and to enable an automatic direct remover to rake dirt, etc., even if the depth of water is shallow. CONSTITUTION:A raking chain 54 is arranged on the downstream side from a screen 51, rake bearings are formed at a plurality of specific positions of the chain, and a rake shaft is borne on them in a rotatble manner, A rake mounting rod is connected eccentrically to one end of the rake shaft, and a plurality of rakes are so formed in the lake mounting rod that they are projected in a comb-shape, a rake cam lever is fixed to the other end of the rake shaft, and a main cam roller and a sub cam roller are eccentically borne on the rake shaft. A main cam guide rail 71 and a sub cam guide rail 72 are formed, A lower semiconductor circle section of the main guide rail 71 is positioned lower than a lower circle section of the sub cam guide rail 72 and, at the same time, both of them are made to intersect.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、自動除塵(じょじん)
機に関するものである。
BACKGROUND OF THE INVENTION The present invention relates to automatic dust removal.
It is about machines.

【0002】[0002]

【従来の技術】従来、下水処理場の沈砂池、排水機場、
農業用水路、浄水場の沈砂池等の施設においては、水中
の塵芥(じんかい)、夾雑(きょうざつ)物等を除去す
るために各種の自動除塵機が設けられている。該自動除
塵機においては、水路又は水門に張設されたスクリーン
に沿ってチェーンドライブ式のレーキを配設し、前記ス
クリーンに掛かった塵芥、夾雑物を前記レーキによって
掻(か)き揚げるようにしている。
2. Description of the Related Art Conventionally, a sand basin of a sewage treatment plant, a drainage station,
Facilities such as agricultural waterways and sand basins of water purification plants are equipped with various types of automatic dust removers to remove dust and dirt in the water. In the automatic dust remover, a chain drive type rake is arranged along a screen stretched over a waterway or a sluice so that dust and foreign matters hanging on the screen can be scraped up by the rake. ing.

【0003】図2は従来の自動除塵機の縦断面図、図3
は従来の自動除塵機の正面図である。図に示すように、
矢印A方向の水流が形成された水路11内に自動除塵機
が配設される。そのため、前記水路11の床面14にケ
ース台座16が配設され、該ケース台座16の上に自動
除塵機のケース18の下端部が固定される。該ケース1
8は前記床面14から傾斜して立ち上がり、水面上に突
出して延在する。
FIG. 2 is a vertical sectional view of a conventional automatic dust remover, and FIG.
FIG. 4 is a front view of a conventional automatic dust remover. As shown in the figure,
An automatic dust remover is arranged in the water channel 11 in which a water flow in the direction of arrow A is formed. Therefore, the case pedestal 16 is disposed on the floor surface 14 of the water channel 11, and the lower end of the case 18 of the automatic dust remover is fixed on the case pedestal 16. Case 1
8 is inclined and rises from the floor surface 14, and projects and extends above the water surface.

【0004】前記ケース18は水路11の左右の側壁5
0に沿って配設された一対のプレート18aを有し、各
プレート18a間の複数箇所にスクリーン受桁(うけげ
た)19が水平方向に架設される。そして、該スクリー
ン受桁19にスクリーン21が取り付けられる。該スク
リーン21は複数の棒材を並列に配設することによって
形成され、各棒材は水路11の床面14近傍から傾斜し
て立ち上がり、水面上に突出して延在する。前記水路1
1を水流に乗って流れてくる塵芥、夾雑物等は、該スク
リーン21に掛かり、下流側に流れるのが阻止される。
The case 18 is formed by the left and right side walls 5 of the water channel 11.
It has a pair of plates 18a arranged along 0, and a screen support beam 19 is horizontally installed at a plurality of positions between the plates 18a. Then, a screen 21 is attached to the screen receiving girder 19. The screen 21 is formed by arranging a plurality of bar members in parallel, and each bar member rises in an inclined manner from the vicinity of the floor surface 14 of the water channel 11 and projects and extends above the water surface. The waterway 1
Dust, contaminants and the like flowing along the water stream 1 are caught on the screen 21 and are prevented from flowing to the downstream side.

【0005】ところが、前記スクリーン21に掛かった
塵芥、夾雑物等が多くなると、前記各棒材間に詰まりス
クリーン21を閉塞(へいそく)してしまう。そこで、
スクリーン21に沿って掻揚装置23が配設される。該
掻揚装置23は、掻揚チェーン24及び該掻揚チェーン
24に固定された複数のレーキ25を有する。そして、
前記掻揚チェーン24及びレーキ25を所定の軌跡で走
行させるために、前記各プレート18aにレーキガイド
レール28a,28bが取り付けられる。各レーキガイ
ドレール28a,28bは互いに対向する側が開口させ
られた断面が「コ」の字状の長尺状部材から成り、互い
に平行に配設される。
However, if the amount of dust, foreign matters, etc., which are hung on the screen 21, becomes large, the rods are clogged and the screen 21 is blocked. Therefore,
A scraping device 23 is arranged along the screen 21. The scraping device 23 has a scraping chain 24 and a plurality of rakes 25 fixed to the scraping chain 24. And
Rake guide rails 28a and 28b are attached to the plates 18a in order to cause the scraping chain 24 and the rake 25 to travel along a predetermined locus. Each of the rake guide rails 28a, 28b is composed of an elongated member having a U-shaped cross-section, the opposite sides of which are opened, and they are arranged in parallel with each other.

【0006】各レーキガイドレール28a,28bは前
記床面14近傍に位置する半円形状の湾曲部a、該湾曲
部aの一端からスクリーン21に沿って傾斜して立ち上
がり、水面上に突出して延在する直線部b、前記湾曲部
aの他端から傾斜して立ち上がり、水面上に突出して延
在する直線部c、前記直線部bの一端から水平に延在す
る水平部d、及び前記直線部cの一端から水平に延在す
る水平部eから成り、各レーキガイドレール28a,2
8b内に、水平部e、直線部c、湾曲部a、直線部b、
及び水平部dにわたって連続して延びる掻揚チェーン走
行路30が形成される。
Each of the rake guide rails 28a, 28b is a semi-circular curved portion a located near the floor surface 14 and rises from one end of the curved portion a along the screen 21 while inclining and rising, and projecting above the water surface. Existing straight part b, straight part c inclined and rising from the other end of the curved part a, protruding and extending on the water surface, horizontal part d horizontally extending from one end of the straight part b, and the straight line The rake guide rails 28a, 2 are each made up of a horizontal portion e extending horizontally from one end of the portion c.
In 8b, a horizontal portion e, a straight portion c, a curved portion a, a straight portion b,
And a scraping chain traveling path 30 that continuously extends over the horizontal portion d is formed.

【0007】前記掻揚チェーン24は前記掻揚チェーン
走行路30に沿って配設され、水平部d,eの各端部に
隣接して配設された各掻揚用スプロケット32に張設さ
れる。各掻揚用スプロケット32は駆動軸33によって
互いに連結され、該駆動軸33は軸受34によって回転
自在に支持される。また、前記駆動軸33の一端に伝導
用スプロケット36が固定され、該伝導用スプロケット
36が図示しないチェーンを介して図示しない駆動源に
接続される。したがって、該駆動源を駆動することによ
って、各掻揚チェーン24を同期させて矢印B方向に走
行させることができる。
The scraping chain 24 is arranged along the scraping chain traveling path 30 and is stretched on each scraping sprocket 32 arranged adjacent to each end of the horizontal portions d and e. It The scraping sprockets 32 are connected to each other by a drive shaft 33, and the drive shaft 33 is rotatably supported by a bearing 34. Further, a conduction sprocket 36 is fixed to one end of the drive shaft 33, and the conduction sprocket 36 is connected to a drive source (not shown) via a chain (not shown). Therefore, by driving the drive source, the scraping chains 24 can be made to travel in the arrow B direction in synchronization with each other.

【0008】そして、前記レーキ25は平行に配設され
た各掻揚チェーン24間に水平方向に架設される。該レ
ーキ25は掻揚チェーン24の走行方向において一定間
隔ごとに複数配設され、掻揚チェーン24の走行に伴っ
て走行させられる。そして、掻揚チェーン24が前記直
線部b内の掻揚チェーン走行路30にある時、各レーキ
25はスクリーン21の各棒材間を貫いて下流側に向け
て上昇し、スクリーン21に掛かった塵芥、夾雑物等を
掻き揚げる。
The rake 25 is installed horizontally between the scraping chains 24 arranged in parallel. A plurality of the rakes 25 are arranged at regular intervals in the traveling direction of the scraping chain 24 and run as the scraping chain 24 travels. Then, when the scraping chain 24 is in the scraping chain traveling path 30 in the straight line portion b, each rake 25 penetrates between the bar members of the screen 21 and rises toward the downstream side, and is hooked on the screen 21. Scrape up dust and foreign matters.

【0009】前記掻揚チェーン24は水平部d内の掻揚
チェーン走行路30から出ると、掻揚用スプロケット3
2上で反転し、水平部e内の掻揚チェーン走行路30に
入るが、前記レーキ25は前記掻揚チェーン24が掻揚
用スプロケット32上で反転する時に同時に反転し、塵
芥、夾雑物等を落下させる。そして、前記掻揚用スプロ
ケット32の下方には塵芥貯留箱35が配設されてい
て、落下させられた塵芥、夾雑物等を受けて回収する。
When the scraping chain 24 comes out of the scraping chain running path 30 in the horizontal portion d, the scraping sprocket 3
2 is turned upside down and enters the scraping chain running path 30 in the horizontal part e, but the rake 25 is reversed at the same time when the scraping chain 24 is reversed upside down on the scraping sprocket 32, and dust, foreign matters, etc. To drop. A dust storage box 35 is disposed below the scraping sprocket 32, and receives and collects the dust and foreign matters that have been dropped.

【0010】なお、前記湾曲部aの前方には複数の棒材
を並列に配設することによって形成された前スクリーン
37が配設される。
A front screen 37 formed by arranging a plurality of bars in parallel is arranged in front of the curved portion a.

【0011】[0011]

【発明が解決しようとする課題】しかしながら、前記従
来の自動除塵機においては、掻揚チェーン24が直線部
c内の掻揚チェーン走行路30を下方に向けて走行させ
られ、湾曲部a内の掻揚チェーン走行路30で反転し、
直線部b内の掻揚チェーン走行路30を上方に向けて走
行させられるが、レーキ25も前記湾曲部aに対応する
箇所で同時に反転する。
However, in the above-mentioned conventional automatic dust remover, the scraping chain 24 is caused to travel downward along the scraping chain travel path 30 in the straight part c, and the scraping chain 24 in the curved part a is formed. Reversing at the scraping chain running path 30,
Although the scraping chain traveling path 30 in the straight portion b can be made to travel upward, the rake 25 is also inverted at the location corresponding to the curved portion a.

【0012】したがって、レーキ25の掻揚開始位置は
前記掻揚チェーン24の反転がほぼ終了した位置、すな
わち湾曲部aと直線部bの接続点に対応する位置とな
る。したがって、レーキ25の掻揚開始位置の深さは、
レーキガイドレール28a,28bの湾曲部aの中心の
深さに相当する。そして、前記レーキガイドレール28
a,28bの湾曲部aに他の掻揚用スプロケットを配設
し、前記掻揚用スプロケット32との間に掻揚チェーン
24を張設したものにおいては、レーキ25の掻揚開始
位置の深さは他の掻揚用スプロケットの中心の深さに相
当する。
Therefore, the raking start position of the rake 25 is a position where the reversing of the raking chain 24 is almost completed, that is, a position corresponding to the connection point of the curved portion a and the straight portion b. Therefore, the depth of the rake 25 starting position is
It corresponds to the depth of the center of the curved portion a of the rake guide rails 28a and 28b. And the rake guide rail 28
In the case where another scraping sprocket is arranged on the curved portion a of a and 28b, and the scraping chain 24 is stretched between the scraping sprocket 32 and the scraping sprocket 32, the depth of the scraping start position of the rake 25 is increased. The depth corresponds to the center depth of the other sprocket.

【0013】このように、レーキ25の掻揚開始位置を
水路11の床面14に近づけることができないので、水
路11の水量が少なくて水深が小さくなると、スクリー
ン21の設置レベル以下の塵芥、夾雑物等をレーキ25
で掻き揚げることができない。また、スクリーン21の
上流側においてレーキ25を上昇させて掻揚げを開始す
ると、スクリーン21にレーキ25が噛(か)み込んだ
時に塵芥、夾雑物等をスクリーン21に押さえ付けたり
挟み込んだりする。したがって、自動除塵機が停止させ
られたり、塵芥、夾雑物等が水路11内に落下したりす
る。
As described above, since the starting position of the rake 25 for scraping cannot be brought close to the floor surface 14 of the water channel 11, when the water amount in the water channel 11 is small and the water depth is small, dust and dirt below the installation level of the screen 21. Rake things 25
I can't scoop up with. Further, when the rake 25 is lifted on the upstream side of the screen 21 to start scooping, when the rake 25 bites into the screen 21, dust, contaminants and the like are pressed or pinched on the screen 21. Therefore, the automatic dust remover is stopped, and dust, foreign matters, and the like fall into the water channel 11.

【0014】本発明は、前記従来の自動除塵機の問題点
を解決して、レーキの掻揚開始位置を水路の床面に近づ
けて、水深が小さくても塵芥、夾雑物等を掻き揚げるこ
とができ、掻揚げを開始する時に塵芥、夾雑物等をスク
リーンに押さえ付けたり挟み込んだりすることがない自
動除塵機を提供することを目的とする。
The present invention solves the above-mentioned problems of the conventional automatic dust remover and brings the rake start position closer to the floor of the waterway to scrape dust, debris and the like even when the water depth is small. It is an object of the present invention to provide an automatic dust remover that does not press dust or foreign substances on the screen or pinch it when starting frying.

【0015】[0015]

【課題を解決するための手段】そのために、本発明の自
動除塵機においては、複数の棒材を並列に配設すること
によってスクリーンが形成され、該スクリーンは水中に
おいて傾斜して立ち上がり、水面上に突出した後に頂部
で反転して延在する。該スクリーンの下流側においてス
クリーンに沿って掻揚チェーンが配設され、駆動されて
走行させられる。該掻揚チェーンの設定された複数箇所
にレーキ軸受が形成され、該レーキ軸受によってレーキ
軸が回転自在に支持される。
To this end, in the automatic dust remover of the present invention, a screen is formed by arranging a plurality of rods in parallel, and the screen rises in water with an inclination and rises above the water surface. After protruding to the top, it is inverted and extends at the top. A scraping chain is arranged along the screen on the downstream side of the screen, and is driven to run. Rake bearings are formed at a plurality of set points of the scraping chain, and the rake shaft rotatably supports the rake bearings.

【0016】そして、該レーキ軸の一端にレーキ取付ロ
ッドが偏心させられて連結され、該レーキ取付ロッドに
複数のレーキが櫛(くし)状に突出して形成される。ま
た、前記レーキ軸の他端にレーキカムレバーが固定さ
れ、レーキ軸に対して主カムローラ及び副カムローラを
偏心させて支持する。そして、前記主カムローラに対応
して主カムガイドレールが、前記副カムローラに対応し
て副カムガイドレールが形成される。
A rake mounting rod is eccentrically connected to one end of the rake shaft, and a plurality of rakes are formed on the rake mounting rod so as to project in a comb shape. A rake cam lever is fixed to the other end of the rake shaft to eccentrically support the main cam roller and the sub cam roller with respect to the rake shaft. A main cam guide rail is formed corresponding to the main cam roller, and a sub cam guide rail is formed corresponding to the sub cam roller.

【0017】前記主カムガイドレール及び副カムガイド
レールは、スクリーンに沿って傾斜して立ち上がり、水
面上に突出して延在する2個の直線部と、該直線部の端
部間を接続する2個の半円形部から成り、主カムガイド
レールの下方の半円形部を副カムガイドレールの下方の
半円形部より低い位置に置くとともに両者を交差させ
る。
The main cam guide rail and the sub cam guide rail are connected to connect the two straight line portions, which extend obliquely along the screen and project and extend above the water surface, and the end portions of the straight line portions. Each of the semi-circular portions is arranged so that the lower semi-circular portion of the main cam guide rail is located at a position lower than the lower semi-circular portion of the sub cam guide rail and the two intersect.

【0018】[0018]

【作用】本発明によれば、前記のように自動除塵機にお
いては、複数の棒材を並列に配設することによってスク
リーンが形成され、該スクリーンは水中において傾斜し
て立ち上がり、水面上に突出した後に頂部で反転して延
在する。該スクリーンの下流側においてスクリーンに沿
って掻揚チェーンが配設され、駆動されて走行させられ
る。該掻揚チェーンの設定された複数箇所にレーキ軸受
が形成され、該レーキ軸受によってレーキ軸が回転自在
に支持される。
According to the present invention, as described above, in the automatic dust remover, the screen is formed by arranging a plurality of rods in parallel, and the screen rises in the water at an inclination and protrudes above the water surface. After that, it is inverted at the top and extends. A scraping chain is arranged along the screen on the downstream side of the screen, and is driven to run. Rake bearings are formed at a plurality of set points of the scraping chain, and the rake shaft rotatably supports the rake bearings.

【0019】そして、該レーキ軸の一端にレーキ取付ロ
ッドが偏心させられて連結され、該レーキ取付ロッドに
複数のレーキが櫛状に突出して形成される。また、前記
レーキ軸の他端にレーキカムレバーが固定され、レーキ
軸に対して主カムローラ及び副カムローラを偏心させて
支持する。そして、前記主カムローラに対応して主カム
ガイドレールが、前記副カムローラに対応して副カムガ
イドレールが形成される。
A rake mounting rod is eccentrically connected to one end of the rake shaft, and a plurality of rakes are formed on the rake mounting rod so as to project in a comb shape. A rake cam lever is fixed to the other end of the rake shaft to eccentrically support the main cam roller and the sub cam roller with respect to the rake shaft. A main cam guide rail is formed corresponding to the main cam roller, and a sub cam guide rail is formed corresponding to the sub cam roller.

【0020】前記主カムガイドレール及び副カムガイド
レールは、スクリーンに沿って傾斜して立ち上がり、水
面上に突出して延在する2個の直線部と、該直線部の端
部間を接続する2個の半円形部から成り、主カムガイド
レールの下方の半円形部を副カムガイドレールの下方の
半円形部より低い位置に置くとともに両者を交差させ
る。
The main cam guide rail and the sub cam guide rail are connected to connect the two straight line portions which are inclined and rise along the screen and project and extend on the water surface, and the end portions of the straight line portions. Each of the semi-circular portions is arranged so that the lower semi-circular portion of the main cam guide rail is located at a position lower than the lower semi-circular portion of the sub cam guide rail and the two intersect.

【0021】したがって、掻揚チェーンを駆動して走行
させると、複数のレーキが水中の床面の近傍でスクリー
ンを貫いてスクリーンに沿って上昇し、スクリーンに掛
かった塵芥、夾雑物等を掻き揚げる。その後、水面上の
スクリーンの頂部で反転して塵芥、夾雑物等を落下させ
る。この場合、掻揚チェーンの走行に伴って前記レーキ
カムレバーが揺動させられ、前記レーキ軸を介してレー
キ取付ロッド及びレーキを掻揚チェーンに対して揺動さ
せることができる。
Therefore, when the scraping chain is driven to run, a plurality of rakes penetrates the screen near the underwater surface and ascends along the screen to scrape up dust, debris and the like caught on the screen. . After that, it is turned over at the top of the screen on the water surface to drop dust, foreign matters, and the like. In this case, the rake cam lever is swung as the scraping chain travels, and the rake mounting rod and the rake can be swung with respect to the scraping chain via the rake shaft.

【0022】[0022]

【実施例】以下、本発明の実施例について図面を参照し
ながら詳細に説明する。図1は本発明の実施例を示す自
動除塵機の縦断面図、図4は本発明の実施例を示す自動
除塵機のレーキ取付部の斜視図、図5は本発明の実施例
を示す自動除塵機のカムガイドレール交差部の詳細図、
図6は本発明の実施例を示す自動除塵機の横断面図、図
7は図6のX−X断面図、図8は図6のY−Y断面図、
図9は主カムガイドレール及び副カムガイドレールの概
念図である。
Embodiments of the present invention will now be described in detail with reference to the drawings. 1 is a longitudinal sectional view of an automatic dust remover showing an embodiment of the present invention, FIG. 4 is a perspective view of a rake mounting portion of the automatic dust remover showing an embodiment of the present invention, and FIG. 5 is an automatic view showing an embodiment of the present invention. Detailed view of the cam guide rail intersection of the dust remover,
6 is a transverse sectional view of an automatic dust remover showing an embodiment of the present invention, FIG. 7 is a sectional view taken along line XX of FIG. 6, and FIG. 8 is a sectional view taken along line YY of FIG.
FIG. 9 is a conceptual diagram of the main cam guide rail and the sub cam guide rail.

【0023】図に示すように、矢印A方向の水流が形成
された水路11内に自動除塵機が配設される。そのた
め、前記水路11の床面14にケース台座16が配設さ
れ、該ケース台座16の上に自動除塵機のケース48の
下端部が固定される。該ケース48は前記床面14から
傾斜して立ち上がり、水面上に突出して延在する。前記
ケース48は水路11の左右の側壁50に沿って配設さ
れた一対のプレート48aから成り、各プレート48a
は前記側壁50に固定される。
As shown in the figure, an automatic dust remover is arranged in the water channel 11 in which a water flow in the direction of arrow A is formed. Therefore, the case pedestal 16 is disposed on the floor surface 14 of the water channel 11, and the lower end of the case 48 of the automatic dust remover is fixed on the case pedestal 16. The case 48 is inclined and rises from the floor surface 14, and projects and extends above the water surface. The case 48 includes a pair of plates 48a arranged along the left and right side walls 50 of the water channel 11, and each plate 48a
Is fixed to the side wall 50.

【0024】また、前記ケース48の上流側にスクリー
ン51が配設される。該スクリーン51は複数の棒材5
2を並列に配設することによって形成され、各棒材52
は一端がケース台座16に固定され、該ケース台座16
から傾斜して立ち上がり、水面上に突出した後に頂部で
反転して延在する。前記水路11を水流に乗って流れて
くる塵芥、夾雑物等は、該スクリーン51に掛かり、下
流側に流れるのが阻止される。なお、前記スクリーン5
1は前記水路11の断面のほぼ全体にわたって配設さ
れ、前記水路11の側壁50との間には、阻流板51a
が配設される。
A screen 51 is arranged on the upstream side of the case 48. The screen 51 is composed of a plurality of bar members 5.
Formed by arranging 2 in parallel, each bar member 52
Has one end fixed to the case pedestal 16, and the case pedestal 16
It inclines and rises up, and after protruding above the water surface, it inverts and extends at the top. Dust, contaminants and the like flowing along the water flow in the water channel 11 are caught on the screen 51 and are prevented from flowing to the downstream side. The screen 5
1 is arranged over almost the entire cross section of the water channel 11, and a baffle plate 51a is provided between the water channel 11 and a side wall 50 of the water channel 11.
Is provided.

【0025】ところが、前記スクリーン51に掛かった
塵芥、夾雑物等が多くなると、前記各棒材52間に詰ま
りスクリーン51を閉塞してしまう。そこで、スクリー
ン51に沿って掻揚装置53が配設される。該掻揚装置
53は、一対の掻揚チェーン54及び該掻揚チェーン5
4に対して揺動自在に支持された複数のレーキ55を有
する。各掻揚チェーン54は、水面上に配設された第1
スプロケット56と水中に配設された第2スプロケット
58の間に張設される。前記プレート48aの中央には
前記掻揚チェーン54に沿って断面が矩形(くけい)の
チェーンガイド59が形成され、掻揚チェーン54はチ
ェーンガイド59に沿って走行させられる。
However, when the amount of dust, foreign matters, etc., which are hung on the screen 51 increases, the rods 52 are clogged and the screen 51 is closed. Therefore, the scraping device 53 is arranged along the screen 51. The lifting device 53 includes a pair of lifting chains 54 and the lifting chains 5.
4 has a plurality of rakes 55 that are swingably supported. Each raking chain 54 has a first
It is stretched between the sprocket 56 and the second sprocket 58 arranged in the water. A chain guide 59 having a rectangular cross section is formed along the scraping chain 54 at the center of the plate 48a, and the scraping chain 54 travels along the chain guide 59.

【0026】各第1スプロケット56は図示しない駆動
軸によって互いに連結され、該駆動軸が図示しない駆動
源に接続される。したがって、該駆動源を駆動すること
によって、各掻揚チェーン54を同期させて矢印C方向
に走行させることができる。一方、前記レーキ55は平
行に配設された各掻揚チェーン54間に水平方向に架設
される。該レーキ55は掻揚チェーン54の走行方向に
おいて一定間隔ごとに複数配設され、掻揚チェーン54
の走行に伴って走行させられる。
The first sprockets 56 are connected to each other by a drive shaft (not shown), and the drive shaft is connected to a drive source (not shown). Therefore, by driving the drive source, the scraping chains 54 can be made to travel in the direction of arrow C in synchronization with each other. On the other hand, the rake 55 is installed horizontally between the scraping chains 54 arranged in parallel. A plurality of the rakes 55 are arranged at regular intervals in the traveling direction of the scraping chain 54.
It is made to run with the running of.

【0027】そのため、図4に示すように、前記掻揚チ
ェーン54の設定された複数箇所に一対のレーキ軸受6
1,62が固定され、該レーキ軸受61,62によって
レーキ軸63が回転自在に支持される。該レーキ軸63
の水路11の中心側の端部にはレーキアーム65の一端
が固定され、該レーキアーム65の他端にレーキ取付ロ
ッド66が固定される。このように、前記レーキ軸63
とレーキ取付ロッド66が偏心させられて連結される。
Therefore, as shown in FIG. 4, a pair of rake bearings 6 are provided at a plurality of set points of the scraping chain 54.
1, 62 are fixed, and the rake shaft 63 is rotatably supported by the rake bearings 61, 62. The rake shaft 63
One end of the rake arm 65 is fixed to the end of the water channel 11 on the center side, and the rake mounting rod 66 is fixed to the other end of the rake arm 65. In this way, the rake shaft 63
And the rake mounting rod 66 are eccentrically connected.

【0028】前記一対のレーキ軸受61,62、レーキ
軸63及びレーキアーム65は各掻揚チェーン54の対
応する箇所にそれぞれ配設されるため、前記レーキ取付
ロッド66は各レーキアーム65間に架設される。な
お、前記レーキ取付ロッド66は中空構造とすることが
でき、中実構造とすることもできる。該レーキ取付ロッ
ド66には、複数のレーキ55が櫛状に突出して形成さ
れる。そして、各レーキ55は前記レーキアーム65に
対して設定された角度を成すように形成される。この場
合、各レーキ55は前記レーキアーム65に対して垂直
な方向に突出する。そして、前記レーキアーム65はレ
ーキ軸63を介してレーキ軸受61,62に揺動自在に
支持され、前記レーキ取付ロッド66はレーキアーム6
5の長さを径とする円弧上を揺動する。
Since the pair of rake bearings 61, 62, the rake shaft 63 and the rake arm 65 are respectively disposed at the corresponding positions of each scraping chain 54, the rake mounting rod 66 is installed between the rake arms 65. . The rake mounting rod 66 may have a hollow structure or a solid structure. A plurality of rakes 55 are formed on the rake mounting rod 66 so as to protrude in a comb shape. Then, each rake 55 is formed so as to form an angle with respect to the rake arm 65. In this case, each rake 55 projects in a direction perpendicular to the rake arm 65. The rake arm 65 is swingably supported by the rake bearings 61 and 62 via the rake shaft 63, and the rake mounting rod 66 is attached to the rake arm 6.
It swings on a circular arc having a length of 5.

【0029】このように、前記レーキ55を掻揚チェー
ン54に対して揺動させることができ、レーキ55は前
記掻揚チェーン54と共に走行するのに伴い、掻揚チェ
ーン54の走行方向に対して各種の角度を採る。そし
て、前記レーキ55を所定の軌跡で走行させるために、
前記各プレート48aに主カムガイドレール71及び副
カムガイドレール72がそれぞれ形成される。前記主カ
ムガイドレール71及び副カムガイドレール72は、い
ずれも互いに対向する側が開口させられた断面が「コ」
の字状の溝から成り、各プレート48aに互いに平行に
配設される。
As described above, the rake 55 can be swung with respect to the scraping chain 54, and as the rake 55 travels together with the scraping chain 54, the rake 55 moves in the traveling direction of the scraping chain 54. Take various angles. Then, in order to run the rake 55 on a predetermined locus,
A main cam guide rail 71 and a sub cam guide rail 72 are formed on each plate 48a. Each of the main cam guide rail 71 and the sub cam guide rail 72 has a cross section in which the opposite sides are opened.
It is composed of a groove having a V shape and is arranged in parallel with each other on each plate 48a.

【0030】前記主カムガイドレール71は、図9に示
すように、前記第2スプロケット58の近傍に形成され
た下方の半円形部71a、該半円形部71aの一端から
スクリーン51に沿って傾斜して立ち上がり、水面上に
突出して延在する直線部71b、前記半円形部71aの
他端から前記直線部71bと平行に傾斜して立ち上が
り、水面上に突出して延在する直線部71c、及び水面
上において前記第1スプロケット56の近傍に形成さ
れ、直線部71b,71cを結ぶ上方の半円形部71d
から成り、主カムガイドレール71内に主カムローラ走
行路73が形成される。
As shown in FIG. 9, the main cam guide rail 71 has a lower semi-circular portion 71a formed in the vicinity of the second sprocket 58, and is inclined from one end of the semi-circular portion 71a along the screen 51. Then, a straight line portion 71b that projects and extends on the water surface, a straight line portion 71c that extends from the other end of the semicircular portion 71a while inclining and rising parallel to the straight line portion 71b, and projecting and extending on the water surface, and An upper semicircular portion 71d formed on the water surface in the vicinity of the first sprocket 56 and connecting the straight portions 71b and 71c.
The main cam roller travel path 73 is formed in the main cam guide rail 71.

【0031】前記副カムガイドレール72は、前記第2
スプロケット58の近傍に形成された下方の半円形部7
2a、該半円形部72aの一端からスクリーン51に沿
って傾斜して立ち上がり、水面上に突出して延在する直
線部72b、前記半円形部72aの他端から前記直線部
72bと平行に傾斜して立ち上がり、水面上に突出して
延在する直線部72c、及び水面上において前記第1ス
プロケット56の近傍に形成され、直線部72b,72
cを結ぶ上方の半円形部72dから成り、副カムガイド
レール72内に副カムローラ走行路74が形成される。
The auxiliary cam guide rail 72 has the second
Lower semi-circular portion 7 formed near sprocket 58
2a, a straight line portion 72b that rises from one end of the semicircular portion 72a along the screen 51 and projects and extends above the water surface, and a slope that is parallel to the straight line portion 72b from the other end of the semicircular portion 72a. And a straight line portion 72c protruding upward on the water surface and a straight line portion 72b formed on the water surface in the vicinity of the first sprocket 56.
A sub-cam roller traveling path 74 is formed in the sub-cam guide rail 72, which is composed of an upper semi-circular portion 72d connecting c.

【0032】そして、主カムガイドレール71を副カム
ガイドレール72より長く設定し、半円形部71aを半
円形部72aより低い位置に、半円形部71dを半円形
部72dより高い位置に置く。また、主カムガイドレー
ル71の直線部71b,71c間の幅を副カムガイドレ
ール72の直線部72b,72c間の幅より狭く設定す
るとともに、主カムガイドレール71を副カムガイドレ
ール72より上流側に配設して、半円形部71dと半円
形部72dを交差させて上方に第1の交差部P1 を形成
するとともに、半円形部71aと半円形部72aを交差
させて下方に第2の交差部P2 を形成する。さらに、直
線部71b,72b間の距離w1 より直線部71c,7
2c間の距離w2 を長く設定する。
Then, the main cam guide rail 71 is set longer than the sub cam guide rail 72, the semicircular portion 71a is placed at a position lower than the semicircular portion 72a, and the semicircular portion 71d is placed at a position higher than the semicircular portion 72d. Further, the width between the straight line portions 71b and 71c of the main cam guide rail 71 is set narrower than the width between the straight line portions 72b and 72c of the sub cam guide rail 72, and the main cam guide rail 71 is located upstream of the sub cam guide rail 72. It is disposed on the side and intersects the semicircular portion 71d and the semicircular portion 72d to form the first intersecting portion P 1 at the upper side, and at the same time, intersects the semicircular portion 71a and the semicircular portion 72a at the lower side. Two intersections P 2 are formed. Furthermore, from the distance w 1 between the straight line portions 71b, 72b, the straight line portions 71c, 7
The distance w 2 between 2c is set long.

【0033】一方、図4に示すように、前記レーキ軸6
3の水路11の壁側50側の端部には「へ」の字状のレ
ーキカムレバー76が固定され、該レーキカムレバー7
6の一端に主カムローラ77が、他端に副カムローラ7
8がそれぞれ回転自在に支持される。すなわち、前記レ
ーキ軸63と、主カムローラ77と、副カムローラ78
は互いに偏心させられる。そして、前記主カムローラ7
7が主カムガイドレール71内に挿入されて主カムロー
ラ走行路73を走行し、前記副カムローラ78が副カム
ガイドレール72内に挿入されて副カムローラ走行路7
4を走行する。
On the other hand, as shown in FIG. 4, the rake shaft 6
A rake cam lever 76 having a "V" shape is fixed to the end of the water channel 11 on the wall side 50 side.
6 has a main cam roller 77 at one end and a sub cam roller 7 at the other end.
8 are rotatably supported. That is, the rake shaft 63, the main cam roller 77, and the sub cam roller 78.
Are eccentric to each other. Then, the main cam roller 7
7 is inserted into the main cam guide rail 71 and travels along the main cam roller travel path 73, and the sub cam roller 78 is inserted into the sub cam guide rail 72 and the sub cam roller travel path 7 is shown.
Drive 4

【0034】なお、前記第1、第2の交差部P1 ,P2
においては、主カムローラ77及び副カムローラ78を
走行させる必要がある。そのため、図5に示すように、
前記主カムガイドレール71を副カムガイドレール72
より浅く形成し、副カムガイドレール72に切欠を形成
して主カムガイドレール71を通すようにしている。し
たがって、その分、前記主カムローラ77を副カムロー
ラ78より長く突出させるようにしている。
The first and second intersections P 1 and P 2
In the above, the main cam roller 77 and the sub cam roller 78 need to run. Therefore, as shown in FIG.
The main cam guide rail 71 is replaced with the sub cam guide rail 72.
The sub cam guide rail 72 is formed to be shallower, and a notch is formed in the sub cam guide rail 72 so that the main cam guide rail 71 can pass through. Therefore, the main cam roller 77 is made to project correspondingly longer than the sub cam roller 78.

【0035】そして、前記掻揚チェーン54を走行させ
ると、前記主カムローラ77が主カムローラ走行路73
を走行し、前記副カムローラ78が副カムローラ走行路
74を走行するが、半円形部71aが半円形部72aよ
り低い位置に、半円形部71dが半円形部72dより高
い位置に置かれ、上方に第1の交差部P1 が、下方に第
2の交差部P2 が形成されているとともに、直線部71
b,72b間の距離w 1 より直線部71c,72c間の
距離w2 が長く設定されているため、掻揚チェーン54
の走行に伴って前記レーキカムレバー76が揺動させら
れる。
Then, the scraping chain 54 is run.
Then, the main cam roller 77 is moved by the main cam roller traveling path 73.
And the auxiliary cam roller 78 runs on the auxiliary cam roller traveling path.
Although the vehicle travels on 74, the semicircular portion 71a is different from the semicircular portion 72a.
The semi-circular portion 71d is higher than the semi-circular portion 72d at a lower position.
Placed at the first position, and the first intersection P1But below
Intersection P of 22Is formed, and the straight portion 71 is formed.
Distance w between b and 72b 1Between the straight portions 71c and 72c
Distance w2Since the length is set to be long, the lifting chain 54
When the rake cam lever 76 swings as the vehicle
Be done.

【0036】その結果、前記レーキ軸63が図1に示す
軌跡81に沿って移動しながら回転し、レーキアーム6
5を介してレーキ取付ロッド66及びレーキ55がレー
キ軸63を中心として掻揚チェーン54に対して揺動す
る。この時、前記レーキ55は掻揚チェーン54の走行
方向に対して各種の角度を採る。すなわち、前記主カム
ローラ77が主カムガイドレール71の直線部71bに
沿って走行し、副カムローラ78が副カムガイドレール
72の直線部72bに沿って走行する場合は、直線部7
1b,72b間の距離w1 が短いため、前記レーキカム
レバー76がほぼ掻揚チェーン54の走行方向に対して
平行な方向に向いた状態で走行する。したがって、図7
から9までの状態R1 で示すように、前記レーキ55は
掻揚チェーン54の走行方向に対して垂直な方向に向
き、スクリーン51に掛かった塵芥、夾雑物等を掻き揚
げる。
As a result, the rake shaft 63 rotates while moving along the locus 81 shown in FIG.
The rake attachment rod 66 and the rake 55 swing about the rake shaft 63 with respect to the raking chain 54 via the 5. At this time, the rake 55 takes various angles with respect to the traveling direction of the scraping chain 54. That is, when the main cam roller 77 travels along the straight line portion 71b of the main cam guide rail 71 and the sub cam roller 78 runs along the straight line portion 72b of the sub cam guide rail 72, the straight line portion 7 is formed.
Since the distance w 1 between 1b and 72b is short, the rake cam lever 76 travels in a direction substantially parallel to the traveling direction of the lifting chain 54. Therefore, FIG.
As indicated by a state R 1 from 9 to 9, the rake 55 is oriented in a direction perpendicular to the traveling direction of the scraping chain 54 and scoops up dust, foreign matters and the like caught on the screen 51.

【0037】また、前記主カムローラ77が主カムガイ
ドレール71の直線部71cに沿って走行し、副カムロ
ーラ78が副カムガイドレール72の直線部72cに沿
って走行する場合は、直線部71c,72c間の距離w
2 が長いため、前記レーキカムレバー76がほぼ掻揚チ
ェーン54の走行方向に対して垂直な方向に向いた状態
で走行する。したがって、図7から9までの状態R2
示すように、前記レーキ55は掻揚チェーン54の走行
方向に対して平行な方向に向く。
When the main cam roller 77 runs along the straight line portion 71c of the main cam guide rail 71 and the sub cam roller 78 runs along the straight line portion 72c of the sub cam guide rail 72, the straight line portion 71c, Distance w between 72c
Since 2 is long, the rake cam lever 76 travels in a state in which the rake cam lever 76 is oriented substantially perpendicular to the traveling direction of the lifting chain 54. Therefore, as shown in the state R 2 of FIGS. 7 to 9, the rake 55 is oriented in a direction parallel to the traveling direction of the scraping chain 54.

【0038】そして、前記主カムローラ77が主カムガ
イドレール71の半円形部71aに沿って走行し、副カ
ムローラ78が副カムガイドレール72の半円形部72
aに沿って走行する場合は、図9の状態R3 で示すよう
に、前記レーキ55は掻揚チェーン54の反転に対して
260〔°〕の回転遅れを形成する。すなわち、半円形
部71aが半円形部72aより低い位置に置かれ、主カ
ムガイドレール71と副カムガイドレール72が第2の
交差部P2 で交差するため、副カムローラ78が半円形
部72aに沿って走行し始めるのに対して主カムローラ
77は直線部71cを走行し続けるため、前記レーキカ
ムレバー76は掻揚チェーン54の走行方向に対して反
時計方向に回転して垂直な方向に向き始める。したがっ
て、前記レーキ55は上流側に傾斜し始める。
The main cam roller 77 runs along the semi-circular portion 71a of the main cam guide rail 71, and the sub-cam roller 78 moves in the semi-circular portion 72 of the sub-cam guide rail 72.
When traveling along a, the rake 55 forms a rotation delay of 260 ° with respect to the reversal of the scraping chain 54, as shown by the state R 3 in FIG. That is, the semi-circular portion 71a is placed at a position lower than the semi-circular portion 72a, and the main cam guide rail 71 and the sub cam guide rail 72 intersect at the second intersecting portion P 2 , so that the sub cam roller 78 causes the semi-circular portion 72a. Since the main cam roller 77 continues to travel along the straight line portion 71c while the vehicle travels along the straight line 71c, the rake cam lever 76 rotates counterclockwise with respect to the traveling direction of the lifting chain 54 and is oriented in the vertical direction. start. Therefore, the rake 55 begins to tilt upstream.

【0039】そして、第2の交差部P2 を通過すると、
副カムローラ78が半円形部72aから直線部72bに
向かうのに対して主カムローラ77は半円形部71aに
沿って走行し続けるため、前記レーキカムレバー76は
掻揚チェーン54の走行方向に対して垂直な方向に向い
た状態で走行する。したがって、前記レーキ55は上流
側に向いてほぼ水平状態になる。
When passing through the second intersection P 2 ,
While the sub cam roller 78 goes from the semicircular portion 72a to the straight portion 72b, the main cam roller 77 continues to travel along the semicircular portion 71a, so that the rake cam lever 76 is perpendicular to the traveling direction of the lifting chain 54. Run in the right direction. Therefore, the rake 55 faces the upstream side and becomes substantially horizontal.

【0040】さらに、前記主カムローラ77が主カムガ
イドレール71の半円形部71dに沿って走行し、副カ
ムローラ78が副カムガイドレール72の半円形部72
dに沿って走行する場合は、図9の状態R4 で示すよう
に、前記レーキ55は掻揚チェーン54の反転に対して
90〔°〕の回転遅れを形成してスクリーン51から抜
ける。この時、塵芥、夾雑物等はスクリーン51に沿っ
て落下させられる。そして、前記第1スプロケット56
の下方には塵芥貯留箱35が配設されていて、落下させ
られた塵芥、夾雑物等を受けて回収する。
Further, the main cam roller 77 runs along the semi-circular portion 71d of the main cam guide rail 71, and the sub cam roller 78 the semi-circular portion 72 of the sub cam guide rail 72.
When traveling along d, the rake 55 exits the screen 51 with a rotation delay of 90 ° with respect to the reverse of the scraping chain 54, as shown by the state R 4 in FIG. At this time, dust, foreign matters, and the like are dropped along the screen 51. Then, the first sprocket 56
A dust storage box 35 is disposed below the container, and collects and collects dust and foreign substances that have been dropped.

【0041】このように、水路11の床面14の近傍に
おいて前記レーキ55は上流側に向いてほぼ水平状態に
なるため、レーキ55の掻揚開始位置の深さを床面14
の深さとほぼ等しくすることができる。したがって、水
路11の水量が少なくて水深が小さくても、スクリーン
51の設置レベル以下の塵芥、夾雑物等も十分に掻き揚
げることができる。
As described above, since the rake 55 faces the upstream side in the vicinity of the floor surface 14 of the water channel 11 and becomes substantially horizontal, the depth of the rake 55 at the start of scraping is set to the floor surface 14.
Can be approximately equal to the depth of. Therefore, even if the amount of water in the water channel 11 is small and the water depth is small, it is possible to sufficiently scrape up dust, foreign matters and the like below the installation level of the screen 51.

【0042】また、スクリーン51の下流側から上流側
にレーキ55を貫きながら上昇させて掻揚げを開始する
ことができるため、塵芥、夾雑物等をスクリーン51に
押さえ付けたり挟み込んだりしない。そして、スクリー
ン51の下流側にレーキ55、掻揚チェーン54等の動
作部を配設することができるため、粗大異物から動作部
を守ることができる。
Further, since it is possible to raise the rake 55 from the downstream side of the screen 51 to the upstream side while penetrating the rake 55, dust and debris are not pressed or pinched on the screen 51. Further, since the operating parts such as the rake 55 and the lifting chain 54 can be arranged on the downstream side of the screen 51, the operating parts can be protected from coarse foreign matters.

【0043】なお、本発明は前記実施例に限定されるも
のではなく、本発明の趣旨に基づいて種々変形すること
が可能であり、これらを本発明の範囲から排除するもの
ではない。
The present invention is not limited to the above-mentioned embodiments, but various modifications can be made based on the spirit of the present invention, and these are not excluded from the scope of the present invention.

【0044】[0044]

【発明の効果】以上詳細に説明したように、本発明によ
れば、複数の棒材を並列に配設することによってスクリ
ーンが形成され、該スクリーンは水中において傾斜して
立ち上がり、水面上に突出した後に頂部で反転して延在
する。該スクリーンの下流側においてスクリーンに沿っ
て掻揚チェーンが配設され、駆動されて走行させられ
る。該掻揚チェーンの設定された複数箇所にレーキ軸受
が形成され、該レーキ軸受によってレーキ軸が回転自在
に支持される。
As described in detail above, according to the present invention, a screen is formed by arranging a plurality of rods in parallel, and the screen rises at an inclination in water and projects above the water surface. After that, it is inverted at the top and extends. A scraping chain is arranged along the screen on the downstream side of the screen, and is driven to run. Rake bearings are formed at a plurality of set points of the scraping chain, and the rake shaft rotatably supports the rake bearings.

【0045】そして、該レーキ軸の一端にレーキ取付ロ
ッドが偏心させられて連結され、該レーキ取付ロッドに
複数のレーキが櫛状に突出して形成される。また、前記
レーキ軸の他端にレーキカムレバーが固定され、レーキ
軸に対して主カムローラ及び副カムローラを偏心させて
支持する。そして、前記主カムローラに対応して主カム
ガイドレールが、前記副カムローラに対応して副カムガ
イドレールが形成される。
A rake mounting rod is eccentrically connected to one end of the rake shaft, and a plurality of rakes are formed on the rake mounting rod so as to project in a comb shape. A rake cam lever is fixed to the other end of the rake shaft to eccentrically support the main cam roller and the sub cam roller with respect to the rake shaft. A main cam guide rail is formed corresponding to the main cam roller, and a sub cam guide rail is formed corresponding to the sub cam roller.

【0046】前記主カムガイドレール及び副カムガイド
レールは、スクリーンに沿って傾斜して立ち上がり、水
面上に突出して延在する2個の直線部と、該直線部の端
部間を接続する2個の半円形部から成り、主カムガイド
レールの下方の半円形部を副カムガイドレールの下方の
半円形部より低い位置に置くとともに両者を交差させ
る。
The main cam guide rail and the sub cam guide rail are connected to connect the two straight line portions, which are inclined and rise along the screen and project and extend on the water surface, and the end portions of the straight line portions. Each of the semi-circular portions is arranged so that the lower semi-circular portion of the main cam guide rail is located at a position lower than the lower semi-circular portion of the sub cam guide rail and the two intersect.

【0047】したがって、掻揚チェーンを駆動して走行
させると、複数のレーキがスクリーンに沿って上昇し、
スクリーンに掛かった塵芥、夾雑物等を掻き揚げる。こ
の場合、掻揚チェーンの走行に伴って前記レーキカムレ
バーが揺動させられ、前記レーキ軸を介してレーキ取付
ロッド及びレーキを掻揚チェーンに対して揺動させるこ
とができる。しかも、下方の半円形部において、前記レ
ーキを上流側に向けてほぼ水平状態に置くことができ
る。
Therefore, when the scraping chain is driven to run, a plurality of rakes rise along the screen,
Scrape up the dust and foreign matter that has hung on the screen. In this case, the rake cam lever is swung as the scraping chain travels, and the rake mounting rod and the rake can be swung with respect to the scraping chain via the rake shaft. Moreover, in the lower semi-circular portion, the rake can be placed in a substantially horizontal state toward the upstream side.

【0048】その結果、レーキの掻揚開始位置の深さを
床面の深さとほぼ等しくすることができ、水路の水深が
小さくても、スクリーンの設置レベル以下の塵芥、夾雑
物等も十分に掻き揚げることができる。また、スクリー
ンの下流側から上流側にレーキを貫きながら上昇させて
掻揚げを開始することができるため、塵芥、夾雑物等を
スクリーンに押さえ付けたり挟み込んだりしない。
As a result, the depth at which the rake is picked up can be made substantially equal to the depth of the floor surface, and even if the water depth of the water channel is small, dust, debris, etc. below the screen installation level will be sufficient. Can be fried. Further, since it is possible to raise the rake while going through the rake from the downstream side to the upstream side of the screen to start the frying, dust, foreign matters, etc. are not pressed or pinched on the screen.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の実施例を示す自動除塵機の縦断面図で
ある。
FIG. 1 is a vertical sectional view of an automatic dust remover showing an embodiment of the present invention.

【図2】従来の自動除塵機の縦断面図である。FIG. 2 is a vertical sectional view of a conventional automatic dust remover.

【図3】従来の自動除塵機の正面図である。FIG. 3 is a front view of a conventional automatic dust remover.

【図4】本発明の実施例を示す自動除塵機のレーキ取付
部の斜視図である。
FIG. 4 is a perspective view of a rake mounting portion of an automatic dust remover showing an embodiment of the present invention.

【図5】本発明の実施例を示す自動除塵機のカムガイド
レール交差部の詳細図である。
FIG. 5 is a detailed view of a cam guide rail intersection portion of an automatic dust remover showing an embodiment of the present invention.

【図6】本発明の実施例を示す自動除塵機の横断面図で
ある。
FIG. 6 is a cross-sectional view of an automatic dust remover showing an embodiment of the present invention.

【図7】図6のX−X断面図である。7 is a sectional view taken along line XX of FIG.

【図8】図6のY−Y断面図である。8 is a sectional view taken along line YY of FIG.

【図9】主カムガイドレール及び副カムガイドレールの
概念図である。
FIG. 9 is a conceptual diagram of a main cam guide rail and a sub cam guide rail.

【符号の説明】[Explanation of symbols]

51 スクリーン 52 棒材 54 掻揚チェーン 55 レーキ 61,62 レーキ軸受 63 レーキ軸 66 レーキ取付ロッド 71 主カムガイドレール 71a,71d,72a,72d 半円形部 72 副カムガイドレール 71b,71c,72b,72c 直線部 76 レーキカムレバー 77 主カムローラ 78 副カムローラ P1 ,P2 交差部51 screen 52 bar material 54 scraping chain 55 rake 61, 62 rake bearing 63 rake shaft 66 rake mounting rod 71 main cam guide rail 71a, 71d, 72a, 72d semi-circular portion 72 sub-cam guide rail 71b, 71c, 72b, 72c Straight part 76 Rake cam lever 77 Main cam roller 78 Sub cam roller P 1 , P 2 Crossing part

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 (a)複数の棒材を並列に配設すること
によって形成され、水中において傾斜して立ち上がり、
水面上に突出した後に頂部で反転して延在するスクリー
ンと、(b)該スクリーンの下流側においてスクリーン
に沿って配設され、駆動されて走行させられる掻揚チェ
ーンと、(c)該掻揚チェーンの設定された複数箇所に
形成されたレーキ軸受と、(d)該レーキ軸受によって
回転自在に支持されたレーキ軸と、(e)該レーキ軸の
一端に偏心させられて連結されたレーキ取付ロッドと、
(f)該レーキ取付ロッドに櫛状に突出して形成された
複数のレーキと、(g)前記レーキ軸の他端に固定さ
れ、レーキ軸に対して主カムローラ及び副カムローラを
偏心させて支持するレーキカムレバーと、(h)前記主
カムローラに対応して形成された主カムガイドレール
と、(i)前記副カムローラに対応して形成された副カ
ムガイドレールを有し、(j)前記主カムガイドレール
及び副カムガイドレールは、スクリーンに沿って傾斜し
て立ち上がり、水面上に突出して延在する2個の直線部
と、該直線部の端部間を接続する2個の半円形部から成
り、主カムガイドレールの下方の半円形部を副カムガイ
ドレールの下方の半円形部より低い位置に置くとともに
両者を交差させたことを特徴とする自動除塵機。
1. (a) It is formed by arranging a plurality of rods in parallel and rises in water with an inclination,
A screen that projects above the water surface and then extends upside down at the top; (b) a scraping chain that is arranged along the screen on the downstream side of the screen and is driven to run; and (c) the scraping chain. A rake bearing formed at a plurality of set points of the lifting chain, (d) a rake shaft rotatably supported by the rake bearing, and (e) a rake eccentrically connected to one end of the rake shaft. Mounting rod,
(F) a plurality of rakes formed on the rake mounting rod so as to project in a comb shape; and (g) fixed to the other end of the rake shaft, and eccentrically supports the main cam roller and the sub cam roller with respect to the rake shaft. A rake cam lever, (h) a main cam guide rail formed corresponding to the main cam roller, (i) a sub cam guide rail formed corresponding to the sub cam roller, and (j) the main cam The guide rail and the sub-cam guide rail are composed of two straight line portions that extend obliquely along the screen and project and extend above the water surface, and two semi-circular portions that connect the ends of the straight line portions. The automatic dust remover is characterized in that the lower semi-circular portion of the main cam guide rail is placed at a position lower than the lower semi-circular portion of the sub cam guide rail and the two intersect.
JP13496993A 1993-06-04 1993-06-04 Automatic dirt remover Withdrawn JPH06346422A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13496993A JPH06346422A (en) 1993-06-04 1993-06-04 Automatic dirt remover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13496993A JPH06346422A (en) 1993-06-04 1993-06-04 Automatic dirt remover

Publications (1)

Publication Number Publication Date
JPH06346422A true JPH06346422A (en) 1994-12-20

Family

ID=15140836

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13496993A Withdrawn JPH06346422A (en) 1993-06-04 1993-06-04 Automatic dirt remover

Country Status (1)

Country Link
JP (1) JPH06346422A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100687053B1 (en) * 2003-01-23 2007-02-27 스미쥬 간쿄 엔지니어링 가부시키가이샤 Treating apparatus for adulteration
KR101407673B1 (en) * 2013-02-08 2014-06-17 구슬 In/out dust remover
CN117626904A (en) * 2024-01-26 2024-03-01 安徽华荣环保科技有限公司 Sewage filtering device for environmental treatment

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100687053B1 (en) * 2003-01-23 2007-02-27 스미쥬 간쿄 엔지니어링 가부시키가이샤 Treating apparatus for adulteration
KR101407673B1 (en) * 2013-02-08 2014-06-17 구슬 In/out dust remover
CN117626904A (en) * 2024-01-26 2024-03-01 安徽华荣环保科技有限公司 Sewage filtering device for environmental treatment
CN117626904B (en) * 2024-01-26 2024-04-09 安徽华荣环保科技有限公司 Sewage filtering device for environmental treatment

Similar Documents

Publication Publication Date Title
CN111926885B (en) Integrated intelligent pump station
JPH06346422A (en) Automatic dirt remover
JP2000273846A (en) Trash removing device
JPH06346423A (en) Automatic dirt remover
JP2000265443A (en) Dust collector
JP3909539B2 (en) Sludge scraping machine
JPS6274804A (en) Vertical conveyor type duster
JP2737604B2 (en) Dust remover
AU2007100270A4 (en) Screen Cleaner
JP2601286Y2 (en) Sludge scraper
JP2803024B2 (en) Back rake type automatic dust remover
JP2001259628A (en) Scum recovering device
JPS6016530B2 (en) Rake oscillating dust remover
JPS602267Y2 (en) Reversible rake lifting type dust remover
JPH0423940Y2 (en)
JPH08232243A (en) Back-rake-type automatic dust collector
JP3002773B2 (en) Rake circulation type dust remover with auxiliary screen
JP2623786B2 (en) Rake drive of automatic dust remover
JPH11107250A (en) Rake-circulation type dust remover with auxiliary screen
KR100363985B1 (en) Apparatus for screening debris
JP2957447B2 (en) Back rake type automatic dust remover
NL8301095A (en) CLEANING VESSEL FOR CLEANING A SEWER OR SUCH DIRT DRAINAGE.
JPH0417619Y2 (en)
JPS5851220Y2 (en) Screen automatic dust remover
JPS5851219Y2 (en) Screen dust remover

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20000905