JPH0633104Y2 - Hanging scaffold mounting bracket - Google Patents
Hanging scaffold mounting bracketInfo
- Publication number
- JPH0633104Y2 JPH0633104Y2 JP7876988U JP7876988U JPH0633104Y2 JP H0633104 Y2 JPH0633104 Y2 JP H0633104Y2 JP 7876988 U JP7876988 U JP 7876988U JP 7876988 U JP7876988 U JP 7876988U JP H0633104 Y2 JPH0633104 Y2 JP H0633104Y2
- Authority
- JP
- Japan
- Prior art keywords
- fixing
- rods
- rod
- fixing bolt
- insertion holes
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Movable Scaffolding (AREA)
Description
【考案の詳細な説明】 (産業上の利用分野) 本考案は、鉄骨の梁等の下側に足場板を吊り下げ状態で
架設するに際して用いる吊り足場取付け金具に関するも
のである。DETAILED DESCRIPTION OF THE INVENTION (Industrial field of application) The present invention relates to a hanging scaffolding mounting bracket used when a scaffolding plate is erected in a suspended state under a steel beam or the like.
(従来の技術) 従来のこの種の金具としては、実公昭57−39471
号公報に示す「足場装置用吊下げ具」がある。(Prior Art) A conventional metal fitting of this type is,
There is a "hanging tool for scaffolding device" disclosed in Japanese Patent Publication No.
これは、鉄骨梁に対する二本の吊下げ杆の挟着的固定
を、当該吊下げ杆に対してリンク的に係止した二本の連
結杆に依る引き絞り的固定に依存するように構成したも
のであった。This is configured such that the sandwiching fixing of the two hanging rods to the steel beam depends on the pulling-like fixing by the two connecting rods locked to the hanging rod in a link manner. It was a thing.
(考案が解決しようとする問題点) 上述したような従来例であると、上記した吊下げ杆の固
定、すなわち、鉄骨梁に対する固定操作は顕著な繁雑を
伴うことが余儀なくされた。(Problems to be Solved by the Invention) In the conventional example as described above, the above-described fixing of the suspension rod, that is, the fixing operation to the steel beam is inevitably accompanied by a considerable complexity.
本考案はこのような従来に於ける問題点の解決化を図る
と同時に、その固定のためのボルト及びナットが、その
締め付け操作時または緩め操作時に、不測の落下を引き
起こしてしまうと言うような事態を未然に防止するよう
に構成したことを特徴とするものである。The present invention aims to solve the problems in the prior art, and at the same time, the bolts and nuts for fixing the same may cause an unexpected drop during the tightening operation or the loosening operation. It is characterized by being configured so as to prevent the situation from occurring.
(問題点を解決するための手段) 本考案は、足場板架設杆1の両端に、上端にクランプ3,
3を装着した手摺り杆架設用柱杆2,2を立設すると共に、
上端に鉄骨梁Bに対する係合用鈎片4a,5aを夫々固設し
て成る吊下げ杆4,5の下端を、上記足場板架設杆1の中
央部分に回動自在に枢着し、また、当該吊下げ杆4,5に
は、夫々互いに重合可能とする連結片9,10を取付けると
共に、当該連結片9,10には固定用ボルト挿通孔9a及び10
aを夫々合致可能に穿設し、更に、上記固定用ボルト挿
通孔に合致させるための固定用ナット12を先端に固着し
たスライド片11を、一方の吊下げ杆に対して摺動かつ回
動自在に支持し、上記固定用ナット12に螺合させるため
の固定用ボルト14に対してチェーン15の先端を連結する
と共に、当該チェーン15の基端を適宜部材に連結したこ
とを特徴とする吊り足場取付け金具に係るものである。
そして、上記した連結片9,10に穿設する固定用ボルト挿
通孔9a及び10aは、これを単数とする以外、複数の固定
用ボルト挿通孔を合致可能とするように穿設するように
構成しても良い。(Means for Solving the Problems) The present invention is directed to both ends of the scaffolding plate erection rod 1 and clamps 3 at the upper end.
While installing the handrail rod installation pole rods 2, 2 with 3 installed,
The lower ends of the hanging rods 4 and 5 each having the hooks 4a and 5a for engaging with the steel beam B fixed to the upper ends thereof are rotatably pivotally attached to the central portion of the scaffolding plate erection rod 1, and The suspension rods 4 and 5 are provided with connecting pieces 9 and 10 which are mutually superimposable, and fixing bolt insertion holes 9a and 10 are attached to the connecting pieces 9 and 10.
Each slide hole 11a is formed so that it can be fitted, and further, a slide piece 11 having a fixing nut 12 fixed at the tip for matching with the fixing bolt insertion hole is slid and rotated with respect to one suspension rod. A suspension characterized in that the tip end of the chain 15 is connected to a fixing bolt 14 that is freely supported and screwed into the fixing nut 12, and the base end of the chain 15 is appropriately connected to a member. It concerns a scaffolding attachment.
Further, the fixing bolt insertion holes 9a and 10a formed in the above-mentioned connecting pieces 9 and 10 are configured so that a plurality of fixing bolt insertion holes are formed so as to be able to match, except that this is a single piece. You may.
(作用) 本考案の使用に際しては、鉄骨梁Bに対して係合用鈎片
4a,5aを係止させた状態で吊下げ杆4,5を固定することに
依り、本考案金具を鉄骨梁Bに対して所定間隔毎に吊下
げ、これに依り、その各足場板架設杆1間に足場板を架
設して吊下げ足場を形成する。また、柱杆2,2の上端に
装着したクランク3,3には手摺り杆を架設して手摺りを
形成する。(Operation) When the present invention is used, the hook piece for engaging the steel beam B
By fixing the hanging rods 4 and 5 with the 4a and 5a locked, the metal fittings of the present invention are hung at predetermined intervals with respect to the steel frame beam B. A scaffold board is erected between 1 to form a suspended scaffold. Further, handrails are installed on the cranks 3, 3 attached to the upper ends of the column rods 2, 2 to form handrails.
一方、上記した吊下げ杆4,5の固定であるが、これは、
連結片9,10を重合してボルト挿通孔9a,10aを合致させ、
当該合致孔に対して固定用ボルト14を挿通すると共に、
固定用ナット12に螺着することに依り、その固定目的が
達成される。On the other hand, the suspension rods 4 and 5 are fixed as described above.
Overlap the connecting pieces 9 and 10 to match the bolt insertion holes 9a and 10a,
While inserting the fixing bolt 14 into the matching hole,
The purpose of fixing is achieved by screwing on the fixing nut 12.
また、当該固定用ナット12は摺動かつ回動自在に支持さ
れたスライド片11に固着されているため、連結片9,10に
穿設するボルト挿通孔9a,10aを複数としても、任意にそ
の所望の合致孔部分に位置させることができる。そし
て、固定用ボルト14はチェーン15を介して吊下げ状態と
成っているため、当該固定用ボルト14の締め付け操作時
または緩め操作時に、不測の落下を引き起こしてしまう
ことを防止する。そして、これに螺合する固定用ナット
12は、上記のように合致孔部分に固定的に位置されるも
のであるため、当該ボルト14の締め付け操作及び緩め操
作は極めて容易に成されることとなる。Further, since the fixing nut 12 is fixed to the slide piece 11 that is slidably and rotatably supported, even if there are a plurality of bolt insertion holes 9a and 10a formed in the connecting pieces 9 and 10, it is possible to arbitrarily. It can be located at the desired mating hole portion. Further, since the fixing bolt 14 is in a suspended state via the chain 15, it is possible to prevent an accidental drop when the fixing bolt 14 is tightened or loosened. And a fixing nut that is screwed into this
Since 12 is fixedly positioned in the matching hole portion as described above, the tightening operation and the loosening operation of the bolt 14 can be performed extremely easily.
(実施例) 本考案の実施例を図面について詳細に説明すれば次の通
りである。(Embodiment) An embodiment of the present invention will be described in detail with reference to the drawings.
図に於いて、1は足場板架設杆であって、その両端には
手摺り杆架設用たる柱杆2,2が立設されている。3,3は当
該柱杆2,2の上端に装着したクランプであって、手摺り
杆A,Aを挟着架設するためのものである。なお、上記足
場板架設杆1には不図示の足場板の端部か掛け止められ
るように成っている。In the figure, reference numeral 1 is a scaffolding plate erection rod, and column rods 2, 2 for erection of handrail rods are erected at both ends thereof. Reference numerals 3 and 3 denote clamps attached to the upper ends of the pole rods 2 and 2 for sandwiching and mounting the handrail rods A and A. It should be noted that the scaffolding plate erection rod 1 is configured so that the end of a scaffolding plate (not shown) can be hooked.
4,5は上記足場板架設杆1の中央部分に対しその下端を
回動自在に枢着した吊下げ杆であって、その上端には、
鉄骨梁Bに対する係合用鈎片4a,5aが夫々固設されてお
り、また当該係合用鈎片4a,5aには、鉄骨梁Bに対する
固定用締着用ボルト4b,5bが螺着されている。Reference numerals 4 and 5 denote hanging rods whose lower ends are pivotally attached to the central portion of the scaffolding plate installation rod 1, and whose upper ends are
Engaging hook pieces 4a, 5a for the steel beam B are fixedly mounted, and fastening bolts 4b, 5b for fixing the steel beam B are screwed to the engaging hook pieces 4a, 5a.
7,8は足場板架設杆1に取付けた枢着用金具であって、
上記吊下げ杆4,5の下端枢着支持を成すためのものであ
る。7,8 are pivotal fittings attached to the scaffolding board erection rod 1,
It serves to support the lower ends of the hanging rods 4 and 5 to be pivotally attached.
9,10は上記した吊下げ杆4,5に互いに重合可能とするよ
うに取付けた連結片であって、当該吊下げ杆4,5を鉄骨
梁Bに対する挟着吊下げ状態で固定化するためのもので
ある。9a…及び10a…は当該連結片9及び10に夫々穿設
した所要数のボルト挿通用孔であって、両者の所要孔を
合致させ、当該合致孔に後記固定用ボルト14を挿通する
と共に、後記固定用ナット12を螺着することに依って、
吊下げ杆4,5を所定の間隔での固定化を図るためのもの
である。Reference numerals 9 and 10 denote connecting pieces attached to the above-mentioned hanging rods 4 and 5 so that they can be overlapped with each other, and for fixing the hanging rods 4 and 5 to the steel beam B in a sandwiched hanging state. belongs to. Reference numerals 9a ... And 10a ... Represent a required number of bolt insertion holes formed in the connection pieces 9 and 10, respectively, so that the required holes of both are matched, and a fixing bolt 14 described later is inserted into the matched hole. By screwing the fixing nut 12 described later,
The purpose is to fix the hanging rods 4 and 5 at predetermined intervals.
11は先端に固定用ナット12を固着したスライド片であっ
て、一方の吊下げ杆4に取付けたガイド片13に対して摺
動かつ回動自在に支持されている。すなわち、当該スラ
イド片11は基端部に開設した案内用長孔11aに対して、
ガイド片13に取付けた案内ボルト13aを挿通させること
に依り、当該スライド片11はその先端に固着した固定用
ナット12を、前記ボルト挿通用孔9a…中の任意の孔部分
に移動合致可能とするように構成してある。そして、上
記案内ボルト13aを締め着することに依り、当該スライ
ド片11の定位置固定が成されるように構成してある。Reference numeral 11 is a slide piece having a fixing nut 12 fixed to the tip thereof, and is slidably and rotatably supported by a guide piece 13 attached to one suspension rod 4. That is, the slide piece 11 is, with respect to the guide long hole 11a opened at the base end,
By inserting the guide bolt 13a attached to the guide piece 13, the slide piece 11 can move and match the fixing nut 12 fixed to the tip of the slide piece 11 to an arbitrary hole portion in the bolt inserting hole 9a. It is configured to do. The slide piece 11 is fixed in position by tightening the guide bolt 13a.
14は上記した固定用ナット12に螺合させるための固定用
ボルトであって、該固定用ボルト14にはチェーン15の先
端を連結すると共に、当該チェーン15の基端を適宜部材
に連結することに依り、当該固定用ボルト14の紛失及び
地上への落下を防止している。尚、図示の実施例にあっ
ては、当該チェーン15の基端をスライド片11の先端寄り
に連結してあるが、これ以外の適宜部分であっても可と
する。Reference numeral 14 is a fixing bolt for screwing into the fixing nut 12 described above, and the tip of the chain 15 is connected to the fixing bolt 14 and the base end of the chain 15 is appropriately connected to a member. Therefore, the fixing bolt 14 is prevented from being lost and falling to the ground. In the illustrated embodiment, the base end of the chain 15 is connected near the tip of the slide piece 11, but any other suitable portion may be used.
(考案の効果) 本考案は、吊下げ杆4,5に対し、夫々互いに重合可能と
する連結片9,10を取付けると共に、当該連結片9,10には
固定用ボルト挿通孔を夫々合致可能に穿設し、更に、上
記固定用ボルト挿通孔に合致させるための固定用ナット
12を先端に固着したスライド片11を、一方の吊下げ杆に
対して摺動かつ回動自在に支持し、上記固定用ナット12
に螺合させるための固定用ボルト14に対してチェーン15
の先端を連結すると共に、当該チェーン15の基端を適宜
部分に連結したから、鉄骨梁Bに対する吊下げ杆4,5の
係合的取付けが極めて確実にしてかつ容易に成されるこ
ととなる。(Effect of the Invention) The present invention attaches the connecting pieces 9 and 10 to the hanging rods 4 and 5 so that the connecting pieces 9 and 10 can be overlapped with each other, and fixing bolt insertion holes can be fitted to the connecting pieces 9 and 10, respectively. Fixing nut to be drilled in the hole and to match the fixing bolt insertion hole.
A slide piece (11) having a tip (12) fixed thereto is slidably and rotatably supported with respect to one of the suspension rods.
Chain 15 to the fixing bolt 14 for screwing
Since the tip end of the chain 15 is connected and the base end of the chain 15 is connected to an appropriate portion, engaging attachment of the suspension rods 4, 5 to the steel beam B can be made extremely reliable and easy. .
そして、当該取付けに際する固定用ボルト14と固定用ナ
ット12の螺合操作時に、過って当該ボルトまたはナット
を地上に落としてしまうと言うようなことが未然に回避
され、従って、当該落下に依る危険性の防止と、螺合操
作の容易化に大きく貢献することとなる。また、当該ボ
ルトとナットの緩め操作に於いても同様な効果を発揮す
ることとなる。Then, at the time of screwing operation of the fixing bolt 14 and the fixing nut 12 at the time of mounting, it is avoided in advance that the bolt or nut is accidentally dropped to the ground. This greatly contributes to the prevention of danger due to the above and the facilitation of screwing operation. In addition, the same effect will be exhibited in the loosening operation of the bolt and nut.
そして、上記連結片9,10に複数の固定用ボルト挿通孔
を、その何れかが夫々合致可能とするように穿設した場
合、鉄骨梁Bに対する吊下げ杆4,5の係合的取付けは、
当該鉄骨梁Bの寸法に即座させてその固定化目的が達成
されることとなる。When a plurality of fixing bolt insertion holes are bored in the connecting pieces 9 and 10 so that any of them can be fitted, the hanging rods 4 and 5 can be attached to the steel beam B in an engaging manner. ,
The size of the steel frame beam B is immediately increased, and the fixing purpose is achieved.
すなわち、鉄骨梁Bの寸法に即応させて、吊下げ杆4,5
の間隔固定を段階的に自由に設定可能とされることとな
る。That is, in accordance with the size of the steel beam B, the hanging rods 4, 5
The fixed interval can be freely set in stages.
図は本考案の一実施例を示すものであって、第1図は本
考案の一部切欠正面図、第2図は本考案の要部部分だけ
を示す正面図、第3図は同上一部切欠横断平面図であ
る。 A…手摺り杆、B…鉄骨梁 1…足場架設杆、2…柱杆 3…クランプ、4,5…吊下げ杆 4a,5a…係合用鈎片 4b,5b…締着用ボルト、7,8…枢着金具 9,10…連結片 9a,10a…ボルト挿通孔、11…スライド片 11a…案内用長孔、12…固定用ナット 13…ガイド片、13a…案内ボルト 14…固定用ボルト、15…チェーンFIG. 1 shows an embodiment of the present invention. FIG. 1 is a partially cutaway front view of the present invention, FIG. 2 is a front view showing only a main part of the present invention, and FIG. It is a partial notch cross-sectional plan view. A ... Railing rod, B ... Steel beam 1 ... Scaffolding rod 2, 2 Pillar rod 3 ... Clamp, 4,5 ... Hanging rod 4a, 5a ... Engaging hook pieces 4b, 5b ... Fastening bolts, 7,8 … Pivoting metal fittings 9,10… Connecting pieces 9a, 10a… Bolt insertion hole, 11… Slide piece 11a… Slot guide hole, 12… Fixing nut 13… Guide piece, 13a… Guide bolt 14… Fixing bolt, 15 …chain
Claims (2)
3,3を装着した手摺り杆架設用柱杆2,2を立設すると共
に、上端に鉄骨梁Bに対する係合用鈎片4a,5aを夫々固
設して成る吊下げ杆4,5の下端を、上記足場板架設杆1
の中央部分に回動自在に枢着し、また、当該吊下げ杆4,
5には、夫々互いに重合可能とする連結片9,10を取付け
ると共に、当該連結片9,10には固定用ボルト挿通孔を夫
々合致可能に穿設し、更に、上記固定用ボルト挿通孔に
合致させるための固定用ナット12を先端に固着したスラ
イド片11を、一方の吊下げ杆4に対して摺動かつ回動自
在に支持し、上記固定用ナット12に螺合させるための固
定用ボルト14に対してチェーン15の先端を連結すると共
に、当該チェーン15の基端を適宜部材に連結したことを
特徴とする吊り足場取付け金具。1. Clamps at both ends of scaffolding plate erection rod 1
Lower ends of hanging rods 4,5, in which the handrail rod installation pole rods 2 and 2 to which 3 and 3 are attached are erected and the hooks 4a and 5a for engaging the steel beam B are fixedly attached to the upper ends, respectively. The above-mentioned scaffold board erection rod 1
Rotatably and pivotally attached to the central portion of the suspension rod 4,
5, the coupling pieces 9 and 10 that can be polymerized with each other are mounted, and fixing bolt insertion holes are formed in the coupling pieces 9 and 10 so that they can be fitted respectively, and further, in the fixing bolt insertion holes. A fixing piece for supporting a slide piece 11 having a fixing nut 12 fixed to the tip for slidingly and rotatably with respect to one of the suspension rods 4 and screwing it into the fixing nut 12 A hanging scaffolding mounting fitting, characterized in that a tip of a chain 15 is connected to a bolt 14 and a base end of the chain 15 is appropriately connected to a member.
を合致可能に穿設した請求項1記載の吊り足場取付け金
具。2. The suspension scaffolding attachment according to claim 1, wherein a plurality of fixing bolt insertion holes are formed in the connecting pieces 9 and 10 so as to be able to coincide with each other.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP7876988U JPH0633104Y2 (en) | 1988-06-14 | 1988-06-14 | Hanging scaffold mounting bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP7876988U JPH0633104Y2 (en) | 1988-06-14 | 1988-06-14 | Hanging scaffold mounting bracket |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH021358U JPH021358U (en) | 1990-01-08 |
JPH0633104Y2 true JPH0633104Y2 (en) | 1994-08-31 |
Family
ID=31303669
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP7876988U Expired - Lifetime JPH0633104Y2 (en) | 1988-06-14 | 1988-06-14 | Hanging scaffold mounting bracket |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0633104Y2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH082311Y2 (en) * | 1990-09-21 | 1996-01-24 | 株式会社竹中工務店 | Scaffold used for beam installation work, etc. |
-
1988
- 1988-06-14 JP JP7876988U patent/JPH0633104Y2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPH021358U (en) | 1990-01-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7152535B2 (en) | Suspended storage shelf | |
US6283425B1 (en) | Mounting bracket | |
US5921049A (en) | Device for forming framework of wooden building | |
US20020088668A1 (en) | Apparatus for securing ladder to building structure | |
US4805863A (en) | Brace and shelf support assembly | |
JPH0633104Y2 (en) | Hanging scaffold mounting bracket | |
KR100761558B1 (en) | Bracket for establishment the dropping prevention net | |
KR200205940Y1 (en) | Supporter for form construction | |
US5769181A (en) | Ladder bracket and staging utilizing the same | |
JPH086896Y2 (en) | Ceiling base muscle abuse hardware | |
JPH05507Y2 (en) | ||
JP2001241184A (en) | Pier stud extension tool for vertical frame of scaffold and auxiliary extension tool therefor | |
JP2525987Y2 (en) | Construction support bracket | |
JPH0312107Y2 (en) | ||
JPH0318581Y2 (en) | ||
JPH1193400A (en) | Bracket for slope scaffold | |
JPS6039395Y2 (en) | Handrail mounting hardware | |
JP2939183B2 (en) | Fixture for temporary stairs | |
JP3054035U (en) | Hanging scaffold | |
KR200172587Y1 (en) | Supporting struture of a net for hanging | |
JP2510604Y2 (en) | Hanging scaffold fixing bracket | |
JP3069424U (en) | Scaffolding hanging brackets that can simultaneously suspend both the suspended under the bridge girder and the two-stage scaffold between the bridge girder | |
JPH0725970Y2 (en) | Parent rope | |
WO1995006179A1 (en) | Safety railing system | |
JP3047743B2 (en) | Assembly type scaffold for construction |