JPH06323106A - Pressure test method for main steam lead pipe of turbine - Google Patents

Pressure test method for main steam lead pipe of turbine

Info

Publication number
JPH06323106A
JPH06323106A JP11570493A JP11570493A JPH06323106A JP H06323106 A JPH06323106 A JP H06323106A JP 11570493 A JP11570493 A JP 11570493A JP 11570493 A JP11570493 A JP 11570493A JP H06323106 A JPH06323106 A JP H06323106A
Authority
JP
Japan
Prior art keywords
main steam
lead pipe
pressure test
steam lead
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP11570493A
Other languages
Japanese (ja)
Inventor
Takehiko Inoue
健彦 井上
Akihiko Motoyama
昭彦 元山
Tadao Nanjo
忠男 南條
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP11570493A priority Critical patent/JPH06323106A/en
Publication of JPH06323106A publication Critical patent/JPH06323106A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To reduce the manhours for working and manufacturing an engine frame which is required for a test on site by omitting installation of a blank cap for pressure test. CONSTITUTION:A main steam lead pipe 1 is connected to regular positions of a main stop valve/main steam control valve 4 and a turbine casing inlet 3. A pressure test jig 5 is arranged on the turbine casing inlet 3, while a pressure test cover 6 and pressure test jigs 7, 8 are arranged on the main stop valve/main steam control valve 4. A pressure test jig 9 is arranged on the main steam lead pipe 1. Water is poured into the main steam lead pipe 1 for carrying out pressure test.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は蒸気タ―ビンの主蒸気系
統で主蒸気リ―ド管の耐圧試験を実施するにあたり、主
蒸気止め弁・蒸気加減弁,主蒸気リ―ド管およびタ―ビ
ン―シング入口部に同時に試験圧力を作用させる耐圧試
験方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention is used for performing a pressure resistance test of a main steam lead pipe in a main steam system of a steam turbine in which a main steam stop valve / steam control valve, a main steam lead pipe and a main steam lead pipe are connected. The present invention relates to a pressure resistance test method in which a test pressure is simultaneously applied to the inlet of a bin.

【0002】[0002]

【従来の技術】一般に、電気工作物の溶接は法律によっ
て規定され、たとえば発電用火力機器に係るボイラ等の
耐圧部及び発電用原子力機器に係る格納容器等につい
て、その溶接部は、通商産業大臣の検査を受け、これに
合格した後でなければこれを使用してはならない旨定め
られており、その溶接検査等は指定された公知機関がこ
れにあたる。
2. Description of the Related Art Generally, welding of electric works is regulated by law. For example, for a pressure-resistant part such as a boiler for a thermal power plant for power generation and a containment container for a nuclear power plant for power generation, the welded part is the Minister of International Trade and Industry. It is stipulated that this product must be used only after it has passed the inspection and passed, and the welding inspection, etc., is performed by a designated publicly known organization.

【0003】またその検査範囲として蒸気タ―ビンの配
管は管径が150mmφ以上、圧力10kg/cm2 (周溶接
部)以上の現地溶接箇所が対象となっている。このう
ち、主蒸気リ―ド管の耐圧試験はサイトで実施する耐圧
試験であり、従来は図3および図4に示すように主蒸気
リ―ド管1の両端つまり主蒸気止め弁・蒸気加減弁4お
よびタ―ビンケ―シング入口部3に接続する部分に耐圧
試験用盲栓を取付け、主蒸気リ―ド管1単独で実施する
のが普通である。図4は耐圧試験のために下に降ろした
主蒸気リ―ド管1aを支える架構2を示す。
As the inspection range, the steam turbine piping is intended for on-site welding spots having a pipe diameter of 150 mmφ or more and a pressure of 10 kg / cm 2 (circumferential weld) or more. Of these, the pressure resistance test of the main steam lead pipe is a pressure resistance test performed at the site, and conventionally, as shown in FIGS. 3 and 4, both ends of the main steam lead pipe 1, that is, the main steam stop valve and steam control It is usual that a blind plug for pressure resistance test is attached to the portion connected to the valve 4 and the turbine casing inlet 3 and the main steam lead pipe 1 is used alone. FIG. 4 shows the frame 2 supporting the main steam lead pipe 1a lowered for the pressure resistance test.

【0004】[0004]

【発明が解決しようとする課題】この従来技術の方法に
よれば、主蒸気リ―ド管1の両端へ耐圧試験用盲栓を取
付け、主蒸気リ―ド管1を単独で耐圧試験を行うため
に、次のような問題がある。
According to this prior art method, pressure-proof test blinds are attached to both ends of the main steam lead pipe 1, and the main steam lead pipe 1 is independently subjected to a pressure test. Therefore, there are the following problems.

【0005】(1)耐圧試験用盲栓の取付け取外し作業
という余分な作業が発生する。 (2)主蒸気リ―ド管の両端へ盲栓を取付けるため、そ
の作業スペ―スを含めて主蒸気リ―ド管を正規位置より
下方へ吊り降す必要が生じ、その仮受架構の据付、撤去
ならびにその架構製作という余分な作業が発生する。
(1) Extra work of attaching and detaching the blind plug for pressure resistance test occurs. (2) Since the blind plugs are attached to both ends of the main steam lead pipe, it is necessary to suspend the main steam lead pipe including the working space below the normal position. Extra work such as installation, removal and construction of the frame will occur.

【0006】(3)主蒸気リ―ド管の耐圧試験のために
天井クレ―ンが占有され、周囲作業の工程進捗を阻害す
る。 (4)主蒸気リ―ド管単独の現地耐圧試験のため、その
両端の主蒸気止め弁・蒸気加減弁と、タ―ビンケ―シン
グ入口部の溶接接続部は、耐圧試験を実施したにもかか
わらず代替試験(放射線透過試験)を行う必要がある。
(3) The ceiling crane is occupied for the pressure resistance test of the main steam lead pipe, which hinders the progress of the surrounding work. (4) Since the main steam lead tube is used for a local pressure resistance test, the main steam stop valve / steam control valve at both ends of the main steam lead tube and the welding connection at the turbine casing inlet are also subjected to the pressure resistance test. However, an alternative test (radiation transmission test) must be performed.

【0007】そこで、本発明の目的は耐圧試験用盲栓の
取付けを省略し、サイトでの試験の遂行のために要する
作業工数,架構製作工数を削減するようにしたタ―ビン
主蒸気リ―ド管の耐圧試験方法を提供するものである。
Therefore, an object of the present invention is to eliminate the installation of blind plugs for pressure test and reduce the work man-hours and frame-manufacturing man-hours required for carrying out the test at the site. It provides a pressure test method for a tube.

【0008】[0008]

【課題を解決するための手段】本発明は蒸気タ―ビンの
主蒸気系統に組込む主蒸気リ―ド管の耐圧試験を実施す
るにあたり、主蒸気止め弁・蒸気加減弁,主蒸気リ―ド
管およびタ―ビン―シング入口部に同時に試験圧力を作
用させて一度に試験するようにしたことを特徴とする。
In carrying out a pressure resistance test of a main steam lead pipe incorporated in a main steam system of a steam turbine, a main steam stop valve, a steam control valve, and a main steam lead according to the present invention. It is characterized in that the test pressure is simultaneously applied to the tube and the inlet of the turbine to perform the test at one time.

【0009】[0009]

【作用】本発明は主蒸気止め弁・蒸気加減弁,主蒸気リ
―ド管およびタ―ビンケ―シング入口部に同時に試験圧
力を作用させる方法であって、主蒸気リ―ド管に耐圧試
験用盲栓を施すことを省略でき、試験の遂行のために要
した作業工数を削減可能である。また、試験の遂行に先
立つ架構製作が不要となり、架構製作工数も削減するこ
とができる。
The present invention is a method for simultaneously applying a test pressure to the main steam stop valve / steam control valve, the main steam lead pipe and the turbine casing inlet, and a pressure resistance test is applied to the main steam lead pipe. It is possible to omit the provision of a blind plug, and it is possible to reduce the number of man-hours required for carrying out the test. Further, it is not necessary to fabricate the frame prior to the execution of the test, and the man-hour for frame production can be reduced.

【0010】[0010]

【実施例】図1に本発明の方法を示している。主蒸気リ
―ド管1は、主蒸気止め弁・蒸気加減弁4とタ―ビンケ
―シング入口部3へ正規の位置へ接続する。タ―ビンケ
―シング入口部3には耐圧試験治具5を主蒸気止め弁・
蒸気加減弁4には耐圧試験蓋6と耐圧試験治具7,8を
それぞれ取付ける。さらに、主蒸気リ―ド管1にも耐圧
試験治具9を取付ける。
EXAMPLE FIG. 1 illustrates the method of the present invention. The main steam lead pipe 1 is connected to the main steam stop valve / steam control valve 4 and the turbine casing inlet 3 at regular positions. A pressure resistance test jig 5 is attached to the turbine casing inlet part 3 as a main steam stop valve.
A pressure resistance test lid 6 and pressure resistance test jigs 7 and 8 are attached to the steam control valve 4. Further, a pressure resistance test jig 9 is attached to the main steam lead pipe 1.

【0011】なお、図中、符号10はタンク、11は水張り
ポンプ、12は水張り元弁を示している。図2はタ―ビン
ケ―シング入口部3で使用する耐圧試験治具5の実施例
を示すもので、連結部材13とプラグ14とから構成され
る。
In the figure, reference numeral 10 is a tank, 11 is a water filling pump, and 12 is a water filling main valve. FIG. 2 shows an embodiment of a pressure resistance test jig 5 used in the turbine casing inlet portion 3, which is composed of a connecting member 13 and a plug 14.

【0012】上記のように基準を完了した後に、耐圧試
験を実施する。タンク10に溜めておいた水張りポンプ11
を運転して主蒸気リ―ド管1に注入し、全域に試験圧力
を及ぼす。すべての箇所で漏洩のないことを確認して試
験を終了する。
After the standard is completed as described above, a breakdown voltage test is carried out. Water-filled pump 11 stored in tank 10
Is injected into the main steam lead pipe 1, and a test pressure is applied to the entire region. Finish the test after confirming that there is no leakage at all points.

【0013】[0013]

【発明の効果】本発明の方法によれば、主蒸気リ―ド管
の耐圧試験を実施するにあたり、その準備復旧作業とし
て主蒸気リ―ド管の仮受架構の据付撤去が不要であり、
その製作についても省略することが可能になる。これに
より作業工数ならびに架構製作工数を削減することがで
きる。
According to the method of the present invention, in carrying out the pressure resistance test of the main steam lead pipe, it is not necessary to remove the temporary receiving frame of the main steam lead pipe as a preparatory restoration work.
It is also possible to omit the production. As a result, it is possible to reduce the work man-hours and the frame manufacturing man-hours.

【0014】また、主蒸気リ―ド管の耐圧試験中、天井
クレ―ンを占有することがなく、周辺工程の進捗を妨げ
ることがなくなる。さらに一括してサイトで耐圧試験を
実施することにより代替試験箇所もなくなり、品質向上
を図ることができる。
Further, during the pressure resistance test of the main steam lead pipe, the ceiling crane is not occupied and the progress of the peripheral process is not hindered. Furthermore, by carrying out the pressure resistance test at the site collectively, there are no alternative test points, and the quality can be improved.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明による耐圧試験を実施するための系統構
成図。
FIG. 1 is a system configuration diagram for carrying out a withstand voltage test according to the present invention.

【図2】タ―ビンケ―シング入口部の耐圧試験治具の一
例を示す構成図。
FIG. 2 is a configuration diagram showing an example of a pressure resistance test jig for a turbine casing entrance portion.

【図3】従来工法による耐圧試験を実施するための系統
構成図。
FIG. 3 is a system configuration diagram for performing a pressure resistance test by a conventional method.

【図4】従来工法による仮架構の一例を示す斜視図。FIG. 4 is a perspective view showing an example of a temporary frame structure by a conventional method.

【符号の説明】 1 主蒸気リ―ド管 3 タ―ビンケ―シング入口部 4 蒸気止め弁・蒸気加減弁 5,7,8,9 耐圧試験治具 6 耐圧試験蓋 11 水張りポンプ[Explanation of symbols] 1 Main steam lead pipe 3 Turbin casing inlet 4 Steam stop valve / steam control valve 5, 7, 8, 9 Pressure resistance test jig 6 Pressure resistance test lid 11 Water filling pump

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 蒸気タ―ビンの主蒸気系統に組込む主蒸
気リ―ド管の耐圧試験を実施するにあたり、主蒸気止め
弁・蒸気加減弁,主蒸気リ―ド管およびタ―ビン―シン
グ入口部に同時に試験圧力を作用させて一度に試験する
ようにしたことを特徴とする耐圧試験方法。
1. A main steam stop valve, a steam control valve, a main steam lead pipe, and a turbine casing are used for conducting a pressure resistance test of a main steam lead pipe incorporated in a main steam system of a steam turbine. A pressure resistance test method characterized in that a test pressure is simultaneously applied to the inlets to perform a test at once.
JP11570493A 1993-05-18 1993-05-18 Pressure test method for main steam lead pipe of turbine Pending JPH06323106A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11570493A JPH06323106A (en) 1993-05-18 1993-05-18 Pressure test method for main steam lead pipe of turbine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11570493A JPH06323106A (en) 1993-05-18 1993-05-18 Pressure test method for main steam lead pipe of turbine

Publications (1)

Publication Number Publication Date
JPH06323106A true JPH06323106A (en) 1994-11-22

Family

ID=14669158

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11570493A Pending JPH06323106A (en) 1993-05-18 1993-05-18 Pressure test method for main steam lead pipe of turbine

Country Status (1)

Country Link
JP (1) JPH06323106A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010031751A (en) * 2008-07-29 2010-02-12 Hitachi Ltd Pressure test method and drain method of piping in steam turbine plant

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010031751A (en) * 2008-07-29 2010-02-12 Hitachi Ltd Pressure test method and drain method of piping in steam turbine plant

Similar Documents

Publication Publication Date Title
JP6332871B2 (en) Repair method for reactor-mounted instrumentation nozzle
JP2011052966A (en) Method for managing internal equipment in reactor pressure vessel and apparatus thereof
JPH06323106A (en) Pressure test method for main steam lead pipe of turbine
US20060078080A1 (en) Small diameter bore pressure vessel penetration modification
JP3425217B2 (en) Sealing device for repairing pressure vessel penetration housing
EP1078375B1 (en) Canopy seal clamp assembly and method of installation
JP3584311B2 (en) Top mount canopy seal clamp assembly
JP2519316B2 (en) Repair method for long housing and repair structure
JPH08271673A (en) Jet pump seal device and jet pump inspection repair method using the same
JP3357779B2 (en) Water handling equipment and water handling method for pressure and leak inspection of nuclear reactor
JPH0543058B2 (en)
JP5106314B2 (en) How to repair the shroud head
JPS6156998A (en) Neutron flux monitor housing and method of repair of neutronflux monitor housing
JP4393011B2 (en) Replacement method of core spray system equipment
JP2941462B2 (en) Nozzle structure for recirculation pump with built-in nuclear reactor and working device for its welded joint
JP2751414B2 (en) Repair method for container penetration piping
JPH0378694A (en) Installation method of piping for control rod housing
JP3684330B2 (en) Piping pressure sealing method
JPS59116035A (en) Jig for testing pressure proof of piping
JPS60210739A (en) Water pressure test for sampling takeoff pipe system
JPS6124960Y2 (en)
JP2000162376A (en) Replacing method for reactor internal structure
JP2766179B2 (en) Maintenance method for furnace internals
JPS623395B2 (en)
JP2008203203A (en) Method of accessing jet pump riser pipe welded portion