JPH06322995A - Field welding operation tent for steel pipe pile - Google Patents

Field welding operation tent for steel pipe pile

Info

Publication number
JPH06322995A
JPH06322995A JP13403493A JP13403493A JPH06322995A JP H06322995 A JPH06322995 A JP H06322995A JP 13403493 A JP13403493 A JP 13403493A JP 13403493 A JP13403493 A JP 13403493A JP H06322995 A JPH06322995 A JP H06322995A
Authority
JP
Japan
Prior art keywords
steel pipe
pipe pile
curtain
welding
attached
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP13403493A
Other languages
Japanese (ja)
Other versions
JP2609045B2 (en
Inventor
Masakazu Kosaka
正和 小坂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KOKUDO KISO KK
Original Assignee
KOKUDO KISO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KOKUDO KISO KK filed Critical KOKUDO KISO KK
Priority to JP13403493A priority Critical patent/JP2609045B2/en
Publication of JPH06322995A publication Critical patent/JPH06322995A/en
Application granted granted Critical
Publication of JP2609045B2 publication Critical patent/JP2609045B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PURPOSE:To carry out welding work without interruptions from wind and rain in a construction site where steep pipe piles are connected by welding and driven into the ground. CONSTITUTION:A tent main body 1 which spreads around a steel pipe pile P in the shape of a skirt and a ring-shaped skeleton 3 which holds its expanded part are arranged to form a welding construction tent. The tent main body 1 is mainly composed of a waterproofing sheet which can be closed around the steel pipe pile P in its single turn. A belt 5 which is clapped with the steel pipe P, a droop covering curtain 7 for an expanded part of a skirt and a curtain 9 are connected to the steel pipe P one after another. When the skeleton 3 is mounted to the lower end of the covering curtain 7 with a string 17 after the steel pile P is clamped with the belt 5, the covering curtain 7 is equally pulled up over the whole circumference with the weight so that the skirt-like expansion may be held as if it were provided with a large number of frameworks.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、山や丘の中腹等に打
ち込まれる地滑り防止の目的あるいは建造物の基礎の目
的とする鋼管杭を現場溶接する際に、殊に、降雨や降雪
を避けるために使用する作業用天幕に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention particularly avoids rainfall and snowfall when welding steel pipe piles for the purpose of preventing landslides driven into mountains or hillsides, or for the purpose of building foundation, on site. For work awnings used for.

【0002】[0002]

【従来の技術】例えば地滑り地帯において、殊にその下
に道路や建物があるときには、土砂の崩壊の危険を未然
に防止するために、その防止に適した箇所に所定の深さ
まで杭が打ち込まれる。これを一般的に鋼管杭と称して
いる。
2. Description of the Related Art For example, in a landslide area, especially when there are roads and buildings below the piles, in order to prevent the risk of sediment collapse, piles are driven to a predetermined depth at a suitable position for preventing the collapse. . This is generally called a steel pipe pile.

【0003】鋼管杭には太い鋼管が使用されるが、一本
では不足であるために、一本を打ち込んでから、その上
に継ぎ足すことによりさらに打ち込むというように、普
通には2〜3本の連結の打ち込みがなされる。この連結
のために電気溶接がなされるが、従来、そのための作業
用天幕はなかった。
A thick steel pipe is used for a steel pipe pile, but since one pipe is insufficient, it is usually a few pipes such that one pipe is first driven and then further pipes are added to add the steel pipe. The linking of books is driven in. Although electric welding is performed for this connection, there has conventionally been no working awning for this purpose.

【0004】鋼管杭の現場溶接法としては、手溶接法、
半自動溶接法、全自動溶接法の3種類が執られるが、現
在最も多く用いられているのが半自動溶接法であり、そ
れにはセルフシールドアーク溶接が用いられる。また、
溶接電源には、一般的に200V交流が使用されるが、
350〜480A程度の大電流を必要とするものが多
い。
As a field welding method for steel pipe piles, a hand welding method,
There are three types of semi-automatic welding and full-automatic welding, but the most widely used at present is the semi-automatic welding, which uses self-shielded arc welding. Also,
200V AC is generally used for the welding power source,
Many require a large current of about 350 to 480A.

【0005】[0005]

【発明が解決しようとする課題】鋼管杭の溶接の良否
は、溶接工の技量ばかりでなく、気候条件に左右される
ことが多く、降雨、降雪時には、溶接作業が停止され、
これが作業能率を阻害していた。また、10m/sec
以上の強い風が吹いている場合には、風を防ぐ衝立を設
けて作業がなされていた。
The quality of welding of steel pipe piles often depends not only on the skill of the welder but also on the climatic conditions. When rain or snow falls, the welding work is stopped.
This hindered work efficiency. Also, 10 m / sec
When the above-mentioned strong wind is blowing, the work is done by providing a screen to prevent the wind.

【0006】溶接中の箇所においては、アークにより1
000℃近くの高温を帯びる溶融池が生じるために、そ
こに雨滴が触れた時には、溶接不良を招くばかりでな
く、溶接箇所が爆発する危険な状態を招く。
At the spot during welding, 1
Since a molten pool having a high temperature of about 000 ° C. is generated, when raindrops come into contact with the molten pool, not only welding defects are caused, but also a dangerous state in which a welding portion explodes is caused.

【0007】この発明は上記のような実情に鑑みて、降
雨や降雪があっても、それが溶接中の箇所に触れること
がないために、溶接作業を中断する必要がなくなり、ま
た風を防ぐこともできる鋼管杭の現場溶接作業用天幕を
提供することを目的とした。
In view of the above circumstances, the present invention eliminates the need for interrupting the welding operation because it does not touch the spot being welded even if there is rain or snow, and it prevents wind. The purpose is to provide an awning for on-site welding work of steel pipe piles.

【0008】[0008]

【課題を解決するための手段】上記目的を達成するため
のこの発明による鋼管杭の現場溶接作業用天幕は、鋼管
杭の周囲にスカート状に広がせる天幕本体と、その広が
りを保持するリング状の縁骨との組合わせからなり、そ
のうち、天幕本体については、鋼管杭の周囲に一回りで
閉じ合わせる防水シートを主体として、鋼管杭に対して
締め付ける帯部と、その下端からスカート状に広がる覆
い幕と、その下端からの垂れ幕とが順次連続し、両端部
に閉じ合わせのために相互に結合し得るファスナーを装
着し、帯部には、鋼管杭に密着し得るように弾性心材を
装着し、覆い幕の下端に、縁骨の着脱可能な取付け手段
を設けたことを特徴とする。
In order to achieve the above object, an awning for field welding work of a steel pipe pile according to the present invention comprises an awning body which can be spread in a skirt shape around the steel pipe pile, and a ring which holds the spread. The awning body is mainly composed of a waterproof sheet that is closed around the steel pipe pile in a single turn. The spreading curtain and the curtain from the lower end of the curtain are successively connected, and fasteners that can be connected to each other for closing are attached to both ends, and an elastic core material is attached to the strip so that it can adhere to the steel pipe pile. It is characterized in that a mounting means for mounting and dismounting a marginal bone is provided at the lower end of the curtain.

【0009】[0009]

【作用】鋼管杭の現場溶接作業用天幕を上記のように構
成したから、作業手順については、打ち込みがなされた
先行の鋼管杭に予め縁骨を入れておき、その鋼管杭に後
続の鋼管杭を仮に連結してから、後続の鋼管杭に天幕本
体を取り付けると共に、その天幕に縁骨を取り付けるこ
とにより組み立てる。
[Operation] Since the awning for on-site welding of steel pipe piles is configured as described above, the work procedure is as follows. After tentatively connecting, attach the awning body to the succeeding steel pipe pile and attach the rim bone to the awning to assemble.

【0010】天幕本体を取り付けるときには、鋼管杭に
回して両端をファスナーで閉じ合わせ、それと同時に帯
部を鋼管杭に締め付ける。そうすると、その締め付けに
より下降しない固定状態が得られるから、縁骨を取り付
けると、覆い幕が縁骨の重みにより周囲に均等に引っ張
られるために、安定したスカート状の広がり形状を保持
する。溶接が終わってからは、丁度逆の作業手順により
取り外す。
When the awning body is attached, the awning body is turned to the steel pipe pile and both ends are closed with fasteners, and at the same time, the band portion is fastened to the steel pipe pile. Then, a fixed state that does not descend due to the tightening is obtained. Therefore, when the rim bone is attached, the curtain is pulled evenly to the periphery by the weight of the rim bone, so that the stable skirt-like spread shape is maintained. After the welding is completed, remove it by just following the reverse procedure.

【0011】[0011]

【実施例】次に、この発明の実施例を図面に基いて説明
する。
Embodiments of the present invention will now be described with reference to the drawings.

【0012】鋼管杭の現場溶接作業用天幕Tは、鋼管杭
Pに装着する天幕本体1と、それに組み付けるリング状
の縁骨3との組合わせからなっている。
The tent T for on-site welding work of a steel pipe pile is composed of a combination of an awning body 1 mounted on the steel pipe pile P and a ring-shaped rim 3 to be assembled thereto.

【0013】天幕本体1は、樹脂シートやテント生地等
の防水シートによって、鋼管杭Pに締め付ける帯部5
と、その下端からスカート状に広がる覆い幕7と、その
周囲から下がる垂れ幕9とが形成され、一回しで鋼管杭
Pに取り付け得るように回りが有端となっている。
The awning body 1 is made of a waterproof sheet such as resin sheet or tent cloth, and is a band portion 5 that is fastened to the steel pipe pile P.
A cover curtain 7 that spreads in a skirt shape from the lower end thereof and a hanging curtain 9 that descends from the periphery thereof are formed, and the periphery is end so that it can be attached to the steel pipe pile P in one turn.

【0014】天幕本体1のこのような形状の防水シート
には、鋼管杭Pに対する締付けと、スカート状態の保持
のために、両端部に相互に結合する面ファスナー11,
13が取り付けられ、結合を強化するためにそれぞれ二
条の取付けとなっている。なお、面ファスナー11,1
3の取付けは、図示の如く、垂れ幕9においては省いて
も良い。
The waterproof sheet having such a shape of the awning main body 1 has surface fasteners 11 which are mutually coupled to both ends in order to tighten the steel pipe pile P and maintain the skirt state.
13 are attached and each have two attachments to strengthen the bond. The surface fasteners 11, 1
The attachment of 3 may be omitted in the banner 9 as shown.

【0015】帯部5は、この面ファスナー11,13の
締結によって鋼管杭Pに締め付けられ、これにより取付
け状態が保持される。けれども、これだけでは鋼管杭P
に密着し難く、雨水がその間から浸入するおそれがある
ために、この帯部5には、上下二段に弾性心材15が取
り付けられる。
The band portion 5 is fastened to the steel pipe pile P by the fastening of the surface fasteners 11 and 13, whereby the attached state is maintained. However, this is the only steel pipe pile P
Since it is difficult to make close contact with and the rainwater may infiltrate between them, the elastic core materials 15 are attached to the band portion 5 in two upper and lower stages.

【0016】弾性心材15には、発泡ウレタン樹脂やゴ
ム等の弾力質の帯状部材が使用される。また、両端部1
5a,15bを帯部5の端から突出させてある。このよ
うにすると、弾性心材15の両端部15a,15bを引
いて締め付けやすい。また、両端部15a,15bで重
なるけれども、下となる端部15aが押し潰されること
によって、その端においても弾性心材15が隙間なく鋼
管杭Pに密着する。
As the elastic core material 15, a band-shaped member having elasticity such as urethane foam resin or rubber is used. In addition, both ends 1
5a and 15b are projected from the end of the band 5. By doing so, it is easy to pull and tighten both ends 15a and 15b of the elastic core material 15. Further, although the both end portions 15a and 15b are overlapped with each other, the lower end portion 15a is crushed, so that the elastic core material 15 closely adheres to the steel pipe pile P even at the end thereof without a gap.

【0017】弾性心材15の重なり部分で、この様な密
着性を良くするためには、図示の如く、帯部5の内側に
弾性心材15を取り付けることが望ましい。しかし、外
側に取り付けても密着性を良くすることも可能である。
例えば、弾性心材15を短くしてその両端部の重なりを
なくする。また、帯部5に沿って弾性心材の挿入部を袋
状に作り、弾性心材を被覆した取付け状態であっても良
い。
In order to improve such adhesion at the overlapping portion of the elastic core member 15, it is desirable to attach the elastic core member 15 inside the band portion 5 as shown in the drawing. However, it is also possible to improve the adhesion even if it is attached to the outside.
For example, the elastic core material 15 is shortened so that both ends thereof are not overlapped. Alternatively, the insertion portion of the elastic core material may be formed in the shape of a bag along the band portion 5 and the elastic core material may be covered therewith.

【0018】覆い幕7の下端には、縁骨3を着脱可能に
取り付ける手段として、外側に紐17が等間隔に取り付
けられている。また、垂れ幕9の下端にも同じく紐19
が取り付けられている。この下の紐19で風雨の吹込み
を防止するシート4を装着することができる。また、垂
れ幕9を長く下に垂れる寸法に形成したときには、垂れ
幕9が風に煽られないように、下端にも他の縁骨3を取
り付けるためにも利用できる。そうすると、風の吹込み
を有効に防止できる。
At the lower end of the covering screen 7, strings 17 are attached to the outside at equal intervals as a means for detachably attaching the rim bone 3. Also, a string 19 is also attached to the lower end of the hanging curtain 9.
Is attached. A seat 4 for preventing wind and rain from being blown in can be attached by the string 19 below this. Further, when the hanging curtain 9 is formed so as to hang down for a long time, the hanging curtain 9 can also be used for attaching another edge 3 to the lower end so that the hanging curtain 9 is not agitated by the wind. Then, the blowing of wind can be effectively prevented.

【0019】縁骨3は、金属またはプラスチック等でリ
ング状に形成するもので、鉄製のように重量があると、
その重みで垂れ幕9の開きが安定する。また、リング形
状については、例えば二つ割りの組立て式にしても良
い。
The rim bone 3 is formed of metal or plastic in a ring shape, and if it is heavy like iron,
The weight stabilizes the opening of the curtain 9. Further, the ring shape may be, for example, a two-piece assembly type.

【0020】作業手順については、先行の鋼管杭Pの打
ち込みがなされると、その鋼管杭Pに予め縁骨3を入れ
てから、後続の鋼管杭Pを仮に連結する。この仮止めの
ために、一方の鋼管杭Pの端部に嵌めて予め鉄製のリン
グ21が溶接されている。なお、縁骨3が上記のように
組立て式であるときには、先行の鋼管杭Pに予め入れて
おく必要がない。
As for the work procedure, when the preceding steel pipe pile P is driven, the marginal bone 3 is inserted in advance in the steel pipe pile P, and then the succeeding steel pipe pile P is temporarily connected. For this temporary fixing, an iron ring 21 is welded in advance by fitting it on the end of one steel pipe pile P. When the rim bone 3 is of the assembly type as described above, it is not necessary to put it in the preceding steel pipe pile P in advance.

【0021】後続の鋼管杭Pを仮止めしてからは、その
鋼管杭Pに天幕本体1を回して、両端部を面ファスナー
11,13により閉じ合わせるとともに、帯部5を締め
付ける。そうすると、帯部5が鋼管杭Pに固定され、覆
い幕7及び垂れ幕9が鋼管杭Pの回りに垂れ下がってい
るから、その外側に縁骨3を持ち上げ、その位置を保持
しながら紐17で縁骨3を縛り付ける。
After the subsequent steel pipe pile P is temporarily fixed, the awning body 1 is turned around the steel pipe pile P, both ends are closed by the surface fasteners 11 and 13, and the band portion 5 is tightened. Then, the strip portion 5 is fixed to the steel pipe pile P, and the covering curtain 7 and the hanging curtain 9 hang down around the steel pipe pile P. Therefore, the rim bone 3 is lifted to the outside of the steel pipe pile P and the edge is held by the string 17 while holding the position. The bone 3 is tied up.

【0022】縁骨3の保持のために、作業台23の上に
縁骨3の支持台が組まれる。そうすると、紐17の結び
作業をなしやすい。そして、支持フレームを外すと、縁
骨3の重みにより覆い幕7の開き状態が保持される。ま
た、鋼管杭Pを帯5が締め付けてその間から雨水が浸入
しないように密着しているので、降雨や降雪があっても
それが溶接中の箇所に触れることがなくなる。
In order to hold the edge frame 3, a support table for the edge frame 3 is assembled on the work table 23. Then, it is easy to tie the string 17. Then, when the support frame is removed, the open state of the cover 7 is held by the weight of the edge bone 3. Further, since the steel pipe pile P is tightly adhered to the band 5 so that rainwater does not intrude between them, even if there is rainfall or snowfall, it does not touch the welding spot.

【0023】なお、溶接を肉付けにより強化するため
に、鋼管杭Pの下端が肉付けしやすく外側全周で傾斜し
て切欠されている。また、溶接が完了して天幕Tが撤去
されると、後続の鋼管杭Pの打ち込み作業が開始され、
必要に応じてさらに鋼管杭が連結され、最後に鋼管杭P
の中にパイプで配筋してコンクリートが打ち込まれる。
It should be noted that, in order to strengthen the welding by fleshing out, the lower end of the steel pipe pile P is easily fleshed out and is cut out so as to be inclined all around the outside. Moreover, when welding is completed and the awning T is removed, the driving operation of the subsequent steel pipe pile P is started,
If necessary, steel pipe piles are connected, and finally steel pipe piles P
Concrete is driven in by arranging with a pipe.

【0024】[0024]

【発明の効果】この発明による鋼管杭の現場溶接作業用
天幕は、上記のごとくであるから、次のような優れた効
果を発揮する。
Since the awning for welding a steel pipe pile in the field according to the present invention is as described above, it exhibits the following excellent effects.

【0025】組立てにより鋼管杭の溶接箇所の回りが全
面的に被覆され、しかも、鋼管杭には弾性心材で密着す
ることにより、締付け部分からの雨水の浸入が防止され
るために、溶接中の高熱箇所に降雨や降雪が触れるおそ
れがなく、降雨や降雪があっても、溶接作業を中断する
必要がなくなり、また、水に触れることを原因とする溶
接不良を招くこともなくなる。
By assembling, the entire periphery of the welded portion of the steel pipe pile is covered, and since the elastic core material is closely attached to the steel pipe pile, rainwater is prevented from entering from the tightened portion. There is no danger of rain or snow coming into contact with the hot spots, it is not necessary to interrupt the welding work even if there is rain or snow, and there is no possibility of welding failure due to contact with water.

【0026】天幕本体を後続の鋼管杭に締め付けてか
ら、それに縁骨を取り付けることにより簡単に組み立て
ることができるために、気候の急変に対応して作業能率
を高め得ることはもちろん、天幕本体と縁骨とは別々で
あって、鋼管杭に対する取付けと同時に組み立てるため
に、運搬や保管をコンパクトになし得る。また、取付け
取外し作業等の取扱いにも極めて好都合である。
Since the awning body can be easily assembled by tightening it to the subsequent steel pipe pile and then attaching the rim to it, work efficiency can be improved in response to sudden changes in the climate, and the awning body and Since it is separate from the curb and is assembled at the same time as mounting to the steel pipe pile, it can be transported and stored compactly. Further, it is extremely convenient for handling such as mounting and dismounting work.

【0027】天幕本体には骨組みがなく、それが軽量で
あるばかりでなく、それに組み付ける縁骨が簡単なリン
グ形状であって、その取付けだけで恰も多数の骨組があ
るように、天幕本体のスカート状の広がりが安定して保
持され、また、その周囲に垂れ幕が下がっているため
に、降雨や降雪ばかりでなく、比較的強い風を防ぐため
にも使用できる。
The awning body has no skeleton, and not only is it lightweight, but the rim bone to be assembled to it has a simple ring shape, and there are many skeletons just by mounting it. It can be used not only for rain and snow, but also for preventing relatively strong winds because the spread of the shape is kept stable and the curtains hang down around it.

【図面の簡単な説明】[Brief description of drawings]

【図1】分解して示す斜視説明図である。FIG. 1 is an exploded perspective view showing an exploded view.

【図2】使用状態において示す縦断面説明図である。FIG. 2 is a vertical cross-sectional explanatory view showing a state of use.

【符号の説明】[Explanation of symbols]

P 鋼管杭 T 鋼管杭の現場溶接作業用天幕 1 天幕本体 3 縁骨 5 帯部 7 覆い幕 9 垂れ幕 11,13 ファスナー 15 弾性心材 17 縁骨の着脱可能な取付け手段としての紐 P steel pipe pile T tent for field welding work of steel pipe pile 1 awning body 3 rim bone 5 band 7 cover curtain 9 hanging curtain 11, 13 fastener 15 elastic core material 17 cord as a detachable attachment means for rim bone

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 鋼管杭(P)の周囲にスカート状に広が
せる天幕本体(1)と、その広がりを保持するリング状
の縁骨(3)との組合わせからなり、そのうち、天幕本
体(1)については、鋼管杭(P)の周囲に一回りで閉
じ合わせる防水シートを主体として、鋼管杭(P)に対
して締め付ける帯部(5)と、その下端からスカート状
に広がる覆い幕(7)と、その下端からの垂れ幕(9)
とが順次連続し、両端部に閉じ合わせのために相互に結
合し得るファスナー(11,13)を装着し、帯部
(5)には、鋼管杭(P)に密着し得るように弾性心材
(15)を装着し、覆い幕(7)の下端に、縁骨(3)
の着脱可能な取付け手段(17)を設けたことを特徴と
する鋼管杭の現場溶接作業用天幕。
1. A combination of an awning main body (1) which is spread in a skirt shape around a steel pipe pile (P) and a ring-shaped rim bone (3) which holds the spread, of which the awning main body is included. As for (1), mainly a waterproof sheet that is closed around the steel pipe pile (P) around once, and a band portion (5) to be fastened to the steel pipe pile (P), and a cover curtain extending from the lower end to a skirt shape. (7) and a curtain (9) from its bottom edge
Are sequentially connected, fasteners (11, 13) that can be connected to each other for closing are attached to both ends, and an elastic core material is attached to the strip (5) so as to be closely attached to the steel pipe pile (P). (15) is attached, and the edge bone (3) is attached to the lower end of the curtain (7).
An awning for on-site welding of steel pipe piles, which is provided with detachable attachment means (17).
JP13403493A 1993-05-11 1993-05-11 Tent for on-site welding of steel pipe piles Expired - Fee Related JP2609045B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13403493A JP2609045B2 (en) 1993-05-11 1993-05-11 Tent for on-site welding of steel pipe piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13403493A JP2609045B2 (en) 1993-05-11 1993-05-11 Tent for on-site welding of steel pipe piles

Publications (2)

Publication Number Publication Date
JPH06322995A true JPH06322995A (en) 1994-11-22
JP2609045B2 JP2609045B2 (en) 1997-05-14

Family

ID=15118828

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13403493A Expired - Fee Related JP2609045B2 (en) 1993-05-11 1993-05-11 Tent for on-site welding of steel pipe piles

Country Status (1)

Country Link
JP (1) JP2609045B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011073044A (en) * 2009-09-30 2011-04-14 Jfe Steel Corp Windbreak apparatus for field welding of steel pipe pile, and field welding method of steel pipe pile using the windbreak apparatus
JP2013023853A (en) * 2011-07-19 2013-02-04 Asahi Kasei Homes Co Rain protection device and rain protection structure
US9828787B1 (en) * 2016-10-05 2017-11-28 Winkler Canvas Ltd. Covering tent for surrounding a wind turbine at its base during a grouting operation
JP2022123315A (en) * 2021-02-12 2022-08-24 株式会社大同機械 Canopy and method for mounting the same

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011073044A (en) * 2009-09-30 2011-04-14 Jfe Steel Corp Windbreak apparatus for field welding of steel pipe pile, and field welding method of steel pipe pile using the windbreak apparatus
JP2013023853A (en) * 2011-07-19 2013-02-04 Asahi Kasei Homes Co Rain protection device and rain protection structure
US9828787B1 (en) * 2016-10-05 2017-11-28 Winkler Canvas Ltd. Covering tent for surrounding a wind turbine at its base during a grouting operation
JP2022123315A (en) * 2021-02-12 2022-08-24 株式会社大同機械 Canopy and method for mounting the same

Also Published As

Publication number Publication date
JP2609045B2 (en) 1997-05-14

Similar Documents

Publication Publication Date Title
CA2051591C (en) Scaffold enclosure
US6668491B1 (en) Device for removing ice from roofs
US3871145A (en) Flashing for pitch pocket
KR101605405B1 (en) Joint System Of Membrane Structures
JP2609045B2 (en) Tent for on-site welding of steel pipe piles
US6591561B1 (en) Waterproof roof deck post construction
JPH0813719A (en) Horizontal drain for drainage of building and its installing structure
KR100994412B1 (en) Membrane fixing structure of architectural structure and construction method thereof
JP2002180701A (en) Prefabricated tent
JP2011042968A (en) Flashing sheet
JP2516259Y2 (en) Sheet for temporary roof
JP2570219Y2 (en) Rain umbrella for steel pipe pile welding
JP2622343B2 (en) Roof panel
JP2521621B2 (en) Seats for temporary roofs and temporary roofs
JP2865998B2 (en) Membrane roof construction method and membrane roof construction
JPH10140843A (en) Roofed sheet cover
JP2003328350A (en) Awning for steel pipe pile
JPS6011244Y2 (en) Large welded building tent
JPH0631056Y2 (en) Prefabricated rainproof building
JP3080139U (en) Roof sheet
JPH06146610A (en) Temporary flashing tool of building unit
JPH0741799Y2 (en) Weather protection
JP2022123315A (en) Canopy and method for mounting the same
JP2001303555A (en) Pile joint weld curing tool
JPH07600Y2 (en) Curing opening and closing dome for scaffolding