JPH0630222U - Reaction force stand for steel pipe pile punching machine - Google Patents

Reaction force stand for steel pipe pile punching machine

Info

Publication number
JPH0630222U
JPH0630222U JP5188893U JP5188893U JPH0630222U JP H0630222 U JPH0630222 U JP H0630222U JP 5188893 U JP5188893 U JP 5188893U JP 5188893 U JP5188893 U JP 5188893U JP H0630222 U JPH0630222 U JP H0630222U
Authority
JP
Japan
Prior art keywords
steel pipe
pipe pile
reaction force
clamp
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP5188893U
Other languages
Japanese (ja)
Other versions
JPH0720178Y2 (en
Inventor
北村  精男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GIKEN LTD.
Original Assignee
GIKEN LTD.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GIKEN LTD. filed Critical GIKEN LTD.
Priority to JP5188893U priority Critical patent/JPH0720178Y2/en
Publication of JPH0630222U publication Critical patent/JPH0630222U/en
Application granted granted Critical
Publication of JPH0720178Y2 publication Critical patent/JPH0720178Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

(57)【要約】 【目的】 鋼管杭打引抜機の初期打設時に、鋼管杭打引
抜機を地上に安定して設置し、かつ初期打設時の反力を
容易に得る。 【構成】 平板状の架台本体2の中心部分に略直線上
に、打設鋼管杭Pの内径と略等しい内径を有するクラン
プ挿入孔3を適宜数配設すると共に、側部の架台支持部
4に、仮に打ち込んだ支持杭Qを挟持する支持杭クラン
プ部20を設ける。この支持杭クランプ部20の挿通孔
21内面とピストン23とで前記支持杭Qを挟持し架台
本体2を安定して設置する。この状態で鋼管杭打引抜機
のクランプをクランプ挿通孔3に装着して鋼管杭打引抜
機を固定し、鋼管杭Pを打設する。
(57) [Abstract] [Purpose] When the steel pipe pile punching machine is initially laid, the steel pipe pile punching machine is stably installed on the ground, and the reaction force at the time of initial laying is easily obtained. [Arrangement] An appropriate number of clamp insertion holes 3 having an inner diameter substantially equal to the inner diameter of the cast steel pipe pile P are arranged substantially linearly in the central portion of the flat plate-shaped pedestal body 2, and the pedestal support portions 4 on the side portions are arranged. Further, a support pile clamp portion 20 for sandwiching the temporarily driven support pile Q is provided. The support pile Q is sandwiched between the inner surface of the insertion hole 21 of the support pile clamp portion 20 and the piston 23 to stably install the gantry body 2. In this state, the clamp of the steel pipe pile punching and pulling machine is attached to the clamp insertion hole 3 to fix the steel pipe pile punching and pulling machine, and the steel pipe pile P is driven.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

本考案は、円筒状の鋼管矢板あるいは鋼管杭などを地中に打設したり、引き抜 いたりする鋼管杭打引抜機の初期打設時に、該鋼管杭打引抜機を地上に安定して 設置し、かつ初期打設時の反力を得るために用いる反力架台に関する。 The present invention is to stably install a steel pipe pile punching machine on the ground at the initial setting of the steel pipe pile punching machine for driving or pulling a cylindrical steel pipe sheet pile or steel pipe pile into the ground. And a reaction force stand used to obtain a reaction force at the time of initial placement.

【0002】[0002]

【従来の技術】[Prior art]

河川の護岸工事や橋梁などの土木作業等において、鋼管、鋼管矢板、鋼管杭( 本明細書では、単に鋼管杭という)はその強力な支持力と、経済性のために、護 岸橋梁工事などの永久構造物のみならず、鋼矢板でカバーできない山留や締切工 事などの仮設構造物あるいは支持杭としても広く利用されている。 これら鋼管杭を打設するためには、従来では、バイブロハンマーの使用や打撃 式あるいはオーガを使用した中堀式などの工法が採用されていた。 Steel pipes, steel pipe sheet piles, and steel pipe piles (simply referred to as steel pipe piles in this specification) are used for river bank protection work, bridge construction, and other civil engineering work because of their strong bearing capacity and economic efficiency. It is widely used not only as a permanent structure but also as a temporary structure that cannot be covered with steel sheet piles, a temporary structure such as a deadline construction work, or a support pile. In order to drive these steel pipe piles, conventional methods such as the use of a vibro hammer, a hitting type, or a Nakabori type using an auger have been adopted.

【0003】[0003]

【考案が解決しようとする課題】[Problems to be solved by the device]

上述のような従来工法では鋼管杭の打設時に騒音振動等の公害が生じ、また設 備も大がかりなため作業コストを高め、作業能率の面からも問題があった。 そこで、本願考案者は静荷重式の鋼管杭打引抜機を考案した。この鋼管杭打引 抜機は、鋼管杭の打設時には既設鋼管杭の上端を、鋼管杭打引抜機の下端に設け たクランプによって把持し、鋼管杭上に鋼管杭打引抜機を固定して反力を得つつ 新たな鋼管杭を打ち込むものである。 In the conventional method as described above, pollution such as noise and vibration occurs when the steel pipe pile is laid, and the equipment is large, which increases the work cost and poses a problem in terms of work efficiency. Therefore, the present inventor has devised a static load type steel pipe pile punching and drawing machine. This steel pipe pile punching machine grips the upper end of an existing steel pipe pile with a clamp provided at the lower end of the steel pipe pile punching machine when the steel pipe pile is driven, and fixes the steel pipe pile punching machine on the steel pipe pile. It drives new steel piles while gaining strength.

【0004】 この鋼管杭打引抜機は、鋼管杭の初期打設に際しては、既設杭がないため打設 の反力が得られない。そのため本考案は、鋼管杭打引抜機の初期打設に際して確 実容易に鋼管杭打引抜機を固定し、確実に打設反力を得られる反力架台を提供す ることを目的としている。This steel pipe pile punching / pulling machine cannot obtain the reaction force of the driving at the time of initial driving of the steel pipe pile because there is no existing pile. Therefore, an object of the present invention is to provide a reaction force platform that can reliably and reliably fix a steel pipe pile punching machine at the time of initial placement of the steel pipe pile punching machine, and can reliably obtain a driving reaction force.

【0005】[0005]

【課題を解決するための手段】 上記の目的を達成するため、本考案の鋼管杭打引抜機用反力架台は、適宜な重 量を有する平板状の架台本体に、打設鋼管杭の内径とほぼ等しい内径を有する、 クランプ挿入孔を適宜数配設すると共に、両側部に、既設支持杭を挾持するため の挾持機構を設けたことを特徴としている。[Means for Solving the Problems] In order to achieve the above object, the reaction force stand for a steel pipe pile punching and pulling machine of the present invention comprises a flat plate-shaped stand body having an appropriate weight, and an inner diameter of the cast steel pipe pile. It is characterized by arranging an appropriate number of clamp insertion holes having an inner diameter approximately equal to that of the above, and providing a holding mechanism on both sides for holding an existing support pile.

【0006】[0006]

【作用】[Action]

鋼管杭を打設する現場に反力架台を搬入し、反力架台両側部に設けた架台支持 部の挿通孔で既設支持杭を挟持して設置する。この状態で反力架台のクランプ挿 入孔に、鋼管杭打引抜機の下端に設けたクランプを挿入装着し鋼管杭打引抜機を 固定する。そして、鋼管杭打引抜機のチャック装置に鋼管杭を挾持し、下降させ て鋼管杭を打設する。この打設時には、鋼管杭打引抜機は反力架台上に安定して 載置され、かつ十分な反力を得ることができる。 The reaction force pedestal will be brought into the site where the steel pipe pile will be placed, and the existing support piles will be installed by sandwiching the existing support piles through the insertion holes of the gantry support parts provided on both sides of the reaction force pedestal. In this state, the clamp installed at the lower end of the steel pipe pile punching and pulling machine is inserted and installed in the clamp insertion hole of the reaction force platform to fix the steel pipe pile punching and pulling machine. Then, the steel pipe pile is held by the chuck device of the steel pipe pile punching and drawing machine and lowered to drive the steel pipe pile. At the time of this placement, the steel pipe pile punching / pulling machine can be stably placed on the reaction force stand, and a sufficient reaction force can be obtained.

【0007】[0007]

【実施例】【Example】

以下、図示した実施例に基づいて、本考案の鋼管杭打引抜機用反力架台を説明 する。 図1は本考案の一実施例である反力架台1の平面図で、図2は反力架台1の側 面図である。図中2は平板状に形成した架台本体である。この架台本体2は、こ れに固定した鋼管杭打引抜機10で鋼管杭Pを打設する場合に受ける反力に対抗 できるに十分な重量を有している。 Hereinafter, the reaction force stand for a steel pipe pile punching / pulling machine of the present invention will be described based on the illustrated embodiment. FIG. 1 is a plan view of a reaction force base 1 according to an embodiment of the present invention, and FIG. 2 is a side view of the reaction force base 1. Reference numeral 2 in the figure denotes a gantry body formed in a flat plate shape. The gantry body 2 has a sufficient weight to counter the reaction force received when the steel pipe pile P is driven by the steel pipe pile punching / pulling machine 10 fixed thereto.

【0008】 この架台本体2の中心部分に3つの孔部を形成してクランプ挿入孔3とした。 これらクランプ挿入孔3はほぼ直線上に配列してあり、その内径を鋼管杭Pの内 径とほぼ等しくすることにより、それぞれのクランプ挿入孔3には後述する鋼管 杭打引抜機10のクランプ15が挿入可能に構成されている。 上記架台本体2の端部には、両側端部を上記クランプ挿入孔3の配列方向と平 行な方向に延長して一対の架台支持部4を形成する。また、この一対の架台支持 部4の間隔は、鋼管杭Pが通過するのに十分な大きさとしてある。Three holes are formed in the central portion of the gantry body 2 to form the clamp insertion hole 3. These clamp insertion holes 3 are arranged in a substantially straight line, and the inner diameter of the clamp insertion holes 3 is made substantially equal to the inner diameter of the steel pipe pile P. Is configured to be insertable. At the ends of the gantry body 2, both ends are extended in a direction parallel to the arrangement direction of the clamp insertion holes 3 to form a pair of gantry support parts 4. Further, the distance between the pair of gantry support portions 4 is set to be large enough for the steel pipe pile P to pass through.

【0009】 この架台支持部4には、仮りに打ち込んだ支持杭Qを挾持する支持杭クランプ 部20を設けてある。この実施例における支持杭QはU形鋼矢板で、架台本体2 の側部には、この支持杭Qが2本連続した状態で挿通できる挿通孔21が形成し てある。 図中22は油圧などの流体圧で作動するシリンダで、そのピストン23が上記 挿通孔21内に進退し、該挿通孔21に挿通した支持杭Qをこのピストン23の 先端面と挿通孔21の内面とで挾持する。The pedestal support portion 4 is provided with a support pile clamp portion 20 that holds the support pile Q that has been temporarily driven. The support pile Q in this embodiment is a U-shaped steel sheet pile, and an insertion hole 21 is formed on the side of the gantry body 2 so that two support piles Q can be inserted in a continuous state. In the figure, reference numeral 22 denotes a cylinder which is operated by a fluid pressure such as hydraulic pressure, and the piston 23 of the cylinder advances and retreats into the insertion hole 21, and the support pile Q inserted into the insertion hole 21 is inserted into the tip surface of the piston 23 and the insertion hole 21. Hold inside and out.

【0010】 そして、予め適宜な位置に打設した支持杭Qが上記挿通孔21に挿通するよう に、この反力架台1を配置し、あるいは、反力架台1を配置後、挿通孔21内に 支持杭Qを打設する。その後、シリンダ22を作動させて支持杭Qを挾持する。 この状態で、鋼管杭打引抜機10をこの反力架台1に固定し、鋼管杭Pを打設す る。Then, this reaction force pedestal 1 is arranged so that the support piles Q which have been driven in advance at appropriate positions are inserted into the above insertion holes 21, or after the reaction force pedestal 1 is arranged, inside the insertion hole 21. The support pile Q is placed in the. Then, the cylinder 22 is operated to hold the support pile Q. In this state, the steel pipe pile punching / pulling machine 10 is fixed to this reaction force base 1, and the steel pipe pile P is driven.

【0011】 このように支持杭クランプ部20を設けた反力架台1では、鋼管杭Pの打設時 の反力が強い場合でも反力架台1が浮き上がったり、不用意に動いたりすること がない。 なお、この実施例では架台支持部4に支持杭クランプ部20を配設してあり、 上記反力に十分に対抗するにはこの位置が好ましい。しかし、例えば、作業現場 の条件などで、支持杭Qを架台支持部4近傍に打ち込む作業が困難な場合は、ク ランプ挿入孔3の側方に支持杭クランプ部20を配設しても構わない。In the reaction force pedestal 1 provided with the support pile clamp portion 20 as described above, even if the reaction force at the time of placing the steel pipe pile P is strong, the reaction force pedestal 1 may float or inadvertently move. Absent. In this embodiment, the support pile clamp portion 20 is provided on the gantry support portion 4, and this position is preferable in order to sufficiently counter the above reaction force. However, for example, when it is difficult to drive the support pile Q into the vicinity of the gantry support portion 4 due to the conditions of the work site, the support pile clamp portion 20 may be arranged on the side of the clamp insertion hole 3. Absent.

【0012】 次に、図3に基づいて鋼管杭打引抜機10の概略を説明する。図3は鋼管杭打 引抜機10の正面図で、基台11の上部にこの基台11に対して同図左右方向に 摺動自在なスライドベース12を設けてあり、このスライドベース12の上面に はマスト13を立設してある。このマスト13の前方には、油圧などの流体圧を 利用してこのマスト13に対して上下方向に摺動自在なチャック装置14を設け このチャック装置14で図3上に二点鎖線で示すように鋼管杭Pを挾持する。Next, an outline of the steel pipe pile punching and drawing machine 10 will be described with reference to FIG. FIG. 3 is a front view of the steel pipe pile punching and drawing machine 10. A slide base 12 that is slidable in the left-right direction with respect to the base 11 is provided above the base 11 and the upper surface of the slide base 12 is shown. A mast 13 is erected on this site. In front of the mast 13, a chuck device 14 which is slidable in the vertical direction with respect to the mast 13 is provided by using fluid pressure such as hydraulic pressure. The chuck device 14 is shown by a two-dot chain line in FIG. Hold the steel pipe pile P.

【0013】 他方、基台11の下面には適宜数のクランプ15が設けてあり、このクランプ 15によって鋼管杭打引抜機10を反力架台1上に固定する。 図4(a)および図4(b)にクランプ15の詳細を示す。 このクランプ15は、円筒形状の把持部を2分割して断面略三日月形の可動把 持部15bと固定把持部15aを構成している。On the other hand, an appropriate number of clamps 15 are provided on the lower surface of the base 11, and the steel pipe pile punching and cutting machine 10 is fixed on the reaction force base 1 by the clamps 15. The details of the clamp 15 are shown in FIGS. 4 (a) and 4 (b). In this clamp 15, a cylindrical gripping portion is divided into two to form a movable gripping portion 15b and a fixed gripping portion 15a having a substantially crescent-shaped cross section.

【0014】 前記把持部には上下に2基の流体圧シリンダ15dが内蔵されている。可動把 持部15bに形成bた凹部に流体圧シリンダ15dの端部を嵌合固定する一方、 固定把持部15aに形成した凹部15cには上記流体圧シリンダ15dを摺動自 在に嵌合すると共に、流体圧シリンダ15dのロッド15eの一端を凹部15c の奥部に固定する。Two fluid pressure cylinders 15d are built in the grip portion, one on the top and one on the bottom. The end of the fluid pressure cylinder 15d is fitted and fixed in the recess formed in the movable grip portion 15b, while the fluid pressure cylinder 15d is slidably fitted in the recess 15c formed in the fixed grip portion 15a. At the same time, one end of the rod 15e of the fluid pressure cylinder 15d is fixed to the inner part of the recess 15c.

【0015】 使用に際しては、流体圧シリンダ15dを作動し、ロッド15eを伸長せしめ ることによって可動把持部15bを鋼管杭Pの内壁面に押圧せしめる。さらにロ ッド15eを伸長し、該可動把持部15bが鋼管杭Pの内壁面より得る反力で固 定把持部15aが外側(図4右側)にわずかに移動し、クランプ15は鋼管杭P 固定する (図4(b)参照)。この状態でクランプ15は鋼管杭P1に確実に 把持する。なお、鋼管杭Pより、クランプ15を取り外すときは、流体圧シリン ダ15dのロッド15eを退縮すれば把持状態は解除される。In use, the fluid pressure cylinder 15d is operated to extend the rod 15e to press the movable grip portion 15b against the inner wall surface of the steel pipe pile P. The rod 15e is further extended, and the movable gripping portion 15b is slightly moved outward (on the right side in FIG. 4) by the reaction force obtained from the inner wall surface of the steel pipe pile P, and the clamp 15 is moved to the steel pipe pile P. Fix it (see Fig. 4 (b)). In this state, the clamp 15 securely grips the steel pipe pile P1. When removing the clamp 15 from the steel pipe pile P, the gripped state is released by retracting the rod 15e of the fluid pressure cylinder 15d.

【0016】 以上の如く構成した本実施例の作用を以下に説明する。 鋼管杭Pの初期打設を行う作業現場に、反力架台1を設置する。このとき、反 力架台1の上面が水平となるようにする。そして、予め適宜な位置に打設した支 持杭Qが上記挿通孔21に挿通するように、この反力架台1を設置し、あるいは 反力架台1を設置後、挿通孔21内に支持杭Qを打設する。その後、シリンダ2 2を作動させて支持杭Qを挾持する。The operation of the present embodiment configured as described above will be described below. The reaction force platform 1 is installed at a work site where the steel pipe pile P is initially placed. At this time, the upper surface of the reaction base 1 is made horizontal. The reaction pedestal 1 is installed so that the supporting pile Q, which is placed in an appropriate position in advance, can be inserted into the insertion hole 21, or after the reaction force pedestal 1 is installed, the support pile Q is inserted into the insertion hole 21. Place Q. Then, the cylinder 22 is operated to hold the support pile Q.

【0017】 この状態で、反力架台1のクランプ挿入孔3に鋼管杭打引抜機10のクランプ 15を挿入し反力架台1に保持させ、鋼管杭打引抜機10をこの反力架台1に固 定し、スライドベース12を適宜に前方に移動し、打ち込むべき鋼管杭Pを一対 の架台支持部4の中間位置でチャック装置14によって挾持し、チャック装置1 4を下降させ鋼管杭Pを地中に打設していく。In this state, the clamp 15 of the steel pipe pile punching / pulling machine 10 is inserted into the clamp insertion hole 3 of the reaction force pedestal 1 and held on the reaction force pedestal 1, and the steel pipe pile punching / pulling machine 10 is mounted on the reaction force pedestal 1. After fixing, the slide base 12 is appropriately moved forward, and the steel pipe pile P to be driven is clamped by the chuck device 14 at an intermediate position between the pair of pedestal support parts 4, and the chuck device 14 is lowered to place the steel pipe pile P in the ground. It will be placed inside.

【0018】 チャック装置14がマスト13の最下位にまで達したら、該チャック装置14 から鋼管杭Pの挾持状態を緩めチャック装置14のみを上昇させ、再びチャック 装置14で鋼管杭Pを挾持し、該チャック装置14を下降させて、さらに鋼管杭 Pを地中に完全に打設する。When the chuck device 14 reaches the lowest position of the mast 13, the holding state of the steel pipe pile P is loosened from the chuck device 14, only the chuck device 14 is raised, and the steel pipe pile P is again held by the chuck device 14. The chuck device 14 is lowered to further drive the steel pipe pile P completely into the ground.

【0019】 この場合、杭打引抜機10は、クランプ15で反力架台1に確実に固定されて いて、杭P打設時の反力を十分に得られるため杭Pは確実に打設される。このよ うに支持杭クランプ部20を設けた反力架台1では、鋼管杭Pの打設時の反力が 強い場合でも反力架台1が浮き上がったり、不用意に動いたりすることがない。In this case, since the pile punching / pulling machine 10 is securely fixed to the reaction force base 1 by the clamps 15 and the reaction force at the time of driving the piles P is sufficiently obtained, the piles P are reliably driven. It In the reaction force pedestal 1 provided with the support pile clamp portion 20 as described above, the reaction force pedestal 1 does not float up or inadvertently move even when the reaction force at the time of placing the steel pipe pile P is strong.

【0020】 以上の動作を繰り返すことにより順次鋼管杭Pを連続して打設し、それに従っ て、杭打引抜機10を杭1ピッチ分ずつ前進させていく。そして、クランプ15 が反力架台1から外れて前方に位置したときには、該クランプ15を既設杭Pに 挿入して、前記のようにこの既設の鋼管杭Pを保持し、鋼管杭打引抜機10を既 設杭P上に固定することになる。By repeating the above-described operation, the steel pipe piles P are successively placed in succession, and the pile punching / pulling machine 10 is advanced by one pitch by one pitch accordingly. Then, when the clamp 15 is disengaged from the reaction force base 1 and positioned forward, the clamp 15 is inserted into the existing pile P to hold the existing steel pipe pile P as described above, and the steel pipe pile punching machine 10 Will be fixed on the existing pile P.

【0021】 以上の実施例では、架台本体2に3つのクランプ挿入孔3を形成したものを示 したが、鋼管杭打引抜機10の備えたクランプ15の数と同数かあるいはそれ以 上であっても構わない。In the above embodiments, the cradle main body 2 is provided with the three clamp insertion holes 3, but the number is equal to or more than the number of the clamps 15 provided in the steel pipe pile punching and drawing machine 10. It doesn't matter.

【0022】[0022]

【考案の効果】[Effect of device]

上述したように、本考案の鋼管杭打引抜機用反力架台によれば、この反力架台 に鋼管杭打引抜機を固定することにより鋼管杭の初期打設を行うことができる。 また、この反力架台は移動も便利で、工事期間を短縮でき工事コストを低減でき る。さらに、反力架台の設置場所に左右されず、このため鋼管杭の打ち込み工事 を始める場所を自由に選択できる。したがって、より作業能率を高めると共に、 作業の安全性を高めることができる。 As described above, according to the reaction stand for the steel pipe pile punching and pulling machine of the present invention, the steel pipe pile can be initially set by fixing the steel pipe pile punching and drawing machine to the reaction stand. In addition, this reaction force platform is convenient to move, shortening the construction period and reducing the construction cost. Furthermore, regardless of the installation location of the reaction force platform, it is possible to freely select the location to start the steel pipe pile driving work. Therefore, it is possible to further improve work efficiency and work safety.

【図面の簡単な説明】[Brief description of drawings]

【図1】本考案の一実施例の平面図FIG. 1 is a plan view of an embodiment of the present invention.

【図2】本考案の一実施例の側面図FIG. 2 is a side view of an embodiment of the present invention.

【図3】鋼管杭打引抜機の正面図[Figure 3] Front view of steel pipe pile punching and drawing machine

【図4】鋼管杭内引抜機のクランプの断面図FIG. 4 is a sectional view of a clamp of a steel pipe pile drawing machine.

【符号の説明】[Explanation of symbols]

1 反力架台 2 架台本体 3 クランプ挿入孔 4 架台支持部 20 支持杭クランプ部 21 挿通孔 22 シリンダ 23 ピストン P 鋼管杭 Q 支持杭 1 Reaction force base 2 Base main body 3 Clamp insertion hole 4 Support base 20 Support pile clamp part 21 Insertion hole 22 Cylinder 23 Piston P Steel pipe pile Q Support pile

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 適宜な重量を有する平板状の架台本体
に、打設鋼管杭の内径とほぼ等しい内径を有する、クラ
ンプ挿入孔を適宜数配設すると共に、両側部に既設支持
杭を挾持するための挾持機構を設けたことを特徴とする
鋼管杭打引抜機用反力架台。
1. An appropriate number of clamp insertion holes having an inner diameter substantially equal to the inner diameter of a cast steel pipe pile are provided in a flat plate-shaped gantry body having an appropriate weight, and existing support piles are held on both sides. A reaction stand for a steel pipe pile punching machine, which is equipped with a gripping mechanism.
JP5188893U 1993-08-19 1993-08-19 Reaction force stand for steel pipe pile punching machine Expired - Lifetime JPH0720178Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5188893U JPH0720178Y2 (en) 1993-08-19 1993-08-19 Reaction force stand for steel pipe pile punching machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5188893U JPH0720178Y2 (en) 1993-08-19 1993-08-19 Reaction force stand for steel pipe pile punching machine

Publications (2)

Publication Number Publication Date
JPH0630222U true JPH0630222U (en) 1994-04-19
JPH0720178Y2 JPH0720178Y2 (en) 1995-05-15

Family

ID=12899425

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5188893U Expired - Lifetime JPH0720178Y2 (en) 1993-08-19 1993-08-19 Reaction force stand for steel pipe pile punching machine

Country Status (1)

Country Link
JP (1) JPH0720178Y2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017043917A (en) * 2015-08-25 2017-03-02 株式会社技研製作所 Pile press-in method, reaction frame and pile press-in/pull-out machine
JP2017106310A (en) * 2015-12-09 2017-06-15 株式会社技研製作所 Reaction cradle
JP2020200627A (en) * 2019-06-07 2020-12-17 株式会社技研製作所 Self-propelled reaction force frame
CN114991119A (en) * 2022-05-27 2022-09-02 广东亿德兴工程建设有限公司 Pile in PC construction method, construction method and device thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017008493A (en) * 2015-06-17 2017-01-12 聖 川口 Method for introducing/withdrawing cylindrical body in/from foundation, method for extracting existing pile, and work machine for introducing and withdrawing cylindrical body

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017043917A (en) * 2015-08-25 2017-03-02 株式会社技研製作所 Pile press-in method, reaction frame and pile press-in/pull-out machine
JP2017106310A (en) * 2015-12-09 2017-06-15 株式会社技研製作所 Reaction cradle
JP2020200627A (en) * 2019-06-07 2020-12-17 株式会社技研製作所 Self-propelled reaction force frame
CN114991119A (en) * 2022-05-27 2022-09-02 广东亿德兴工程建设有限公司 Pile in PC construction method, construction method and device thereof
CN114991119B (en) * 2022-05-27 2024-01-16 广东亿德兴工程建设有限公司 PC construction method pile, construction method and device thereof

Also Published As

Publication number Publication date
JPH0720178Y2 (en) 1995-05-15

Similar Documents

Publication Publication Date Title
WO2009035392A1 (en) Apparatus for driving down or pulling up elongated objects
JPH0720178Y2 (en) Reaction force stand for steel pipe pile punching machine
GB2356004A (en) Two stage pile driving apparatus
JPH0624423Y2 (en) Reaction force stand for steel pipe pile punching machine
JP2011162990A (en) Device for pulling out h-shaped steel for earth retaining
JPH0720177Y2 (en) Reaction force stand for steel pipe pile punching machine
US4925159A (en) Vertical power pulling device
JP2015169062A (en) Pile press-in device
CN104452760A (en) Noiseless steel sheet pile pressing equipment and construction method thereof
JPH0643226Y2 (en) Clamp attachment for pile punching machine
JP6271664B2 (en) Pile press-fitting device
CN219364605U (en) Adjustable foundation pit pile driver
CN217870522U (en) Easy-to-assemble and disassemble foundation pit supporting structure
KR200258887Y1 (en) Vertical controling apparatus for a basic pile of underwater construction
CN216809896U (en) Base-type pile stabilizing platform and single-pile foundation pile sinking system
CN109736347A (en) A kind of construction technology of underwater foundation trench gear mud wall
CN221345594U (en) Concrete grouting guiding device
CN218521778U (en) Clamping and fixing device for sleeve pulling hole of rotary excavating full-sleeve cast-in-place pile
CN214424052U (en) Lattice column steel bracket mounting tool
CN219586713U (en) Sinking pipe filling pile
CN218521781U (en) Positioning construction device for construction of overwater pile sinking for improving verticality
JPH0619631Y2 (en) Auxiliary weight
CN218520968U (en) Steel reinforcement cage pulls positioner for building installation
CN113718810B (en) Sinking-assisting construction method for open caisson
CN211256984U (en) Portable flood prevention emergency pile driver

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19951031