JPH06301437A - Nonstop job automatic execution device - Google Patents

Nonstop job automatic execution device

Info

Publication number
JPH06301437A
JPH06301437A JP5088268A JP8826893A JPH06301437A JP H06301437 A JPH06301437 A JP H06301437A JP 5088268 A JP5088268 A JP 5088268A JP 8826893 A JP8826893 A JP 8826893A JP H06301437 A JPH06301437 A JP H06301437A
Authority
JP
Japan
Prior art keywords
job
schedule
unit
jobs
main control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP5088268A
Other languages
Japanese (ja)
Inventor
Yukiharu Nomiya
行治 野宮
Hideo Nihei
英男 仁平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OKAYAMA NIPPON DENKI SOFTWARE KK
NEC Solution Innovators Ltd
NEC Software Okayama Ltd
Original Assignee
OKAYAMA NIPPON DENKI SOFTWARE KK
NEC Solution Innovators Ltd
NEC Software Okayama Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OKAYAMA NIPPON DENKI SOFTWARE KK, NEC Solution Innovators Ltd, NEC Software Okayama Ltd filed Critical OKAYAMA NIPPON DENKI SOFTWARE KK
Priority to JP5088268A priority Critical patent/JPH06301437A/en
Publication of JPH06301437A publication Critical patent/JPH06301437A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Stored Programmes (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PURPOSE:To automatically start jobs without any stop in 24 hours by providing two schedule files. CONSTITUTION:This device consists of a data base part 5 which has schedule files A and B containing daily jobs to be executed automatically, a job schedule part 4 which schedules and stores the jobs in the schedule files, a job start part 3 which retrieves startable jobs in the schedule files and automatically starts the jobs, a command processing part 1 which processes operation indications, and a main control part 2 which controls the job start part 3 and job schedule part 4. The main control part 2 performs control to allow the job start part 3 and job schedule part 4 to use the schedule files A and B alternately, so that the jobs can be started without any stop.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は無停止ジョブ自動実行装
置に関し、特にスケジュールされたジョブの自動実行を
24時間無停止で運用できる無停止ジョブ自動実行装置
に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a non-stop job automatic execution apparatus, and more particularly to a non-stop job automatic execution apparatus that can operate a scheduled job automatically for 24 hours.

【0002】[0002]

【従来の技術】スケジュールされたジョブを自動実行さ
せるための従来のジョブ自動実行装置は、図3に示すよ
うに、ジョブのスケジューリングを行うジョブスケジュ
ール装置6と、ジョブの自動起動を行うジョブ起動装置
7との二つの装置と、一つのスケジュールファイル8で
構成されていた。ジョブスケジュール装置6により一日
分の自動起動予定のジョブの情報をスケジュールファイ
ル8に格納し、ジョブ自動起動装置7がスケジュールフ
ァイル8から起動ジョブを検索してジョブの自動起動を
実現していた。
2. Description of the Related Art As shown in FIG. 3, a conventional job automatic execution apparatus for automatically executing a scheduled job includes a job scheduling apparatus 6 for scheduling a job and a job activation apparatus for automatically starting a job. It was composed of two devices, No. 7, and one schedule file 8. The job schedule device 6 stores information on jobs scheduled to be automatically started for one day in the schedule file 8, and the job automatic start device 7 searches the schedule file 8 for a startup job to realize automatic job startup.

【0003】この方法は、二つの装置が一つのスケジュ
ールファイル8を使用することになるため、同時に二つ
の装置を実行させることは不可能であった。そのため、
運用の手順としては、図4に示すように、(1)ジョブ
スケジュール装置で当日起動予定のジョブのスケジュー
ルを行う処理と、(2)ジョブ起動装置でスケジュール
結果に従いジョブを起動する処理とを交互に繰り返すこ
とになる。なお、前日にジョブ起動装置で起動できなか
ったジョブや異常終了したジョブがあれば、当日起動予
定のジョブに含めて再スケジュールを行う。
According to this method, since two devices use one schedule file 8, it is impossible to execute two devices at the same time. for that reason,
As shown in FIG. 4, the operation procedure is such that (1) the process of scheduling the job scheduled to be started on the current day by the job scheduling device and (2) the process of starting the job according to the schedule result on the job starting device are alternated. Will be repeated. If there is a job that could not be started by the job starter on the previous day or a job that ended abnormally, it is rescheduled by including it in the jobs scheduled to start on the day.

【0004】そのため、一日のうち、ジョブスケジュー
ル装置でジョブのスケジューリングを行っている間は、
スケジュールファイルがジョブスケジュール装置に占有
されるため、ジョブ起動装置によるジョブの起動は不可
能であった。
Therefore, during the day when the job is scheduled by the job scheduling device,
Since the schedule file is occupied by the job schedule device, the job activation device cannot activate the job.

【0005】[0005]

【発明が解決しようとする課題】上述した従来のジョブ
自動実行装置は、以下のような問題点を抱えている。
The above-described conventional job automatic execution device has the following problems.

【0006】まず、スケジュールファイルが一つしかな
く、それをジョブスケジュール装置とジョブ起動装置と
で交互に使用するため、ジョブスケジュール装置で翌日
分のジョブのスケジュールを行っている間は、ジョブ起
動装置は停止させなければならず、ジョブの自動実行が
行えない時間帯が発生する。特に、未処理ジョブを翌日
に引き継ぐ場合、ジョブ起動装置を停止させる時間帯は
長くなる。
First, since there is only one schedule file and it is used alternately by the job schedule device and the job activation device, while the job scheduling device is scheduling the job for the next day, the job activation device Must be stopped, and there are times when the job cannot be executed automatically. In particular, when the unprocessed job is handed over to the next day, the time period for stopping the job activation device becomes long.

【0007】又、一日の実行予定ジョブが多くなるに従
って、本来ならばよりコンスタントにジョブの自動実行
が行われなければならないのに、スケジュールにもより
多くの時間を必要とするため、逆にジョブ起動装置の停
止時間が延びてしまいジョブのコンスタントな起動の弊
害となる。それが未実行ジョブの増加の原因となり、ス
ケジュール時間の増加、ジョブ起動装置の停止時間の延
長、未実行ジョブの増加と悪循環を招く原因ともなって
いる。
Further, as the number of jobs scheduled to be executed in one day increases, the automatic execution of jobs should normally be performed more constantly, but the schedule also requires more time. This increases the stop time of the job activation device, which is an obstacle to constant activation of the job. This causes an increase in unexecuted jobs, which leads to an increase in schedule time, an increase in the stop time of the job activation device, an increase in unexecuted jobs, and a vicious circle.

【0008】更に、ジョブスケジュール装置とジョブ起
動装置が独立しているために、ジョブ起動装置の停止・
再開の指示や、ジョブスケジュール装置の実行・結果の
確認などオペレータが行う手作業の負担も大きく、運用
上のミスが起きる可能性も大きかった。
Further, since the job scheduling device and the job starting device are independent, it is possible to stop the job starting device.
The operator's manual work such as restart instructions, execution of the job schedule device, and confirmation of the results was heavy, and there was a high possibility that operational errors would occur.

【0009】本発明の目的は、上述の問題点を解消し、
24時間無停止でジョブの自動実行を行える無停止ジョ
ブ自動実行装置を提供することにある。
The object of the present invention is to solve the above problems,
An object of the present invention is to provide a non-stop job automatic execution device capable of executing a job automatically without stopping for 24 hours.

【0010】[0010]

【課題を解決するための手段】本発明の無停止ジョブ自
動実行装置は、自動実行対象の一定期間分のジョブを格
納するスケジュールファイルを二つ有するデータベース
部と、自動実行させたい一定期間分のジョブをスケジュ
ールして前記スケジュールファイルに格納するジョブス
ケジュール部と、前記スケジュールファイルから起動可
能ジョブを検索してジョブの自動起動を行うジョブ起動
部と、外部からの動作指示を処理するコマンド処理部
と、前記各部に対して指示を行い前記ジョブ起動部と前
記ジョブスケジュール部とが前記データベース部の二つ
のスケジュールファイルを交互に使用し重複使用しない
よう制御する主制御部とを備えて構成されている。
SUMMARY OF THE INVENTION An automatic non-stop job execution apparatus according to the present invention has a database section having two schedule files for storing jobs for a fixed period to be automatically executed and a fixed period for automatic execution. A job scheduling unit that schedules jobs and stores them in the schedule file, a job starting unit that searches for a startable job from the schedule file and automatically starts the job, and a command processing unit that processes an operation instruction from the outside. , A main control unit for instructing each unit to control the job starting unit and the job schedule unit to alternately use the two schedule files of the database unit and not to use the two schedule files overlappingly. .

【0011】[0011]

【実施例】次に、本発明の実施例について図面を参照し
て説明する。
Embodiments of the present invention will now be described with reference to the drawings.

【0012】図1は本発明の一実施例の構成を示すブロ
ック図である。
FIG. 1 is a block diagram showing the configuration of an embodiment of the present invention.

【0013】本実施例の無停止ジョブ自動実行装置は、
図1に示すように、自動実行の対象となる一日分のジョ
ブを格納するためのスケジュールファイルA及びBを有
するデータベース部5と、ジョブをスケジュールしデー
タベース部5に格納するジョブスケジュール部4と、デ
ータベース部5から起動可能なジョブを検索してジョブ
の自動起動を行うジョブ起動部3と、オペレータや上部
装置からの動作指示を処理するコマンド処理部1と、コ
マンド処理部1から指示を受けジョブ起動部3及びジョ
ブスケジュール部4を制御する主制御部2とで構成され
ている。
The non-stop job automatic execution apparatus of this embodiment is
As shown in FIG. 1, a database unit 5 having schedule files A and B for storing jobs for one day to be automatically executed, and a job scheduling unit 4 for scheduling jobs and storing them in the database unit 5. , A job starting unit 3 that searches the database unit 5 for a startable job and automatically starts the job, a command processing unit 1 that processes an operation instruction from an operator or an upper device, and an instruction from the command processing unit 1. The main control unit 2 controls the job starting unit 3 and the job scheduling unit 4.

【0014】コマンド処理部1は、オペレータや上部装
置などの装置外から動作指示のコマンドを受け取ると、
その内容を主制御部2へ転送する。
When the command processing unit 1 receives an operation command command from outside the device such as an operator or an upper device,
The contents are transferred to the main control unit 2.

【0015】主制御部2は、あらかじめ決められている
基本パターン又はコマンドで指定された動作パターンに
従って、ジョブ起動部3及びジョブスケジュール部4の
制御を行う。
The main control unit 2 controls the job starting unit 3 and the job scheduling unit 4 in accordance with a predetermined basic pattern or an operation pattern designated by a command.

【0016】ジョブ起動部3は、主制御部2からの指示
に従い、データベース部5内の指定されたスケジュール
ファイルA又はBから起動可能なジョブを検索し、その
ジョブの起動を行う。該当スケジュールファイル内に起
動可能なジョブが無くなるとその旨を主制御部2に通知
する。
According to the instruction from the main control unit 2, the job starting unit 3 searches the designated schedule file A or B in the database unit 5 for a startable job and starts the job. When there are no jobs that can be started in the corresponding schedule file, the fact is notified to the main control unit 2.

【0017】ジョブスケジュール部4は、主制御部2か
らの指示に従い、翌日実行するジョブのスケジュールを
行い、データベース部5内の指定されたスケジュールフ
ァイルB又はAにその結果を格納する。
The job schedule section 4 schedules a job to be executed the next day according to an instruction from the main control section 2, and stores the result in a designated schedule file B or A in the database section 5.

【0018】なお、主制御部2は、ジョブ起動部3とジ
ョブスケジュール部4とが同一のスケジュールファイル
を同時にしないように制御するため、ジョブ起動部3と
ジョブスケジュール部4とは並列処理が可能となってい
る。
Since the main control unit 2 controls the job starting unit 3 and the job scheduling unit 4 so that the same schedule file is not simultaneously executed, the job starting unit 3 and the job scheduling unit 4 can perform parallel processing. Has become.

【0019】次に、図2を参照して本実施例の基本パタ
ーンの動作を説明する。
Next, the operation of the basic pattern of this embodiment will be described with reference to FIG.

【0020】最初に本実施例の無停止ジョブ自動実行装
置を起動すると、主制御部2はジョブスケジュール部4
に対してスケジュールファイルAにn日(起動日以後の
日)の起動予定ジョブをスケジュールするよう指示する
(参照番号10)。それと同時に、ジョブスケジュール
部4に対してスケジュールファイルBには(n+1)日
の起動予定ジョブをスケジュールするよう指示する(参
照番号11)。二つの別々のスケジュールファイルA及
びBを使用することにより、同時に2日分のスケジュー
ルが可能である。
When the automatic non-stop job execution apparatus of the present embodiment is first activated, the main control unit 2 causes the job scheduling unit 4 to operate.
The schedule file A is instructed to schedule a scheduled job for n days (days after the startup date) (reference numeral 10). At the same time, the job scheduling unit 4 is instructed to schedule a scheduled job for (n + 1) days in the schedule file B (reference numeral 11). By using two separate schedule files A and B, it is possible to schedule two days at the same time.

【0021】ジョブスケジュール部4は、主制御部2か
ら指示されたスケジュールファイルA,Bにそれぞれ指
示された日のスケジュールを行う(参照番号12,1
3)。スケジュールが終了すると、主制御部2に対して
n日と(n+1)日のジョブ起動準備が完了した旨を通
知する(参照番号14,15)。
The job schedule section 4 schedules the days designated by the schedule files A and B designated by the main control section 2 (reference numerals 12 and 1).
3). When the schedule ends, the main control unit 2 is notified that the job activation preparations for the nth day and the (n + 1) th day have been completed (reference numerals 14 and 15).

【0022】主制御部2は、ジョブスケジュール部4か
らn日のジョブ起動準備の終了の通知を受け取った後に
n日がくると、ジョブ起動部3に対してスケジュールフ
ァイルAから起動可能ジョブを検索し起動するよう指示
する(参照番号16)。
When n days come after receiving the notification of the completion of the job starting preparation from the job scheduling unit 4 for the n days, the main control unit 2 searches the job starting unit 3 for a startable job from the schedule file A. And instruct it to start (reference numeral 16).

【0023】ジョブ起動部3は、スケジュールファイル
Aから起動可能なジョブを検索し、ジョブの自動実行を
行う(参照番号17)。スケジュールファイルAに格納
されているすべてのジョブをスケジュール結果に従って
起動終了すると、主制御部2に対してスケジュールファ
イルAからの起動が終了した旨を通知する(参照番号1
8)。
The job activation unit 3 searches the schedule file A for a job that can be activated and automatically executes the job (reference numeral 17). When all the jobs stored in the schedule file A have been started according to the schedule result, the main control unit 2 is notified that the start from the schedule file A has ended (reference number 1).
8).

【0024】主制御部2は、ジョブ起動部3からスケジ
ュールファイルAのジョブ起動が完了した通知を受け取
り、且つ(n+1)日がくると、ジョブ起動部3に対し
スケジュールファイルBからの起動可能ジョブの検索と
ジョブの起動を指示する(参照番号19)。このとき、
スケジュールファイルBには既に(n+1)日のスケジ
ュール結果がジョブスケジュール部4により作成されて
いるため、即時にジョブの起動を行うことが可能である
(参照番号20)。それと同時に、ジョブスケジュール
部4に対して、不要となったn日のスケジュール結果が
格納されているスケジュールファイルAに(n+2)日
のスケジュールを行うよう指示する(参照番号21)。
When the main control unit 2 receives the notification that the job activation of the schedule file A is completed from the job activation unit 3 and (n + 1) days arrive, the main control unit 2 instructs the job activation unit 3 to start a job from the schedule file B. To search for and to start the job (reference numeral 19). At this time,
Since the schedule result of the (n + 1) th day has already been created in the schedule file B by the job scheduling unit 4, it is possible to immediately start the job (reference numeral 20). At the same time, the job schedule unit 4 is instructed to schedule the (n + 2) th day in the schedule file A in which the schedule result of the unnecessary nth day is stored (reference numeral 21).

【0025】ジョブスケジュール部4は、すべてが起動
され不要となったn日のスケジュール結果が格納されて
いるスケジュールファイルAに対して、新たに(n+
2)日のスケジュールを行いその結果を格納する(参照
番号22)。スケジュールが終了すると、主制御部2に
対して(n+2)日のジョブ起動準備が完了した旨を通
知する(参照番号23)。
The job schedule section 4 newly adds (n +
2) Schedule the day and store the result (reference number 22). When the schedule ends, the main control unit 2 is notified that the job start preparation for (n + 2) days is completed (reference numeral 23).

【0026】一方、これと並行してジョブ起動部3は、
スケジュールファイルBから起動可能ジョブを検索しジ
ョブの自動起動を行う(参照番号20)。スケジュール
ファイルBのスケジュール結果に従って格納されている
ジョブをすべて起動終了すると、主制御部2に対してス
ケジュールファイルBからの起動が終了した旨を通知す
る(参照番号24)。
On the other hand, in parallel with this, the job starting unit 3
The schedule file B is searched for a startable job and the job is automatically started (reference numeral 20). When all the jobs stored according to the schedule result of the schedule file B are finished, the main control unit 2 is notified that the start from the schedule file B is finished (reference numeral 24).

【0027】以上説明した参照番号16から参照番号2
4までの処理を繰り返すと、ジョブスケジュール部4と
ジョブ起動部3とは別々のスケジュールファイルを交互
に使用するためファイル競合は起こらず、結果としてス
ケジュールとジョブ起動の同時実行が可能となる。その
ため装置全体としてみた場合、ジョブの自動起動を無停
止で行うことが可能となる。
Reference number 16 to reference number 2 described above
When the processes up to 4 are repeated, the job schedule unit 4 and the job activation unit 3 alternately use different schedule files, so that file conflict does not occur, and as a result, it is possible to simultaneously execute the schedule and the job activation. Therefore, when the entire apparatus is viewed, it is possible to automatically start a job without stopping.

【0028】又、障害等が発生して未実行のジョブを翌
日に引き継ぐ場合でも、この方式なら特別の処理を必要
としない。前日の未処理ジョブと当日のスケジュールジ
ョブとを同時実行してもよいなら、当日(障害発生の翌
日)の(n+m)日になったときに、主制御部2からジ
ョブ起動部3に対して(n+m)日のスケジュール結果
が格納されているスケジュールファイルBからジョブ起
動を行う指示をするだけでよい(参照番号25)。これ
によって、ジョブ起動部3はスケジュールファイルA,
Bの双方から起動可能なジョブを検索して起動すること
になる。翌日の(n+m+1)日のスケジュールは、ジ
ョブ起動部3から前日の(n+m−1)日のジョブ起動
がすべて完了した通知を受けた後に(参照番号26)、
ジョブスケジュール部4に対して指示すればよい(参照
番号27)。
Further, even if an unexecuted job is handed over to the next day due to a failure or the like, this method does not require special processing. If the unprocessed job of the previous day and the scheduled job of the current day may be executed at the same time, when the (n + m) day of the current day (the day after the occurrence of the failure) comes, the main control unit 2 instructs the job activation unit 3 to do so. It is only necessary to give an instruction to start a job from the schedule file B in which the schedule result of (n + m) days is stored (reference numeral 25). As a result, the job activation unit 3 causes the schedule file A,
Jobs that can be activated from both B are searched and activated. The schedule of the next day's (n + m + 1) day is (reference numeral 26) after receiving a notification from the job starting unit 3 that all the job starts on the previous day's (n + m−1) day have been completed.
The job schedule section 4 may be instructed (reference numeral 27).

【0029】なお、前日の未処理ジョブを当日のスケジ
ュールジョブより優先して実行させる場合は、前日分の
ジョブ起動がすべて終了したという通知をジョブ起動部
3から受け取った後に(参照番号28)、ジョブ起動部
3に当日分スケジュールファイルAから起動を行う指示
と(参照番号29)、ジョブスケジュール部4に翌日の
スケジュールを作成する指示を行うだけでよい(参照番
号30)。
When the unprocessed job of the previous day is to be executed with priority over the scheduled job of the current day, after receiving the notification from the job starting unit 3 that all the jobs of the previous day have been started (reference numeral 28), It is only necessary to instruct the job activation unit 3 to activate from the current day's schedule file A (reference number 29) and to instruct the job scheduling unit 4 to create a schedule for the next day (reference number 30).

【0030】又、緊急な業務等により基本パターンでは
対応できなくなったときには、コマンドによりいつでも
動作パターンを変更できるので、より柔軟な運用をサポ
ートできる。特に、今まではジョブスケジューリング装
置とジョブ起動装置の二つの装置を個別に起動し制御し
なければならなかったが、本実施例の装置では一元管理
が可能となり、運用の複雑さによるミスの低減にもつな
がる。
Further, when the basic pattern cannot be dealt with due to urgent business or the like, the operation pattern can be changed at any time by the command, so that more flexible operation can be supported. In particular, until now, it was necessary to individually start and control two devices, a job scheduling device and a job activation device, but with the device of this embodiment, it is possible to perform unified management and reduce errors due to operational complexity. Also leads to

【0031】[0031]

【発明の効果】以上説明したように、本発明の無停止ジ
ョブ自動実行装置は、ジョブ起動部とジョブスケジュー
ル部とを共通の主制御部で制御し、更にスケジュールフ
ァイルを二つ持つようにしたため、ジョブの自動起動を
無停止で行える効果がある。
As described above, in the automatic non-stop job execution apparatus of the present invention, the job starting section and the job schedule section are controlled by the common main control section, and two schedule files are provided. There is an effect that the job can be automatically started without stopping.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例の構成を示すブロック図であ
る。
FIG. 1 is a block diagram showing the configuration of an embodiment of the present invention.

【図2】本実施例の処理動作を示す説明図である。FIG. 2 is an explanatory diagram showing a processing operation of this embodiment.

【図3】従来のジョブ自動実行装置の一例を示すブロッ
ク図である。
FIG. 3 is a block diagram showing an example of a conventional job automatic execution device.

【図4】従来のジョブ自動実行装置の処理動作を示す説
明図である。
FIG. 4 is an explanatory diagram showing a processing operation of a conventional job automatic execution device.

【符号の説明】[Explanation of symbols]

1 コマンド処理部 2 主制御部 3 ジョブ起動部 4 ジョブスケジュール部 5 データベース部 6 ジョブスケジュール装置 7 ジョブ起動装置 8 スケジュールファイル 1 Command processing unit 2 Main control unit 3 Job activation unit 4 Job schedule unit 5 Database unit 6 Job schedule device 7 Job activation device 8 Schedule file

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 自動実行対象の一定期間分のジョブを格
納するスケジュールファイルを二つ有するデータベース
部と、自動実行させたい一定期間分のジョブをスケジュ
ールして前記スケジュールファイルに格納するジョブス
ケジュール部と、前記スケジュールファイルから起動可
能ジョブを検索してジョブの自動起動を行うジョブ起動
部と、外部からの動作指示を処理するコマンド処理部
と、前記各部に対して指示を行い前記ジョブ起動部と前
記ジョブスケジュール部とが前記データベース部の二つ
のスケジュールファイルを交互に使用し重複使用しない
よう制御する主制御部とを備えたことを特徴とする無停
止ジョブ自動実行装置。
1. A database unit having two schedule files for storing jobs for a fixed period to be automatically executed, and a job schedule unit for scheduling jobs for a fixed period to be automatically executed and storing them in the schedule file. A job starting unit that searches for a startable job from the schedule file to automatically start the job; a command processing unit that processes an operation instruction from the outside; An automatic non-stop job execution apparatus comprising: a job schedule section and a main control section that controls two schedule files of the database section so as to be used alternately and not to be used again.
JP5088268A 1993-04-15 1993-04-15 Nonstop job automatic execution device Withdrawn JPH06301437A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5088268A JPH06301437A (en) 1993-04-15 1993-04-15 Nonstop job automatic execution device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5088268A JPH06301437A (en) 1993-04-15 1993-04-15 Nonstop job automatic execution device

Publications (1)

Publication Number Publication Date
JPH06301437A true JPH06301437A (en) 1994-10-28

Family

ID=13938153

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5088268A Withdrawn JPH06301437A (en) 1993-04-15 1993-04-15 Nonstop job automatic execution device

Country Status (1)

Country Link
JP (1) JPH06301437A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020178967A1 (en) * 2019-03-05 2020-09-10 株式会社Fuji Component mounting system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020178967A1 (en) * 2019-03-05 2020-09-10 株式会社Fuji Component mounting system
JPWO2020178967A1 (en) * 2019-03-05 2021-12-23 株式会社Fuji Component mounting system

Similar Documents

Publication Publication Date Title
KR20030031395A (en) Information processing apparatus, power supply control method for plural information processing apparatuses, and program therefor
JPS6364144A (en) Inter-memory data transfer system
JPH06301437A (en) Nonstop job automatic execution device
JP2809271B2 (en) Job re-execution method
JPH07168704A (en) Job execution control system
JPH01259432A (en) Reexecution system for batch job
JPH0728657A (en) Unmanned system of virtual computer
JP2000112773A (en) Processor dynamically executing job scheduling
JP2732948B2 (en) Magnetic tape volume mounting method and computer system
JPH0679283B2 (en) Interruption processing control method
JPH04116729A (en) Automatic execution control system for job
JPH0844574A (en) Job operation management device
JPH01169635A (en) Job activating system
JPH06259159A (en) Automatic operation schedule reservation system
JPH0764909A (en) Management device for execution order of on-line job processing
JPH02165340A (en) Job schedule device
JPH02222056A (en) Batch job submitting system
JP2002328810A (en) Job re-execution system
JPH0773051A (en) Thread execution order determining method
JPH11161503A (en) Job executing controller
JPH05250230A (en) Job execution result processor for computer system
JPH06202892A (en) Program restart system
JPH06162028A (en) Schedule controller
JPH0991355A (en) Account system
JPH0527984A (en) Automatic switching method for ipl device

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20000704