JPH06257241A - Construction method of concrete wall - Google Patents

Construction method of concrete wall

Info

Publication number
JPH06257241A
JPH06257241A JP4364793A JP4364793A JPH06257241A JP H06257241 A JPH06257241 A JP H06257241A JP 4364793 A JP4364793 A JP 4364793A JP 4364793 A JP4364793 A JP 4364793A JP H06257241 A JPH06257241 A JP H06257241A
Authority
JP
Japan
Prior art keywords
wall
vertical
slab
concrete
ribs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP4364793A
Other languages
Japanese (ja)
Other versions
JP3239151B2 (en
Inventor
Terumasa Miura
輝正 三浦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP04364793A priority Critical patent/JP3239151B2/en
Publication of JPH06257241A publication Critical patent/JPH06257241A/en
Application granted granted Critical
Publication of JP3239151B2 publication Critical patent/JP3239151B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PURPOSE:To promote execution efficiency, to have structurally high reliability and to promote economic efficiency. CONSTITUTION:Longitudinal ribs 3 into which vertical reinforcements 2 are inserted every specific intervals are projected to a vertical wall slab 1, joining inserts 4 are buried in the front ends of the same ribs 3, and a pair of semi- precast concrete wall slabs A boring bolt holes 8 in the middle of adjacent longitudinal ribs 3 in the wall slab 1 mentioned above are so opposed that the ribs 3 are inconsistent with each other to position. Bolts 10 inserted through the bolt holes 8 of the wall slabs A are screwed and fastened to the inserts 4, and concrete B is placed between both wall slabs A and A.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は建築物や工作物のコンク
リート壁の施工方法に係るものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a concrete wall of a building or a work.

【0002】[0002]

【従来の技術】従来、前記コンクリート壁を構築する場
合、 (イ) 型枠を組立てて鉄筋を配筋してコンクリートを
打設する場所打ちコンクリート工法。 (ロ) 他の場所で予めコンクリート壁を造り、設置場
所に運搬して組立てるプレキャストコンクリート工法。 (ハ) オムニア版等の半プレキャストコンクリート板
を構築すべき壁体の片側に、型枠を他側に組み立てると
ともに配筋して両者間にコンクリートを打設し、壁厚を
確保するハーフプレキャストコンクリート工法。 等が行なわれている。
2. Description of the Related Art Conventionally, in the case of constructing the concrete wall, (a) a cast-in-place concrete construction method in which a formwork is assembled, reinforcing bars are arranged and concrete is placed. (B) A precast concrete construction method in which concrete walls are created in advance at other locations and transported to the installation location for assembly. (C) Half-precast concrete that secures the wall thickness by assembling the formwork on one side of the wall where the semi-precast concrete plate such as the Omnia version is to be constructed and by arranging the concrete and placing concrete between them. Construction method. And so on.

【0003】[0003]

【発明が解決しようとする課題】しかしながら前記
(イ)の型枠工法では多職種の労務を必要とし、工期及
び工費の点で難点がある。(ロ)のプレキャストコンク
リート工法では、プレキャストコンクリート壁版の重量
が大きくなり運搬、揚重の面で制約を受ける。(ハ)の
ハーフプレキャストコンクリート工法では矢張り多くの
労務を必要とする。
However, the formwork method of (a) above requires labor of many types of work, and has a problem in terms of construction period and construction cost. In the precast concrete construction method of (b), the weight of the precast concrete wall slab becomes large and there are restrictions in terms of transportation and lifting. The half-precast concrete method of (c) requires a lot of labor.

【0004】本発明は前記従来技術の有する問題点に鑑
みて提案されたもので、その目的とする処は、施工性が
向上され、構造的に信頼性が高く、経済性に優れたコン
クリート壁の施工方法を提供する点にある。
The present invention has been proposed in view of the above problems of the prior art. The object of the present invention is to improve the workability of the concrete wall, which is structurally highly reliable and economical. The point is to provide a construction method.

【0005】[0005]

【課題を解決するための手段】前記の目的を達成するた
め、本発明に係るコンクリート壁の施工方法によれば、
垂直壁版に所定間隔毎に、縦筋が挿入された縦方向リブ
が突設され、同リブの先端には接合用インサートが埋設
され、基端部には空気抜き孔が貫通され、且つ前記壁版
における相隣る縦方向リブの中間にボルト孔が穿設され
た一双の半プレキャストコンクリート壁版を、同各壁版
の対向面に設けられた前記各縦方向リブが互いに齟齬し
て位置するように対設するとともに、同各壁版のボルト
孔に貫挿した接合ボルトを対向壁版の前記インサートに
螺着緊締し、前記両半プレキャストコンクリート壁版間
に形成された中空部にコンクリートを打設するものであ
る。
In order to achieve the above object, according to the concrete wall construction method of the present invention,
Vertical ribs in which vertical streaks are inserted are projectingly provided at predetermined intervals on the vertical wall slab, a joining insert is embedded at the tip of the rib, and an air vent hole is penetrated at the base end, and the wall is formed. A pair of semi-precast concrete wall slabs in which bolt holes are bored in the middle of adjacent vertical ribs in the slab are positioned so that the respective vertical ribs provided on the facing surfaces of the respective wall slabs are different from each other. As opposed to each other, the joint bolts inserted into the bolt holes of each wall slab are screwed and tightened to the insert of the opposite wall slab, and the concrete is placed in the hollow part formed between the two half precast concrete wall slabs. It is to be placed.

【0006】[0006]

【作用】本発明によれば前記したように、垂直壁版に所
定間隔毎に突設され、夫々縦筋が挿入された縦方向リブ
の先端に接合用インサートが埋設された半プレキャスト
コンクリート壁版を対設し、各半プレキャストコンクリ
ート壁版における互いに齟齬して配設された前記リブを
対向する半プレキャストコンクリート壁版に衝接し、同
リブ先端に埋設されたインサートに、前記各半プレキャ
ストコンクリート壁版における相隣る縦方向リブ間に穿
設されたボルト孔にボルトを挿入して螺着緊締したこと
によって、前記一双の半プレキャストコンクリート壁版
によって所定の壁厚が保持された壁型枠を構成し、同両
半プレキャストコンクリート壁版間に形成された中空部
にコンクリートを打設することによって所定の壁厚を有
するコンクリート壁を施工し、前記縦方向リブに挿入さ
れた鉄筋によって、前記コンクリート壁を補強するもの
である。
According to the present invention, as described above, the semi-precast concrete wall slab in which the joining inserts are embedded at the tips of the vertical ribs projecting from the vertical wall slab at predetermined intervals and having vertical lines respectively inserted therein. Oppositely, abutting the ribs arranged disagreement with each other in each semi-precast concrete wall slab to the opposing semi-precast concrete wall slab, to the insert embedded in the rib tip, each of the semi-precast concrete wall By inserting a bolt into a bolt hole formed between adjacent vertical ribs in the plate and screwing and tightening, a wall formwork in which a predetermined wall thickness is held by the pair of semi-precast concrete wall plates Constituting concrete into the hollow part formed between the two half precast concrete wall slabs, and concrete with a predetermined wall thickness And applying a by inserted reinforcing bars in the longitudinal direction ribs, is to reinforce the concrete wall.

【0007】この際前記縦方向リブ基端部に貫通された
空気孔によって、打設コンクリート中の空気が抜かれ、
密実な壁体コンクリートが打設されるものである。
At this time, the air in the concrete is removed by the air holes penetrating the base end of the longitudinal ribs.
Solid wall concrete is cast.

【0008】[0008]

【実施例】以下本発明を図示の実施例について説明す
る。Aは半プレキャストコンクリート壁版で、横筋及び
ひび割れ防止筋の配された薄肉垂直壁版1に所定間隔毎
に、夫々縦筋2が挿入された縦方向リブ3が突設され、
同リブ3の先端には接合用インサート4が埋設され、基
端部には水平方向に延びる空気抜き孔5が貫通される。
また前記壁版1には壁横筋6及びひび割れ防止筋7が埋
設されている。更に相隣る縦方向リブ3間にはボルト孔
8が穿設されている。
The present invention will be described below with reference to the illustrated embodiments. A is a semi-precast concrete wall slab, and vertical ribs 3 in which vertical ribs 2 are inserted are projected at predetermined intervals on a thin-walled vertical wall slab 1 on which horizontal streaks and crack prevention streaks are arranged,
A joining insert 4 is embedded in the tip of the rib 3, and an air vent hole 5 extending in the horizontal direction is penetrated in the base end portion.
Further, the wall slab 1 is embedded with a lateral wall reinforcement 6 and a crack prevention reinforcement 7. Further, bolt holes 8 are formed between adjacent vertical ribs 3.

【0009】更にまた前記壁版1には倒V字形フープ筋
9の基部が埋設され、同フープ筋9の突出端部に設けら
れた弯形部が縦筋2に捲曲されている。前記壁版Aの製
作に際しては、製作に際しては予め前記リブ3を製作し
たものを壁版型枠にセットして壁版コンクリートを打設
し、縦方向リブが突設された半プレキャストコンクリー
ト壁版Aを成型するものである。
Furthermore, the base of the inverted V-shaped hoop muscle 9 is embedded in the wall slab 1, and the curved portion provided at the projecting end of the hoop muscle 9 is wound around the vertical muscle 2. At the time of manufacturing the wall slab A, a semi-precast concrete wall slab in which the ribs 3 having been manufactured in advance are set in a wall slab form and the wall slab concrete is placed in the wall slab, and vertical ribs are projected. A is molded.

【0010】而して一双の前記半プレキャストコンクリ
ート壁版Aを対設し、前記各壁版Aの対向面に齟齬して
位置する縦方向リブ3を相対する前記各壁版Aに衝接す
るとともに、前記壁版Aのボルト孔8に挿貫したボルト
10を前記接合用インサート4に螺着緊締し、かくして
前記リブ3を介して所定間隔に対設された一双の半プレ
キャストコンクリート壁版A間の中空部にコンクリート
Bを打設して壁体を構築する。
Thus, one pair of the semi-precast concrete wall slabs A are placed opposite to each other, and the longitudinal ribs 3 located opposite to the facing surfaces of the wall slabs A are abutted against the wall slabs A facing each other. Between the pair of semi-precast concrete wall slabs A, bolts 10 inserted into the bolt holes 8 of the wall slab A are screwed and tightened to the joining insert 4, and thus are opposed to each other at a predetermined interval via the ribs 3. Concrete B is cast in the hollow part of the above to construct a wall body.

【0011】この際コンクリート中の空気は空気抜き孔
5より排除され、密実な壁コンクリートが打設され、前
記垂直壁版1に埋設された鉄筋、及び前記リブ3に挿入
された縦筋2、並に同縦筋2に捲回された倒V字形フー
プ筋9の存在と相俟って剛強な鉄筋コンクリート壁が構
築されるものである。なお前記壁版A端部における縦方
向リブ3の空気抜き孔5は、前記壁版1の横方向接続鉄
筋11の取付孔として利用される。
At this time, the air in the concrete is removed from the air vent holes 5, solid wall concrete is placed, and the reinforcing bars embedded in the vertical wall slab 1 and the vertical bars 2 inserted in the ribs 3, Along with the existence of the inverted V-shaped hoop muscles 9 wound around the vertical muscles 2, a rigid reinforced concrete wall is constructed. The air vent hole 5 of the longitudinal rib 3 at the end of the wall slab A is used as a mounting hole for the horizontal connecting rebar 11 of the wall slab 1.

【0012】[0012]

【発明の効果】本発明によれば前記したように、縦筋が
挿入され、且つ先端に、接合用インサートが埋設された
縦方向リブが所定間隔毎に突設され、同各リブ間にボル
ト孔が穿設された一双の半プレキャストコンクリート壁
版を対設し、同各壁版の前記リブを対向壁版に対設し
て、ボルト孔に挿貫したボルトを前記インサートに螺着
緊締することによって、前記壁版の間隔が決定され、前
記リブの形によって壁厚の調整が簡単に行なわれ、施工
精度も向上する。
As described above, according to the present invention, the vertical ribs having the vertical stripes inserted therein and the bonding inserts embedded therein are projected at predetermined intervals, and the bolts are provided between the ribs. A pair of semi-precast concrete wall slabs with holes are installed in opposition, the ribs of each wall slab are installed in opposition to the opposing wall slab, and the bolts inserted in the bolt holes are screwed and tightened on the inserts. Thereby, the space between the wall slabs is determined, the wall thickness is easily adjusted by the shape of the ribs, and the construction accuracy is also improved.

【0013】而して前記半プレキャスト壁版間に形成さ
れた空間に壁コンクリートを打設することによって、壁
体が施工され、前記壁版が壁型枠を兼用し、施工性を向
上しうるものであるが、この際、打設コンクリート中の
空気は前記縦方向リブの基端の空気抜き孔より排出さ
れ、密実なコンクリートが打設されることとなり、前記
壁版に埋設された鉄筋と相俟って剛強なコンクリート壁
体が構成される。
A wall body is constructed by casting concrete wall into the space formed between the semi-precast wall slabs, and the wall slab also serves as a wall formwork, which can improve workability. However, at this time, the air in the cast concrete is discharged from the air vent hole at the base end of the vertical ribs, and solid concrete is to be cast, and the reinforcing bars embedded in the wall slab and Together, they form a rigid concrete wall.

【0014】請求項2の発明は、倒V字形フープ筋を半
プレキャストコンクリート壁版に埋設して、同フープ筋
の突出端部を、同壁版の縦方向リブの縦筋に捲回するこ
とによって、同リブと前記壁版とを一体化するものであ
る。
According to a second aspect of the present invention, the inverted V-shaped hoop reinforcement is embedded in the semi-precast concrete wall slab, and the projecting end of the hoop reinforcement is wound around the vertical reinforcement of the longitudinal rib of the wall slab. Thus, the rib and the wall slab are integrated.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の方法によって施工されたコンクリート
壁の横断平面図である。
1 is a cross-sectional plan view of a concrete wall constructed by the method of the present invention.

【図2】前記コンクリート壁の施工用型枠の分解斜視図
である。
FIG. 2 is an exploded perspective view of the concrete wall construction form.

【図3】半プレキャストコンクリート壁版の縦断平面図
である。
FIG. 3 is a vertical plan view of a semi-precast concrete wall slab.

【図4】図3のイーイ線に沿って截断した横断平面図で
ある。
FIG. 4 is a cross-sectional plan view cut along the E-line of FIG.

【符号の説明】[Explanation of symbols]

A 半プレキャストコンクリート壁版 B コンクリート 1 垂直壁版 2 縦筋 3 縦方向リブ 4 接合用インサート 5 空気抜き孔 6 壁横筋 7 ひび割れ防止筋 8 ボルト孔 9 倒V字形フープ筋 10 ボルト 11 接続鉄筋 A Semi-precast concrete wall slab B Concrete 1 Vertical wall slab 2 Vertical bar 3 Longitudinal rib 4 Joining insert 5 Air vent hole 6 Wall lateral bar 7 Crack preventive bar 8 Bolt hole 9 Inverted V-shaped hoop bar 10 Bolt 11 Connecting rebar

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 垂直壁版に所定間隔毎に、縦筋が挿入さ
れた縦方向リブが突設され、同リブの先端には接合用イ
ンサートが埋設され、基端部には空気抜き孔が貫通さ
れ、且つ前記壁版における相隣る縦方向リブの中間にボ
ルト孔が穿設された一双の半プレキャストコンクリート
壁版を、同各壁版の対向面に設けられた前記各縦方向リ
ブが互いに齟齬して位置するように対設するとともに、
同各壁版のボルト孔に貫挿した接合ボルトを対向壁版の
前記インサートに螺着緊締し、前記両半プレキャストコ
ンクリート壁版間に形成された中空部にコンクリートを
打設することを特徴とするコンクリート壁の施工方法。
1. A vertical wall slab is provided with protruding vertical ribs in which vertical stripes are inserted at predetermined intervals, a joining insert is embedded at the tip of the rib, and an air vent hole is penetrated at the base end. And, a pair of semi-precast concrete wall slabs in which bolt holes are bored in the middle of the adjacent vertical ribs in the wall slab, the vertical ribs provided on the facing surfaces of the wall slabs to each other. While facing opposite to each other,
The joint bolts inserted into the bolt holes of each wall slab are screwed and tightened to the inserts of the opposite wall slab, and concrete is placed in the hollow portion formed between the two half precast concrete wall slabs. Concrete wall construction method.
【請求項2】 前記半プレキャストコンクリート壁版に
は倒V字形フープ筋が埋設され、同フープ筋の突出端部
が前記縦筋に捲曲された請求項1記載のコンクリート壁
の施工方法。
2. The method for constructing a concrete wall according to claim 1, wherein an inverted V-shaped hoop reinforcement is embedded in the semi-precast concrete wall slab, and a protruding end portion of the hoop reinforcement is wound around the vertical reinforcement.
JP04364793A 1993-03-04 1993-03-04 Concrete wall construction method Expired - Fee Related JP3239151B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP04364793A JP3239151B2 (en) 1993-03-04 1993-03-04 Concrete wall construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP04364793A JP3239151B2 (en) 1993-03-04 1993-03-04 Concrete wall construction method

Publications (2)

Publication Number Publication Date
JPH06257241A true JPH06257241A (en) 1994-09-13
JP3239151B2 JP3239151B2 (en) 2001-12-17

Family

ID=12669663

Family Applications (1)

Application Number Title Priority Date Filing Date
JP04364793A Expired - Fee Related JP3239151B2 (en) 1993-03-04 1993-03-04 Concrete wall construction method

Country Status (1)

Country Link
JP (1) JP3239151B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006317152A (en) * 2005-05-10 2006-11-24 Taisei Corp Reinforced concrete structure
JP2017515026A (en) * 2014-04-03 2017-06-08 タラリダ, ドミニクTALLARIDA, Dominique Formwork for wall or vault
CN108457404A (en) * 2018-03-30 2018-08-28 中冶建工集团有限公司 Overlap the thread alternating formula monolithic prefabricated panel of wall
WO2022115886A1 (en) * 2020-11-25 2022-06-02 Pytago Science Joint Stock Company A semi-assembled wall and floor structural system and construction method using this system

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102479194B1 (en) * 2022-03-08 2022-12-20 피씨에스솔루션 주식회사 The twin wall manufacturing mold structure, the method of manufacturing twin walls using them, and the precast twin walls with zigwag ribs manufacturing thereby

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006317152A (en) * 2005-05-10 2006-11-24 Taisei Corp Reinforced concrete structure
JP2017515026A (en) * 2014-04-03 2017-06-08 タラリダ, ドミニクTALLARIDA, Dominique Formwork for wall or vault
CN108457404A (en) * 2018-03-30 2018-08-28 中冶建工集团有限公司 Overlap the thread alternating formula monolithic prefabricated panel of wall
CN108457404B (en) * 2018-03-30 2024-01-30 中冶建工集团有限公司 Cross-buckling single-piece prefabricated wallboard of laminated wall body
WO2022115886A1 (en) * 2020-11-25 2022-06-02 Pytago Science Joint Stock Company A semi-assembled wall and floor structural system and construction method using this system

Also Published As

Publication number Publication date
JP3239151B2 (en) 2001-12-17

Similar Documents

Publication Publication Date Title
US6668502B2 (en) Ledger mould for building a ledger
JP2522714B2 (en) Construction method of building frame
JPH06257241A (en) Construction method of concrete wall
KR20040105940A (en) Structures and Methods for Connection between Precast Decks and Prestressed Concrete Girders
JP3418606B2 (en) Girder members for PC bridge
JP3002742B2 (en) Reinforcement support structure to formwork
JPH10184028A (en) Earthquake-resisting reinforcing structure of building
JP2000038798A (en) Semi-precast floor slab
JPH083932A (en) Base curb construction method
JP3119117B2 (en) PC version driving formwork and formwork method
JPH0868113A (en) Connecting structure for steel beam and reinforced concrete beam
JPS6322241Y2 (en)
JP2002146954A (en) Built-up form apparatus for use in forming skeleton
JP3014972U (en) Precast underground beams
JP2618839B2 (en) Manufacturing method of precast slab
JP2579944Y2 (en) Load-bearing wall assembly structure
JPH05230837A (en) Concrete expendable form construction method
JPH02296948A (en) Construction method of reinforced concrete construction slab
JPH031531Y2 (en)
JPH0617482A (en) Permanent form made of steel plate for construction
JPH0333348A (en) Building skeleton construction column, beam member and manufacture thereof, and building skeleton construction technique
JPH08333828A (en) Method for constructing concrete structure
JPH0420639A (en) Pc small beam
JPS59114313A (en) Construction of prestressed concrete floor panel in road bridge
JPH06280310A (en) Steel frame small beam installation joint structure of half pc large beam

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees