Prior art keywords
steel
wire
steel frame
mounting piece
wire mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP16784588U
Other languages
Japanese (ja)
Other versions
JPH0287867U (en
Inventor
和則 岡田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Corp
Original Assignee
Takenaka Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Corp filed Critical Takenaka Corp
Priority to JP16784588U priority Critical patent/JPH0623652Y2/en
Publication of JPH0287867U publication Critical patent/JPH0287867U/ja
Application granted granted Critical
Publication of JPH0623652Y2 publication Critical patent/JPH0623652Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【考案の詳細な説明】 「産業上の利用分野」 本考案は、鉄骨建起し専用ワイヤー取付ピースに関す
る。
[Detailed Description of the Invention] [Industrial Application Field] The present invention relates to a wire mounting piece for steel frame erection.

「従来の技術」 鉄骨工事で建起しの際には、従来第2図に示す如く、鉄
骨柱1の頭部と脚部にワイヤー2を対角線に張りターン
バックル3等で巻きあげ、鉄骨柱1の建起しをしてお
り、その際鉄骨柱1にワイヤー2を直接巻きつけて行っ
ている。
"Prior art" When constructing a steel structure, as shown in Fig. 2, a wire 2 is diagonally attached to the head and legs of the steel column 1 and wound around with a turnbuckle 3 or the like. 1 is being erected, and at that time, the wire 2 is wound directly around the steel column 1.

「考案が解決しようとする課題」 しかるに叙上のワイヤー2の鉄骨柱1に対する直接巻き
つけは、特に頭部の場合には高所で足場不安定な条件の
もとでしなければならず、鉄骨柱1の形状,大きさによ
っては困難なことが多く、弋工の技量によっては、所要
時間にバラツキがあって作業計画が立てにくくなった
り、力の作用線上にワイヤー2の結び目を持ってこれず
に、巻きあげて鉄骨柱1にねじれを生じさせたりするこ
とがある。
"Problems to be solved by the device" However, the direct winding of the above wire 2 around the steel column 1 must be performed under the condition that the foot is unstable at a high place, especially in the case of the head, It is often difficult depending on the shape and size of the steel column 1, and it may be difficult to make a work plan due to variations in the required time depending on the skill of the builder, or by holding the knot of the wire 2 on the line of action of force. Without this, the steel column 1 may be rolled up and twisted.

本考案は、従来の技術の有するこのような問題点に鑑み
てなされたものであり、その目的とするところは、予じ
め鉄骨建方時に頭部と脚部とに先行取付けされ、力の作
用線上にワイヤー止着部を有する着脱自在な足場の悪い
条件下でも、簡単に確実に力の作用線上にワイヤー端を
止着することのできる鉄骨建起し専用ワイヤー取付ピー
スを提供しようとするものである。
The present invention has been made in view of such problems of the conventional technology, and the purpose thereof is to attach the head and legs in advance during pre-construction of the steel frame, and An attempt is to provide a steel-framed dedicated wire mounting piece that has a wire fastening part on the line of action and can easily and reliably fix the wire end on the line of action of force even under conditions of unremovable scaffolding. It is a thing.

「課題を解決するための手段」 上記目的を達成するために、本考案における鉄骨建起し
専用ワイヤー取付ピースは、鉄骨柱面に当接するプレー
トの表面にワイヤー挿通用のループ状アームを起立させ
ると共に当該アームの両脚間中央部に該ループ面に直交
する態様で少なくとも両端部にネジを刻設のボルトを溶
接着し、当該ボルト両端には鉄骨柱を挟持するチャンネ
ルと固定されたナットを装着するとしたものである。
[Means for Solving the Problems] In order to achieve the above object, the steel-frame-installed dedicated wire mounting piece of the present invention has a loop-shaped arm for wire insertion upright on the surface of the plate that abuts the steel column surface. At the same time, a bolt having a screw engraved on at least both ends thereof is welded to the central portion between both legs of the arm in a manner orthogonal to the loop surface, and a nut fixed to a channel for sandwiching a steel column is attached to both ends of the bolt. That is what I did.

「作用」 ナットを適当に回動させるとチャンネルを被挟持の鉄骨
柱の幅にほぼ合致させることができる。
"Action" By properly rotating the nut, the channel can be made to substantially match the width of the steel column to be clamped.

この調整を施こしたところでチャンネルの鉄骨柱挟持を
行う。この際、プレート背面は鉄骨柱面に押し当てられ
る。
After this adjustment, the steel columns of the channel are clamped. At this time, the back surface of the plate is pressed against the steel pillar surface.

これにより、鉄骨柱表面の力の作用線上にワイヤー端を
挿通止着するのに好適なループ状アームが起立して構成
され、足場の悪い条件下でも簡単にワイヤー端を止着す
ることができる。
As a result, a loop-shaped arm suitable for inserting and fixing the wire end on the line of action of the force on the surface of the steel column is erected and configured, and the wire end can be easily fixed even under poor scaffolding conditions. .

よって、鉄骨柱建方時に叙上ピースを先行して取付けて
おけば、ワイヤーの緊結作業は正確,迅速にできる。
又、該ピースは着脱自在なので、建方完了後、転用する
ことができる。
Therefore, if the overhead piece is attached in advance when constructing the steel column, the work of binding the wire can be performed accurately and quickly.
Further, since the piece is detachable, it can be diverted after the construction is completed.

「実施例」 実施例について図面を参照して説明する。[Example] An example will be described with reference to the drawings.

第1図a〜cにおいて鉄骨柱1面に背面を当接するとこ
ろのプレート4の表面には、ループ状アーム5が溶接で
もって起立されている。
In FIGS. 1A to 1C, a loop-shaped arm 5 is erected by welding on the surface of the plate 4 where the back surface contacts the surface of the steel frame column 1.

よって、当該プレート4を鉄骨柱1面の中央に一体的に
固定させれば、前記のアーム5は力の作用線上に簡単に
ワイヤーを挿通させたうえ止着させることのできる止め
部となる訳である。
Therefore, if the plate 4 is integrally fixed to the center of the surface of the steel frame column 1, the arm 5 serves as a stop portion that allows the wire to be easily inserted and fixed on the line of action of force. Is.

上述の固定を達成する構成は、次の記の通りである。The structure that achieves the above-described fixation is as follows.

すなわち、プレート4表面の該アーム5の両脚間中央部
に少なくとも両端部にネジ6aを刻設のボルト6を該ルー
プ面に直交する態様で溶接着7し、当該ボルト6の両端
に鉄骨柱1を挟持する(図示実施例の部分はH型鋼なの
で、フランジを挟持するとしている)チャンネル8と固
定されたナット9を装着する。
That is, a bolt 6 having a screw 6a engraved at least at both ends is welded 7 at a central portion between the legs of the arm 5 on the surface of the plate 4 in a manner orthogonal to the loop surface, and the steel pillar 1 is attached to both ends of the bolt 6. (It is assumed that the flange is clamped because the portion of the illustrated embodiment is H-shaped steel) and the fixed nut 9 is attached.

しかして、b図に示す如くチャンネル8はナット9の回
動によって変位し、チャンネル8を鉄骨柱1を挟持する
のに合った位置に設定させることが出来る。
Then, as shown in FIG. 7B, the channel 8 is displaced by the rotation of the nut 9, and the channel 8 can be set at a position suitable for holding the steel column 1.

尚、図中10はチャンネル8締結用のボルトを示す。当該
ボルト10の操作で本案ピースは鉄骨柱1に対して着脱自
在である。
Reference numeral 10 in the figure denotes a bolt for fastening the channel 8. By operating the bolt 10, the proposed piece can be attached to and detached from the steel column 1.

よって、鉄骨柱建方時、予じめ本案ピースを取付けてお
くと、正常なワイヤー張設が弋工の技量に左右されるこ
となく迅速になし得る。
Therefore, when the main body piece is attached in advance when the steel frame pillar is erected, normal wire tension can be promptly performed without being influenced by the skill of the singer.

「考案の効果」 本考案は上述のとおり構成されているので、次に記載す
る効果を奏する。
"Effects of the Invention" Since the present invention is configured as described above, it has the following effects.

鉄骨建方精度を確保する為、建方計画の中に建起しの手
順をもり込み、しかもその治具(本案ピース)を予じめ
用意する事により確実にしかも能力よく作業を行う事
で、目標の精度が期待できる。
In order to secure the steel frame erection accuracy, the procedure of erection is included in the erection plan, and the jig (main item) is prepared in advance to ensure reliable and efficient work. , Target accuracy can be expected.

【図面の簡単な説明】[Brief description of drawings]

第1図a〜cはH型鋼の鉄骨柱の場合で示した本案ピー
ス取付態様を示す正面図,平面図,右側面図、第2図は
鉄骨柱の建方要領説明図である。 1…鉄骨柱、2…ワイヤー、3…ターンバックル、4…
プレート、5…アーム、6…ボルト、6a…ネジ、7…溶
接着、8…チャンネル、9…ナット、10…ボルト。
1A to 1C are a front view, a plan view and a right side view showing a mode of mounting the present invention piece in the case of an H-shaped steel frame column, and FIG. 2 is an explanatory view of a steel frame column construction method. 1 ... Steel column, 2 ... Wire, 3 ... Turnbuckle, 4 ...
Plate, 5 ... Arm, 6 ... Bolt, 6a ... Screw, 7 ... Weld, 8 ... Channel, 9 ... Nut, 10 ... Bolt.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】鉄骨柱面に当接するプレートの表面にワイ
ヤー挿通用のループ状アームを起立させると共に当該ア
ームの両脚間中央部に該ループ面に直交する態様で少な
くとも両端部にネジを刻設のボルトを溶接着し、当該ボ
ルト両端には鉄骨柱を挟持するチャンネルに固定された
ナットを装着するとしてなることを特徴とする鉄骨建起
し専用ワイヤー取付ピース。
1. A loop-shaped arm for inserting a wire is erected on the surface of a plate that abuts a steel column surface, and at least both ends of the arm are engraved in a central portion between both legs of the arm in a manner orthogonal to the loop surface. The steel wire erected wire mounting piece, characterized in that the above bolts are welded and attached to both ends of the bolts, and nuts fixed to channels for sandwiching the steel column are mounted.
JP16784588U 1988-12-26 1988-12-26 Dedicated wire mounting piece for steel frame construction Expired - Lifetime JPH0623652Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16784588U JPH0623652Y2 (en) 1988-12-26 1988-12-26 Dedicated wire mounting piece for steel frame construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16784588U JPH0623652Y2 (en) 1988-12-26 1988-12-26 Dedicated wire mounting piece for steel frame construction

Publications (2)

Publication Number Publication Date
JPH0287867U JPH0287867U (en) 1990-07-11
JPH0623652Y2 true JPH0623652Y2 (en) 1994-06-22

Family

ID=31456506

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16784588U Expired - Lifetime JPH0623652Y2 (en) 1988-12-26 1988-12-26 Dedicated wire mounting piece for steel frame construction

Country Status (1)

Country Link
JP (1) JPH0623652Y2 (en)

Also Published As

Publication number Publication date
JPH0287867U (en) 1990-07-11

Similar Documents

Publication Publication Date Title
JPH0713416B2 (en) Anchor frame positioning tool
JPH0623652Y2 (en) Dedicated wire mounting piece for steel frame construction
JP3761188B2 (en) Seismic isolation device installation method and installation device
JPH04155035A (en) Joint member between steelwork member and steelwork member having flange
JPS6140804Y2 (en)
JP2548953Y2 (en) Connection holding bracket
JPH0732662Y2 (en) Mounting structure for frame material on horizontal plate
JPS5911525Y2 (en) Assembly fittings for heavy temporary gantry
JPH0410282Y2 (en)
JPH0333156Y2 (en)
JPH0113687Y2 (en)
JPS6026765A (en) Member connecting apparatus of scaffold
JPS642027Y2 (en)
JPH0228027Y2 (en)
JPH046832B2 (en)
JP2524735Y2 (en) Steel column base
JP2001090188A (en) Binding metal fitting and method for binding framework member
JPS6332262Y2 (en)
JP2526940Y2 (en) Pole-mounted transformer mounting device
JPH079964Y2 (en) Fixing nut washer rotation jig for PC steel rod
JPH0745683Y2 (en) Steel column base structure
JP2513791Y2 (en) Anchor bolt holding device for foundation when placing foundation concrete
JP2833429B2 (en) Beam positioning method for beam-column joints
JPS6224675Y2 (en)
JPH11229502A (en) Joining tool, joining method and joining structure of house unit