JPH06223017A - Computer system - Google Patents
Computer systemInfo
- Publication number
- JPH06223017A JPH06223017A JP5009726A JP972693A JPH06223017A JP H06223017 A JPH06223017 A JP H06223017A JP 5009726 A JP5009726 A JP 5009726A JP 972693 A JP972693 A JP 972693A JP H06223017 A JPH06223017 A JP H06223017A
- Authority
- JP
- Japan
- Prior art keywords
- computer
- proxy response
- communication
- turned
- power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Computer And Data Communications (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、サスペンド/リジュー
ム機能を有する計算機が、ネットワーク接続されている
計算機システムに関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a computer system in which computers having suspend / resume functions are network-connected.
【0002】[0002]
【従来の技術】近年、計算機は、小型軽量化の進展によ
る携帯性の向上に従い、移動しながら断続的に使用する
形態が増加している。このような利用形態を支援するに
は、リジューム機能が必須とされている。この機能は、
電源断要求時に計算機上で動いているOSやアプリケー
ションの実行に必要な情報を記憶装置に退避させ、電源
再投入時にこれらの情報を回復することによって電源断
要求直前の状態を瞬時に再現するものである。そのため
OSおよびアプリケーションの起動や停止の操作が不要
であり、大変操作性がよい。2. Description of the Related Art In recent years, computers have been increasingly used intermittently while moving, as portability has improved due to advances in size and weight reduction. In order to support such a usage pattern, the resume function is essential. This feature
When a power-off request is made, the information necessary for executing the OS and applications running on the computer is saved in a storage device, and when the power is turned on again, the information is restored to instantly reproduce the state immediately before the power-off request. Is. Therefore, the operation of starting and stopping the OS and the application is unnecessary, and the operability is very good.
【0003】[0003]
【発明が解決しようとする課題】今日、計算機、特にワ
ークステーションでは、その使用形態において、ネット
ワーク接続された計算機間で通信することは、当り前に
なってきている。しかしながら、現在のリジューム機能
というものは、スタンドアロンで使用している計算機の
継続実行するのに必要なデータの退避/復元するもの
で、復元後のネットワークを介しての通信の再開は保証
されていない。サスペンド中に相手の計算機からのデー
タ送信に対する確認応答を返すことができず、再送のタ
イムアウトによってコネクションが切断されたり、サス
ペンド中に相手の計算機からの計算機がダウンしてるか
の確認パケットが送信され、それに応答できなくて、計
算機がダウンしている状態が確認されるとコネクション
が切断されて、電源再投入後に通信を再開できないとい
う問題点を有していた。In computers, especially workstations, it has become commonplace today to communicate between computers connected to a network in the form of use. However, the current resume function saves / restores the data necessary for the continuous use of the computer used as a stand-alone computer, and does not guarantee the resumption of communication via the network after restoration. . During suspension, the confirmation response to the data transmission from the partner computer could not be returned, the connection was disconnected due to the timeout of retransmission, or during the suspension, a confirmation packet from the partner computer indicating whether the computer was down was sent. However, there was a problem that it could not respond to it, and when it was confirmed that the computer was down, the connection was cut off and communication could not be resumed after the power was turned on again.
【0004】本発明は上記問題点に鑑み、サスペンド中
のコネクションの切断の問題を解決し、電源再投入後に
通信を再開できることを目的とする。In view of the above problems, it is an object of the present invention to solve the problem of disconnection of a connection during suspension and to restart communication after power is turned on again.
【0005】[0005]
【課題を解決するための手段】上記問題点を解決するた
めに本発明は、計算機A、計算機B、計算機Cが、ネッ
トワーク接続されている計算機システムにおいて、計算
機Aが、通信機能を用いて計算機B上の資源を使用して
おり、計算機Aは、電源オフ操作後電源オフの状態に転
ずるまでの間に動作する第1、第2の手段と、電源オン
後計算機Bの資源を使用して処理を開始するまでの間に
動作する第3、第4の手段を有し、前記第1の手段は、
電源オフ操作された時に計算機Cに対して、代理応答の
依頼をする代理応答依頼手段で、第2の手段は、代理応
答の依頼後における計算機Aの継続実行するのに必要な
データを退避させる退避手段で、第3の手段は、電源オ
フ直前に退避された継続実行するのに必要なデータを回
復する回復手段で、第4の手段は、計算機Cに対して代
理応答の解除を行う代理応答解除手段であり、計算機C
は、計算機Aから代理応答の依頼の通知を受けると計算
機Bのデータの送信を停止する送信停止手段と計算機B
との通信を計算機Aの代わりに行う代理応答通信手段を
有し、計算機Aから代理応答の解除の通知を受けると代
理応答通信手段を停止させ、計算機Bのデータの送信を
再開する送信再開手段を有することを特徴としている。In order to solve the above problems, the present invention provides a computer system in which computer A, computer B, and computer C are connected to a network, and computer A uses a communication function to perform computer processing. Using the resources on B, computer A uses the resources of computer B after turning on the power, and the first and second means that operate before turning off the power after the power is turned off. It has the 3rd and 4th means which operate | moves by the time of starting a process, The said 1st means is,
Proxy response request means for requesting a proxy response to the computer C when the power is turned off. The second means saves data necessary for continued execution of the computer A after requesting the proxy response. Of the saving means, the third means is a recovery means for recovering the data saved immediately before the power is turned off and necessary for continuous execution, and the fourth means is a proxy for canceling the proxy response to the computer C. Response canceling means, computer C
Is a transmission stop means for stopping the data transmission of the computer B when receiving the request for the proxy response from the computer A and the computer B.
A transmission resuming unit that has a proxy response communication unit that communicates with the computer A instead of the computer A, and that stops the proxy response communication unit when the notice of cancellation of the proxy response is received from the computer A and restarts the data transmission of the computer B. It is characterized by having.
【0006】また他の発明は、前記の計算機Aが、サス
ペンドしている状態において、計算機Cが、サスペンド
後一定時間たっても、代理応答の解除の通知を受信でき
ない時、計算機Bの拘束している資源を解放するため
に、計算機Cが、時間監視手段と資源解放手段を有する
ことを特徴としている。According to another aspect of the invention, when the computer A is in a suspended state and the computer C cannot receive a notice of cancellation of the proxy response even after a lapse of a certain time after suspension, the computer B is restrained. The computer C is characterized by having a time monitoring means and a resource releasing means in order to release the existing resources.
【0007】[0007]
【作用】請求項1記載の発明により、計算機Aが、通信
機能を用いて計算機B上の資源を使用することが可能な
計算機システムにおいて、計算機Aが、電源オフ操作す
る時に計算機Cに対して、代理応答を依頼し、計算機C
が、計算機Bのデータの送信を停止させ、さらに、計算
機Cが、計算機Bからの計算機がダウンしてるかの確認
パケットに対する応答を計算機Aの代わりに行って、サ
スペンド中のコネクションの切断の問題を解決すること
により、電源再投入後の通信を再開することが可能にな
る。According to the invention described in claim 1, in the computer system in which the computer A can use the resources on the computer B by using the communication function, the computer A instructs the computer C when the power is turned off. , Ask for a proxy response, computer C
Causes the computer B to stop transmitting data, and the computer C responds to the confirmation packet from the computer B indicating whether the computer is down, instead of the computer A, and disconnects the suspended connection. By solving the above problem, it becomes possible to restart the communication after the power is turned on again.
【0008】請求項2記載の発明により、前記の計算機
Aが、サスペンドしている状態において、サスペンド後
一定時間たっても、代理応答の解除の通知が無いとき
は、計算機Cが、時間監視手段と資源解放手段を用い
て、計算機Bの拘束している資源を解放し、資源が不足
することを回避できる。According to the second aspect of the present invention, when the computer A is in the suspended state and there is no notification of cancellation of the proxy response even after a lapse of a certain time after the suspension, the computer C becomes the time monitoring means. It is possible to avoid the resource shortage by releasing the resource bound by the computer B by using the resource releasing means.
【0009】[0009]
【実施例】以下、本発明を実施例にもとづき説明する。EXAMPLES The present invention will be described below based on examples.
【0010】図1は本発明の実施例としての計算機シス
テムのブロック図を示すものである。図1ように、計算
機システムとして、Aの計算機、Bの計算機、Cの計算
機がある。計算機Aが、通信機能を用いて計算機Bと通
信している場合を想定しているので、その場合の必要な
構成を示す。計算機Aは、中央処理装置1、主記憶装置
2、通信制御装置3、周辺装置4から構成され、計算機
Bも、中央処理装置5、主記憶装置6、通信制御装置
7、周辺装置8から構成され、計算機Cも、中央処理装
置9、主記憶装置10、通信制御装置11、周辺装置1
2から構成される。FIG. 1 is a block diagram of a computer system as an embodiment of the present invention. As shown in FIG. 1, there are computer A, computer B, and computer C as computer systems. Since it is assumed that the computer A communicates with the computer B using the communication function, the necessary configuration in that case is shown. The computer A is composed of a central processing unit 1, a main storage unit 2, a communication control unit 3 and a peripheral unit 4, and the computer B is also composed of a central processing unit 5, a main storage unit 6, a communication control unit 7 and a peripheral unit 8. The computer C also has the central processing unit 9, the main storage device 10, the communication control device 11, and the peripheral device 1.
It consists of two.
【0011】前記計算機Aの主記憶装置2は、バッテリ
バックアップされており、電源がオフされても記憶内容
を保持でき、記憶領域の一部に電源オフ時に中央処理装
置1のレジスタの内容や通信制御装置3内の情報やOS
等の継続実行するのに必要なデータを退避できる。The main storage device 2 of the computer A is backed up by a battery, and can retain the stored contents even when the power is turned off, and the contents of the register of the central processing unit 1 and the communication are stored in a part of the storage area when the power is turned off. Information and OS in control device 3
It is possible to save the data required for continuous execution such as.
【0012】計算機Aの通信制御装置3は、計算機Aと
計算機Bとの通信、計算機Aと計算機Cとの通信を制御
する装置で、特に本実施例の場合、代理応答の依頼及び
代理応答の解除の通知を計算機Cへ送信する。The communication control device 3 of the computer A is a device for controlling the communication between the computer A and the computer B and the communication between the computer A and the computer C. In the case of this embodiment, in particular, the request for the proxy response and the proxy response The cancellation notice is transmitted to the computer C.
【0013】計算機Bの通信制御装置7は、計算機Bと
計算機Aとの通信、計算機Bと計算機Cとの通信を制御
する装置で、計算機がダウンしてるかの確認パケットを
計算機Aへ送信する。The communication control device 7 of the computer B is a device for controlling the communication between the computer B and the computer A and the communication between the computer B and the computer C, and transmits a confirmation packet to the computer A as to whether the computer is down. .
【0014】計算機Cの通信制御装置11は、計算機C
と計算機Aとの通信、計算機Cと計算機Bとの通信を制
御する装置で、特に本実施例の場合、送信停止及び送信
再開の通知を計算機Bへ送信する。The communication control device 11 of the computer C is the computer C
Is a device for controlling the communication between the computer A and the computer A, and the communication between the computer C and the computer B, and particularly in the case of the present embodiment, the transmission stop and transmission restart notifications are transmitted to the computer B.
【0015】図2は本発明の実施例としての計算機シス
テムの機能ブロック図を示すものである。図2におい
て、計算機Aは、代理応答依頼手段21と、退避手段2
2と、回復手段23と、代理応答解除手段24を有し、
計算機Cは、送信停止手段25と、代理応答通信手段2
6と、時間監視手段27と、資源解放手段28と、送信
再開手段29を有する。FIG. 2 is a functional block diagram of a computer system as an embodiment of the present invention. In FIG. 2, the computer A has a proxy response requesting means 21 and a saving means 2
2, a recovery means 23, and a proxy response cancellation means 24,
The computer C uses the transmission stop means 25 and the proxy response communication means 2
6, a time monitoring unit 27, a resource releasing unit 28, and a transmission resuming unit 29.
【0016】代理応答依頼手段21は、電源オフ操作後
電源オフの状態に転ずるまでの間に動作し、電源オフ操
作された時に計算機Cに対して、代理応答の依頼をす
る。退避手段22は、電源オフ操作後電源オフの状態に
転ずるまでの間に動作し、代理応答の依頼後における計
算機Aの継続実行するのに必要なデータを退避する。回
復手段23は、電源オン後計算機Bの資源を使用して処
理を開始するまでの間に動作し、電源オフ直前に退避さ
れた継続実行するのに必要なデータを回復する。代理応
答解除手段24は、電源オン後計算機Bの資源を使用し
て処理を開始するまでの間に動作し、計算機Cに対して
代理応答の解除を行う。The proxy response requesting means 21 operates after the power is turned off until the power is turned off, and when the power is turned off, the proxy response request means 21 requests the computer C for a proxy response. The save means 22 operates after the power is turned off and before the power is turned off, and saves the data necessary for the continuous execution of the computer A after the proxy response is requested. The recovery unit 23 operates after the power is turned on until the processing is started using the resources of the computer B, and recovers the data saved immediately before the power is turned off and necessary for continuous execution. The proxy response canceling unit 24 operates after the power is turned on until the processing is started using the resources of the computer B, and cancels the proxy response to the computer C.
【0017】送信停止手段25は、計算機Aから代理応
答の依頼の通知を受けると計算機Bのデータの送信を停
止する。代理応答通信手段26は、計算機Bとの通信を
計算機Aの代わりに行う。時間監視手段27は、代理応
答の依頼の通知から代理応答の解除の通知を受けるまで
の時間を監視する。資源解放手段28は、計算機Bの拘
束している資源を解放する。送信再開手段29は、計算
機Aから代理応答の解除の通知を受けると計算機Bのデ
ータの送信を再開する。次に、図3、4を用いて計算機
A側の動作を説明する。図1のような構成において、計
算機Aが、通信機能を用いて計算機B上の資源を使用し
ている。図3は、電源オフ操作された時の動作シーケン
スで、まず、電源オフ操作されると、その時点で通信機
能を使用しているプログラムが存在するかどうかの判定
を行なう(ステップ31、32)。どのプログラムが、
他の計算機Bと通信しているかは、主記憶装置2に格納
されているOS部分で管理されているので、ステップ3
1の判断は、OSを参照することにより行なわれる。ま
た、この判定において、そのプログラムと通信している
相手計算機Bも特定され、計算機Aの通信情報と特定さ
れた通信相手の計算機の通信情報も得られる。ステップ
32において、通信機能を使用中のプログラムがあると
判定されると、ステップ33へ、ないと判定されるとス
テップ34へ分岐する。ステップ33では、通信機能を
使用しているかどうかを示す、通信機能使用中フラグを
オンにして、以下の処理を行なう。代理応答依頼手段2
1を用いて、計算機Cに対して代理応答の依頼を通知す
る(ステップ35)。この時、計算機Aの通信情報と通
信相手の計算機の通信情報も一緒に送信される。そし
て、計算機Cで代理応答が可能な時、計算機Cからサス
ペンドOKの通知を受信する(ステップ36)。サスペ
ンドOKの通知を受信した後、退避手段22を用いて計
算機Aの継続実行するのに必要なデータを主記憶装置2
に退避する(ステップ37)。必要なデータを退避した
後、電源オフを行なう(ステップ38)。ステップ34
では、通信機能使用中フラグをオフにして、以下の処理
を行なう。退避手段22を用いて計算機Aの継続実行す
るのに必要なデータを主記憶装置2に退避する(ステッ
プ37)。必要なデータを退避した後、電源オフを行な
う(ステップ38)。図4は、上記の動作を通じて電源
オフ状態にある計算機Aが、電源オンされた時の動作シ
ーケンスを示している。まず電源オンされる(ステップ
41)と、通信機能使用中フラグをチェックする(ステ
ップ42)。ステップ43において、通信機能使用中フ
ラグがオンの時、ステップ44へ、通信機能使用中フラ
グがオフの時、ステップ46へ分岐する。ステップ44
では、代理応答解除手段24を用いて、計算機Cに対し
て代理応答の解除を通知する(ステップ44)。そし
て、計算機Cで代理応答が解除された時、計算機Aが、
計算機CからリジュームOKの通知を受信する(ステッ
プ45)。リジュームOKの通知を受信した後、あるい
は、通信機能使用中フラグがオフの時、回復手段23を
用いて、主記憶装置2に退避している継続実行するのに
必要なデータが回復される。(ステップ46)。次にプ
ログラム処理が再開される(ステップ47)。計算機C
の代理応答通信手段26によって、コネクションが切断
されることがなく、計算機Bとの通信機能が回復され、
通信プログラムも再開可能である。次に、図5を用い
て、計算機Cの動作を説明する。図5は、ステップ35
及びステップ44において代理応答の依頼、代理応答の
解除の通知を計算機Aから受けた計算機Cの動作シーケ
ンスを示している。図中、ステップ501は、計算機A
からのイベントを判断して条件分岐するステップであ
り、計算機Aからのイベントが、代理応答の依頼を指示
する場合はステップ502へ、そうでない場合ステップ
506へ分岐する。従って、計算機Aから代理応答の依
頼の通知があった場合には、ステップ502へ進み、送
信停止手段25を用いて計算機Bのデータの送信を停止
させる(ステップ502)。これによって、データ再送
における再送のタイムアウトによってコネクションが切
断されることを防ぐことができる。計算機Cが送信停止
手段25の処理を行なうと次に、ステップ503におい
て代理応答通信手段26を開始する。The transmission stopping means 25 stops the transmission of the data of the computer B when receiving the notice of the request for the proxy response from the computer A. The proxy response communication unit 26 communicates with the computer B in place of the computer A. The time monitoring means 27 monitors the time from the notification of the request for the proxy response to the notification of the cancellation of the proxy response. The resource releasing means 28 releases the resources bound by the computer B. The transmission restart means 29 restarts the transmission of the data of the computer B upon receiving the notification of the cancellation of the proxy response from the computer A. Next, the operation on the computer A side will be described with reference to FIGS. In the configuration as shown in FIG. 1, the computer A uses the resources on the computer B by using the communication function. FIG. 3 shows an operation sequence when the power is turned off. First, when the power is turned off, it is determined whether or not there is a program using the communication function at that time (steps 31 and 32). . Which program
Whether it is communicating with another computer B is controlled by the OS part stored in the main storage device 2, so step 3
The determination of 1 is made by referring to the OS. Further, in this determination, the partner computer B communicating with the program is also identified, and the communication information of the computer A and the communication information of the identified computer of the communication partner are also obtained. If it is determined in step 32 that there is a program using the communication function, the process branches to step 33, and if not, the process branches to step 34. In step 33, a communication function in-use flag indicating whether or not the communication function is used is turned on, and the following processing is performed. Proxy response requesting means 2
1 is used to notify the computer C of the proxy response request (step 35). At this time, the communication information of the computer A and the communication information of the computer of the communication partner are also transmitted together. Then, when the proxy response is possible in the computer C, the notification of suspend OK is received from the computer C (step 36). After receiving the notification of Suspend OK, the data necessary for the continuous execution of the computer A is stored in the main storage device 2 by using the saving means 22.
(Step 37). After saving the necessary data, the power is turned off (step 38). Step 34
Then, the communication function busy flag is turned off, and the following processing is performed. The data necessary for the continuous execution of the computer A is saved in the main storage device 2 by using the saving means 22 (step 37). After saving the necessary data, the power is turned off (step 38). FIG. 4 shows an operation sequence when the computer A in the power-off state through the above operation is powered on. First, when the power is turned on (step 41), the communication function in-use flag is checked (step 42). In step 43, when the communication function in-use flag is on, the process branches to step 44, and when the communication function in-use flag is off, the process branches to step 46. Step 44
Then, the proxy response cancellation means 24 is used to notify the computer C of cancellation of the proxy response (step 44). Then, when the proxy response is canceled by computer C, computer A
The notification of resume OK is received from the computer C (step 45). After receiving the notification of the resume OK or when the communication function in-use flag is off, the recovery means 23 is used to recover the data saved in the main storage device 2 and necessary for continuous execution. (Step 46). Next, the program processing is restarted (step 47). Calculator C
By the proxy response communication means 26, the communication function with the computer B is restored without disconnection,
The communication program can also be restarted. Next, the operation of the computer C will be described with reference to FIG. FIG. 5 shows step 35.
3 shows an operation sequence of the computer C which receives the request for the proxy response and the notice of cancellation of the proxy response from the computer A in step 44. In the figure, step 501 is computer A
This is the step of judging the event from the above and branching conditionally. If the event from the computer A indicates the request of the proxy response, the processing branches to step 502, and if not, the processing branches to step 506. Therefore, when the request for the proxy response is notified from the computer A, the process proceeds to step 502, and the transmission of the data of the computer B is stopped by using the transmission stop means 25 (step 502). As a result, it is possible to prevent the connection from being disconnected due to the retransmission timeout in data retransmission. When the computer C performs the processing of the transmission stop means 25, next, in step 503, the proxy response communication means 26 is started.
【0018】そして、サスペンド中に、計算機Cの代理
応答通信手段26によって、代理応答が行なわれる。代
理応答通信手段26は、次の処理を行なう。計算機Bが
計算機A宛てに、計算機Aがダウンしているかどうかを
確認する確認パケットを送信しているので、計算機C
が、サスペンドした計算機Aの代わりに、計算機Bから
計算機A宛の確認パケットを取り出す。これは、代理応
答の依頼の通知の時の計算機Aの情報と通信相手の計算
機の情報をもとにしている。次に、サスペンドした計算
機Aがダウンしていないように、計算機Cが、送信元の
計算機Bへ応答する。Then, during the suspension, the proxy response communication means 26 of the computer C makes a proxy response. Proxy response communication means 26 performs the following processing. Computer B sends a confirmation packet to computer A, which confirms whether computer A is down, so computer C
However, instead of the suspended computer A, a confirmation packet addressed to computer A is taken out from computer B. This is based on the information of the computer A at the time of the notification of the request for the proxy response and the information of the computer of the communication partner. Next, the computer C responds to the transmission source computer B so that the suspended computer A is not down.
【0019】計算機Cが代理応答通信手段26の処理を
開始すると次に、サスペンドOKを計算機Aに対して送
信する(ステップ504)。次に、ステップ505にお
いてサスペンド時間監視タイマを起動する。図中、ステ
ップ506は、計算機Aからのイベントを判断して条件
分岐するステップである。時間監視手段27を用いてサ
スペンド時間監視タイマがタイムアップするまでに、計
算機Aからのイベントがあって、代理応答の解除を指示
する場合はステップ507へ、計算機Aからのイベント
がない場合ステップ511へ分岐する。ステップ507
は、サスペンド時間監視タイマを解除する。次に、代理
応答通信手段26を止める(ステップ508)。次に、
送信再開手段29を用いて計算機Bのデータの送信を再
開させる(ステップ509)。次に、リジュームOKを
計算機Aに対して送信する(ステップ510)。一方、
代理応答の解除の通知がないまま、サスペンド時間監視
タイマがタイムアップすると(ステップ511)、資源
解放手段28を用いて計算機Bの使用中の資源の解放を
行なう(ステップ512)。ここで、資源の解放とは、
コネクション断要求を送って、コネクションを切断し、
バッファ等の資源を解放することである。以上本説明を
実施例にもとづき説明してきたが、本説明は何も上記実
施例に限定されないのは勿論である。相手計算機Bを1
台として、説明してきたが、複数台の時でも同様に、電
源再投入後の通信を再開することが可能にすることがで
きる。When the computer C starts the processing of the proxy response communication means 26, the suspend OK is transmitted to the computer A (step 504). Next, in step 505, the suspend time monitoring timer is started. In the figure, step 506 is a step of judging an event from the computer A and branching conditionally. If there is an event from the computer A before the suspension time monitoring timer times out using the time monitoring means 27 and an instruction to cancel the proxy response is given, the process proceeds to step 507. If there is no event from the computer A, the process proceeds to step 511. Branch to. Step 507
Cancels the suspend time monitoring timer. Next, the proxy response communication means 26 is stopped (step 508). next,
The transmission of the data of the computer B is restarted using the transmission restart means 29 (step 509). Then, the resume OK is transmitted to the computer A (step 510). on the other hand,
When the suspend time monitoring timer times out without the notification of the cancellation of the proxy response (step 511), the resource releasing means 28 is used to release the resource being used by the computer B (step 512). Here, release of resources means
Send a disconnection request, disconnect the connection,
Freeing resources such as buffers. Although the present description has been described based on the embodiment, it goes without saying that the present description is not limited to the above embodiment. Opponent computer B 1
Although it has been described as a device, it is possible to restart communication after the power is turned on again even when a plurality of devices are used.
【0020】[0020]
【発明の効果】以上のように本発明によれば、計算機A
が、通信機能を用いて計算機B上の資源を使用すること
が可能な計算機システムにおいて、計算機Aが、電源オ
フ操作する時に計算機Cに対して、代理応答を依頼し、
計算機Cが、計算機Bのデータの送信を停止させ、さら
に、計算機Cが、計算機Bからの計算機がダウンしてる
かの確認パケットに対する応答を計算機Aの代わりに行
って、サスペンド中のコネクションの切断の問題を解決
することにより、電源再投入後の通信を再開することが
可能になる。As described above, according to the present invention, the computer A
In a computer system capable of using the resources on the computer B by using the communication function, the computer A requests a substitute response from the computer C when the power is turned off.
The computer C stops the data transmission of the computer B, and further, the computer C responds to the confirmation packet from the computer B indicating whether the computer is down, instead of the computer A, and disconnects the suspended connection. By solving the above problem, it becomes possible to restart communication after the power is turned on again.
【0021】さらに、請求項2記載の発明により、前記
の計算機Aが、サスペンドしている状態において、サス
ペンド後一定時間たっても、代理応答の解除の通知が無
いときは、計算機Cが、時間監視手段と資源解放手段を
用いて、計算機Bが拘束している資源を解放し、資源が
不足することを回避できる。Further, according to the invention described in claim 2, when the computer A is in a suspended state and there is no notice of cancellation of the proxy response even after a lapse of a certain time after suspension, the computer C monitors the time. By using the means and the resource releasing means, it is possible to release the resource bound by the computer B and avoid running out of resources.
【図1】本発明の一実施例における計算機システムの構
成を示す構成図FIG. 1 is a configuration diagram showing a configuration of a computer system according to an embodiment of the present invention.
【図2】同実施例における機能ブロック図FIG. 2 is a functional block diagram of the embodiment.
【図3】同実施例における計算機Aが電源オフ操作され
た時の動作シーケンスを示す図FIG. 3 is a view showing an operation sequence when the computer A in the embodiment is turned off.
【図4】同実施例における計算機Aが電源オンされた時
の動作シーケンスを示す図FIG. 4 is a diagram showing an operation sequence when the computer A in the embodiment is powered on.
【図5】同実施例における計算機Cの動作シーケンスを
示す図FIG. 5 is a diagram showing an operation sequence of a computer C in the embodiment.
1、5、9 中央処理装置 2、6、10 主記憶装置 3、7、11 通信制御装置 4、8、12 周辺装置 21 代理応答依頼手段 22 退避手段 23 回復手段 24 代理応答解除手段 25 送信停止手段 26 代理応答通信手段 27 時間監視手段 28 資源解放手段 29 送信再開手段 1, 5, 9 Central processing unit 2, 6, 10 Main storage device 3, 7, 11 Communication control device 4, 8, 12 Peripheral device 21 Proxy response request means 22 Evacuation means 23 Recovery means 24 Proxy response cancellation means 25 Transmission stop Means 26 Proxy response communication means 27 Time monitoring means 28 Resource releasing means 29 Transmission restarting means
Claims (2)
ワーク接続されている計算機システムにおいて、計算機
Aが、通信機能を用いて計算機B上の資源を使用してお
り、計算機Aは、電源オフ操作後電源オフの状態に転ず
るまでの間に動作する第1、第2の手段と、電源オン後
計算機Bの資源を使用して処理を開始するまでの間に動
作する第3、第4の手段を有し、前記第1の手段は、電
源オフ操作された時に計算機Cに対して、代理応答の依
頼をする代理応答依頼手段で、第2の手段は、代理応答
の依頼後における計算機Aの継続実行するのに必要なデ
ータを退避させる退避手段で、第3の手段は、電源オフ
直前に退避された継続実行するのに必要なデータを回復
する回復手段で、第4の手段は、計算機Cに対して代理
応答の解除を行う代理応答解除手段で、計算機Cは、計
算機Aから代理応答の依頼の通知を受けると計算機Bの
データの送信を停止する送信停止手段と計算機Bとの通
信を計算機Aの代わりに行う代理応答通信手段を有し、
計算機Aから代理応答の解除の通知を受けると代理応答
通信手段を停止させ、計算機Bのデータの送信を再開す
る送信再開手段を有する計算機システム。1. In a computer system in which computer A, computer B, and computer C are connected to a network, computer A uses resources on computer B by using a communication function, and computer A is powered off. After the operation, the first and second means operate until the power is turned off, and the third and fourth means operate after the power is turned on and the processing is started using the resources of the computer B. The first means is a proxy response requesting means for requesting a proxy response to the computer C when the power is turned off, and the second means is a computer A after requesting the proxy response. Is a saving means for saving the data necessary for continuous execution, the third means is a recovery means for recovering the data necessary for continuous execution saved immediately before the power is turned off, and the fourth means is Cancels the proxy response to computer C In the physical response canceling means, the computer C performs the communication between the computer B and the transmission stopping means for stopping the data transmission of the computer B when the computer A receives the notification of the request for the proxy response from the computer A. Have means,
A computer system having a transmission restart means for stopping the proxy response communication means and restarting the data transmission of the computer B upon receiving a notification of cancellation of the proxy response from the computer A.
いて、計算機Cが、サスペンド後一定時間たっても、代
理応答の解除の通知を受信できない時、計算機Bの拘束
している資源を解放するために、計算機Cが、時間監視
手段と資源解放手段を有する請求項1記載の計算機シス
テム。2. When the computer A is in a suspended state and the computer C cannot receive the notice of cancellation of the proxy response even after a lapse of a certain period of time after the suspension, the resources bound by the computer B are released. The computer system according to claim 1, wherein the computer C has a time monitoring means and a resource releasing means.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5009726A JPH06223017A (en) | 1993-01-25 | 1993-01-25 | Computer system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5009726A JPH06223017A (en) | 1993-01-25 | 1993-01-25 | Computer system |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH06223017A true JPH06223017A (en) | 1994-08-12 |
Family
ID=11728319
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP5009726A Pending JPH06223017A (en) | 1993-01-25 | 1993-01-25 | Computer system |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH06223017A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002287936A (en) * | 2001-03-26 | 2002-10-04 | Minolta Co Ltd | Printer, data processor, print system, printer control method, data processor processing method and program, data processing program, and recording medium storing program |
JP2002297352A (en) * | 2001-03-30 | 2002-10-11 | Minolta Co Ltd | Network printing system, printer, service proxy server and program |
JP2002297337A (en) * | 2001-03-30 | 2002-10-11 | Minolta Co Ltd | Network printing system, service proxy server and program |
-
1993
- 1993-01-25 JP JP5009726A patent/JPH06223017A/en active Pending
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002287936A (en) * | 2001-03-26 | 2002-10-04 | Minolta Co Ltd | Printer, data processor, print system, printer control method, data processor processing method and program, data processing program, and recording medium storing program |
US6807907B2 (en) | 2001-03-26 | 2004-10-26 | Minolta Co., Ltd. | Printing system for carrying out energy conservation operation |
JP2002297352A (en) * | 2001-03-30 | 2002-10-11 | Minolta Co Ltd | Network printing system, printer, service proxy server and program |
JP2002297337A (en) * | 2001-03-30 | 2002-10-11 | Minolta Co Ltd | Network printing system, service proxy server and program |
US7286252B2 (en) | 2001-03-30 | 2007-10-23 | Minolta Co., Ltd. | Printing system with enhanced efficiency in power-saving, printer, substitute server, and method and program used by the substitute server |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2012149750A1 (en) | User service migration method, device and system | |
JPH06223017A (en) | Computer system | |
JP4882537B2 (en) | Request control method by timer cooperation | |
JP3515839B2 (en) | Communication system between computer systems | |
JP2776442B2 (en) | Compound computer system | |
JP2705617B2 (en) | Power off method | |
JPH0667747A (en) | Digital computer system | |
JPH0728546A (en) | Electronic computer system with suspend/resume function | |
JP2019197352A (en) | Service continuing system and service continuing method | |
JP3255446B2 (en) | Resume control device and battery protection device | |
JPH0734567B2 (en) | Telephone terminal with data communication processing function | |
JPH06243059A (en) | Interruption/resumption system for film transfer | |
KR100595089B1 (en) | Financial terminal remote management apparatus and method | |
JP4821867B2 (en) | Communication device and communication program | |
JP2003050753A (en) | OPERATION SYSTEM FOR AUTOMATIC RECOVERY Web SERVER | |
JPH10336242A (en) | Data communication system | |
JPH1027159A (en) | Communication line recovering system and its method | |
JPH1125062A (en) | Fault recovery system | |
JP2629415B2 (en) | A business process switching method in a mutual standby system | |
JPH0834615B2 (en) | Line state management control method in switching system | |
JP2000312244A (en) | Network interface switching method, its system and its recording medium | |
JPS61166655A (en) | Deadlock preventing system for receiving resource of communication controller | |
JP2561932B2 (en) | Line corresponding part switching system | |
JPH05324596A (en) | Parallel multiprocessing system | |
JPH09319684A (en) | Health check system |