JPH0620179A - Device and method for managing building - Google Patents

Device and method for managing building

Info

Publication number
JPH0620179A
JPH0620179A JP4178099A JP17809992A JPH0620179A JP H0620179 A JPH0620179 A JP H0620179A JP 4178099 A JP4178099 A JP 4178099A JP 17809992 A JP17809992 A JP 17809992A JP H0620179 A JPH0620179 A JP H0620179A
Authority
JP
Japan
Prior art keywords
building
equipment
abnormality
building equipment
check
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP4178099A
Other languages
Japanese (ja)
Inventor
Isao Sasao
勇夫 笹尾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP4178099A priority Critical patent/JPH0620179A/en
Publication of JPH0620179A publication Critical patent/JPH0620179A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To prevent the drop of the function of a building and the drop of service for the user of the building after the start of the operation of the building due to the abnormality of building equipment at the time of the restoration of the building after long-term stoppage. CONSTITUTION:A check program to judge a schedule or the stoppage of a prescribed period and check automatically the building equipment 5 when the building is in a stopping state for a long period and a reporting device 4 to detect the abnormality of the building equipment 5 on the basis of the check program and report it to a building management company 6 or a maintenance company are provided, and it is confirmed beforehand whether the building equipment 5 operates normally or not before the start of the operation of the building, and in the case of the abnormality, the execution of restoring work is completed before the start of the operation of the building. Accordingly, the drop of the function and the drop of the service for the user at the time of the operation of the building can be prevented.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【作業上の利用分野】本発明は、ビル設備の異常検出に
関するもので、特に長期間にわたり、ビル設備を休止さ
せた後の復旧時にビルが稼働する直前にビル設備が正常
に動作するか否かを事前にチェックし、ビル稼働前に復
旧させるようにしたビル管理装置及びビル管理方法に関
するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to detection of abnormalities in building equipment, and in particular, for a long period of time, whether the building equipment operates normally immediately before the building is put into operation at the time of restoration after the building equipment is suspended. The present invention relates to a building management device and a building management method that are checked in advance to restore before a building starts operating.

【0002】[0002]

【従来の技術】従来のビル管理装置では通常の機能とし
てビル稼働時の異常検出及び異常時の対応方法について
提案されている。
2. Description of the Related Art Conventional building management apparatuses have proposed, as a normal function, a method of detecting abnormalities during building operation and a method of dealing with abnormalities.

【0003】その提案の一例として特開平3−2555
99号公報に記載の非常通報装置を挙げることができ
る。この従来の非常通報装置は、ビル稼働時のビル設備
機器の異常を検出し、検出信号に応じて非常通報を発
し、電話回線を通じ、保守員が携帯する情報出力装置を
介して保守員に通報するようにしたものである。つま
り、この従来の非常通報装置は通常のビル稼働時にビル
設備の異常を検出した時、電話回線を介して保守員に非
常通報するようにしたものである。
As an example of the proposal, Japanese Patent Application Laid-Open No. 3-2555
An example is the emergency notification device described in Japanese Patent Publication No. 99. This conventional emergency notification device detects anomalies in building equipment when the building is operating, issues an emergency notification in response to the detection signal, and notifies the maintenance personnel through the telephone line and the information output device carried by the maintenance personnel. It is something that is done. In other words, this conventional emergency call device is designed to make an emergency call to a maintenance person via a telephone line when an abnormality in building equipment is detected during normal building operation.

【0004】[0004]

【発明が解決しようとする課題】従来の異常通報装置で
は、ビル稼働時におけるビル設備の異常を検出して、通
報するように構成されている。従って、長期間の休館後
のビル設備が正常に動作するか否かは、ビルが稼働状態
に入った後だけにしか検出できないため、もしも故障し
ていれば修理が完了するまで、ビル機能を低下させると
いう問題点があった。
The conventional abnormality reporting device is configured to detect and report an abnormality in the building equipment when the building is in operation. Therefore, whether or not the building equipment operates normally after being closed for a long time can be detected only after the building enters the operating state. There was a problem of lowering it.

【0005】本発明は、ビルが長期間の休館後におい
て、稼働状態に入ったときにビル設備の異常状態を無く
し、ビル機能の低下を未然に防止するすることができる
ビル管理装置及びビル管理方法を得ることを目的とす
る。
The present invention eliminates an abnormal state of building equipment when the building enters an operating state after the building is closed for a long period of time, and can prevent the deterioration of the building function in advance. Aim to get a way.

【0006】[0006]

【課題を解決するための手段】この発明に係るビル管理
装置及びビル管理方法では、ビル管理スケジュール又は
ビル機能停止後の経過時間などによりビル機能が復帰す
る前にビル設備の各機能を自動的に事前にチェックする
手段を設け、ビル設備が異常があれば、ビル稼働前に保
守員に通報するようにしたものである。
SUMMARY OF THE INVENTION In a building management apparatus and a building management method according to the present invention, each function of a building facility is automatically activated before the building function is restored due to the building management schedule or the elapsed time after the building function is stopped. A means for checking in advance is provided to notify maintenance personnel if the building equipment is abnormal before the building starts operation.

【0007】[0007]

【作用】この発明に係るビル管理装置及びビル管理方法
においては、ビル稼働前にビル内の各機器を事前チェッ
クすることにより、故障設備を事前に修理することがで
き、ビル稼働後のビル設備故障によるビル機能低下及び
ビル利用者へのサービス低下を防止することができる。
In the building management apparatus and the building management method according to the present invention, the malfunctioning equipment can be repaired in advance by preliminarily checking each equipment in the building before the building is operated, and the building equipment after the building is operated. It is possible to prevent the deterioration of the building function and the deterioration of the service to the building users due to the failure.

【0008】[0008]

【実施例】【Example】

実施例1.以下、本発明の実施例1の構成を図1を参照
しながら説明する。図1は、本発明の実施例1をビルシ
ステムの他の構成とともに示すブロック図である。図1
において、1はビル設備を管理するためのビル管理装
置、2はビル設備の監視状態を表示する表示装置、3は
ビル設備の稼働時間、異常情報を記録するプリンタ、4
はビル設備の異常をビル管理会社あるいは保守会社へ通
報するための通報装置、5はビル設備、6はビル管理会
社又は保守会社である。
Example 1. Hereinafter, the configuration of the first embodiment of the present invention will be described with reference to FIG. First Embodiment FIG. 1 is a block diagram showing a first embodiment of the present invention together with another configuration of a building system. Figure 1
In the figure, 1 is a building management device for managing the building equipment, 2 is a display device for displaying the monitoring status of the building equipment, 3 is a printer for recording the operating time of the building equipment, and abnormality information, 4
Is a reporting device for reporting the abnormality of the building equipment to the building management company or the maintenance company, 5 is the building equipment, and 6 is the building management company or the maintenance company.

【0009】また、ビル設備5には空調設備、受変電設
備、エレベーター、エスカレーター等が含まれているも
のとする。さらに、ビル設備5に含まれる各機器はビル
管理装置1により常時その状態を監視又は制御される。
7はビル管理装置1に設けられてビル設備5の監視制御
を行なうための中央処理装置(以下、「CPU」とい
う。)である。
Further, the building equipment 5 includes an air conditioning equipment, a power receiving and transforming equipment, an elevator, an escalator and the like. Furthermore, the state of each device included in the building facility 5 is constantly monitored or controlled by the building management device 1.
Reference numeral 7 denotes a central processing unit (hereinafter, referred to as "CPU") provided in the building management apparatus 1 and for monitoring and controlling the building equipment 5.

【0010】なお、図示しないがビル管理装置1にはC
PU7を動作させるためのプログラムが記憶されたリー
ドオンリメモリ(以下、「ROM」という。)及びCP
Uのデータを一時記憶するランダムアクセスメモリ(以
下、「RAM」という。)が備えられている。
Although not shown, the building management device 1 has a C
A read only memory (hereinafter referred to as "ROM") in which a program for operating the PU 7 is stored, and a CP
A random access memory (hereinafter referred to as “RAM”) for temporarily storing U data is provided.

【0011】次に、上記のように構成された本実施例1
のビル管理装置1の動作を図2及び図3を参照しながら
説明する。図2は、本発明の実施例1のビル設備チェッ
クルーチンを示すフローチャートである。
Next, the first embodiment configured as described above
The operation of the building management device 1 will be described with reference to FIGS. 2 and 3. FIG. 2 is a flowchart showing a building facility check routine according to the first embodiment of the present invention.

【0012】なお、CPU7は図2に示すビル設備チェ
ックルーチンの他に図示しないメインルーチンに基づい
て、前記したビル設備の制御、監視、表示、プリントア
ウト及び通報等の監視、制御を実行し、ビル機能を長期
間停止させる場合に図2のビル設備チェックルーチンが
開始される。
In addition to the building equipment check routine shown in FIG. 2, the CPU 7 executes the above-mentioned building equipment control, monitoring, display, printout, notification and the like based on a main routine (not shown). When the building function is stopped for a long period of time, the building equipment check routine of FIG. 2 is started.

【0013】ここで、長期間ビル機能を停止させるか否
かは図示しない入力装置(例えば、キーボード、マウ
ス、ライトペン等)により設備管理者又はビルオーナー
がそのスケジュールあるいは停止時間等を入力すること
ができる構成となっている。
Here, whether or not to stop the building function for a long period of time is to be entered by the facility manager or the building owner using an input device (for example, a keyboard, a mouse, a light pen, etc.) which is not shown, and the schedule or the stop time. It is configured to be able to.

【0014】まず、ステップ10において、長期間ビル
機能停止する必要があるか否かを停止前にチェックす
る。例えば、図示しないがRAMに記録されたカレンダ
ーにより確認する。ステップ11において、ビル機能停
止後のビル設備5のチェック方法、順序、及びその実施
時期等が設定されているかを確認し、設定されていなけ
ればステップ12にて設定する(RAMに記憶され
る)。
First, in step 10, it is checked before the stop whether or not it is necessary to stop the building function for a long time. For example, although not shown, it is confirmed by a calendar recorded in RAM. In step 11, it is confirmed whether or not the check method, the order, and the execution time of the building equipment 5 after the building function is stopped are set, and if not set, it is set in step 12 (stored in the RAM). .

【0015】ステップ13で停止期間になったかを判定
し、停止期間に入っていればステップ15でビル設備5
のチェックタイミングに達したかを判断する。チェック
タイミングに達していれば、ステップ12で設定された
チェック手順、方法に従って、順次、ビル設備5をチェ
ックする。チェック方法については図示していないか、
該当設備に動作指令を出力し、その指令に基づいて設備
が動作するか否かを監視、制御する。ステップ16にお
いて、ビル設備5に異常がないか否かを判定し、異常と
判断したならばステップ17においてその異常情報を通
報装置4によりビル管理会社6(又はビル保守会社)へ
通報し、修理を依頼する。ステップ19では故障設備の
復旧が完了したかを確認する。
In step 13, it is judged whether or not the suspension period is reached. If it is in the suspension period, in step 15 the building equipment 5
Judgment whether the check timing of is reached. If the check timing has been reached, the building equipment 5 is sequentially checked according to the check procedure and method set in step 12. Isn't the check method illustrated?
An operation command is output to the corresponding equipment, and whether or not the equipment operates based on the instruction is monitored and controlled. In step 16, it is determined whether or not there is an abnormality in the building equipment 5, and if it is determined that there is an abnormality, the abnormality information is notified to the building management company 6 (or the building maintenance company) by the notification device 4 in step 17 for repair. Ask. In step 19, it is confirmed whether the restoration of the failed equipment is completed.

【0016】図3は、ビル設備5に含まれるエレベータ
ーを例にとり図2の内容を詳細に説明するためのフロー
チャートである。
FIG. 3 is a flow chart for explaining the contents of FIG. 2 in detail by taking an elevator included in the building equipment 5 as an example.

【0017】まず、ステップ20において、エレベータ
ーの状態をビル管理装置1に入力し、エレベーターが現
在どのような状態、例えば停止床位置などを確認する。
ステップ21において、エレベーターを動作させるため
に所定の階床のかご呼び又は乗場呼びの登録をビル管理
装置1の指令に基づいて実施する。呼び登録の手段とし
ては、図示しないがビル管理装置1の指令入力をエレベ
ーター制御回路で受け、エレベーター制御回路の指示に
より呼び登録ができるよう、エレベーター制御回路にそ
のプログラムが組込まれているものとする。
First, in step 20, the state of the elevator is input to the building management apparatus 1 to check what state the elevator is currently in, for example, the stop floor position.
In step 21, registration of a car call or a hall call of a predetermined floor to operate the elevator is performed based on a command from the building management device 1. As means for call registration, although not shown, it is assumed that the elevator control circuit receives a command input from the building management device 1 and the program is incorporated in the elevator control circuit so that the call can be registered according to an instruction from the elevator control circuit. .

【0018】ステップ22において、呼び登録がなされ
るとエレベーターはその呼びに対しサービスを行なうが
その状態をステップ20と同様の機能によりビル管理装
置1に入力する。ステップ23ではステップ20で入力
したデータとステップ22で入力したデータを比較し、
エレベーターが正常に動作したかを判定する。異常であ
れば、ステップ24でその異常内容をRAMに記憶して
おく。
When the call is registered in step 22, the elevator services the call, but the state is input to the building management device 1 by the same function as in step 20. In step 23, the data input in step 20 is compared with the data input in step 22,
Determine if the elevator worked properly. If it is abnormal, the content of the abnormality is stored in the RAM in step 24.

【0019】ステップ25では他のエレベーターに対し
ても呼び登録を行ない、全号機完了するまでステップ2
2〜25までの処理をくり返す。ステップ26におい
て、全号機完了したかを確認し、完了していれば、ステ
ップ27において、エレベーターに異常が有ったかどう
かをステップ24で記憶したRAMの内容により判定す
る。
In step 25, call registration is also performed for other elevators, and step 2 is performed until all units are completed.
Repeat the process from 2 to 25. In step 26, it is confirmed whether all the units are completed. If they are completed, it is determined in step 27 whether the elevator has an abnormality or not based on the contents of the RAM stored in step 24.

【0020】異常有りの場合は、ステップ28におい
て、ビル管理会社6(又はビル保守会社)へ通報し、修
理を依頼する。ステップ29では保守員による復旧作業
を行ない、ステップ30で復旧確認後、エレベーターの
チェックは完了する。
If there is an abnormality, in step 28, the building management company 6 (or building maintenance company) is notified and a repair is requested. In step 29, the maintenance work is performed by the maintenance staff, and after the restoration is confirmed in step 30, the elevator check is completed.

【0021】なお、図3においてはエレベーターを例に
とり説明したが他の設備(例えば、空調設備)に対して
も同様、その設備に適したチェック方法、手順により実
施可能である。
Although the elevator has been described as an example in FIG. 3, it can be similarly applied to other equipment (for example, air conditioning equipment) by a check method and a procedure suitable for the equipment.

【0022】このように、上記実施例1ではビル稼働前
に自動的にビル設備5を自動的にチェックする機能をビ
ル管理装置1に設けたことにより、ビル稼働時のビル機
能低下、ビル利用者へのサービス低下を防止することが
可能となる。
As described above, in the first embodiment, the building management apparatus 1 is provided with the function of automatically checking the building equipment 5 before the building is operated. It is possible to prevent deterioration of service to persons.

【0023】また、上記実施例1では長期間ビル停止の
場合について説明したが定期保守に利用することにより
保守員の省力化も可能となる。
In the first embodiment described above, the case where the building is stopped for a long period of time has been described, but it is possible to save the labor of the maintenance staff by using it for the periodic maintenance.

【0024】この発明の実施例1は、前述したように、
ビルが長期間停止後の復帰時にビル設備異常によるビル
稼働後のビル機能低下,ビル利用者へのサービス低下を
防止することを目的とする。そこで、ビルが長期間停止
状態にあるとき、スケジュール又は所定期間停止したこ
とを判断し、ビル設備5を自動的にチェックするチェッ
クプログラムと、そのチェックプログラムに基づいてビ
ル設備5の異常を検出し、ビル管理会社6又はビル保守
会社へ通報する通報装置4を具備し、ビル稼働前にビル
設備5が正常に動作するか否かを事前に確認し、異常の
場合はビル稼働前に復旧作業の実施を完了しておく。そ
の結果、ビル稼働時の機能低下及び利用者へのサービス
低下を防止することが可能となるという効果を奏する。
The first embodiment of the present invention, as described above,
The purpose of this is to prevent the deterioration of building functions and the service to the building users after the operation of the building due to abnormalities in the building equipment when the building is restored after a long stop. Therefore, when the building has been stopped for a long period of time, a check program for automatically checking the building equipment 5 by judging that it has been stopped for a predetermined period or a schedule, and an abnormality of the building equipment 5 is detected based on the check program. , A building management company 6 or a building maintenance company is equipped with a reporting device 4 to check in advance whether or not the building equipment 5 operates normally before building operation, and if there is an error, restore work before building operation Have been completed. As a result, it is possible to prevent deterioration of functions when the building is in operation and deterioration of services to users.

【0025】[0025]

【発明の効果】以上のように、本発明によれば、ビルが
長期間停止後の復帰においてビル設備が正常に動作する
か否かを事前に自動的にチェックし、異常時にはビル稼
働前ビル管理会社又はビル保守会社へ通報する構成とし
たことにより、ビル稼働後のビル機能低下、ビル利用者
へのサービス低下を未然に防止することができるという
効果を奏する。
As described above, according to the present invention, it is automatically checked in advance whether or not the building equipment normally operates when the building is restored after being stopped for a long period of time. With the configuration that the management company or the building maintenance company is notified, it is possible to prevent the deterioration of the building function after the operation of the building and the deterioration of the service for the building user.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の実施例1を含むビル管理システムの構
成を示すブロック図である。
FIG. 1 is a block diagram showing a configuration of a building management system including a first embodiment of the present invention.

【図2】本発明の実施例1のCPUが実行するビル設備
チェックルーチンを示すフローチャートである。
FIG. 2 is a flowchart showing a building facility check routine executed by a CPU according to the first embodiment of the present invention.

【図3】本発明の実施例1のビル設備チェックルーチン
の詳細説明のためにエレベーターのチェックを例にとっ
たフローチャートである。
FIG. 3 is a flow chart taking an elevator check as an example for detailed description of a building facility check routine according to the first embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1 ビル管理装置 2 表示装置 3 プリンタ 4 通報装置 5 ビル設備 6 ビル管理会社 7 CPU 1 Building Management Device 2 Display Device 3 Printer 4 Notification Device 5 Building Equipment 6 Building Management Company 7 CPU

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 ビル設備を制御、監視するビル管理手段
と、前記ビル設備が異常になったとき通報する通報手段
とを有するビル管理装置において、ビル機能を長期間に
わたり停止させた後の復帰時において、ビル稼働前に前
記ビル設備を自動的にチェックするビル設備チェック手
段を備えたことを特徴とするビル管理装置。
1. A building management apparatus having a building management means for controlling and monitoring building equipment and a reporting means for notifying when the building equipment has an abnormality, and returning after the building function is stopped for a long period of time. A building management device comprising a building equipment check means for automatically checking the building equipment before the building starts operating.
【請求項2】 ビル設備を制御、監視するビル管理ステ
ップと、前記ビル設備が異常になったとき通報する通報
ステップとを有するビル管理方法において、ビル機能を
長期間にわたり停止させた後の復帰時において、ビル稼
働前に前記ビル設備を自動的にチェックするビル設備チ
ェックステップを含むことを特徴とするビル管理方法。
2. A building management method comprising: a building management step of controlling and monitoring building equipment; and a reporting step of reporting when the building equipment becomes abnormal. Sometimes, a building management method comprising a building equipment check step of automatically checking the building equipment before the building starts operation.
JP4178099A 1992-07-06 1992-07-06 Device and method for managing building Pending JPH0620179A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4178099A JPH0620179A (en) 1992-07-06 1992-07-06 Device and method for managing building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4178099A JPH0620179A (en) 1992-07-06 1992-07-06 Device and method for managing building

Publications (1)

Publication Number Publication Date
JPH0620179A true JPH0620179A (en) 1994-01-28

Family

ID=16042629

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4178099A Pending JPH0620179A (en) 1992-07-06 1992-07-06 Device and method for managing building

Country Status (1)

Country Link
JP (1) JPH0620179A (en)

Similar Documents

Publication Publication Date Title
JP5363729B2 (en) Elevator control measure execution method and elevator remote control system
JPH02138081A (en) Elevator system
JP3224914B2 (en) Elevator failure sign system
JP2747071B2 (en) Elevator remote monitoring device
JPH0620179A (en) Device and method for managing building
JPH05132256A (en) Elevator controller and remote supervisory system thereof
JP4708211B2 (en) Elevator apparatus and elevator control method
JPH0616356A (en) Emergency operation device for elevator
JPH08198541A (en) Remote monitor for elevator
JP6537745B2 (en) Elevator remote monitoring system
JP2000023362A (en) Power system monitor and control system and recording medium with program recorded therein
JPH02225273A (en) Remote monitoring device for elevator
JPH05193856A (en) Remote trouble diagnostic device for elevator
JP2728149B2 (en) Elevator notification device
JP2008056360A (en) Elevator restoration device and restoration method for elevator after occurrence of earthquake
JP2894420B2 (en) Building management equipment
JP3437915B2 (en) Elevator inspection device
JPS6186376A (en) Group controller for elevator
JP2781484B2 (en) Monitoring system for passenger conveyor
JP3080504B2 (en) Work instruction creation system for elevator failure signs
JPH05221589A (en) Elevator monitoring device
JPH05254749A (en) Control operation collating device for elevator
JPH03106777A (en) Revone monitoring device for elevator
JPH05147848A (en) Monitor of elevator
JPH06206674A (en) Elevator trouble restoring device

Legal Events

Date Code Title Description
FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090622

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 9

Free format text: PAYMENT UNTIL: 20100622

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110622

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120622

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120622

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 12

Free format text: PAYMENT UNTIL: 20130622

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140622

Year of fee payment: 13