JPH06193195A JP34802392A JP34802392A JPH06193195A JP H06193195 A JPH06193195 A JP H06193195A JP 34802392 A JP34802392 A JP 34802392A JP 34802392 A JP34802392 A JP 34802392A JP H06193195 A JPH06193195 A JP H06193195A
Authority
JP
Japan
Prior art keywords
column
reinforcing
bar
reinforcing main
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP34802392A
Other languages
Japanese (ja)
Inventor
Mimio Shimoyama
巳三夫 下山
Kozo Imai
公三 今井
Hiroaki Kuno
宏明 久野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP34802392A priority Critical patent/JPH06193195A/en
Publication of JPH06193195A publication Critical patent/JPH06193195A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To reduce the cost of working by an arrangement wherein a beam- reinforcing main bar at the part to the outside of a column, at which part big-sized column-reinforcing main bars and the beam-reinforcing main bar intersect with each other, is replaced with a connector having through holes on the side thereof and is connected with the connector and the column-reinforcing main bars are inserted into the through holes on the connector. CONSTITUTION:Big-sized vertical column-reinforcing main bars 1 comprising a column, big-sized horizontal beam-reinforcing main bars 2 comprising a girder and reinforcing bars 3 against shearing are arranged. The beam-reinforcing main bar 2 at the part where the column-reinforcing main bars 1 at the position to the outside of the column and the beam-reinforcing main bar 2 intersect with each other, is replaced with a connector 4 having through holes 5 vertically opening at the side thereof. After that, four pieces of the column-reinforcing main bars 1 are inserted into the through holes 5 on the connector 4 two by two, and reinforced concrete structure is constructed by placing concrete 6. Therefore, the amount of the concrete can be reduced by minimizing the covering depth of the concrete.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、鉄筋、あるいは鉄筋
鉄骨コンクリート構造物を構成する太径鉄筋の配筋構造
に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a reinforcing bar or a reinforcing bar structure of a large diameter reinforcing bar which constitutes a reinforced concrete structure.

【0002】[0002]

【発明が解決しようとする課題】鉄筋を用いて柱、大梁
あるいは壁式ラーメン方式の構造物等を構築する場合、
配筋した鉄筋の外側面から所定の厚さのコンクリートの
かぶりが必要となる。太径鉄筋(φ22〜38)が交差
する部分は、鉄筋厚さが特に大となるので、かぶり厚さ
を加えたコンクリートの厚さは必然的に大となり、コス
ト高の要因となる。
When constructing columns, girders, wall type rigid frame type structures, etc. using reinforcing bars,
It is necessary to cover concrete with a specified thickness from the outer surface of the reinforced bar. Since the thickness of the reinforcing bar is particularly large at the portion where the large diameter reinforcing bars (φ22 to 38) intersect, the thickness of the concrete including the cover thickness is inevitably large, which causes a high cost.

【0003】この発明は上記問題点に着目しなされたも
のである。その目的は、かぶり厚を最小限となし得る太
径鉄筋の配筋構造を提案するにある。
The present invention has been made in view of the above problems. Its purpose is to propose a reinforcing structure for large diameter reinforcing bars that can minimize the cover thickness.

【0004】[0004]

【課題を解決するための手段】この太径鉄筋の配筋構造
は2条の太径鉄筋が交差した配筋構造において、一方の
鉄筋の交差部分を側面に透孔がある継手金物で置換し、
他方の鉄筋を継手金物の透孔を挿通して配筋してあるこ
とを特徴とする。
[Means for Solving the Problems] In this reinforcing bar structure of large diameter reinforcing bars, in the reinforcing bar structure in which two large diameter reinforcing bars cross each other, the intersecting part of one reinforcing bar is replaced with a joint metal fitting having a through hole on the side surface. ,
It is characterized in that the other reinforcing bar is inserted through the through hole of the joint metal.

【0005】この配筋構造は、梁が集った鉄筋、鉄骨鉄
筋コンクリート柱、あるいは柱、壁厚が同厚の壁式ラー
メン方式の構造物の配筋に好適に用いられる。
This bar arrangement structure is preferably used for bar arrangement of a reinforcing bar where beams are gathered, a steel frame reinforced concrete column, or a wall type rigid frame structure having the same wall thickness.

【0006】継手金物は鋼あるいは鋳物製で長さ600
〜1600mm程度である。継手金物は端部に筒形の継手
部が設けてあり、鉄筋と機械式(ネジ螺着式)あるいは
圧接等で接合する。
The joint metal fitting is made of steel or casting and has a length of 600.
It is about 1600 mm. The metal fitting has a tubular joint provided at the end and is joined to the reinforcing bar by mechanical (screw-screw) or pressure welding.

【0007】[0007]

【実施例】図1に示す実施例は、柱と梁が交差する鉄筋
コンクリート構造物の角部の配筋構造を示す。柱を構成
する縦方向の太径の柱主筋1、大梁を構成する横方向の
太径の梁主筋2、および剪断補強筋3が配筋してある。
この配筋において柱外側寄り位置の柱主筋1と梁主筋2
とが交差する部分の梁主筋2は、継手金物4で置換され
ている。継手金物4は側面に上下方向に開口したこの横
幅の広い透孔5を有し、両端を梁主筋2に接合してあ
る。交差する4本の柱主筋1は2本づつ、この透孔5を
挿通して配筋し、コンクリート6を打設して鉄筋コンク
リート構造物を構築してある。
EXAMPLE An example shown in FIG. 1 shows a reinforcing structure of a corner portion of a reinforced concrete structure where columns and beams intersect. A vertical large-diameter column main bar 1 forming a column, a horizontal large-diameter beam main bar 2 forming a girder, and a shear reinforcing bar 3 are arranged.
In this bar arrangement, the column main bar 1 and the beam main bar 2 located outside the column
The beam main bar 2 at the intersection of and is replaced with a joint metal piece 4. The joint metal piece 4 has a through hole 5 having a large lateral width, which is opened in the vertical direction on the side surface, and both ends thereof are joined to the main beam 2. Two of the four column main bars 1 intersecting each other are inserted through the through holes 5 to arrange the bars, and concrete 6 is placed to construct a reinforced concrete structure.

【0008】図2に示す実施例は柱と梁が交差する鉄筋
コンクリート構造物の側部の配筋構造を示す。柱を構成
する縦方向の太径の柱主筋1、大梁を構成する横方向の
太径の梁主筋2、および剪断補強筋3が配筋してあり、
柱主筋1と梁主筋2が交差する柱外側寄り位置の梁主筋
2は接合した継手金物4で置換されている。この継手金
物4は側面に上下方向に開口した横幅の広い3の透孔5
を有し、5本の柱主筋1はこの透孔5を挿通して配筋
し、コンクリート6を打設し鉄筋コンクリート構造物を
構築してある。
The embodiment shown in FIG. 2 shows a side bar arrangement structure of a reinforced concrete structure where columns and beams intersect. There are arranged a large-diameter column main bar 1 in the vertical direction forming a column, a large-diameter beam main bar 2 in the horizontal direction forming a girder, and a shear reinforcing bar 3,
The beam main bar 2 at a position closer to the outside of the column where the column main bar 1 and the beam main bar 2 intersect is replaced with a joint metal fitting 4 which is joined. The joint hardware 4 has three through-holes 5 with a wide width that are vertically opened on the side surface.
The column main reinforcements 1 of 5 columns are arranged by inserting the through holes 5 and placing concrete 6 to construct a reinforced concrete structure.

【0009】図1,2に示す実施例の構造物は、図3
(a) のように柱主筋1を梁主筋2に接合し置換した継手
金物4の透孔5を挿通してあり、図3(b) に示す従来の
柱主筋1と梁主筋2とを交差させ配筋した場合と比べ、
鉄筋外側面からのかぶり厚さtを等しくして、梁主筋2
中心からのコンクリート厚さTを薄くすることができ
る。
The structure of the embodiment shown in FIGS. 1 and 2 is shown in FIG.
As shown in (a), the main reinforcement 1 of the column is connected to the main reinforcement 2 of the beam, and the through hole 5 of the joint metal fitting 4 is inserted through the main reinforcement 1 and the main reinforcement 2 of the beam shown in FIG. 3 (b). Compared to the case of arranging
The cover thickness t from the outer surface of the reinforcing bar is made equal, and the beam main bar 2
The concrete thickness T from the center can be reduced.

【0010】図3に示す実施例は大梁と小梁とが交差す
る鉄筋コンクリート柱部分の配筋構造を示す。4本の大
梁筋7と小梁筋8が上下2段をなし交差する交差部分の
大梁筋7を継手金物4で置換し、継手金物横側面に開口
した横幅の広い透孔5に小梁筋8を挿通して配筋し、コ
ンクリート6を打設し構築してなる。
The embodiment shown in FIG. 3 shows a reinforcing structure of a reinforced concrete column portion where a large beam and a small beam intersect. The four beam beams 7 and beam beams 8 form two upper and lower steps, and the beam beams 7 at the intersection where they intersect are replaced with the joint hardware 4, and the beam beams are wide through holes 5 opened on the lateral side of the joint metal. It is constructed by inserting 8 and arranging and placing concrete 6.

【0011】この実施例では大梁筋7と小梁筋8の関係
での上下関係がなくなり、正規のかぶりおよび梁の断面
性能の確保が可能となる。
In this embodiment, the vertical relationship in the relationship between the girder reinforcement 7 and the girder reinforcement 8 is eliminated, and it becomes possible to ensure proper fogging and cross-sectional performance of the beam.

【0012】継手金物3は、鉄筋交差部分の長さに見合
った長さのものが用いられる。図5(a),(b),(c),(d),
(e) に柱幅と、その柱幅に適した長さの継手金物の例を
示す。
As the joint metal piece 3, one having a length corresponding to the length of the reinforcing bar crossing portion is used. 5 (a), (b), (c), (d),
(e) shows an example of a column width and a metal fitting with a length suitable for the column width.

【0013】なお、最外端に用いる継手金物は片端にの
み継手部があるものを用いる。
The metal fitting used at the outermost end has a joint portion only at one end.

【0014】[0014]

【作用および発明の効果】この発明は以上の通りであ
り、この配筋構造によるとコンクリートかぶり厚さを最
小限となし、コンクリート量の低減を図ることができ
る。同時にコンクリート打設能力によるコンクリート充
填性の改善、コンクリート表面平滑化による品質の確
保、鉄筋プレファブ化の促進等の効果を奏する。
The present invention is as described above. According to this reinforcing structure, the concrete cover thickness can be minimized and the amount of concrete can be reduced. At the same time, it has the effects of improving concrete filling properties by the ability to place concrete, ensuring quality by smoothing the concrete surface, and promoting the prefabrication of reinforcing bars.

【図面の簡単な説明】[Brief description of drawings]

【図1】実施例の鉄筋コンクリート構造物の角部の配筋
構造を示す横断面図である。
FIG. 1 is a cross-sectional view showing a reinforcing structure of a corner portion of a reinforced concrete structure according to an embodiment.

【図2】実施例の鉄筋コンクリート構造物の側部の配筋
構造を示す横断面図である。
FIG. 2 is a transverse cross-sectional view showing a side bar arrangement structure of a reinforced concrete structure according to an embodiment.

【図3】(a),(b) はこの配筋構造および従来の配筋構造
とコンクリートかぶり厚さとの関係を示す断面図であ
る。
3 (a) and 3 (b) are cross-sectional views showing the relationship between this bar arrangement structure and the conventional bar arrangement structure and the concrete cover thickness.

【図4】(a),(b) は実施例の大梁と小梁が交差する柱部
の配筋構造を示す横断面図およびA−A断面図である。
4 (a) and 4 (b) are a horizontal cross-sectional view and a cross-sectional view taken along the line AA showing a reinforcing structure of a column portion where a large beam and a small beam of the embodiment intersect.

【図5】柱幅とその柱幅に適した長さの継手金具の説明
図である。
FIG. 5 is an explanatory view of a column width and a joint fitting having a length suitable for the column width.

【符号の説明】[Explanation of symbols]

1…柱主筋、2…梁主筋、3…剪断補強筋、4…継手金
物、5…透孔、6…コンクリート、7…大梁鉄筋、8…
小梁鉄筋。
1 ... Column main bar, 2 ... Beam main bar, 3 ... Shear reinforcement, 4 ... Joint metal, 5 ... Through hole, 6 ... Concrete, 7 ... Large beam rebar, 8 ...
Beam girder rebar.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 2条の太径鉄筋が交差した配筋構造にお
いて、一方の鉄筋の交差部分を側面に透孔がある継手金
物で置換し、他方の鉄筋を継手金物の透孔を挿通して配
筋してあることを特徴とする太径鉄筋の配筋構造。
1. In a bar arrangement structure in which two large-diameter reinforcing bars intersect each other, an intersecting portion of one reinforcing bar is replaced with a fitting metal having a through hole on a side surface, and the other reinforcing bar is inserted through a through hole of the fitting. Reinforcing structure of large-diameter reinforcing bars characterized in that
JP34802392A 1992-12-28 1992-12-28 Arranging structure for big-sized reinforcement Pending JPH06193195A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP34802392A JPH06193195A (en) 1992-12-28 1992-12-28 Arranging structure for big-sized reinforcement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP34802392A JPH06193195A (en) 1992-12-28 1992-12-28 Arranging structure for big-sized reinforcement

Publications (1)

Publication Number Publication Date
JPH06193195A true JPH06193195A (en) 1994-07-12

Family

ID=18394219

Family Applications (1)

Application Number Title Priority Date Filing Date
JP34802392A Pending JPH06193195A (en) 1992-12-28 1992-12-28 Arranging structure for big-sized reinforcement

Country Status (1)

Country Link
JP (1) JPH06193195A (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58173243A (en) * 1982-04-02 1983-10-12 株式会社長谷川工務店 Crossed reinforcing wire metal fittings

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58173243A (en) * 1982-04-02 1983-10-12 株式会社長谷川工務店 Crossed reinforcing wire metal fittings

Similar Documents

Publication Publication Date Title
JP3272530B2 (en) Through-hole upper and lower reinforcement hardware for reinforced concrete perforated beams
JP2000027299A (en) Column structure
JPH11100900A (en) Joint part structure between reinforced concrete column and steel beam
JP2972043B2 (en) Method of joining different kinds of structural members and column / beam joining structural members
JPH06193195A (en) Arranging structure for big-sized reinforcement
JPH0441829A (en) Pillar/beam joint and its execution method
JPH0728269Y2 (en) Precast beams
JP2001032377A (en) Joint structure between reinforced concrete column and reinforced beam
JPH0420457B2 (en)
JP2000034780A (en) Column structure
JP2002115369A (en) Prefabricated reinforcement member
JPH06136822A (en) Column and girder joint construction of reinforced steel frame concrete construction
JP3389910B2 (en) Beam-column joint
JPH09228655A (en) Reinforcing structure of existing structure
JPH0715922Y2 (en) Joining hardware for reinforced concrete columns and steel beams
JP2560965Y2 (en) Column / beam joint structure
JPH0617482A (en) Permanent form made of steel plate for construction
JPH0621470B2 (en) Lap joint method of main bars in column and beam joints
JP2514859B2 (en) Precast Steel Reinforced Concrete Concrete Column
JPH05272171A (en) Column-beam mixed structure
JP2653339B2 (en) Reinforced concrete buried formwork
JPH0718191B2 (en) Connection structure of columns and beams of multi-story building
JPH05302361A (en) Joining structure between column and beam
JPH0823148B2 (en) Drop-in steel column base
JPH11107371A (en) Connection structure in composite structure building

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 19970128