JPH0613303U - Frame for switchboard and switchboard - Google Patents

Frame for switchboard and switchboard

Info

Publication number
JPH0613303U
JPH0613303U JP5146692U JP5146692U JPH0613303U JP H0613303 U JPH0613303 U JP H0613303U JP 5146692 U JP5146692 U JP 5146692U JP 5146692 U JP5146692 U JP 5146692U JP H0613303 U JPH0613303 U JP H0613303U
Authority
JP
Japan
Prior art keywords
switchboard
attached
corner connecting
framework
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP5146692U
Other languages
Japanese (ja)
Other versions
JP2598256Y2 (en
Inventor
亨 奥野
新一 薮田
清之 辻
Original Assignee
内外電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 内外電機株式会社 filed Critical 内外電機株式会社
Priority to JP1992051466U priority Critical patent/JP2598256Y2/en
Publication of JPH0613303U publication Critical patent/JPH0613303U/en
Application granted granted Critical
Publication of JP2598256Y2 publication Critical patent/JP2598256Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

(57)【要約】 【目的】 枠組の組立作業を、多種の機械工具や作業ス
ペースを必要とせず、また、熟練度等も必要とせずに、
簡単かつ容易に行なうことができようにする。 【構成】 配電盤用枠組体はコーナ連結金具2とアング
ルバー3を基本構成部材とし、コーナ連結金具2の3個
の取付面2A,2B,2Cの各稜線部の両側にはねじ挿
通孔5,5が設けられており、取付面の中央部にはアン
カーボルトや吊環等が取付けられるねじ挿通孔6が設け
られている。アングルバー3は、両フランジ部3A,3
Bの長手方向に多数のねじ挿通孔7が列設されている。
8個のコーナ連結金具2の各取付面2A,2B,2Cの
各稜線部に12本のアングルバー3の端部内面を当接
し、ねじ挿通孔5と7でねじ止めすることにより直方体
状に枠組を組立てる。
(57) [Abstract] [Purpose] Assembling the framework does not require various machine tools or working spaces, and does not require skill levels.
Be easy and easy to do. [Structure] The switchboard frame has a corner connecting fitting 2 and an angle bar 3 as basic constituent members, and screw mounting holes 5 are formed on both sides of each ridge of the three mounting surfaces 2A, 2B, 2C of the corner connecting fitting 2. 5 is provided, and a screw insertion hole 6 into which an anchor bolt, a suspension ring or the like is attached is provided at the center of the attachment surface. The angle bar 3 has two flange portions 3A, 3
A large number of screw insertion holes 7 are arranged in the longitudinal direction of B.
The inner surfaces of the end portions of the twelve angle bars 3 are brought into contact with the ridges of the mounting surfaces 2A, 2B, 2C of the eight corner connecting fittings 2 and are screwed with the screw insertion holes 5 and 7 to form a rectangular parallelepiped shape. Assemble the framework.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

この考案は、配電盤の枠組を構成する配電盤用枠組体およびこの配電盤用枠組 体によって構成される配電盤に関する。 The present invention relates to a switchboard frame assembly forming a switchboard frame and a switchboard configured by the switchboard frame assembly.

【0002】[0002]

【従来の技術】[Prior art]

従来、電気室に設置される配電盤は、図7に示すように、フレームパイプ30 を設置場所のスペースに合わせて適当な長さに切断し、固定金具31や連結金具 32を用いて枠組し、枠組されたフレームパイプに棚を設け、そこにCB,LB S,変圧器,継電器,制御用スイッチ等の配電用電気機器を適当な取付具によっ て取付け、前面に計器パネル33を取付け電気配線を行って設置されていた。 Conventionally, in a switchboard installed in an electric room, as shown in FIG. 7, a frame pipe 30 is cut into an appropriate length according to the space of the installation place, and a frame is fixed using a fixing bracket 31 and a connecting bracket 32. A shelf is provided in the framed frame pipe, and electric distribution equipment such as CB, LBS, transformer, relay, and control switch are attached thereto with appropriate attachments, and the instrument panel 33 is attached to the front to attach electrical wiring. Had been installed.

【0003】[0003]

【考案が解決しようとする課題】[Problems to be solved by the device]

しかしながら、フレームパイプを用いた枠組の組立作業は、上記したように、 作業現場での切断や連結といった作業のために、機械工具や作業スペースを要し 、作業現場が煩雑になり、作業者にとり加工・組立が行いにくい危険な作業にな っていた。特に、図7に示すように、フレームパイプ30の連結には、L型金具 やUボルト、ワッシャ等からなる連結金具32を用いるため、煩雑な作業になっ ていた。また、丸いフレームパイプ30の切断作業を正確に行うには、特殊な工 具を用いるため作業に対する熟練性を必要としていた。このため、従来より作業 の省力化と簡易化が望まれていた。また、変圧器等の容量の大型化とともに、電 気室自体のスペースが採れなくなっているため、省スペース化も望まれている。 However, as described above, the work of assembling the frame using the frame pipe requires a machine tool and a work space for the work such as cutting and connecting at the work site, which makes the work site complicated and makes it difficult for the worker. It was a dangerous work that was difficult to process and assemble. In particular, as shown in FIG. 7, the frame pipe 30 is connected with a connecting metal fitting 32 including an L-shaped metal fitting, a U-bolt, a washer, etc., which is a complicated task. Further, in order to perform the cutting work of the round frame pipe 30 accurately, a special tool is used, which requires skill for the work. Therefore, labor saving and simplification of the work have been desired in the past. In addition, as the capacity of transformers, etc. becomes larger and space for the electric room itself cannot be taken, space saving is also desired.

【0004】 一方、配電盤の設置作業は、上記したように、フレームパイプの枠組、機器の 取付け、電気配線といった手順で行われるが、機器の仕様変更や配置変更等があ った場合には、枠組からやり直す必要が生じ、作業手順の変更に対する対応性が 低いという問題点もあった。 したがって、この考案の目的は、枠組の組立作業を、多種の機械工具や作業ス ペースを必要とせず、また、熟練度等も必要とせずに、簡単かつ容易に行なうこ とができ、配置変更等に対する対応度も高く作業性に優れた配電盤用枠組体並び にかかる配電盤用枠組体によって構成される配電盤を提供することである。On the other hand, as described above, the installation work of the switchboard is performed by the procedures such as the frame pipe framework, the equipment installation, and the electric wiring. However, when the equipment specifications or layout are changed, There was also a problem that it was necessary to start over from the framework and the responsiveness to changes in work procedures was low. Therefore, the purpose of the present invention is to easily and easily perform the assembly work of the frame without requiring various kinds of machine tools or work space and skill level, and to change the layout. It is an object of the present invention to provide a switchboard that is composed of a switchboard frame assembly and a switchboard frame assembly that are highly compatible with the above and have excellent workability.

【0005】[0005]

【課題を解決するための手段】[Means for Solving the Problems]

請求項1記載の配電盤用枠組体は、上記課題を解決するために、8個のコーナ 連結金具と12本のアングルバーとを基本構成とし、コーナ連結金具は3個の取 付面が互いに直角をなす三角錐体状をなし、これらの各取付面の各稜線部の両側 にねじ挿通孔を設け、アングルバーの両フランジに長手方向に多数のねじ挿通孔 を列設し、コーナ連結金具の各取付面の各稜線部にアングルバーの端部内面を当 接してねじ止めすることにより直方体状に枠組するようにしている。 In order to solve the above-mentioned problems, the frame body for a switchboard according to claim 1 has a basic structure of eight corner connecting fittings and twelve angle bars, and the corner connecting fittings have three mounting surfaces at right angles to each other. It has a triangular pyramid shape, and has screw insertion holes on both sides of each ridge line on each of these mounting surfaces, and a large number of screw insertion holes are arranged in the longitudinal direction on both flanges of the angle bar. The inner surface of the end of the angle bar is brought into contact with each ridge of each mounting surface and screwed to form a rectangular parallelepiped frame.

【0006】 請求項2記載の配電盤用枠組体は、請求項1の配電盤用枠組体において直方体 状の枠組の一面に前面パネルを取付けている。 請求項3記載の配電盤用枠組体は、請求項1の配電盤用枠組体においてアング ルバーの間に配電用電気機器取付用桟を取付けている。 請求項4記載の配電盤用枠組体は、請求項1の配電盤用枠組体において下面に チャンネル枠を取付け、このチャンネル枠のウエブにアンカーボルト挿通孔を設 けている。According to a second aspect of the present invention, there is provided a switchboard frame assembly in which a front panel is attached to one surface of the rectangular parallelepiped frame structure. According to a third aspect of the present invention, there is provided a distribution board frame assembly in which a distribution electrical equipment mounting bar is attached between the angle bars of the distribution board framework. According to a fourth aspect of the present invention, there is provided a switchboard frame assembly in which a channel frame is attached to a lower surface of the switchboard frame assembly, and an anchor bolt insertion hole is provided in a web of the channel frame.

【0007】 請求項5記載の配電盤用枠組体は、請求項1の配電盤用枠組体において直方体 状の枠組の少なくとも一面に遮蔽板を取付けている。 請求項6記載の配電盤は、請求項2記載の配電盤用枠組体の前面パネルに配電 用電気機器を取付けている。 請求項7記載の配電盤は、請求項3記載の配電盤用枠組体の配電用電気機器取 付用桟に配電用電気機器を取付けている。According to a fifth aspect of the present invention, there is provided a switchboard frame assembly in which the shield plate is attached to at least one surface of the rectangular parallelepiped frame structure. According to a sixth aspect of the switchboard, an electrical device for power distribution is attached to the front panel of the frame body for the switchboard according to the second aspect. In the distribution board according to claim 7, the distribution electrical equipment is attached to the distribution electrical equipment installation rail of the distribution board framework.

【0008】[0008]

【作用】[Action]

請求項1の構成によれば、コーナ連結金具は3個の取付面が互いに直角をなす 三角錐体状をなし、これらの各取付面の各稜線部の両側にねじ挿通孔が設けられ るとともに、アングルバーの両フランジに長手方向に多数のねじ挿通孔が列設さ れているので、8個のコーナ連結金具の各取付面の各稜線部にアングルバーの端 部内面を当接してねじ止めするだけで簡単に直方体状に枠組を組立てることがで きる。また、コーナ連結金具のねじ挿通孔とアングルバーのねじ挿通孔との締結 位置を調節することで枠組の組立サイズの微調整を簡単に行うことができる。ま た、アングルバーは断面L字状をしており、容易に切断することができる。 According to the structure of claim 1, the corner connecting fitting has a triangular pyramid shape in which the three mounting surfaces are perpendicular to each other, and the screw insertion holes are provided on both sides of each ridge line portion of each of these mounting surfaces. Since a large number of screw insertion holes are lined up in the longitudinal direction on both flanges of the angle bar, the inner surface of the end of the angle bar is abutted against each ridge of each mounting surface of the eight corner connecting fittings. The frame can be easily assembled into a rectangular parallelepiped by simply stopping it. Further, by adjusting the fastening position of the screw insertion hole of the corner connecting fitting and the screw insertion hole of the angle bar, the fine adjustment of the frame assembly size can be easily performed. Moreover, the angle bar has an L-shaped cross section and can be easily cut.

【0009】 請求項2の構成によれば、直方体状の枠組の一面に前面パネルを取付けている ので、この前面パネルに計器類を取付けることができる。 請求項3の構成によれば、アングルバーの間に配電用電気機器取付用桟を取付 けているので、この桟に配電用電気機器を取付けることができる。 請求項4の構成によれば、下面にチャンネル枠を取付け、このチャンネル枠の ウエブにアンカーボルト挿通孔を設けているので、設置場所の床面が水平でない 場合にチャンネルによってレベルを出すことができる。また、床面にアンカーボ ルトが敷設されていれば、容易に据えつけることができる。According to the structure of the second aspect, since the front panel is attached to one surface of the rectangular parallelepiped frame, instruments can be attached to the front panel. According to the structure of claim 3, the distribution electric device mounting bar is mounted between the angle bars, so that the distribution electric device can be mounted on this bar. According to the structure of claim 4, since the channel frame is attached to the lower surface and the anchor bolt insertion hole is provided in the web of the channel frame, the level can be obtained by the channel when the floor surface of the installation place is not horizontal. . Also, if an anchor bolt is laid on the floor, it can be easily installed.

【0010】 請求項5の構成によれば、直方体状の枠組の少なくとも一面に遮蔽板を取付け ているので、配電盤として構成した際の安全性を保つことができる。 請求項6および請求項7の構成によれば、請求項1の配電盤用枠組体を配電盤 として設置することができる。According to the configuration of claim 5, since the shielding plate is attached to at least one surface of the rectangular parallelepiped frame, it is possible to maintain safety when configured as a switchboard. According to the configurations of claims 6 and 7, the switchboard frame assembly of claim 1 can be installed as a switchboard.

【0011】[0011]

【実施例】【Example】

以下、この考案の実施例について図面に基づいて説明する。 図1は、この考案の実施例にかかる配電盤用枠組体を構成する基本部材である コーナ連結金具2とアングルバー3の外観および組立状態を示す斜視図であり、 コーナ連結金具2は3個の取付面が互いに直角をなす三角錐体状に形成されてい る。図2(a)(b)(c)にそれぞれコーナ連結金具2の3個の取付面2A, 2B,2Cを示す。取付面2A,2B,2Cの各稜線部の両側にはねじ挿通孔5 ,5が設けられており、取付面の中央部にはアンカーボルトや吊環等が取付けら れるねじ挿通孔6が設けられている。ねじ挿通孔5は、長孔に形成されているが 、複数の丸孔に形成してもよい。また、アングルバー3は、図3に示すように、 両フランジ部3A、3Bの長手方向に多数のねじ挿通孔7,7…が設けられてい る。同図において(a)は側面図、(b)は正面図である。 An embodiment of the present invention will be described below with reference to the drawings. FIG. 1 is a perspective view showing an external appearance and an assembled state of a corner connecting fitting 2 and an angle bar 3 which are basic members constituting a frame body for a switchboard according to an embodiment of the present invention. The mounting surface is formed in the shape of a triangular pyramid that is perpendicular to each other. 2A, 2B and 2C show three mounting surfaces 2A, 2B and 2C of the corner connecting fitting 2, respectively. Screw insertion holes 5, 5 are provided on both sides of each ridge of the mounting surfaces 2A, 2B, 2C, and a screw insertion hole 6 for mounting an anchor bolt, a suspension ring, etc. is provided at the center of the mounting surface. ing. Although the screw insertion hole 5 is formed as a long hole, it may be formed as a plurality of round holes. Further, as shown in FIG. 3, the angle bar 3 is provided with a large number of screw insertion holes 7, 7 ... In the longitudinal direction of both flange portions 3A, 3B. In the figure, (a) is a side view and (b) is a front view.

【0012】 このように形成されたコーナ連結金具2とアングルバー3は、図1に示すよう に、コーナ連結金具2の取付面2A,2B,2Cの各稜線部にアングルバー3の 端部内面を当接させ、コーナ連結金具2のねじ挿通孔5とアングルバー3のねじ 挿通孔7とが重なるように位置合わせをしてねじで締結すれば、簡単に両者を連 結することができる。As shown in FIG. 1, the corner connecting fitting 2 and the angle bar 3 formed as described above are provided on the inner surface of the end portion of the angle bar 3 at the ridges of the mounting surfaces 2A, 2B, 2C of the corner connecting fitting 2, respectively. If they are brought into contact with each other, and the screw insertion hole 5 of the corner connecting fitting 2 and the screw insertion hole 7 of the angle bar 3 are aligned and fastened with a screw, the both can be easily connected.

【0013】 したがって、コーナ連結金具2を8個と、アングルバー3を12本用意してお き、8個のコーナ連結金具2を直方体の各コーナとなるように配置し、アングル バー3の両端部をコーナ連結金具2に対して上記のように連結すれば、直方体状 の枠組を容易に組立てることができる。また、コーナ連結金具2のねじ挿通孔5 とアングルバー3のねじ挿通孔7との締結位置を調節することで枠組の微調整を 行うことができる。また、枠組自体のサイズを変更するときは、アングルバー3 を切断してサイズ変更を行えばよい。アングルバー3は断面L字状なので、特殊 な工具を用いずに容易に切断することができる。Therefore, eight corner connecting fittings 2 and twelve angle bars 3 are prepared, and the eight corner connecting fittings 2 are arranged so as to be each corner of the rectangular parallelepiped, and both ends of the angle bar 3 are arranged. By connecting the parts to the corner connecting fitting 2 as described above, a rectangular parallelepiped frame can be easily assembled. Further, the frame can be finely adjusted by adjusting the fastening position between the screw insertion hole 5 of the corner connecting fitting 2 and the screw insertion hole 7 of the angle bar 3. When changing the size of the framework itself, the angle bar 3 may be cut to change the size. Since the angle bar 3 has an L-shaped cross section, it can be easily cut without using a special tool.

【0014】 組立てとしては、例えば、枠組の底面部の奥行き方向を形成するアングルバー 3の両端にあらかじめ工場出荷時にコーナ連結金具2を溶接によって連結してお き、このコーナ連結金具2に幅方向のアングルバー3を取付けて先ず底面側の枠 を組立てる。次に、高さ方向のアングルバー3を取付けて上面となるコーナ部分 にコーナ連結金具2を取付け、上面の奥行方向と幅方向のアングルバー3を取付 けて枠組の組立てを完了する。 このようにして組立てられた配電盤用枠組体1 の組立例を図4に示す。図示のように、コーナ連結金具2のねじ挿通孔5とアン グルバー3のねじ挿通孔7を共用し、連結部Dで共締めして配電盤用枠組体1を 並設することもできる。同図において(a)は正面図、(b)は側面図である。 また、上面側に別の配電盤用枠組体1を二段重ねにして設置することもできる。As for the assembly, for example, the corner connecting fittings 2 are preliminarily welded to both ends of the angle bar 3 forming the depth direction of the bottom surface of the frame at the time of factory shipment, and the corner connecting fittings 2 are attached in the width direction. First, assemble the frame on the bottom side by attaching the angle bar 3 of. Next, the angle bars 3 in the height direction are attached, the corner connecting fittings 2 are attached to the corner portions serving as the upper surface, and the angle bars 3 in the depth direction and the width direction of the upper surface are attached to complete the frame assembly. An example of the assembly of the switchboard frame assembly 1 assembled in this manner is shown in FIG. As shown in the drawing, the screw insertion hole 5 of the corner connecting fitting 2 and the screw insertion hole 7 of the angle bar 3 can be shared and tightened together at the connecting portion D, so that the switchboard frame 1 can be installed side by side. In the figure, (a) is a front view and (b) is a side view. Further, another switchboard frame assembly 1 can be installed on the upper surface side in a two-tiered manner.

【0015】 上記のように組立てられた配電盤用枠組体1の一面に前面パネルを取付け、ア ングルバー3の間に桟を取付けて、前面パネルおよび桟に配電用電気機器を取付 ければ、配電盤を構成することができる。 図5は、上記のようにして組立てられた3つの配電盤用枠組体1A,1B,1 Cによって構成された配電盤101の構成例を示す側面図で、枠組体1Aは低圧 配電室を構成し、その前面にはパネル10が取付けられ、パネル10には計器類 11が取付けられている。If a front panel is attached to one surface of the switchboard frame assembly 1 assembled as described above, a crosspiece is attached between the angle bars 3, and a distribution electrical device is attached to the front panel and the crosspiece, the distribution board is installed. Can be configured. FIG. 5 is a side view showing a configuration example of a switchboard 101 configured by the three switchboard frameworks 1A, 1B, and 1C assembled as described above. The framework 1A constitutes a low-voltage power distribution chamber, A panel 10 is attached to the front surface thereof, and instruments 11 are attached to the panel 10.

【0016】 枠組体1Bは変圧器ユニット室を構成し、変圧器12が設置されている。枠組 体1Bの上部には枠組体1Cが二段重ねにして設置され、枠組体1CはLSB充 電室を構成する。枠組体1Cの中央付近には電気機器取付用桟13が鉛直方向に 取付けられ、さらにこの桟に対して水平方向に取付けた桟に高圧負荷開閉器14 が取付けられている。また、枠組体1Cの左辺側アングルバー3に対して水平方 向に取付けた電気機器取付用桟には変流器15が取付けられている。枠組体1B および1Cの背後面には充電部保護用の遮蔽板16、17がそれぞれ取付けられ ている。The framework 1B constitutes a transformer unit room, and the transformer 12 is installed therein. The framework 1C is installed in a two-tiered manner above the framework 1B, and the framework 1C constitutes an LSB charging chamber. An electrical equipment mounting bar 13 is vertically mounted near the center of the frame body 1C, and a high voltage load switch 14 is mounted on the bar horizontally mounted on the bar. In addition, a current transformer 15 is attached to the electrical equipment attachment rail that is attached horizontally to the angle bar 3 on the left side of the framework 1C. Shielding plates 16 and 17 for protecting the charging part are attached to the rear surfaces of the frameworks 1B and 1C, respectively.

【0017】 枠組体1Aと1Bの設置フロアーと接する下面にはチャンネル枠18,19が 設けられており、チャンネル枠18,19のウェブにはアンカーボルト用の挿通 孔が形成され、フロアーに埋め込んだアンカーボルトによって枠組体1Aと1B が据え付け設置される。設置フロアーが水平でない場合には、これらのチャンネ ル枠によってレベルを出すことができる。Channel frames 18 and 19 are provided on the lower surfaces of the frame bodies 1A and 1B that are in contact with the installation floors. The webs of the channel frames 18 and 19 are formed with insertion holes for anchor bolts and are embedded in the floor. Frames 1A and 1B are installed and installed by anchor bolts. If the installation floor is not level, these channel frames allow you to level up.

【0018】 また、枠組体1Aで構成される低圧配電室と枠組体1Bおよび1Cで構成され る変圧器ユニット室とは、接続用のアングルバー21によって連結され、両室の 間は通路22が形成されている。LSB充電室と低圧配電室に取付けられた配線 用電気機器間の配線はこの接続用アングルバー21内を通して行われる。 上記したようにコーナ連結金具2のねじ挿通孔5とアングルバー3のねじ挿通 孔7を共用し、連結部で共締めして枠組体を並設して配電盤を構成すれば、図6 に示すように、電気室内に複数の配電盤を設置することができる。配電盤の構成 は実施例である配電盤用枠組体1によって個別に行えるので、系統毎や機能毎に ユニット化して構成することができる。同図において(a)は平面図、(b)は 正面図である。Further, the low-voltage power distribution chamber constituted by the frame 1A and the transformer unit chamber constituted by the frames 1B and 1C are connected by an angle bar 21 for connection, and a passage 22 is provided between both chambers. Has been formed. The wiring between the LSB charging chamber and the wiring electrical equipment attached to the low voltage distribution chamber is performed through the inside of the connecting angle bar 21. As described above, if the screw insertion hole 5 of the corner connecting fitting 2 and the screw insertion hole 7 of the angle bar 3 are commonly used and tightened together at the connecting portions to form the frame body side by side to form a switchboard, it is shown in FIG. Thus, a plurality of switchboards can be installed in the electric room. Since the structure of the switchboard can be individually performed by the switchboard frame 1 of the embodiment, it can be configured as a unit for each system or each function. In the figure, (a) is a plan view and (b) is a front view.

【0019】 また、枠組の組立てに際して、図4に示すように、コーナ連結金具2のねじ挿 通孔6に吊りボルト25を取付けておけば、枠組体を構成する部材の運搬を容易 に行うこともでき、変圧器の大容量化にともなって建物の屋上に電気室を設ける 場合等において、運搬作業の効率化と設置作業の能率化を図ることもできる。 この考案の実施例である配電盤用枠組体1は、上記したように、コーナ連結金 具2の3個の取付面2A,2B,2Cが互いに直角をなす三角錐体状をしており 、これらの各取付面の各稜線部の両側にねじ挿通孔5が設けられるとともに、ア ングルバー3の両フランジに長手方向に多数のねじ挿通孔7が列設されているの で、8個のコーナ連結金具2の各取付面の各稜線部に12本のアングルバー3の 端部内面を当接してねじ止めすることによって直方体状に組立てられるので、切 断等の作業を必要とせず、また、多種の機械工具も必要としないことから、組立 作業の省力化、簡易化を図るこがとができ、作業スペースを取らなくてすむ。Further, when assembling the framework, as shown in FIG. 4, if the suspension bolt 25 is attached to the screw insertion hole 6 of the corner connecting fitting 2, the members constituting the framework can be easily transported. It is also possible to increase the efficiency of transportation work and the efficiency of installation work when an electric room is installed on the rooftop of a building as the capacity of the transformer increases. As described above, the switchboard frame 1 according to the embodiment of the present invention has a triangular pyramid shape in which the three mounting surfaces 2A, 2B, 2C of the corner connecting tool 2 are perpendicular to each other. Since the screw insertion holes 5 are provided on both sides of each ridge of each mounting surface, and a large number of screw insertion holes 7 are arranged in the longitudinal direction on both flanges of the angle bar 3, eight corners are connected. It is assembled into a rectangular parallelepiped by abutting the inner surfaces of the end portions of the 12 angle bars 3 to the ridges of the mounting surfaces of the metal fitting 2 and fixing them with screws, so that no work such as cutting is required, and various types are available. Since no mechanical tools are required, it is possible to save labor and simplify the assembly work, and save a work space.

【0020】 また、この配電盤用枠組体1を用いて配電盤101を構成する場合は、その組 立・分解が容易に行えることから、仕様変更や配置変更等に対して現場で即対応 でき、作業手順の変更等に対しても対応度を高めることができる。Further, when the switchboard 101 is configured by using the switchboard frame assembly 1, the assembly and disassembly of the switchboard 101 can be easily performed, so that it is possible to immediately respond to a specification change, a layout change, etc. It is possible to increase the degree of correspondence to changes in procedures.

【0021】[0021]

【考案の効果】[Effect of device]

この考案の配電盤用枠組体によれば、8個のコーナ連結金具と12本のアング ルバーとを基本構成とし、コーナ連結金具の3個の取付面が互いに直角をなす三 角錐体状をし、これらの各取付面の各稜線部の両側にねじ挿通孔が設けられ、ア ングルバーの両フランジ部の長手方向に多数のねじ挿通孔が列設されているので 、コーナ連結金具の各取付面の各稜線部にアングルバーの端部内面を当接してね じ止めすることにより直方体状に組立てることができる。このため、作業スペー スを取らず、切断等の作業や多種の機械工具も必要としないことから、組立作業 の省力化、簡易化を図るこがとができる。 According to the frame structure for a switchboard of the present invention, eight corner connecting fittings and twelve angle bars are used as a basic structure, and three mounting surfaces of the corner connecting fittings are in the shape of a triangular pyramid that is perpendicular to each other. Since screw insertion holes are provided on both sides of each ridge of each mounting surface and a large number of screw insertion holes are arranged in a row in the longitudinal direction of both flange portions of the angle bar, the mounting surface of each corner connecting bracket is A rectangular parallelepiped can be assembled by abutting the inner surface of the end portion of the angle bar against each ridge portion and screwing. For this reason, the work space is not taken, and the work such as cutting and various kinds of machine tools are not required, so that labor saving and simplification of the assembling work can be achieved.

【0022】 また、この配電盤用枠組体を用いて配電盤を構成する場合は、その組立・分解 が容易に行えることから、仕様変更や配置変更等に対して現場で即対応でき、作 業手順の変更等に対しても対応度を高めることができる。さらに、配電盤をユニ ット的に構成でき、複数の配電盤を色々組合せて設置するこができる。Further, when a switchboard is constructed using this switchboard frame, it can be easily assembled and disassembled, so that it is possible to immediately respond to changes in specifications, changes in layout, etc. on site, and It is possible to improve the degree of response to changes and the like. Further, the switchboard can be configured in a unit, and various switchboards can be installed in various combinations.

【図面の簡単な説明】[Brief description of drawings]

【図1】この考案の実施例にかかる配電盤用枠組体を構
成する基本部材であるコーナ連結金具とアングルバーの
外観および組立状態を示す斜視図である。
FIG. 1 is a perspective view showing an outer appearance and an assembled state of a corner connecting fitting and an angle bar which are basic members constituting a frame body for a switchboard according to an embodiment of the present invention.

【図2】(a)(b)(c)はそれぞれコーナ連結金具
の3個の取付面を示す図である。
2 (a), (b) and (c) are views showing three mounting surfaces of a corner connecting fitting, respectively.

【図3】(a)(b)はアングルバーの構成を示す側面
図と正面図である。
3A and 3B are a side view and a front view showing a configuration of an angle bar.

【図4】配電盤用枠組体を組立てた例を示す図である。FIG. 4 is a view showing an example of assembling a frame body for a switchboard.

【図5】配電盤用枠組体によって構成された配電盤の構
成を示す側面図である。
FIG. 5 is a side view showing a configuration of a switchboard configured by a switchboard frame assembly.

【図6】(a)(b)は配電盤を複数設置した状態を示
す平面図と正面図である。
6A and 6B are a plan view and a front view showing a state in which a plurality of switchboards are installed.

【図7】従来例の構成を示す斜視図である。FIG. 7 is a perspective view showing a configuration of a conventional example.

【符号の説明】[Explanation of symbols]

1 配電盤用枠組体 2 コーナ連結金具 2A、2B、2C 取付面 3 アングルバー 5 ねじ挿通孔 7 ねじ挿通孔 10 パネル 11 計器 13 電気機器取付用桟 16、17 遮蔽板 18、19 チャンネル枠 101 配電盤 1 Frame for switchboard 2 Corner connecting fittings 2A, 2B, 2C Mounting surface 3 Angle bar 5 Screw insertion hole 7 Screw insertion hole 10 Panel 11 Instrument 13 Electrical equipment mounting bar 16, 17 Shielding plate 18, 19 Channel frame 101 Switchboard

Claims (7)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 8個のコーナ連結金具と、12本のアン
グルバーとを備え、前記コーナ連結金具は3個の取付面
が互いに直角をなす三角錐体状をなし、これらの各取付
面の各稜線部の両側にねじ挿通孔を設け、 前記アングルバーの両フランジに長手方向に多数のねじ
挿通孔を列設し、 前記コーナ連結金具の各取付面の各稜線部に前記アング
ルバーの端部内面を当接してねじ止めすることにより直
方体状に枠組した配電盤用枠組体。
1. A corner connecting fitting comprising eight corner connecting fittings and twelve angle bars, the corner connecting fittings having a triangular pyramid shape in which three mounting surfaces are perpendicular to each other. Screw insertion holes are provided on both sides of each ridge, and a large number of screw insertion holes are provided in the longitudinal direction on both flanges of the angle bar, and the end of the angle bar is provided on each ridge of each mounting surface of the corner connecting fitting. A frame body for a switchboard, which is framed in a rectangular parallelepiped shape by abutting the inner surfaces of the parts and screwing.
【請求項2】 直方体状の枠組の一面に前面パネルを取
付けた請求項1記載の配電盤用枠組体。
2. The framework for a switchboard according to claim 1, wherein a front panel is attached to one surface of the rectangular parallelepiped framework.
【請求項3】 アングルバーの間に配電用電気機器取付
用桟を取付けた請求項1記載の配電盤用枠組体。
3. The frame body for a distribution board according to claim 1, wherein a crosspiece for mounting a distribution electric device is attached between the angle bars.
【請求項4】 下面にチャンネル枠を取付け、このチャ
ンネル枠のウエブにアンカーボルト挿通孔を設けた請求
項1記載の配電盤用枠組体。
4. The frame body for a switchboard according to claim 1, wherein a channel frame is attached to a lower surface, and an anchor bolt insertion hole is provided in a web of the channel frame.
【請求項5】 直方体状の枠組の少なくとも一面に遮蔽
板を取付けた請求項1記載の配電盤用枠組体。
5. The framework for a switchboard according to claim 1, wherein a shielding plate is attached to at least one surface of the rectangular parallelepiped framework.
【請求項6】 請求項2記載の配電盤用枠組体の前面パ
ネルに配電用電気機器を取付けた配電盤。
6. A switchboard in which an electrical device for power distribution is attached to a front panel of the frame body for switchboard according to claim 2.
【請求項7】 請求項3記載の配電盤用枠組体の配電用
電気機器取付用桟に配電用電気機器を取付けた配電盤。
7. A distribution board in which the distribution electrical equipment is attached to a distribution electrical equipment mounting rail of the distribution board framework according to claim 3.
JP1992051466U 1992-07-22 1992-07-22 Switchboard framework and switchboard Expired - Lifetime JP2598256Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1992051466U JP2598256Y2 (en) 1992-07-22 1992-07-22 Switchboard framework and switchboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1992051466U JP2598256Y2 (en) 1992-07-22 1992-07-22 Switchboard framework and switchboard

Publications (2)

Publication Number Publication Date
JPH0613303U true JPH0613303U (en) 1994-02-18
JP2598256Y2 JP2598256Y2 (en) 1999-08-03

Family

ID=12887722

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1992051466U Expired - Lifetime JP2598256Y2 (en) 1992-07-22 1992-07-22 Switchboard framework and switchboard

Country Status (1)

Country Link
JP (1) JP2598256Y2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5032342U (en) * 1973-07-19 1975-04-09
JPH07255927A (en) * 1994-03-18 1995-10-09 Daiichi Shokai Co Ltd Pachinko machine
JP2010268615A (en) * 2009-05-15 2010-11-25 Nitto Electric Works Ltd Frame fixing structure of cabinet for storing electric and electronic equipment
JP2016127785A (en) * 2015-01-08 2016-07-11 河村電器産業株式会社 Incoming panel for rental room transformation
JP2019068689A (en) * 2017-10-04 2019-04-25 河村電器産業株式会社 High-voltage power receiving equipment frame

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52154633U (en) * 1976-05-19 1977-11-24
JPS54114728U (en) * 1978-02-01 1979-08-11
JPS55120203U (en) * 1979-02-15 1980-08-26
JPS55111608A (en) * 1979-02-22 1980-08-28 Tokyo Shibaura Electric Co Housing frame
JP3084301U (en) * 2001-08-27 2002-03-22 株式会社青木製作所 Vehicle door marker

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52154633U (en) * 1976-05-19 1977-11-24
JPS54114728U (en) * 1978-02-01 1979-08-11
JPS55120203U (en) * 1979-02-15 1980-08-26
JPS55111608A (en) * 1979-02-22 1980-08-28 Tokyo Shibaura Electric Co Housing frame
JP3084301U (en) * 2001-08-27 2002-03-22 株式会社青木製作所 Vehicle door marker

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5032342U (en) * 1973-07-19 1975-04-09
JPH07255927A (en) * 1994-03-18 1995-10-09 Daiichi Shokai Co Ltd Pachinko machine
JP2010268615A (en) * 2009-05-15 2010-11-25 Nitto Electric Works Ltd Frame fixing structure of cabinet for storing electric and electronic equipment
JP2016127785A (en) * 2015-01-08 2016-07-11 河村電器産業株式会社 Incoming panel for rental room transformation
JP2019068689A (en) * 2017-10-04 2019-04-25 河村電器産業株式会社 High-voltage power receiving equipment frame

Also Published As

Publication number Publication date
JP2598256Y2 (en) 1999-08-03

Similar Documents

Publication Publication Date Title
US5820289A (en) Corner joint element
KR101757664B1 (en) Switchboard equipped with earthquake-resistance frame and the method of earthquake-resistance switchboard
JPH0613303U (en) Frame for switchboard and switchboard
JPH03233062A (en) Construction method of column
KR101751651B1 (en) Earthquake-Resistant Swichboard with Enclosure Applied Triaxis Corner Piece of Double and Symmetric Structure
KR200268195Y1 (en) A clamping unit for a floor panel supporting frame of clean room
KR20190015913A (en) Construction for exterior material of building
JP2987027B2 (en) Mounting structure of air conditioner indoor unit
JPH0546571Y2 (en)
JP2602586Y2 (en) Low-voltage switchboard
JPH0689573B2 (en) Wall unit of wall construction method
JP2931288B1 (en) Work platform support
JPH0647840B2 (en) How to connect structures
JP3107749B2 (en) Steel House Frame Structure
JPH031922Y2 (en)
JPH04136343A (en) House unit
JPH0344900Y2 (en)
JPH0670336B2 (en) External wall panel mounting structure
CA1107934A (en) Electrified ceiling system
JP3199658B2 (en) Floor panel mounting structure
JPH062410Y2 (en) Frame structure for board
JPH0455128Y2 (en)
JPH0719591A (en) Structure and method for fitting indoor machine for air-conditioning equipment
JPH062922U (en) Cable rack fixing device
JP4070341B2 (en) Connecting bracket for unit housing and unit housing using the same

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080604

Year of fee payment: 9