JPH06113458A - Power-system control apparatus - Google Patents
Power-system control apparatusInfo
- Publication number
- JPH06113458A JPH06113458A JP4224425A JP22442592A JPH06113458A JP H06113458 A JPH06113458 A JP H06113458A JP 4224425 A JP4224425 A JP 4224425A JP 22442592 A JP22442592 A JP 22442592A JP H06113458 A JPH06113458 A JP H06113458A
- Authority
- JP
- Japan
- Prior art keywords
- power
- power supply
- control
- load
- command
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E20/00—Combustion technologies with mitigation potential
- Y02E20/14—Combined heat and power generation [CHP]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/10—Internal combustion engine [ICE] based vehicles
- Y02T10/12—Improving ICE efficiencies
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/12—Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/14—Energy storage units
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
【0001】[0001]
【産業上の技術分野】本発明は、コージェネレーション
システムが接続される電力系統を制御する技術に関す
る。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a technique for controlling a power system to which a cogeneration system is connected.
【0002】[0002]
【従来の技術】従来、電力系統は、広範囲に分散された
発変電所、開閉所や電力供給線等の給電側設備と、電力
供給線とから構成され、給電業務として、需給調整を行
っている。この需給調整では、原子力・火力発電調整、
主要貯水池・調整池の運用、経済的な発電調整などを行
っている。2. Description of the Related Art Conventionally, an electric power system is composed of power supply side equipment such as a power station and a substation, a switchyard, and a power supply line dispersed over a wide area, and a power supply line. There is. In this supply and demand adjustment, nuclear and thermal power generation adjustment,
It operates the main reservoirs and regulating reservoirs and adjusts the power generation economically.
【0003】ところで、近年地球環境問題への関心の高
まりから、コージェネレーションシステム(熱電併給シ
ステム)などの総合エネルギ効率重視型のエネルギ供給
技術が採用され始めている。By the way, in recent years, due to the growing concern about global environmental problems, energy supply technology focusing on total energy efficiency such as cogeneration system (cogeneration system) has begun to be adopted.
【0004】[0004]
【発明が解決しようとする課題】しかしながら従来の電
力系統では、揚水発電や電力貯蔵などの技術によって需
給調整を行なうだけであった。このため、立地上の制約
が多い揚水発電所を、莫大な資金や長い年限を費やして
建設するしかなく、既に設置されていたり、これから設
置されるであろうコージェネレーションシステムを需給
調整に活用することができなかった。However, in the conventional electric power system, the supply and demand is adjusted only by the technology such as pumped storage power generation and electric power storage. For this reason, there is no choice but to construct a pumped storage power plant with many restrictions on location by spending a huge amount of money and a long maturity. I couldn't.
【0005】本発明は、コージェネレーションシステム
を活用して、社会全体の総合エネルギ効率の向上を図る
ことを目的とする。An object of the present invention is to improve the total energy efficiency of society as a whole by utilizing a cogeneration system.
【0006】[0006]
【課題を解決するための手段】本発明の電力系統制御装
置は、公共電力を供給する電力供給線と、該電力供給線
への電力供給状態を指令する給電指令手段と、該電力供
給線に接続されたコージェネレーションシステムと、上
記給電指令手段内に配設され、上記コージェネレーショ
ンシステムに給電指令を行うコージェネ給電指令手段
と、上記コージェネレーションシステム内に配設され、
上記コージェネ指令手段からの給電指令を受信する給電
指令受信手段と、該給電指令受信手段が受信した給電指
令に基づいて、上記コージェネレーションシステムを制
御するコージェネ制御手段とを備えることを要旨とす
る。An electric power system control device of the present invention includes a power supply line for supplying public power, a power supply command means for commanding a power supply state to the power supply line, and a power supply line for the power supply line. A cogeneration system connected, and arranged in the power supply command means, cogeneration power supply command means for performing a power supply command to the cogeneration system, and arranged in the cogeneration system,
The gist is provided with a power supply command receiving means for receiving a power supply command from the cogeneration command means, and a cogeneration control means for controlling the cogeneration system based on the power supply command received by the power supply command receiving means.
【0007】[0007]
【作用】本発明の電力系統制御装置は、給電指令手段内
に配設されたコージェネ給電指令手段がコージェネレー
ションシステムに給電指令を行うと、コージェネレーシ
ョンシステム内に配設された給電指令受信手段が、これ
を受信し、コージェネ制御手段が給電指令に基づいて、
コージェネレーションシステムを制御する。これによ
り、公共電力を供給する電力供給線に接続されているコ
ージェネレーションシステムを給電指令手段側から制御
することができる。In the electric power system control device of the present invention, when the cogeneration power supply command means arranged in the power supply command means issues a power supply command to the cogeneration system, the power supply command receiving means arranged in the cogeneration system is operated. , Receiving this, the cogeneration control means based on the power supply command,
Control the cogeneration system. Thereby, the cogeneration system connected to the power supply line that supplies the public power can be controlled from the power supply command means side.
【0008】[0008]
【実施例】次に本発明の実施例を説明する。図1は、電
力系統制御装置1の全体構成図である。電力系統制御装
置1は、中央給電指令所3と、地方給電所5と、分散給
電指令所7と、光ケーブルネットワーク9とを備えてい
る。中央給電指令所3は、給電指令組織の最上位に位置
する機関である。地方給電所5は、管轄電力系統の直接
の運転操作指令を担当しており、給電指令組織に応じて
複数設けられている。分散給電指令所7は、中央給電指
令所3からの指令に基づいて、後述する分散給電指令を
実行する。中央給電指令所3は、給電業務を行うため
に、需給調整用の給電指令信号を地方給電所5と、分散
給電指令所7とに出力する。EXAMPLES Examples of the present invention will be described below. FIG. 1 is an overall configuration diagram of the power system control device 1. The power system control device 1 includes a central power feeding command station 3, a local power feeding station 5, a distributed power feeding command station 7, and an optical cable network 9. The central power feeding command center 3 is an organization located at the highest level of the power feeding command organization. The local power supply station 5 is in charge of direct driving operation command of the jurisdiction power system, and a plurality of local power supply stations 5 are provided according to the power supply command organization. The distributed power supply command station 7 executes a distributed power supply command, which will be described later, based on the command from the central power supply command station 3. The central power feeding command station 3 outputs a power feeding command signal for supply and demand adjustment to the local power feeding station 5 and the distributed power feeding command station 7 in order to perform power feeding work.
【0009】光ケーブルネットワーク9は、メイン端末
装置13と、光リンク装置15と、個別端末装置18
と、光ケーブル19とを備えている。メイン端末装置1
3は、分散給電指令所7の専用端末装置であって、分散
給電指令所7から出力された指令を、光ケーブルネット
ワーク9に送信する。個別端末装置18は、コージェネ
制御を行う住宅エネルギ制御システム101の近傍に設
けられており、光ケーブルネットワーク9上を流されて
きた分散給電指令所7からの指令を受信して、制御装置
115に出力する。光ケーブル19は、配電線路沿いに
付設されている。The optical cable network 9 includes a main terminal device 13, an optical link device 15, and an individual terminal device 18.
And an optical cable 19. Main terminal device 1
Reference numeral 3 is a dedicated terminal device of the distributed power supply command station 7, and transmits the command output from the distributed power supply command station 7 to the optical cable network 9. The individual terminal device 18 is provided in the vicinity of the house energy control system 101 that performs cogeneration control, receives a command from the distributed power supply command station 7 that has been sent over the optical cable network 9, and outputs the command to the control device 115. To do. The optical cable 19 is attached along the distribution line.
【0010】図2は、コージェネレーションシステム2
1の構成図である。コージェネレーションシステム21
は、空気圧縮機Cと、燃焼室CCと、ガスタービンGT
と、コントローラ22と、ボイラBと、発電機Gと、空
調機23と、貯湯タンク25とを備えている。発電機G
には、回転数センサ26が取り付けられている。ボイラ
Bには、排ガスの温度を検出するボイラ温度センサ28
が取り付けられている。コントローラ22は、回転数セ
ンサ26と、ボイラ温度センサ28と、制御装置115
とに接続されている。コントローラ22は、制御装置1
15から燃料供給量信号が入力されている場合には、こ
れに基づく燃料fを燃焼室CCに供給する。また、運転
信号が入力されている場合には、回転数センサ26の出
力に基づいて、発電機Gを所定回転数の範囲内に保持す
るとともに、ボイラ温度センサ28の出力に基づいて、
ボイラBの温度を所定温度範囲内に保持する燃料fを、
燃焼室CCに供給する。停止信号が入力している場合に
は、燃焼室CCへの燃料f供給を停止する。コージェネ
レーションシステム21は、コントローラ22によって
起動、運転、停止、及び燃料供給量が制御される。コー
ジェネレーションシステム21は、空気圧縮機Cによっ
て圧縮した空気aと、燃料fとを、燃焼室CCに供給す
る。ガスタービンGTは、発電機Gを駆動する。ガスタ
ービンGTの排ガスgは、ボイラBに供給される。従っ
て、ボイラBに供給される熱量は、制御装置115から
の燃料供給量信号に応じて、増減される。ボイラBは、
熱交換器27を介して、空調機23に熱源を供給すると
ともに、貯湯タンク25に供給される給水を加熱する。
コントローラ22は、温度制御に用いたボイラBの温度
に基づいて、ボイラBの作動中を判断し、ボイラ作動中
信号を制御装置115に出力する。FIG. 2 shows a cogeneration system 2
It is a block diagram of 1. Cogeneration system 21
Is an air compressor C, a combustion chamber CC, a gas turbine GT
A controller 22, a boiler B, a generator G, an air conditioner 23, and a hot water storage tank 25. Generator G
A rotation speed sensor 26 is attached to the. The boiler B has a boiler temperature sensor 28 for detecting the temperature of the exhaust gas.
Is attached. The controller 22 includes a rotation speed sensor 26, a boiler temperature sensor 28, and a control device 115.
Connected to. The controller 22 is the controller 1
When the fuel supply amount signal is input from 15, the fuel f based on this is supplied to the combustion chamber CC. When the operation signal is input, based on the output of the rotation speed sensor 26, the generator G is maintained within the range of the predetermined rotation speed, and based on the output of the boiler temperature sensor 28,
The fuel f that keeps the temperature of the boiler B within a predetermined temperature range is
Supply to the combustion chamber CC. When the stop signal is input, the fuel f supply to the combustion chamber CC is stopped. The cogeneration system 21 is started, operated, stopped, and the fuel supply amount is controlled by the controller 22. The cogeneration system 21 supplies the air a compressed by the air compressor C and the fuel f to the combustion chamber CC. The gas turbine GT drives the generator G. The exhaust gas g of the gas turbine GT is supplied to the boiler B. Therefore, the amount of heat supplied to the boiler B is increased or decreased according to the fuel supply amount signal from the control device 115. Boiler B
The heat source is supplied to the air conditioner 23 via the heat exchanger 27, and the water supply supplied to the hot water storage tank 25 is heated.
The controller 22 determines that the boiler B is operating based on the temperature of the boiler B used for temperature control, and outputs a boiler operating signal to the control device 115.
【0011】空調機23は、コントローラ23Aと、温
水ポンプPと、図示しない吸収冷凍機と、本体熱交換器
とを備えている。コントローラ23Aは、制御装置11
5からの冷房信号、暖房信号を受信して、図示しない空
調用熱交換器に冷房用の冷水、又は暖房用の温水を供給
する。貯湯タンク25は、給湯弁29と、水位センサ3
1と、給湯ポンプ33と、保温ヒータ35とを備え、熱
湯を蓄えるとともに、供給する。空調機23と、貯湯タ
ンク25と、及びこれらに関連する部分は、制御装置1
15によって運転状態が検出され、各部が制御される。
保温ヒータ35は、図3に示す分岐開閉器123Aに接
続されており、貯湯タンク25内の湯温を所定温度範囲
内に保持する。給湯ポンプ33は、図示しない圧力室
と、圧力スイッチとを有し、熱湯を図示しない給湯蛇口
に圧送する。The air conditioner 23 includes a controller 23A, a hot water pump P, an absorption refrigerating machine (not shown), and a main body heat exchanger. The controller 23A is the controller 11
Upon receiving the cooling signal and the heating signal from 5, the cooling water for heating or the hot water for heating is supplied to the heat exchanger for air conditioning (not shown). The hot water storage tank 25 includes a hot water supply valve 29 and a water level sensor 3
1, hot water supply pump 33, and heat retention heater 35 are provided to store and supply hot water. The air conditioner 23, the hot water storage tank 25, and the parts related thereto are controlled by the control device 1
The operating state is detected by 15 and each part is controlled.
The heat retention heater 35 is connected to the branch switch 123A shown in FIG. 3 and keeps the hot water temperature in the hot water storage tank 25 within a predetermined temperature range. The hot water supply pump 33 has a pressure chamber (not shown) and a pressure switch, and sends hot water under pressure to a hot water supply tap (not shown).
【0012】図3は住宅エネルギ制御システム101の
全体構成図である。住宅エネルギ制御システム101
は、引き込みメータユニット103と、引き込み開閉器
部105と、パワーユニット109と、コージェネレー
ションシステム21と、制御装置115とを備えてい
る。FIG. 3 is an overall configuration diagram of the house energy control system 101. Home energy control system 101
Includes a retractable meter unit 103, a retractable switch unit 105, a power unit 109, a cogeneration system 21, and a control device 115.
【0013】図4は引き込みメータユニット103の構
成図である。引き込みメータユニット103は、一次側
端子103Aが図3に示すように、住宅の引込口117
に接続され、二次側端子103Bが引き込み開閉器11
9に接続されている。引き込みメータユニット103
は、電圧センサ103Cと、電流センサ103D、10
3Eと、電力量演算装置103Fと、表示装置103G
とを備えている。電力量演算装置103Fは、制御装置
115からの指令に従い、電圧センサ103Cと、電流
センサ103D、103Eとの検出値に基づいて、電力
量を算出する。表示装置103Gは、表示部103G
A、103GB、103GC、103GD、103G
E、103GFを備え、第1〜第6種電力量を表示す
る。第1種電力量は、昼間消費電力量であり、第2種電
力量は、夜間消費電力量であり、第3種電力量は、昼間
送電電力量であり、第4種電力量は、夜間送電電力量で
ある。第5種電力量は、分散消費電力量であり、第6種
電力量は、分散送電電力量である。第5種と、第6種の
電力量の積算は、制御装置115から分散電力量計測信
号が出力されている場合に、実行される。FIG. 4 is a block diagram of the retractable meter unit 103. The retractable meter unit 103 has a primary inlet 103A, as shown in FIG.
The secondary side terminal 103B is connected to
9 is connected. Retractable meter unit 103
Is a voltage sensor 103C and a current sensor 103D, 10
3E, electric energy calculation device 103F, and display device 103G
It has and. The power amount calculation device 103F calculates the power amount based on the detection values of the voltage sensor 103C and the current sensors 103D and 103E in accordance with a command from the control device 115. The display device 103G has a display unit 103G.
A, 103GB, 103GC, 103GD, 103G
E and 103GF are provided, and the first to sixth types of electric energy are displayed. Type 1 power is daytime power consumption, Type 2 power is nighttime power consumption, Type 3 power is daytime power transmission, and Type 4 power is nighttime. It is the amount of transmitted power. The fifth type power amount is distributed power consumption amount, and the sixth type power amount is distributed transmission power amount. The integration of the electric energy of the fifth type and the electric energy of the sixth type is executed when the distributed electric energy measurement signal is output from the control device 115.
【0014】引き込み開閉器部105は、図3に示すよ
うに引き込み開閉器119と、電流センサ121と、分
岐開閉器123A、123B、123C、123Dとを
備えている。電流センサ121は、引き込み開閉器11
9と、分岐開閉器123A〜Dとの間に介装されてお
り、制御装置115に接続されている。As shown in FIG. 3, the pull-in switch unit 105 includes a pull-in switch 119, a current sensor 121, and branch switches 123A, 123B, 123C, 123D. The current sensor 121 has a retractable switch 11
9 and the branch switches 123A to 123D, and is connected to the control device 115.
【0015】引き込み開閉器119は、制御装置115
からの信号によってオンオフされるものであって、これ
の二次側には、パワーユニット109が接続されてい
る。図5はパワーユニット109の構成図である。パワ
ーユニット109は、電圧調整器127と、蓄電池13
1と、インバータユニット133と、系統連携装置13
5とを備えている。電圧調整器127の出力127A
と、蓄電池131との間には、電流センサ137と、電
磁開閉器139とが介装されている。蓄電池131に
は、電圧センサ141が取り付けられている。電圧調整
器127の出力127Aと、インバータユニット133
の入力133Aとの間には、電流センサ143が介装さ
れている。電圧調整器127は、発電機Gの発生電力を
所定電圧の直流電力に変換して、蓄電池131と、イン
バータユニット133とに供給する。蓄電池131は、
発電機Gの発生電力を蓄える。インバータユニット13
3は、発電機Gの発生電力や蓄電池131に蓄えられて
いた電力を商用電力と同品質の電力に変換する。系統連
携装置135は、引込口117の商用電力と、インバー
タユニット133の出力とを連携させる。系統連携装置
135と、インバータユニット133とにより、インバ
ータユニット13の入力133Aに加えられた直流電力
は、商用電力に連携されて出力端子133TAに出力さ
れる。また、住宅エネルギ制御システム101内で自家
消費する分を越える電力は、引き込み開閉器119、引
き込みメータユニット103を順に経由して、商用電力
配電線に送電される。The retraction switch 119 is provided with the control device 115.
The power unit 109 is connected to the secondary side of the power unit 109. FIG. 5 is a configuration diagram of the power unit 109. The power unit 109 includes a voltage regulator 127 and a storage battery 13
1, an inverter unit 133, and a system cooperation device 13
5 and. Output 127A of voltage regulator 127
A current sensor 137 and an electromagnetic switch 139 are interposed between the battery and the storage battery 131. A voltage sensor 141 is attached to the storage battery 131. The output 127A of the voltage regulator 127 and the inverter unit 133
A current sensor 143 is interposed between the input 133A and the input 133A. The voltage regulator 127 converts the power generated by the generator G into DC power having a predetermined voltage and supplies the DC power to the storage battery 131 and the inverter unit 133. The storage battery 131 is
It stores the power generated by the generator G. Inverter unit 13
3 converts the generated power of the generator G and the power stored in the storage battery 131 into power of the same quality as commercial power. The system cooperation device 135 links the commercial power of the service port 117 and the output of the inverter unit 133. The DC power applied to the input 133A of the inverter unit 13 by the system cooperation device 135 and the inverter unit 133 is output to the output terminal 133TA in cooperation with the commercial power. In addition, the electric power exceeding the amount consumed by the house energy control system 101 is transmitted to the commercial power distribution line through the pull-in switch 119 and the pull-in meter unit 103 in this order.
【0016】図6は、制御装置115の構成図である。
制御装置115は、入力インタフェース231と、入出
力インタフェース232と、CPU233と、ROM2
35と、RAM237と、出力インタフェース239
と、通信インタフェース241と、キーボード243
と、ディスプレイ245と、外部記憶装置247とを備
えている。キーボード243は、分散制御キー243A
と、独立制御キー243Bと、冷房制御キー243C
と、暖房制御キー243Dと、給湯制御キー243E
と、ガスタービン制御キー243Fと、蓄電制御キー2
43Gと、送電制御キー243Hと、発電制御キー24
3Iとを備えている。FIG. 6 is a block diagram of the controller 115.
The control device 115 includes an input interface 231, an input / output interface 232, a CPU 233, and a ROM 2.
35, RAM 237, and output interface 239
, Communication interface 241, keyboard 243
And a display 245 and an external storage device 247. The keyboard 243 is a distributed control key 243A.
, Independent control key 243B, and cooling control key 243C
, Heating control key 243D, hot water supply control key 243E
, Gas turbine control key 243F, and power storage control key 2
43G, power transmission control key 243H, and power generation control key 24
3I and.
【0017】通信インタフェース241には、個別端末
装置18と、コージェネレーションシステム21のコン
トローラ22とが接続されている。通信インタフェース
241は、接続された先方の通信インタフェースとの間
でデータ通信を行う。入力インタフェース231には、
電流センサ137と、電圧センサ141と、電流センサ
143と、電流センサ121と、水位センサ31とが接
続されている。入出力インタフェース232には、空調
機23のコントローラ23Aが接続されている。入出力
インタフェース232は、コントローラ23Aとの間
で、データの送受信を行う。The individual terminal device 18 and the controller 22 of the cogeneration system 21 are connected to the communication interface 241. The communication interface 241 performs data communication with the communication interface of the connected destination. The input interface 231 includes
The current sensor 137, the voltage sensor 141, the current sensor 143, the current sensor 121, and the water level sensor 31 are connected. The controller 23A of the air conditioner 23 is connected to the input / output interface 232. The input / output interface 232 transmits / receives data to / from the controller 23A.
【0018】出力インタフェース239には、動力盤2
51が接続されており、動力盤251には、電磁開閉器
139と、引き込みメータユニット103と、給湯ポン
プ33と、温水ポンプPと、給湯弁29と、引き込み開
閉器119とが接続されている。動力盤251は、出力
インタフェース239からの駆動信号に基づいて作動さ
れる図示しない電磁開閉器を備え、接続された機器に駆
動電力を供給する。The output interface 239 includes a power board 2
51 is connected, and the power panel 251 is connected with the electromagnetic switch 139, the drawing meter unit 103, the hot water supply pump 33, the hot water pump P, the hot water supply valve 29, and the drawing switch 119. . The power board 251 includes an electromagnetic switch (not shown) that is operated based on a drive signal from the output interface 239, and supplies drive power to connected equipment.
【0019】図7は、分散給電指令制御処理のフローチ
ャートである。この処理は、図1に示した、分散給電指
令所7に備えられた図示しないコンピュータによって実
行される。まず、給電指令信号の入力を行う(S300
0)。給電指令信号は、図1に示した中央給電指令所3
から出力されたものを入力する。FIG. 7 is a flowchart of the distributed power supply command control processing. This processing is executed by a computer (not shown) provided in the distributed power supply command station 7 shown in FIG. First, a power supply command signal is input (S300
0). The power supply command signal is sent to the central power supply command station 3 shown in FIG.
Input the one output from.
【0020】次いで、需給予想の入力を行う(S301
0)。需給予想は、翌日の電力の需給状態の予想であっ
て、翌日の日照状態や気温などの気候予測から統計的処
理によって推測した太陽光や風力発電による発電量と、
電力消費量とに基づいて求められたものである。Next, the supply and demand forecast is input (S301).
0). The supply and demand forecast is a forecast of the power supply and demand state of the next day, and the amount of power generated by solar power and wind power generation estimated by statistical processing from the climate forecast such as the sunshine state and temperature of the next day,
It is calculated based on the power consumption.
【0021】次に、個別分散応答信号の入力を行う(S
3030)。個別分散応答信号は、個別制御を行ってい
る住宅エネルギ制御システム101から光ケーブルネッ
トワーク9を経由して返送されてくるものである。例え
ば、所定の住宅エネルギ制御システムが分散制御状態で
あるか、又は独立制御状態であるかの信号や、分散制御
の実行状態を示す信号が返送されてくる。Next, an individual dispersion response signal is input (S
3030). The individual distributed response signal is returned from the residential energy control system 101 performing individual control via the optical cable network 9. For example, a signal indicating whether a predetermined residential energy control system is in the distributed control state or the independent control state, or a signal indicating the execution state of the distributed control is returned.
【0022】次に、個別分散給電信号の生成が行われる
(S3040)。個別分散給電信号は、給電指令信号
と、需給予想とに基づいて作成されるものであって、所
定の住宅エネルギ制御システム101に対して、後述す
る送電状態を指令するための分散給電指示値を含むもの
である。Next, the individual distributed power supply signal is generated (S3040). The individual distributed power supply signal is created based on the power supply command signal and the supply and demand forecast, and a distributed power supply instruction value for commanding a power transmission state to be described later to the predetermined home energy control system 101. It includes.
【0023】上述した給電指令信号を生成した後、個別
分散給電指令信号の出力(S3060)を行う。個別分
散給電指令信号の出力は、メイン端末装置13に行われ
る。これにより、光リンク装置15を介して光ケーブル
19に、分散給電指令信号が流される。After the power supply command signal is generated, the individual distributed power supply command signal is output (S3060). The output of the individual distributed power supply command signal is performed to the main terminal device 13. As a result, the distributed power supply command signal is sent to the optical cable 19 via the optical link device 15.
【0024】図8は、個別指令入力制御処理のフローチ
ャートである。個別指令入力制御処理は、制御装置11
5によって、所定時間毎に実行される。まず、個別分散
給電指令信号の入力が行われる(S3230)。個別分
散給電指令信号の入力は、図6に示すように、通信イン
タフェース241を介して、個別端末装置18から行わ
れる。次に、個別分散給電指令の作成が行われる(S3
240)。これは、入力した個別分散給電指令信号に基
づいて行われる。FIG. 8 is a flowchart of the individual command input control process. The individual command input control process is performed by the control device 11
5 is executed every predetermined time. First, the individual distributed power supply command signal is input (S3230). As shown in FIG. 6, the input of the individual distributed power supply command signal is performed from the individual terminal device 18 via the communication interface 241. Next, the individual distributed power supply command is created (S3).
240). This is performed based on the input individual distributed power supply command signal.
【0025】次いで、個別分散給電指令の出力が行われ
る(S3250)。これは、RAM237内の分散給電
指令格納エリアに対して行われる。図9は、個別指令出
力制御処理のフローチャートである。個別指令出力制御
処理は、制御装置115によって、所定時間毎に実行さ
れる。Next, the individual distributed power supply command is output (S3250). This is performed for the distributed power supply command storage area in the RAM 237. FIG. 9 is a flowchart of the individual command output control process. The individual command output control process is executed by the control device 115 at predetermined time intervals.
【0026】まず、制御状態の入力が行われる(S32
60)。制御状態としては、後述する分散制御の別、独
立制御の別や受電量、発電量、送電量などが取り込まれ
る。分散、又は独立制御の別の判断は、図10の分散・
独立制御の選択ルーチンによって設定される分散制御フ
ラグの状態と、独立制御フラグの状態とに基づいて行わ
れる。First, the control state is input (S32).
60). As the control state, whether the distributed control or the independent control, which will be described later, the amount of received power, the amount of generated power, the amount of transmitted power, or the like is taken in. Dispersion, or another judgment of independent control, is the distribution / distribution of FIG.
This is performed based on the state of the distributed control flag set by the independent control selection routine and the state of the independent control flag.
【0027】次に、個別分散応答信号の生成が行われる
(S3270)。個別分散応答信号は、入力した制御状
態を分散給電指令所7に送信するためのものである。信
号の生成後、出力を実行する(S3280)。これによ
り、住宅エネルギ制御システム101の動作状態が分散
給電指令所7に伝えられる。Next, the individual dispersion response signal is generated (S3270). The individual distributed response signal is for transmitting the input control state to the distributed power supply command station 7. After the signal is generated, the output is executed (S3280). As a result, the operating state of the home energy control system 101 is transmitted to the distributed power supply command station 7.
【0028】図10は分散・独立制御の選択処理ルーチ
ンのフローチャートである。このルーチンは、制御装置
115のCPU233によって所定時間毎に実行され
る。まず分散か独立かの判断が行われる(S330
0)。この判断は、図6に示すキーボード243の分散
制御キー243Aが押されたか、独立制御キー243B
が押されたかの別によって行われる。FIG. 10 is a flow chart of a distributed / independent control selection processing routine. This routine is executed by the CPU 233 of the control device 115 at predetermined time intervals. First, it is determined whether distributed or independent (S330).
0). This determination is based on whether the distributed control key 243A of the keyboard 243 shown in FIG. 6 has been pressed or the independent control key 243B.
Is done depending on whether or not was pressed.
【0029】ここで分散であるとされれば、分散制御フ
ラグのセットが行われる(S3310)。分散制御フラ
グは、RAM237の所定エリアに設定される。分散制
御フラグのセット後、本ルーチンを一旦終了する。一
方、独立と判断した場合は、独立制御フラグのセットを
行う(S3320)。独立制御フラグは、RAM237
の所定エリアに設定される。If it is determined to be the dispersion, the dispersion control flag is set (S3310). The distribution control flag is set in a predetermined area of the RAM 237. After setting the dispersion control flag, this routine is once ended. On the other hand, if it is determined to be independent, the independent control flag is set (S3320). The independent control flag is the RAM 237.
Is set in a predetermined area.
【0030】図11は、タスクの選択処理ルーチンのフ
ローチャートである。この処理は、CPU233によっ
て所定時間毎に起動される。まず、分散制御フラグがセ
ットされているか、あるいは独立制御フラグがセットさ
れているかの判断を行う(S3400)。この判断は、
RAM237内の分散制御フラグと、独立制御フラグの
セット状態によって行われる。FIG. 11 is a flowchart of a task selection processing routine. This process is activated by the CPU 233 at predetermined time intervals. First, it is determined whether the distributed control flag is set or the independent control flag is set (S3400). This decision is
This is performed by setting the distributed control flag and the independent control flag in the RAM 237.
【0031】ここで独立制御フラグであると判断された
場合には、独立制御タスクを実行する(S3410)。
又、分散制御フラグであるとされた場合には、分散制御
タスクを実行する(S3420)。独立制御タスクが選
択されると、図12に示す独立空調機制御処理と、図1
3に示す独立給湯制御処理と、図14に示す燃料供給量
制御処理と、図15に示す独立蓄電制御処理と、図16
に示す独立送電制御処理とが選択起動される。If it is determined that the flag is the independent control flag, the independent control task is executed (S3410).
If the distributed control flag is set, the distributed control task is executed (S3420). When the independent control task is selected, the independent air conditioner control process shown in FIG.
Independent hot water supply control process shown in FIG. 3, fuel supply amount control process shown in FIG. 14, independent power storage control process shown in FIG.
The independent power transmission control process shown in is selectively activated.
【0032】図12に示す独立空調機制御がCPU23
3によって起動されると、まず冷房又は暖房を実行の判
断が行われる(S3500)。冷房又は暖房の実行の判
断は、キーボード243の冷房制御キー243Cが押さ
れて冷房実行が設定された場合、又は暖房制御キー24
3Dが押されて暖房実行が設定された場合に行われる。The independent air conditioner control shown in FIG.
When it is started by 3, it is first determined whether to perform cooling or heating (S3500). Whether to execute cooling or heating is determined when the cooling control key 243C on the keyboard 243 is pressed to set cooling execution, or when the heating control key 24 is pressed.
This is performed when 3D is pressed and heating execution is set.
【0033】ここで、冷房又は暖房を実行と判断された
場合には、次にボイラ作動要求出力が行われる(S35
10)。一方、冷房又は暖房を実行でないと判断された
場合には、ボイラ作動非要求を行う(S3520)。ボ
イラ作動要求では、RAM237内の所定エリアのボイ
ラ作動要求フラグを設定する。ボイラ作動非要求では、
ボイラ作動要求フラグの設定状態を変更することなく、
そのままにする。If it is determined that cooling or heating is to be executed, then the boiler operation request output is performed (S35).
10). On the other hand, when it is determined that the cooling or the heating is not executed, the boiler operation non-request is issued (S3520). In the boiler operation request, a boiler operation request flag of a predetermined area in the RAM 237 is set. With no boiler operation required,
Without changing the setting state of the boiler operation request flag,
leave it as it is.
【0034】次いで、ボイラ作動中かの判断を行う(S
3530)。ボイラBの作動中の判断は、コントローラ
22から入力したボイラ作動中信号に基づいて行う。こ
こで、ボイラBの作動中でないと判断された場合には、
次に冷房信号「オフ」の処理(S3540)と、暖房信
号「オフ」の処理(S3550)とを行って、本ルーチ
ンを一旦終了する。冷房信号が「オフ」にされると、コ
ントローラ23Aは、空調機23による冷房用の冷水の
製造を停止する。暖房信号が「オフ」にされると、コン
トローラ23Aは、空調機23による暖房用の温水の製
造を停止する。Next, it is judged whether the boiler is in operation (S
3530). The determination that the boiler B is operating is made based on the boiler operating signal input from the controller 22. Here, when it is determined that the boiler B is not operating,
Next, the cooling signal “OFF” processing (S3540) and the heating signal “OFF” processing (S3550) are performed, and the present routine is ended once. When the cooling signal is turned off, the controller 23A stops the cooling water for cooling by the air conditioner 23. When the heating signal is turned off, the controller 23A stops the production of hot water for heating by the air conditioner 23.
【0035】一方、ボイラBが作動中であると判断され
た場合には、次に温水ポンプ作動を行う(S356
0)。温水ポンプPの作動は、出力インタフェース23
9を介して、動力盤251に温水ポンプの駆動信号を出
力することにより行われる。これにより、ボイラBから
空調機23に熱が供給される。On the other hand, if it is determined that the boiler B is operating, then the hot water pump is operated (S356).
0). The operation of the hot water pump P is performed by the output interface 23.
This is performed by outputting a drive signal for the hot water pump to the power board 251 via the control panel 9. As a result, heat is supplied from the boiler B to the air conditioner 23.
【0036】次いで、冷房実行かを判断し(S357
0)、冷房の実行でないと判断した場合には、冷房信号
「オフ」を出力し(S3580)、冷房実行と判断した
場合には、冷房信号「オン」を出力する(S359
0)。冷房信号の次は、暖房実行かを判断し(S360
0)、暖房実行でないと判断した場合には、暖房信号
「オフ」を出力し(S3610)、一方暖房実行と判断
した場合には、暖房信号「オン」を出力する(S362
0)。Next, it is judged whether cooling is to be performed (S357).
0), if it is determined that the cooling is not executed, the cooling signal “OFF” is output (S3580), and if it is determined that the cooling is executed, the cooling signal “ON” is output (S359).
0). Next to the cooling signal, it is determined whether heating is to be performed (S360
0), if it is determined that the heating is not executed, the heating signal “OFF” is output (S3610), while if it is determined that the heating is executed, the heating signal “ON” is output (S362).
0).
【0037】以上に説明した独立空調機制御処理によ
り、制御装置115のキーボード243の操作によっ
て、ガスタービンGTやボイラBの運転操作を行なっ
て、冷房の実行と、暖房の実行とを行うことができる。
図13に示す独立給湯制御が起動されると、まず給湯を
実行かが判断される(S3700)。給湯の実行の判断
は、給湯制御キー243Eが操作されて、給湯実行が設
定された場合になされる。With the independent air conditioner control processing described above, the operation of the gas turbine GT and the boiler B can be performed by operating the keyboard 243 of the control unit 115 to perform cooling and heating. it can.
When the independent hot water supply control shown in FIG. 13 is activated, it is first determined whether hot water supply is to be executed (S3700). The determination of hot water supply execution is made when hot water supply control key 243E is operated to set hot water supply execution.
【0038】ここで、給湯の実行でないと判断された場
合には、ボイラの作動非要求を行って(S3710)、
本ルーチンを一旦終了する。一方、給湯の実行であると
判断した場合には、次に水位が低下か否かを判断する
(S3720)。水位の低下との判断は、水位センサ3
1から送られてきた水位信号に基づいて行う。If it is determined that the hot water supply is not executed, the boiler operation is not requested (S3710),
This routine is once ended. On the other hand, if it is determined that hot water supply is being performed, then it is determined whether or not the water level is lowered (S3720). The water level sensor 3 determines that the water level has dropped.
It is performed based on the water level signal sent from 1.
【0039】水位が低下していなければ、つまり貯湯タ
ンク25に熱湯が満タンにある場合には、ボイラ作動非
要求処理を行って(S3710)、本ルーチンを一旦終
了する。一方、水位が低下していれば、ボイラ作動要求
を行って(S3730)、ボイラBが作動中かを判断し
(S3740)、作動していなければ給湯弁「オフ」を
出力し(S3750)、作動していれば給湯弁「オン」
を出力する。つまり、貯湯タンク25の湯量が不足して
きたら、ボイラBを作動させ、実際に作動したら、給湯
弁29を開けて、貯湯タンク25に熱湯を供給する。If the water level is not lowered, that is, if the hot water storage tank 25 is full of hot water, boiler operation non-request processing is performed (S3710), and this routine is once terminated. On the other hand, if the water level has dropped, a boiler operation request is made (S3730), it is determined whether boiler B is operating (S3740), and if it is not operating, the hot water supply valve "OFF" is output (S3750), Hot water supply valve "ON" when operating
Is output. That is, when the amount of hot water in the hot water storage tank 25 becomes insufficient, the boiler B is operated, and when it actually operates, the hot water supply valve 29 is opened to supply hot water to the hot water storage tank 25.
【0040】以上に説明した独立給湯制御処理により、
制御装置115のキーボード243の操作によって、ガ
スタービンGTやボイラBの運転操作を行なって、貯湯
タンク25への自動給湯の実行を行うことができる。図
14の燃料供給量制御が起動されると、まずガスタービ
ン作動かを判断する(S3800)。ガスタービン作動
の判断は、ガスタービン制御キー243Fの操作によっ
て、ガスタービン作動が設定された場合に行われる。こ
こで、ガスタービン作動でないと判断した場合には、停
止信号出力を行って(S3810)、本ルーチンを一旦
終了する。停止信号は、コントローラ22に出力され
る。By the independent hot water supply control processing described above,
By operating the keyboard 243 of the control device 115, the gas turbine GT and the boiler B can be operated to perform automatic hot water supply to the hot water storage tank 25. When the fuel supply amount control of FIG. 14 is started, it is first determined whether the gas turbine is operating (S3800). The determination of the gas turbine operation is performed when the gas turbine operation is set by operating the gas turbine control key 243F. If it is determined that the gas turbine is not operating, a stop signal is output (S3810) and the present routine is ended. The stop signal is output to the controller 22.
【0041】一方、ガスタービン作動であると判断され
た場合には、次にボイラ作動要求ありか否かを判断する
(S3820)。ボイラの作動要求がなければ、次に発
電機作動要求があるかを判断する(S3830)。ボイ
ラの作動要求の判断は、RAM237内の所定エリアに
ボイラ作動要求フラグがセットされているか否かで行
う。発電機作動要求の判断は、RAM237内の所定エ
リアに発電機作動要求フラグがセットされているか否か
で行う。On the other hand, if it is determined that the gas turbine is operating, then it is determined whether there is a boiler operation request (S3820). If there is no boiler operation request, then it is determined whether there is a generator operation request (S3830). The boiler operation request is determined by whether or not the boiler operation request flag is set in a predetermined area in the RAM 237. The determination of the generator operation request is made based on whether or not the generator operation request flag is set in a predetermined area in the RAM 237.
【0042】ボイラ作動要求も発電機作動要求もなけれ
ば、停止信号を出力して本ルーチンを一旦終了し(S3
810)、何れかがあれば、次に燃料供給量の指示があ
るか否かを判断する(S3840)。燃料供給量の指示
は、RAM237内の燃料供給量指示エリアを参照す
る。この燃料供給量の指示は、後述する。If there is no boiler operation request or generator operation request, a stop signal is output and this routine is once terminated (S3).
810), if there is any, it is then determined whether or not there is an instruction of the fuel supply amount (S3840). The fuel supply amount instruction refers to the fuel supply amount instruction area in the RAM 237. The instruction of the fuel supply amount will be described later.
【0043】燃料供給量の指示がなければ、次に運転信
号を出力する(S3850)。運転信号は、コントロー
ラ22に出力する。コントローラ22は、運転信号を入
力すると、発電機GとボイラBの運転を行う。一方、燃
料供給量の指示がある場合には、次に指示値の燃料供給
量信号出力を行う(S3860)。燃料供給量信号は、
コントローラ22に入力され、燃焼室CCに供給される
燃料fが制御される。If the fuel supply amount is not instructed, then the operation signal is output (S3850). The operation signal is output to the controller 22. When the controller 22 receives the operation signal, the controller 22 operates the generator G and the boiler B. On the other hand, if the fuel supply amount is instructed, then the fuel supply amount signal of the instructed value is output (S3860). The fuel supply signal is
The fuel f input to the controller 22 and supplied to the combustion chamber CC is controlled.
【0044】以上に説明した燃料供給量制御により、ボ
イラBか発電機Gを使用したいとき、ガスタービンGT
が自動運転される。図15の独立蓄電制御が起動される
と、まず蓄電を実行かを判断する(S3900)。蓄電
の実行の判断は、蓄電制御キー243Gの操作によっ
て、蓄電実行が設定されている場合に行われる。蓄電を
実行しないと判断されれば、次に発電機作動非要求を行
って(S3910)、本ルーチンを一旦終了する。発電
機作動非要求では、発電機作動要求フラグを変更するこ
となく次の処理に移行する。発電機作動要求フラグは、
RAM237内の所定エリアに設定される。When it is desired to use the boiler B or the generator G by the fuel supply amount control described above, the gas turbine GT is used.
Is automatically driven. When the independent power storage control in FIG. 15 is activated, it is first determined whether power storage is to be executed (S3900). The determination of power storage execution is performed when the power storage execution key is set by operating the power storage control key 243G. If it is determined that power storage is not to be performed, then a generator operation non-request is made (S3910), and this routine is once terminated. When the generator operation is not requested, the process proceeds to the next process without changing the generator operation request flag. The generator operation request flag is
It is set in a predetermined area in the RAM 237.
【0045】蓄電を実行と判断した場合には、次に蓄電
状態の選択を行う(S3920)。蓄電状態の選択で
は、「自動」か「手動」かを選択する。自動か、手動か
は、蓄電制御キー243Gの操作によって、「自動」、
「手動」が設定されているかを見て行う。If it is determined that the power storage is to be executed, then the power storage state is selected (S3920). When selecting the power storage state, "automatic" or "manual" is selected. Whether it is automatic or manual is set to "automatic" by operating the electricity storage control key 243G.
Check if "Manual" is set.
【0046】ここで、自動が設定されていれば、次に電
磁開閉器「オン」を行って、本ルーチンを一旦終了する
(S3930)。電磁開閉器139の「オン」は、出力
インタフェース239を介して動力盤251を操作する
ことにより行う。電磁開閉器139の「オン」により、
発電機Gの出力が蓄電池131に供給される。If the automatic setting is set, the electromagnetic switch is turned "on" and the present routine is terminated (S3930). “ON” of the electromagnetic switch 139 is performed by operating the power board 251 via the output interface 239. By turning on the electromagnetic switch 139,
The output of the generator G is supplied to the storage battery 131.
【0047】一方、手動が設定されていれば、次に電磁
開閉器「オン」を行って(S3940)、発電機作動要
求出力を行う(S3950)。これにより、手動の場合
には、ガスタービンGTが強制的に回され、蓄電池13
1の充電が実行される。以上に説明した独立蓄電池制御
により、蓄電池131を手動、又は自動で充電すること
ができる。On the other hand, if the manual mode is set, then the electromagnetic switch is turned on (S3940) and the generator operation request output is performed (S3950). As a result, in the case of manual operation, the gas turbine GT is forcibly turned and the storage battery 13
1 charging is executed. By the independent storage battery control described above, the storage battery 131 can be charged manually or automatically.
【0048】図16の独立送電制御が起動されると、ま
ず送電を実行かが判断される(S4000)。送電の実
行の判断は、送電制御キー243Hの操作によって、送
電実行が選択された場合に行われる。送電が実行である
と判断された場合には、次に発電機作動要求出力を行っ
て(S4010)、引き込み開閉器「オン」を実行後
(S4020)、本ルーチンを一旦終了する。引き込み
開閉器「オン」では、引き込み開閉器119を「オン」
状態にする。これにより、インバータユニット133の
出力端子133TAと、引込口117とが接続状態にな
る。When the independent power transmission control of FIG. 16 is activated, it is first determined whether power transmission is to be executed (S4000). The determination of power transmission execution is performed when the power transmission execution key is selected by operating the power transmission control key 243H. If it is determined that power transmission is being executed, then a generator operation request output is performed (S4010), the retracting switch "ON" is executed (S4020), and then this routine is once terminated. With the retract switch "on", the retract switch 119 is turned "on".
Put in a state. As a result, the output terminal 133TA of the inverter unit 133 and the lead-in port 117 are connected.
【0049】送電を実行しないと判断した場合には、次
に発電かを判断する(S4030)。発電の判断は、発
電制御キー243Iの操作によって、発電実行が選択さ
れている場合に行われる。発電であると判断した場合に
は、次に発電機作動要求出力を行って(S4040)、
引き込み開閉器「オフ」を実行する(S4050)。こ
れにより、引き込み開閉器119が「オフ」になり、引
込口117に送電されることなく電力が発電され、消費
される。If it is determined that power transmission is not to be executed, it is next determined whether or not power is generated (S4030). The determination of power generation is performed when the power generation execution key is selected by operating the power generation control key 243I. If it is determined that the power is being generated, then a generator operation request output is performed (S4040),
The retracting switch "OFF" is executed (S4050). As a result, the pull-in switch 119 is turned off, and power is generated and consumed without being transmitted to the pull-in port 117.
【0050】一方、発電でないと判断した場合には、つ
まり送電も、発電もしない場合には、発電機作動非要求
を行い(S4060)、次いで引き込み開閉器「オン」
を行う(S4070)。これにより、発電電力がなくて
も商用電力を消費することができる。On the other hand, when it is determined that the power is not generated, that is, when neither power transmission nor power generation is performed, the generator operation is not requested (S4060), and then the retractable switch "ON".
Is performed (S4070). As a result, commercial power can be consumed without generating power.
【0051】以上に説明した独立送電制御により、受
電、送電、発電を選択して実行することができる。以上
図12〜図16の処理が図11の独立制御タスクであ
る。次にS3420の分散制御タスクを説明する。分散
制御タスクでは、図17に示すリアルタイム制御処理ル
ーチンが実行される。By the independent power transmission control described above, power reception, power transmission, and power generation can be selected and executed. The processing of FIGS. 12 to 16 is the independent control task of FIG. Next, the distributed control task of S3420 will be described. In the distributed control task, the real-time control processing routine shown in FIG. 17 is executed.
【0052】リアルタイム制御が起動されると、まず個
別分散給電指令入力が行われる(S4100)。個別分
散給電指令は、RAM237内の格納エリアから入力す
る。このエリアへの格納は、S3250にて行われる。
次いで、自由状態か否かの判断を行う(S4110)。
自由状態の判断は、個別分散給電指令に基づいて行う。
自由状態とは、分散給電指令所7からの指令が非拘束状
態のことであり、自由状態でない場合とは、分散給電指
令所7から送電量が拘束される状態のことである。ここ
で、自由状態であると判断された場合には、次に独立制
御タスクを実行して(S4115)、本ルーチンを一旦
終了する。つまり、自由状態の場合には、分散制御フラ
グが設定されていても独立制御フラグが設定されている
場合と同様の制御が実行される。When the real-time control is activated, the individual distributed power supply command is input (S4100). The individual distributed power supply command is input from the storage area in the RAM 237. Storage in this area is performed in S3250.
Next, it is determined whether or not it is in a free state (S4110).
The free state is determined based on the individual distributed power supply command.
The free state means that the command from the distributed power supply command station 7 is in an unrestricted state, and the non-free state means that the power transmission amount is restricted from the distributed power supply command station 7. If it is determined that the free state is set, the independent control task is then executed (S4115), and the present routine is ended. That is, in the free state, the same control as in the case where the independent control flag is set is executed even if the distributed control flag is set.
【0053】一方、自由状態でないと判断された場合に
は、まず分散電力量計測信号出力が行われる(S412
0)。この分散電力量計測信号は、引き込みメータユニ
ット103に出力され、引き込みメータユニット103
に第5種と、第6種の分散消費電力量と、分散送電電力
量との計測を行わせる。つまり、分散制御時専用の計測
を行わせる。On the other hand, if it is determined that the free state is not reached, then the distributed power amount measurement signal is first output (S412).
0). This dispersed electric energy measurement signal is output to the pull-in meter unit 103,
Causes the fifth type, the sixth type distributed power consumption, and the distributed transmission power amount to be measured. That is, dedicated measurement is performed during distributed control.
【0054】次いで、送電ランクの入力を行う(S41
30)。送電ランクは、個別分散給電指令から抽出す
る。ランクの入力後、ランクを判断する(S414
0)。ランクは、「0」、「1」、又は「2」の何れで
あるかを判断する。ランク「0」は、分散給電指令所7
からの拘束状態が最も小さい状態を示し、ランク「1」
は通常の拘束状態を示し、ランク「2」は全発電能力を
送電に振り分けさせる状態を示す。Next, the power transmission rank is input (S41).
30). The power transmission rank is extracted from the individual distributed power supply command. After the rank is input, the rank is determined (S414
0). It is determined whether the rank is “0”, “1”, or “2”. Rank “0” is for distributed power supply command center 7
Indicates that the restraint state from is the smallest, and rank "1"
Indicates a normal restraint state, and rank "2" indicates a state in which all power generation capacity is distributed to power transmission.
【0055】まず、ランク「0」と判断された場合に
は、軽送電処理を実行する(S4150)。詳細は後述
する。また、ランク「1」と判断された場合には、中送
電処理を実行する(S4160)。詳細は後述する。First, when it is determined that the rank is "0", the light power transmission process is executed (S4150). Details will be described later. If it is determined that the rank is “1”, the medium power transmission process is executed (S4160). Details will be described later.
【0056】一方、ランク「2」と判断された場合に
は、最大送電処理を実行する(S4170)。詳細は後
述する。上記何れかの処理の実行後、図12〜図14に
既述した独立空調機制御(S4180)、独立給湯制御
(S4190)、燃料供給量制御(S4200)を順次
実行して、本ルーチンを一旦終了する。On the other hand, if it is determined that the rank is "2", the maximum power transmission process is executed (S4170). Details will be described later. After the execution of any of the above processes, the independent air conditioner control (S4180), the independent hot water supply control (S4190), and the fuel supply amount control (S4200) described in FIGS. finish.
【0057】図18は、軽送電処理ルーチンのフローチ
ャートである。これは、S4150の処理内容である。
まず発電機作動要求出力を行う(S4300)。次い
で、引き込み開閉器「オン」を出力し(S4310)、
燃料供給量10%以上の指示を出力する(S432
0)。これにより、発電機Gが作動され、引き込み開閉
器119が「オン」状態となり、ガスタービンGTへの
燃料が10%以上供給される。FIG. 18 is a flowchart of the light power transmission processing routine. This is the processing content of S4150.
First, the generator operation request output is performed (S4300). Then, the retract switch "ON" is output (S4310),
An instruction to supply 10% or more of fuel is output (S432).
0). As a result, the generator G is operated, the retractable switch 119 is turned on, and fuel of 10% or more is supplied to the gas turbine GT.
【0058】次に、図15に既述した独立蓄電制御を実
行する(S4330)。以上の軽送電ルーチンが実行さ
れた場合には、分散給電指令所7からの指令に基づい
て、ガスタービンGTが軽負荷で運転されるとともに、
発電機Gが発生した電力を売電側に送電する。Next, the independent power storage control described in FIG. 15 is executed (S4330). When the above light power transmission routine is executed, the gas turbine GT is operated under a light load based on the command from the distributed power supply command station 7, and
The electric power generated by the generator G is transmitted to the power selling side.
【0059】図19は、中送電処理ルーチンのフローチ
ャートである。これは、S4160の処理内容である。
まず発電機作動要求出力を行う(S4400)。次い
で、引き込み開閉器「オン」を出力し(S4410)、
燃料供給量50%以上の指示を出力して(S442
0)、独立蓄電制御を実行する(S4430)。これに
より、発電機Gが作動され、引き込み開閉器119が
「オン」状態となり、ガスタービンGTへの燃料が50
%以上供給される。FIG. 19 is a flowchart of the medium power transmission processing routine. This is the processing content of S4160.
First, the generator operation request output is performed (S4400). Then, the retract switch "ON" is output (S4410),
Output an instruction to supply 50% or more of fuel (S442
0), independent power storage control is executed (S4430). As a result, the generator G is operated, the retraction switch 119 is turned on, and the fuel to the gas turbine GT is 50%.
% Or more is supplied.
【0060】以上の中送電ルーチンが実行された場合に
は、分散給電指令所7からの指令に基づいて、ガスター
ビンGTが中負荷で運転されるとともに、発電機Gが発
生した電力を売電側に送電する。図20は、最大送電処
理ルーチンのフローチャートである。これは、S417
0の処理内容である。まず発電機作動要求出力を行う
(S4500)。次いで、引き込み開閉器「オン」を出
力し(S4510)、燃料供給量100%以上の指示を
出力して(S4520)、電磁開閉器「オン」を実行す
る(S4530)。これにより、発電機Gが作動され、
引き込み開閉器119が「オン」状態となり、ガスター
ビンGTへの燃料が100%以上供給される。また、電
磁開閉器139が「オン」される。When the above medium power transmission routine is executed, the gas turbine GT is operated at a medium load based on a command from the distributed power supply command station 7, and the power generated by the generator G is sold. To the side. FIG. 20 is a flowchart of the maximum power transmission processing routine. This is S417
The processing content is 0. First, the generator operation request output is performed (S4500). Then, the pull-in switch "ON" is output (S4510), an instruction for a fuel supply amount of 100% or more is output (S4520), and the electromagnetic switch "ON" is executed (S4530). This activates the generator G,
The pull-in switch 119 is turned on, and 100% or more of fuel is supplied to the gas turbine GT. Further, the electromagnetic switch 139 is turned “on”.
【0061】以上の最大送電ルーチンが実行された場合
には、分散給電指令所7からの指令に基づいて、ガスタ
ービンGTが最大負荷で運転されるとともに、発電機G
が発生した電力、及び蓄電池131の電力を売電側に送
電する。つまり、住宅エネルギ制御システム101から
得られる最大電力を商用電力系統に供給することができ
る。When the above maximum power transmission routine is executed, the gas turbine GT is operated at the maximum load and the generator G is operated based on the command from the distributed power supply command station 7.
The generated power and the power of the storage battery 131 are transmitted to the power selling side. That is, the maximum electric power obtained from the house energy control system 101 can be supplied to the commercial electric power system.
【0062】[0062]
【発明の効果】本発明の電力系統制御装置は、公共電力
を供給する電力供給線に接続されているコージェネレー
ションシステムを給電指令手段側から制御することがで
きる。これにより、電力系統の需給調整にコージェネレ
ーションシステムを組み込むことができる。この結果、
コージェネレーションシステムが有効に活用され、社会
全体の省エネ、及びコストの低下を図ることができると
いう極めて優れた効果を奏する。The power system control device of the present invention can control the cogeneration system connected to the power supply line for supplying public power from the side of the power supply command means. As a result, the cogeneration system can be incorporated in the supply and demand adjustment of the power system. As a result,
The cogeneration system is effectively used, and it has an extremely excellent effect that energy saving and cost reduction of the whole society can be achieved.
【図1】電力系統制御装置1の全体構成図である。FIG. 1 is an overall configuration diagram of a power system control device 1.
【図2】コージェネレーションシステム21の構成図で
ある。FIG. 2 is a configuration diagram of a cogeneration system 21.
【図3】住宅エネルギ制御システム101の全体構成図
である。FIG. 3 is an overall configuration diagram of a house energy control system 101.
【図4】引き込みメータユニット103の構成図であ
る。FIG. 4 is a configuration diagram of a retractable meter unit 103.
【図5】パワーユニット109の構成図である。5 is a configuration diagram of a power unit 109. FIG.
【図6】制御装置115の構成図である。FIG. 6 is a configuration diagram of a control device 115.
【図7】分散給電指令制御処理のフローチャートであ
る。FIG. 7 is a flowchart of distributed power supply command control processing.
【図8】個別指令入力制御処理のフローチャートであ
る。FIG. 8 is a flowchart of an individual command input control process.
【図9】個別指令出力制御処理のフローチャートであ
る。FIG. 9 is a flowchart of an individual command output control process.
【図10】分散・独立制御の選択ルーチンのフローチャ
ートである。FIG. 10 is a flowchart of a selection routine for distributed / independent control.
【図11】タスクの選択処理ルーチンのフローチャート
である。FIG. 11 is a flowchart of a task selection processing routine.
【図12】独立空調機制御処理のフローチャートであ
る。FIG. 12 is a flowchart of an independent air conditioner control process.
【図13】独立給湯制御処理のフローチャートである。FIG. 13 is a flowchart of an independent hot water supply control process.
【図14】燃料供給量制御処理のフローチャートであ
る。FIG. 14 is a flowchart of a fuel supply amount control process.
【図15】独立蓄電制御処理のフローチャートである。FIG. 15 is a flowchart of an independent power storage control process.
【図16】独立送電制御処理のフローチャートである。FIG. 16 is a flowchart of an independent power transmission control process.
【図17】リアルタイム制御処理ルーチンのフローチャ
ートである。FIG. 17 is a flowchart of a real-time control processing routine.
【図18】軽送電処理ルーチンのフローチャートであ
る。FIG. 18 is a flowchart of a light power transmission process routine.
【図19】中送電処理ルーチンのフローチャートであ
る。FIG. 19 is a flowchart of a medium power transmission processing routine.
【図20】最大送電処理ルーチンのフローチャートであ
る。FIG. 20 is a flowchart of a maximum power transmission processing routine.
1…電力系統制御装置 3…中央給電所 5…地方給電所 7…分散給電指令所 9…光ケーブルネットワーク 13…インバータユニット 18…個別端末装置 21…コージェネレーションシステム 101…住宅エネルギ制御システム 1 ... Power system control device 3 ... Central power supply station 5 ... Local power supply station 7 ... Distributed power supply command station 9 ... Optical cable network 13 ... Inverter unit 18 ... Individual terminal device 21 ... Cogeneration system 101 ... Housing energy control system
Claims (1)
と、 該電力供給線に接続されたコージェネレーションシステ
ムと、 上記給電指令手段内に配設され、上記コージェネレーシ
ョンシステムに給電指令を行うコージェネ給電指令手段
と、 上記コージェネレーションシステム内に配設され、上記
コージェネ指令手段からの給電指令を受信する給電指令
受信手段と、 該給電指令受信手段が受信した給電指令に基づいて、上
記コージェネレーションシステムを制御するコージェネ
制御手段とを備える電力系統制御装置。1. A power supply line for supplying public power, a power supply command means for commanding a power supply state to the power supply line, a cogeneration system connected to the power supply line, and the power supply command means. And a power generation command receiving means for receiving a power supply command from the cogeneration command means, the power generation command receiving means being disposed in the cogeneration system, and supplying the power generation command to the cogeneration system. A power system control device comprising: a cogeneration control unit that controls the cogeneration system based on a power supply command received by the reception unit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP4224425A JP2857284B2 (en) | 1992-08-24 | 1992-08-24 | Power system controller |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP4224425A JP2857284B2 (en) | 1992-08-24 | 1992-08-24 | Power system controller |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH06113458A true JPH06113458A (en) | 1994-04-22 |
JP2857284B2 JP2857284B2 (en) | 1999-02-17 |
Family
ID=16813580
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP4224425A Expired - Lifetime JP2857284B2 (en) | 1992-08-24 | 1992-08-24 | Power system controller |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2857284B2 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5666345A (en) * | 1987-09-02 | 1997-09-09 | Sharp Kabushiki Kaisha | Optical memory medium with predetermined guide tracks and prepits |
JP2014143816A (en) * | 2013-01-23 | 2014-08-07 | Hitachi Ltd | Power system monitoring control system |
-
1992
- 1992-08-24 JP JP4224425A patent/JP2857284B2/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5666345A (en) * | 1987-09-02 | 1997-09-09 | Sharp Kabushiki Kaisha | Optical memory medium with predetermined guide tracks and prepits |
JP2014143816A (en) * | 2013-01-23 | 2014-08-07 | Hitachi Ltd | Power system monitoring control system |
Also Published As
Publication number | Publication date |
---|---|
JP2857284B2 (en) | 1999-02-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8180499B2 (en) | Power supply system | |
US10855076B2 (en) | Domestic energy generation installation and operating method for operating a domestic energy generation installation | |
JP6001712B2 (en) | Power conditioner, power system and control method | |
CN102545273B (en) | Distribution system and distribution method | |
EP2484988A1 (en) | Heat pump hot-water supply system | |
KR20190048623A (en) | Solar-based autonomous stand-alone micro grid system and its operation method | |
KR101792761B1 (en) | Method for operating of fuel cell system | |
CN204793041U (en) | Fuel cell power generation system and use vehicle of this system | |
US20140236375A1 (en) | Electric power conditioning device and method for conditioning electric power | |
KR20090054664A (en) | Combined heat and power co-generation system for fuel cell and operating method thereof | |
GB2562532B (en) | Heat and power generation and storage system | |
JP3347161B2 (en) | Power system controller | |
JP2857284B2 (en) | Power system controller | |
JP2002095168A (en) | Power system controller | |
KR102507752B1 (en) | Building Integrated Photovoltaic and Thermal system with control mode of electrical energy | |
JP3347162B2 (en) | Power system controller | |
JP6036016B2 (en) | Heat pump hot water supply system | |
CN111412567A (en) | Temperature monitoring control system | |
GB2577231A (en) | Power supply apparatus and method | |
KR20120017181A (en) | An air conditioner | |
CN212618914U (en) | Temperature monitoring control system | |
KR102652833B1 (en) | Power supply for late-night electricity boiler | |
US11742505B2 (en) | Fuel cell system | |
US20220223891A1 (en) | Fuel cell system | |
JP2018040556A (en) | Thermal apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081127 Year of fee payment: 10 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081127 Year of fee payment: 10 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101127 Year of fee payment: 12 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101127 Year of fee payment: 12 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111127 Year of fee payment: 13 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121127 Year of fee payment: 14 |
|
EXPY | Cancellation because of completion of term | ||
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121127 Year of fee payment: 14 |