JPH06104997B2 - Joint device and installation method of joint device - Google Patents

Joint device and installation method of joint device

Info

Publication number
JPH06104997B2
JPH06104997B2 JP27562789A JP27562789A JPH06104997B2 JP H06104997 B2 JPH06104997 B2 JP H06104997B2 JP 27562789 A JP27562789 A JP 27562789A JP 27562789 A JP27562789 A JP 27562789A JP H06104997 B2 JPH06104997 B2 JP H06104997B2
Authority
JP
Japan
Prior art keywords
rails
base
joint
ground
cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP27562789A
Other languages
Japanese (ja)
Other versions
JPH03137334A (en
Inventor
英夫 後藤
Original Assignee
ドーエイ外装有限会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ドーエイ外装有限会社 filed Critical ドーエイ外装有限会社
Priority to JP27562789A priority Critical patent/JPH06104997B2/en
Publication of JPH03137334A publication Critical patent/JPH03137334A/en
Publication of JPH06104997B2 publication Critical patent/JPH06104997B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Building Environments (AREA)

Description

【発明の詳細な説明】 「産業上の利用分野」 本発明は隣接する左右の建物間の目地部を目地プレート
や目地カバーで覆う目地装置および目地装置の設置方法
に関する。
TECHNICAL FIELD The present invention relates to a joint device that covers a joint between adjacent left and right buildings with a joint plate or a joint cover, and a method for installing the joint device.

「従来の技術」 従来、隣接する左右の建物の接続する部位の床面に設置
される目地装置は、接続する部位の床面の端部に左右の
下地レール取付け凹部をコンクリートのハツリ作業等で
形成した後、該下地レール取付け凹部の底面にモルタル
によって水平面あるいは所定の傾斜面となるように形成
する。
"Conventional technology" Conventionally, jointing equipment installed on the floor surface of the connecting part of the adjacent left and right buildings has a concave part for mounting the left and right base rails at the end part of the floor surface of the connecting part, for example, when chipping concrete. After the formation, the bottom surface of the base rail mounting recess is formed by mortar so as to have a horizontal surface or a predetermined inclined surface.

しかる後、該モルタル層上に下地レールを位置させて複
数本のアンカーボルト等によって固定していた。
After that, a base rail was positioned on the mortar layer and fixed with a plurality of anchor bolts or the like.

このため、下地レール取付け凹部の底面を平坦あるいは
所定の傾斜面に形成する作業が大変で、モルタルが凝固
するまでに時間がかかるという欠点があった。
Therefore, it is difficult to form the bottom surface of the base rail mounting recess into a flat or predetermined inclined surface, and it takes a long time for the mortar to solidify.

また、隣接する建物の対向する左右のパラペット上に目
地カバーを設置する場合にも、左右のパラペットの上面
を平坦面に形成しなければならず、その作業が大変で時
間がかかるという欠点があった。
In addition, even when the joint covers are installed on the left and right parapets of the adjoining building, the upper surfaces of the left and right parapets must be formed into a flat surface, which is a laborious and time-consuming task. It was

「本発明の目的」 本発明は以上のような従来の欠点に鑑み、下地レール取
付け凹部が平坦でなくても、下地レールを平坦状態ある
いは所定の傾斜面に容易に設置して固定することがで
き、短時間に、楽に目地プレートを設置することのでき
る目地装置および目地装置の設置方法を得るにある。
“Object of the Invention” In view of the above-mentioned conventional drawbacks, the present invention can easily install and fix the base rail in a flat state or on a predetermined inclined surface even if the base rail mounting recess is not flat. The present invention provides a joint device and a joint device installation method capable of installing the joint plate easily and in a short time.

また、本発明はパラペットの上部に容易に下地レールを
平坦に固定することができ、短時間に、楽に目地カバー
を設置することのできる目地装置および目地装置の設置
方法を得るにある。
Another object of the present invention is to provide a joint device and a joint device installation method in which the base rail can be easily fixed to the upper part of the parapet flatly and the joint cover can be easily installed in a short time.

「本発明の目的を達成するための手段」 本発明は隣接する左右の建物の接続する部位の左右の床
の端部に形成された下地レール取付け凹部にそれぞれ設
置される左右の下地レールと、この左右の下地レールに
それぞれ取付けられた該左右の下地レールを所定の設置
状態にすることのできる複数個の高さ調整金具と、前記
左右の下地レールをそれぞれ前記左右の床端部の下地レ
ール取付け凹部内に固定する複数本のアンカーボルト等
の固定ピンと、前記左右の下地レール間の目地部を覆う
ように該左右の下地レール間に掛渡された目地プレート
と、この目地プレートの両端部をそれぞれ覆うように前
記左右の下地レールに取付けられた支持カバーとで目地
装置を構成している。
"Means for achieving the object of the present invention" The present invention, the left and right base rails respectively installed in the base rail mounting recesses formed at the left and right floor end portions of the connecting parts of the adjacent left and right buildings, A plurality of height adjusting metal fittings, which are attached to the left and right ground rails, respectively, to bring the left and right ground rails into a predetermined installation state, and the left and right ground rails, respectively. Fixing pins such as a plurality of anchor bolts fixed in the mounting recesses, joint plates suspended between the left and right base rails so as to cover the joints between the left and right base rails, and both ends of the joint plate. And a support cover attached to each of the left and right base rails so as to cover the respective joints.

また、本発明は隣接する左右の建物の接続する部位の左
右の床端部に下地レール取付け凹部を形成する下地レー
ル取付け凹部形成工程と、この下地レール取付け凹部形
成工程後に下地レール取付け凹部内に複数個の高さ調整
金具で所定の設置状態となるように左右の下地レールを
設置させる左右の下地レール設置工程と、この左右の下
地レール設置工程後に左右の下地レールをそれぞれ前記
左右の床端部の下地レール取付け部内に複数本のアンカ
ーボルト等の固定ピンによって固定する左右の下地レー
ル固定工程と、この下地レール固定工程後に左右の下地
レールと前記下地レール取付け凹部との間の隙間にモル
タル等の充填剤を充填する充填剤充填工程と、この充填
剤充填工程後に左右の下地レール間の目地部を覆うよう
に該左右の下地レール間に掛渡す目地プレート取付け工
程し、この目地プレート取付け工程後に目地プレートの
両端部をそれぞれ覆うように支持カバーを左右の下地レ
ールに取付ける支持カバー取付け工程とで目地装置の設
置方法を構成している。
Further, the present invention provides a base rail mounting recess forming step of forming base rail mounting recesses at the left and right floor end portions of adjacent left and right connecting parts, and a step of forming a base rail mounting recess in the base rail mounting recess after the base rail mounting recess forming step. After installing the left and right ground rails so that the right and left ground rails are installed with a plurality of height adjustment fittings so that the right and left ground rails are in a predetermined installation state, after the left and right ground rail installation steps, the left and right ground rails are respectively attached to the left and right floor ends. Mortar in the gap between the left and right base rails and the base rail mounting recess after the step of fixing the left and right base rails by fixing pins such as anchor bolts in the base rail mounting part And the like, and after the filler filling step, the left and right base layers are covered so as to cover the joints between the left and right base rails. The joint plate is installed between the base and the joint plate, and after the joint plate is attached, the support covers are attached to the left and right base rails to cover both ends of the joint plate. ing.

「本発明の作用」 上記のように構成された目地装置は左右の下地レール取
付け凹部を凹凸のある形状のままでも、左右の下地レー
ルを所定の高さや傾斜状態に高さ調整金具によって取付
けることができるとともに、左右の下地レールと左右の
下地レール取付け凹部との間に、後でもモルタル等を充
填することができる。また複数個の高さ調整金具の調整
作業は、複数個の高さ調整ボルトの回動作業で行うこと
ができる。
[Operation of the Present Invention] In the joint device configured as described above, the left and right base rails can be mounted to the predetermined height or inclined state by the height adjusting metal fittings even if the recesses for mounting the left and right base rails are left in an uneven shape. In addition, it is possible to fill the space between the left and right base rails and the left and right base rail mounting recesses with mortar and the like later. Further, the adjustment work of the plurality of height adjustment fittings can be performed by rotating the plurality of height adjustment bolts.

「本発明の実施例」 以下、図面に示す実施例により、本発明を詳細に説明す
る。
"Examples of the Present Invention" Hereinafter, the present invention will be described in detail with reference to the examples shown in the drawings.

第1図ないし第17図の実施例において、1は隣接する左
右の建物2、2A間を接続する通路の床面を覆う目地装置
で、この目地装置1は接続する通路の左右の床面の端部
に形成された下地レール取付け凹部3、3Aにそれぞれ設
置される左右の下地レール4、4Aと、この左右の下地レ
ール4、4Aにそれぞれ取付けられた該左右の下地レール
4、4Aを所定の高さ寸法でかつ一端部よりも他端部が高
くなる傾斜状態に設置することのできる複数個の高さ調
整金具5と、前記左右の下地レール4、4Aをそれぞれ前
記左右の下地レール取付け凹部3、3A内に固定する複数
本のアンカーボルト等の固定ピン6と、前記左右の下地
レール4、4A間の目地部7を覆うように該左右の下地レ
ール4、4A間に掛渡された目地プレート8と、この目地
プレート8の両端部をそれぞれ覆うように前記左右の下
地レール4、4Aに複数本のタッピングビス9等で取付け
られた支持カバー10、10と、前記左右の下地レール4、
4Aの他端部に防水可能に接着剤あるいは溶接等によって
取付けられた小口蓋11、11と、前記左右の下地レール
4、4Aの一端部に防水可能に接着剤あるいは溶接等によ
って取付けられた排水パイプ12、12を有する小口蓋13、
13と、この小口蓋13、13の排水パイプ12、12に接続され
た縦桶14、14と、前記左右の下地レール取付け凹部3、
3Aの端部に取付けられたホルダー金具15、15によって取
付けられた耐火帯16とから構成されている。
In the embodiment shown in FIGS. 1 to 17, 1 is a joint device for covering the floor surface of the passage connecting between the adjacent left and right buildings 2 and 2A, and this joint device 1 is for the left and right floor faces of the connecting passage. The left and right base rails 4 and 4A respectively installed in the base rail mounting recesses 3 and 3A formed at the ends and the left and right base rails 4 and 4A respectively attached to the left and right base rails 4 and 4A are predetermined. A plurality of height adjustment fittings 5 that can be installed in a tilted state in which the height of the other is higher than the other end, and the left and right base rails 4 and 4A are attached to the left and right base rails, respectively. The fixing pins 6 such as a plurality of anchor bolts fixed in the recesses 3 and 3A and the left and right ground rails 4 and 4A are hung between the left and right ground rails 4 and 4A so as to cover the joint portion 7 between the left and right ground rails 4 and 4A. The joint plate 8 and both ends of the joint plate 8. A supporting cover 10, 10 attached by a plurality of tapping screws 9 or the like to the right and left of the base rails 4,4A to respectively cover the left and right base rail 4,
Small lids 11 and 11 waterproofly attached to the other end of 4A by an adhesive or welding, and drainage waterproofly attached to one end of the left and right ground rails 4 and 4A by an adhesive or welding. Small palate 13 with pipes 12, 12.
13, vertical tubs 14 and 14 connected to the drainage pipes 12 and 12 of the small lids 13 and 13, and the left and right base rail mounting recesses 3,
It is composed of holder metal fittings 15 attached to the end of 3A and a fireproof zone 16 attached by means of 15.

前記左右の下地レール4、4Aは第4図および第5図に示
すように、板上の下地レール本体17と、この下地レール
本体17の一側面より上方に突出された玉縁形状の目地プ
レート支持部18と、前記下地レール本体17の他側面より
上方に逆L字状に突出させた支持カバー取付け部19と、
前記下地レール本体17に所定間隔で形成された固定ピン
挿入孔20とから構成されている。
As shown in FIGS. 4 and 5, the left and right base rails 4 and 4A are base rail main bodies 17 on a plate, and a joint plate in the shape of a bead projecting upward from one side surface of the base rail main body 17. A support portion 18 and a support cover attachment portion 19 which projects upward from the other side surface of the base rail main body 17 in an inverted L shape,
The base rail main body 17 is composed of fixing pin insertion holes 20 formed at predetermined intervals.

前記高さ調整金具5は第6図に示すように前記左右の下
地レール4、4Aの固定ピン挿入孔20の周囲に形成された
複数個、本実施例では4個のねじ孔21に外周部にシール
剤を塗布されてそれぞれ螺合され、先端部が該左右の下
地レール4、4Aの下面へ突出する先端部が円錐状に形成
された複数本の高さ調整ボルト22で構成されている。
As shown in FIG. 6, a plurality of the height adjusting metal fittings 5 are formed around the fixing pin insertion holes 20 of the left and right base rails 4 and 4A, and in this embodiment, four screw holes 21 are provided at the outer peripheral portion. It is composed of a plurality of height adjusting bolts 22 each having a tip end portion projecting to the lower surfaces of the left and right base rails 4 and 4A, each of which has a sealing agent applied thereto and is screwed into the tip end portion in a conical shape. .

前記目地プレート8は第7図に示すように、大きな円弧
状に形成された目地プレート本体24と、この目地プレー
ト本体24両側面に下方に折曲げられて形成された水切り
部23、23とから構成されている。
As shown in FIG. 7, the joint plate 8 includes a joint plate body 24 formed in a large arc shape and drainage portions 23, 23 formed by bending the joint plate body 24 on both side surfaces downward. It is configured.

前記支持カバー10は第8図に示すように、前記左右の下
地レール4、4Aの上部を覆うことのできる支持カバー本
体26と、この支持カバー本体26の後端部にほぼ直角に下
方に折曲げ形成された係止片27と、前記支持カバー本体
26の支持カバー取付け部19と対応する部位に形成された
タッピングビス挿入孔28とから構成されている。
As shown in FIG. 8, the support cover 10 includes a support cover body 26 that can cover the upper portions of the left and right base rails 4 and 4A, and a rear end portion of the support cover body 26 that is folded downward substantially at a right angle. Bently formed locking piece 27 and the support cover body
It is composed of a support cover attachment portion 19 of 26 and a tapping screw insertion hole 28 formed at a corresponding portion.

前記ホルダー金具15は第9図に示すように、L字状のホ
ルダー金具本体29と、このホルダー金具本体29の先端部
をほぼ直角方向の下方に折曲げた脱落阻止片30と、この
脱落阻止片30の先端部および背面との隙間31を有するよ
うに前記ホルダー金具本体29に一体成形されたL字状の
支持片32と、前記ホルダー金具本体29に所定間隔で形成
された固定ピン挿入孔33とから構成されている。
As shown in FIG. 9, the holder fitting 15 has an L-shaped holder fitting body 29, a fall prevention piece 30 formed by bending the tip of the holder fitting body 29 downward in a substantially right angle direction, and a fall prevention piece 30. An L-shaped support piece 32 integrally formed with the holder fitting body 29 so as to have a gap 31 between the tip and the back surface of the piece 30, and a fixing pin insertion hole formed at a predetermined interval in the holder fitting body 29. It is composed of 33 and.

前記耐火帯16は第10図に示すように、耐火断熱性のシー
ト34、このシート34の両面を覆うステンレス細線等で形
成されたメッシュ35、35とからなる耐火帯本体36と、こ
の耐火帯本体36の両側面に複数本のボルト37、ナット38
によって取付けられたクランク状に形成された前記ホル
ダー金具15、15の支持片32、32に支持される耐火取付け
板39、39とから構成されている。
As shown in FIG. 10, the fire-resistant zone 16 is a fire-resistant and heat-insulating sheet 34, a fire-resistant zone main body 36 including meshes 35 and 35 formed of stainless thin wires or the like covering both sides of the sheet 34, and the fire-resistant zone 36. Multiple bolts 37 and nuts 38 on both sides of body 36
And the fireproof mounting plates 39, 39 supported by the supporting pieces 32, 32 of the holder fittings 15, 15 formed in the shape of a crank.

「本発明の実施例における施工手順」 上記構成の目地装置1は、左右の床面の端部に下地レー
ル取付け凹部3、3Aを、第11図に示すようにコンクリー
トのハツリ作業等によって形成する下地レール取付け凹
部形成工程を行なう。
"Construction procedure in the embodiment of the present invention" In the joint device 1 having the above configuration, the base rail mounting recesses 3 and 3A are formed at the ends of the left and right floor surfaces by concrete chipping work or the like as shown in FIG. The base rail mounting recess forming step is performed.

しかる後、下地レール取付け凹部3、3A内に第12図およ
び第13図に示すように左右の下地レール4、4Aを位置さ
せるとともに、複数個の高さ調整金具5としての複数個
の高さ調整ボルト22を回転させて、左右の下地レール
4、4Aがそれぞれ一端部よりも他端部が高くなる傾斜状
態の安定状態となるように位置される左右の下地レール
設置工程を行う。
After that, the left and right ground rails 4 and 4A are positioned in the ground rail mounting recesses 3 and 3A as shown in FIGS. 12 and 13, and a plurality of height adjustment metal fittings 5 The adjustment bolt 22 is rotated to perform the left and right ground rail installation step in which the left and right ground rails 4 and 4A are positioned so as to be in a stable state in which the other ends are higher than the one ends.

次に左右の下地レール4、4Aを第14図に示すようにそれ
ぞれ左右の下地レール取付け凹部3、3A内に複数本の固
定ピン6によって固定する、左右の下地レール固定工程
を行なった後、第15図に示すように左右の下地レール
4、4Aと左右の下地レール取付け凹部3、3Aとの間にモ
ルタル等の充填剤40を充填する充填剤充填工程を行な
う。
Next, as shown in FIG. 14, after fixing the left and right ground rails 4 and 4A in the left and right ground rail mounting recesses 3 and 3A by a plurality of fixing pins 6, respectively, after performing the left and right ground rail fixing steps, As shown in FIG. 15, a filler filling step of filling a filler 40 such as mortar between the left and right base rails 4 and 4A and the left and right base rail mounting recesses 3 and 3A is performed.

次に第16図に示すように、左右の下地レール4、4Aの目
地プレート支持部18、18に目地部17を覆うように目地プ
レート8を取付ける目地プレート取付け工程を行なった
後、該目地プレート8の両端部を第17図に示すようにそ
れぞれ支持カバー10、10で覆うように位置させ、該支持
カバー10、10を複数本のタッピングビス9等で左右の下
地レール4、4Aの支持カバー取付け部19、19に固定する
支持カバー取付け工程を行なう。
Next, as shown in FIG. 16, after performing the joint plate attaching step of attaching the joint plate 8 to the joint plate supporting portions 18 of the left and right base rails 4 and 4A so as to cover the joint portion 17, the joint plate is attached. As shown in FIG. 17, both end portions of 8 are positioned so as to be covered with support covers 10 and 10, respectively, and the support covers 10 and 10 are supported by a plurality of tapping screws 9 or the like on the left and right ground rails 4 and 4A. A support cover mounting process for fixing the mounting portions 19 to 19 is performed.

しかる後、左右の支持カバー10、10と床面との間の隙間
に充填剤40、40を充填して、該左右の支持カバー10、10
と通路の床面とが同一平面となるようにするとともに、
排水パイプ12、12に縦桶14、14をそれぞれ接続する。
Thereafter, the gap between the left and right support covers 10, 10 and the floor surface is filled with the filler 40, 40, and the left and right support covers 10, 10 are filled.
And make sure that the floor of the passage is on the same plane,
Vertical tubs 14, 14 are connected to the drainage pipes 12, 12, respectively.

「本発明の異なる実施例」 次に第18図ないし第40図に示す本発明の異なる実施例に
つき説明する。なお、これらの実施例の説明に当って、
前記本発明の実施例と同一構成部分には同一符号を付し
て重複する説明を省略する。
[Different Embodiments of the Present Invention] Next, different embodiments of the present invention shown in FIGS. 18 to 40 will be described. In the description of these examples,
The same components as those of the embodiment of the present invention are designated by the same reference numerals, and duplicate description will be omitted.

第18図ないし第20図の実施例において、前記本発明の実
施例と主に異なる点は高さ調節金具5Aで、この高さ調節
金具5Aは円錐形状の先端部41が形成され、頭部にドライ
バーが挿入されるドライバー挿入溝、本実施例ではマイ
ナス溝42が形成された複数本の高さ調整ボルト22Aを用
いた点で、このように形成された、複数本の高さ調整ボ
ルト22Aを用いた高さ調整金具5Aを備えた目地装置1Aに
しても前記本発明の実施例と同様な作用効果が得られ
る。
In the embodiment of FIGS. 18 to 20, the main difference from the embodiment of the present invention is the height adjusting metal fitting 5A, which is formed with a conical tip portion 41, A plurality of height adjusting bolts 22A formed in this manner are used in that a plurality of height adjusting bolts 22A in which a driver is inserted into the driver inserting groove, in the present embodiment, a minus groove 42 are formed are used. Even in the joint device 1A including the height adjusting fitting 5A using the same, the same effects as those of the embodiment of the present invention can be obtained.

第21図ないし第23図の実施例において、前記本発明の実
施例と主に異なる点は、左右の下地レール4、4Aの下地
レール本体17、17にねじ孔21、21部位よりも内側に防水
壁43、43を形成して目地プレート8から挿入する水を防
水壁43間に落下させるようにした点で、このように形成
した左右の下地レール4、4Aを用いて目地装置1Bを構成
することにより、左右の下地レール4、4Aからねじ孔21
を介して床面へ水が漏れるのを効率良く防止することが
できる。
21 to 23, the main difference from the embodiment of the present invention is that the base rail bodies 17 and 17 of the left and right base rails 4 and 4A are located inside the screw holes 21 and 21. The joint device 1B is configured by using the left and right base rails 4 and 4A thus formed in that the waterproof walls 43 and 43 are formed so that water to be inserted from the joint plate 8 is dropped between the waterproof walls 43. The left and right ground rails 4 and 4A to screw holes 21
It is possible to efficiently prevent water from leaking to the floor via the.

第24図ないし第26図の実施例において、前記本発明の実
施例と主に異なる点は高さ調整金具5Bで、この高さ調整
金具5Bは左右の下地レール4、4Aの外底面に位置するプ
レート44と、このプレート44の中央部に形成された固定
ピン挿入孔45と、前記プレート44の外周部寄りの部位に
形成された複数個のねじ孔21から構成されている。
In the embodiment shown in FIGS. 24 to 26, the main difference from the embodiment of the present invention is the height adjusting metal fitting 5B, which is located on the outer bottom surface of the left and right ground rails 4 and 4A. Plate 44, a fixing pin insertion hole 45 formed in the central portion of the plate 44, and a plurality of screw holes 21 formed in a portion near the outer peripheral portion of the plate 44.

なお、この複数個のねじ孔21と対応する部位の左右の下
地レール4、4Aには高さ調整ボルト挿入孔46がそれぞれ
形成されている。
Height adjustment bolt insertion holes 46 are formed in the left and right base rails 4 and 4A corresponding to the plurality of screw holes 21, respectively.

このように構成された高さ調節金具5Bを用いて目地装置
1Cを構成しても前記本発明の実施例と同様な作用効果が
得られる。
A joint device using the height adjustment fitting 5B configured in this way
Even if 1C is configured, the same operation and effect as those of the embodiment of the present invention can be obtained.

第27図ないし第29図の実施例において、前記本発明の実
施例と主に異なる点は、左右の下地レール4、4Aの両側
面に高さ調整ボルト22が螺合される支持片47、47を一体
成形あるいは溶接固定した点で、このように形成された
左右の下地レール4、4Aを用いて目地装置1Dを構成して
も良い。
27 to 29 is different from the embodiment of the present invention mainly in that a support piece 47 to which height adjusting bolts 22 are screwed is attached to both side surfaces of the left and right base rails 4 and 4A. The joint device 1D may be configured by using the left and right base rails 4 and 4A thus formed in that 47 is integrally formed or fixed by welding.

第30図ないし第37図の実施例において、前記本発明の実
施例と主に異なる点は、後端部が下方に直角に折曲げら
れた左右の下地レール4、4Aを隣接する左右の建物の
2、2Aの対向する部位の左右のパラペット48、48A上に
設置するとともに、該左右の下地レール4、4Aに、左右
の建物2、2Aが地震よって上下方向および前後左右方向
に揺れ動いても、該揺れ動きを吸収する左右の取付け金
具49、49Aを介して目地カバー50を取付けた点で、この
ように目地装置1Eを構成して良い。
In the embodiment of FIGS. 30 to 37, the main difference from the embodiment of the present invention is that the left and right base rails 4 and 4A whose rear ends are bent downward at right angles adjoin the left and right buildings. 2 and 2A facing each other on the left and right parapets 48, 48A, and even if the left and right buildings 2, 2A sway vertically and front-rear and left-right on the left and right ground rails 4, 4A. The joint device 1E may be configured in this manner in that the joint cover 50 is attached via the left and right attachment fittings 49, 49A that absorb the shaking motion.

なお、前記左右の取付け金具49、49Aは、第31図に示す
ように固定ピン6で固定されるアングル状の複数個の支
持金具51と、この支持金具51に支持される、第32図に示
すように形成された左右のパラペット48、48Aの上部内
壁面との間にシール剤充填凹部52を形成するカバー板5
3、ストッパー片54および前記支持金具51に固定された
ボルト55が挿入されるボルト挿入孔56が形成された取付
け部57を有する支持金具58と、この支持金具58との間に
スライド溝59ができるように、第33図に示すように形成
された前記支持金具58の取付け部57と当接するボルト挿
入孔60を有する取付け部61を備える保持金具62と、この
保持金具62と前記支持金具58との間のスライド溝59に前
後左右方向にスライド可能に支持される第34図に示すよ
うに形成された先端部にC字状の軸受部63を有するスラ
イド板64と、このスライド板64の軸受部63に所定の角度
回動可能に取付けられた玉縁形状の軸部65を有するT字
状の取付け板66とから構成されている。
The left and right mounting brackets 49, 49A are a plurality of angle-shaped support brackets 51 fixed by fixing pins 6 as shown in FIG. 31, and are supported by the support brackets 51. The cover plate 5 that forms a sealant filling recess 52 between the left and right parapets 48, 48A formed as shown and the upper inner wall surface of the parapet 48, 48A.
3, a support metal fitting 58 having a mounting portion 57 in which a bolt insertion hole 56 into which the bolt 55 fixed to the stopper piece 54 and the support metal fitting 51 is inserted is formed, and a slide groove 59 is provided between the support metal fitting 58. As shown in FIG. 33, a holding metal fitting 62 having a mounting portion 61 having a bolt insertion hole 60 that comes into contact with the mounting portion 57 of the support metal fitting 58 formed as shown in FIG. 33, and the holding metal fitting 62 and the support metal fitting 58. A slide plate 64 having a C-shaped bearing portion 63 at the tip portion formed as shown in FIG. 34, which is slidably supported in the slide groove 59 between the slide plate 64, and a slide plate 64 of this slide plate 64. It is composed of a T-shaped mounting plate 66 having a bead-shaped shaft portion 65 mounted on the bearing portion 63 so as to be rotatable by a predetermined angle.

第38図ないし第40図の実施例において、前記本発明の実
施例と主に異なる点は、右の下地レール4Aに先端部にC
字状の軸受部63を形成した軸受部67を一体成形した点
で、このように形成された右の下地レール4Aを用いて目
地装置1Fを構成しても良い。
In the embodiment of FIGS. 38 to 40, the main difference from the embodiment of the present invention is that the base rail 4A on the right has a C at the tip.
Since the bearing portion 67 having the character-shaped bearing portion 63 is integrally formed, the joint device 1F may be configured by using the right base rail 4A thus formed.

「本発明の効果」 以上の説明から明らかなように、本発明にあっては次に
列挙する効果が得られる。
"Effects of the Present Invention" As is clear from the above description, the following effects can be obtained in the present invention.

(1)隣接する左右の建物の接続する部位の左右の床の
端部に形成された下地レール取付け凹部にそれぞれ設置
される左右の下地レールと、この左右の下地レールにそ
れぞれ取付けられた該左右の下地レールを所定の設置状
態にすることのできる複数個の高さ調整金具と、前記左
右の下地レールをそれぞれ前記左右の床端部の下地レー
ル取付け凹部内に固定する複数本のアンカーボルト等の
固定ピンと、前記左右の下地レール間の目地部を覆うよ
うに該左右の下地レール間に掛渡された目地プレート
と、この目地プレートの両端部をそれぞれ覆うように前
記左右の下地レールに取付けられた支持カバーとで構成
されているので、左右の下地レール取付け凹部を凹凸の
ある形状のままでも、左右の下地レールを所定の高さや
傾斜状態に高さ調整金具によって取付けることができ
る。したがって、左右の下地レールの設置が容易にでき
る。
(1) Left and right base rails respectively installed in the base rail mounting recesses formed at the left and right floor end portions of the adjacent left and right building connecting parts, and the left and right base rails respectively mounted on the left and right base rails. Height adjusting metal fittings capable of setting the base rails in a predetermined state, and a plurality of anchor bolts for fixing the left and right base rails in the base rail mounting recesses of the left and right floor ends, respectively. Fixing pin, and a joint plate that is hung between the left and right base rails so as to cover the joint between the left and right base rails, and attached to the left and right base rails so as to cover both ends of the joint plate. Since it is configured with a supported support cover, the height of the left and right base rails can be adjusted to a predetermined height or inclination even if the recesses on the left and right base rail mountings have an uneven shape. It can be attached by the ingredients. Therefore, the left and right base rails can be easily installed.

(2)前記(1)によって、左右の下地レールと左右の
下地レール取付け凹部との間に、後でもモルタル等を充
填することができるので、従来のようにモルタルを塗布
した後、左右の下地レールを設置する場合のようにモル
タルが凝固するまで左右の下地レールの設置を待たなく
ても良く、短時間に効率良く設置することができる。
(2) According to the above (1), mortar or the like can be filled between the left and right ground rails and the left and right ground rail mounting recesses even afterwards. It is not necessary to wait for the left and right base rails to be installed until the mortar is solidified as in the case of installing the rails, and the installation can be performed efficiently in a short time.

(3)前記(1)によって、複数個の高さ調節金具の調
整作業は、複数個の高さ調節ボルトの回動作業で良いの
で、その作業を容易に行なうことができる。
(3) According to the above (1), the work of adjusting the plurality of height adjusting fittings can be performed by rotating the plurality of height adjusting bolts, and therefore the work can be easily performed.

(4)前記(1)によって、左右の下地レール取付け凹
部の形成作業が、該凹部の底面が凹凸状でも良いので、
楽に形成することができる。
(4) According to the above (1), the work of forming the left and right base rail mounting recesses may be such that the bottom surfaces of the recesses are uneven.
It can be easily formed.

(5)請求項2も前記(1)〜(4)と同様な効果が得
られる。
(5) According to claim 2, the same effect as that of the above (1) to (4) can be obtained.

(6)請求項3も左右のパラペットの上面に容易に左右
の下地レールを平坦状態で取付けることができる。
(6) According to claim 3, the left and right base rails can be easily attached to the upper surfaces of the left and right parapets in a flat state.

(7)請求項4も前記(6)と同様な効果が得られる。(7) According to claim 4, the same effect as that of (6) can be obtained.

【図面の簡単な説明】 第1図は本発明の一実施例を示す断面図、第2図および
第3図は本発明の取付け状態を示す説明図、第4図およ
び第5図は左右の下地レールの説明図、第6図は高さ調
整金具の説明図、第7図は目地プレートの説明図、第8
図は支持カバーの説明図、第9図はホルダー金具の説明
図、第10図は耐火帯の説明図、第11図ないし第17図は本
発明の設置工程を示す説明図、第18図ないし第20図、第
21図ないし第23図、第24図ないし第26図、第27図ないし
第29図、第30図ないし第37図、第38図ないし第40図はそ
れぞれ本発明の異なる実施例を示す説明図である。 1、1A〜1F:目地装置、 2、2A:左右の建物、 3、3A:左右の下地レール取付け凹部、 4、4A:左右の下地レール、 5、5A、5B:高さ調節金具、 6:固定ピン、7:目地部、 8:目地プレート、9:タッピングビス、 10:支持カバー、11:小口蓋、 12:排水パイプ、13:小口蓋、 14:縦桶、15:ホルダー金具、 16:耐火帯、17:下地レール本体、 18:目地プレート支持部、 19:支持カバー取付け部、 20:固定ピン挿入孔、21:ねじ孔、 22、22A:高さ調整ボルト、 23:水切り部、24:目地プレート本体、 26:支持カバー本体、27:係止片、 28:タッピングビス挿入孔、 29:ホルダー金具本体、 30:脱落防止片、31:隙間、 32:支持片、33:固定ピン挿入孔、 34:シート、35:メッシュ、 36:耐火帯本体、37:ボルト、 38:ナット、39:耐火帯取付け板、 40:充填剤、41:先端部、 42:マイナス溝、43:防水壁、 44:プレート、45:固定ピン挿入孔、 46:高さ調節ボルト挿入孔、 47:支持片、 48、48A:左右のパラペット、 49、49A:左右の取付け金具、 50:目地カバー、51:支持金具、 52:シール剤充填凹部、53:カバー板、 54:ストッパー片、55:ボルト、 56:ボルト挿入孔、57:取付け部、 58:支持金具、59:スライド溝、 60:ボルト挿入孔、61:取付け部 62:保持金具、63:軸受部、 64:スライド板、65:軸部、 66:取付け板、67:軸受板。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a sectional view showing an embodiment of the present invention, FIGS. 2 and 3 are explanatory views showing a mounting state of the present invention, and FIGS. 6 is an explanatory view of the base rail, FIG. 6 is an explanatory view of the height adjusting fitting, FIG. 7 is an explanatory view of the joint plate, and FIG.
FIG. 9 is an explanatory view of a support cover, FIG. 9 is an explanatory view of a holder fitting, FIG. 10 is an explanatory view of a refractory zone, and FIGS. 11 to 17 are explanatory views showing an installation process of the present invention. Figure 20, Figure
21 to 23, 24 to 26, 27 to 29, 30 to 37, 38 to 40 are explanatory views showing different embodiments of the present invention. Is. 1, 1A-1F: Joint device, 2, 2A: Left and right buildings, 3, 3A: Left and right ground rail mounting recesses, 4, 4A: Left and right ground rails, 5, 5A, 5B: Height adjustment metal fittings, 6: Fixing pin, 7: Joint part, 8: Joint plate, 9: Tapping screw, 10: Support cover, 11: Small lid, 12: Drain pipe, 13: Small lid, 14: Vertical trough, 15: Holder metal fitting, 16: Refractory zone, 17: Base rail body, 18: Joint plate support part, 19: Support cover attachment part, 20: Fixing pin insertion hole, 21: Screw hole, 22, 22A: Height adjustment bolt, 23: Drain part, 24 : Joint plate body, 26: Support cover body, 27: Locking piece, 28: Tapping screw insertion hole, 29: Holder metal fitting body, 30: Fall prevention piece, 31: Gap, 32: Support piece, 33: Fixing pin insertion Hole, 34: Sheet, 35: Mesh, 36: Refractory belt body, 37: Bolt, 38: Nut, 39: Refractory belt mounting plate, 40: Filler, 41: Tip part, 42: Minus groove, 43: Waterproof wall , 44: Plate 45: Fixing pin insertion hole, 46: Height adjustment bolt insertion hole, 47: Support piece, 48, 48A: Left and right parapets, 49, 49A: Left and right mounting brackets, 50: Joint cover, 51: Support bracket, 52: Sealing agent filling recess, 53: Cover plate, 54: Stopper piece, 55: Bolt, 56: Bolt insertion hole, 57: Mounting part, 58: Support fitting, 59: Slide groove, 60: Bolt insertion hole, 61: Mounting part 62: Holding bracket, 63: Bearing part, 64: Slide plate, 65: Shaft part, 66: Mounting plate, 67: Bearing plate.

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】隣接する左右の建物の接続する部位の左右
の床の端部に形成された下地レール取付け凹部にそれぞ
れ設置される左右の下地レールと、この左右の下地レー
ルにそれぞれ取付けられた該左右の下地レールを所定の
設置状態にすることのできる複数個の高さ調整金具と、
前記左右の下地レールをそれぞれ前記左右の床端部の下
地レール取付け凹部内に固定する複数本のアンカーボル
ト等の固定ピンと、前記左右の下地レール間の目地部を
覆うように該左右の下地レール間に掛渡された目地プレ
ートと、この目地プレートの両端部をそれぞれ覆うよう
に前記左右の下地レールに取付けられた支持カバーとか
らなることを特徴とする目地装置。
1. Left and right ground rails respectively installed in ground rail mounting recesses formed at the left and right floor end portions of the connecting parts of adjacent left and right buildings, and each of the left and right ground rails is mounted respectively. A plurality of height adjustment fittings capable of setting the left and right base rails in a predetermined installation state,
Fixing pins such as a plurality of anchor bolts for fixing the left and right base rails in the base rail mounting recesses of the left and right floor ends, respectively, and the left and right base rails so as to cover joints between the left and right base rails. A joint device comprising a joint plate suspended between the joint plates and a support cover attached to the left and right base rails so as to cover both ends of the joint plate.
【請求項2】隣接する左右の建物の接続する部位の左右
の床端部に下地レール取付け凹部を形成する下地レール
取付け凹部形成工程と、この下地レール取付け凹部形成
工程後に下地レール取付け凹部内に複数個の高さ調整金
具で所定の設置状態となるように左右の下地レールを設
置させる左右の下地レール設置工程と、この左右の下地
レール設置工程後に左右の下地レールをそれぞれ前記左
右の床端部の下地レール取付け凹部内に複数本のアンカ
ーボルト等の固定ピンによって固定する左右の下地レー
ル固定工程と、この下地レール固定工程後に左右の下地
レールと前記下地レール取付け凹部との間の隙間にモル
タル等の充填剤を充填する充填剤充填工程と、この充填
剤充填工程後に左右の下地レール間の目地部を覆うよう
に該左右の下地レール間に掛渡す目地プレート取付け工
程と、この目地プレート取付け工程後に目地プレートの
両端部をそれぞれ覆うように支持カバーを左右の下地レ
ールに取付ける支持カバー取付け工程とを含むことを特
徴とする目地装置の設置方法。
2. A base rail mounting recess forming step of forming base rail mounting recesses at left and right floor ends of adjacent left and right building connecting portions, and a base rail mounting recess after the base rail mounting recess forming step. After installing the left and right ground rails so that the right and left ground rails are installed with a plurality of height adjustment fittings so that the right and left ground rails are in a predetermined installation state, after the left and right ground rail installation steps, the left and right ground rails are respectively attached to the left and right floor ends. Of the left and right base rails, which are fixed by fixing pins such as anchor bolts, in the base rail mounting recess of the base part, and in the gap between the left and right base rails and the base rail mounting recess after this base rail fixing process. After the filler filling step of filling a filler such as mortar, the left and right base layers are covered so as to cover the joints between the left and right base rails after the filler filling step. Joint device, which includes a joint plate attaching step for hanging between joints, and a support cover attaching step for attaching the support covers to the left and right base rails so as to cover both ends of the joint plate after the joint plate attaching step. Installation method.
【請求項3】隣接する左右の建物の対向する部位の左右
のパラペット上に設置される左右の下地レールと、この
左右の下地レールにそれぞれ取付けられた該左右の下地
レールを所定の設置状態にすることのできる複数個の高
さ調整金具と、前記左右の下地レールをそれぞれ前記左
右のパラペットに固定する複数本のアンカーボルト等の
固定ピンと、前記左右の下地レールに地震等の揺れを吸
収できる左右の取付け金具を介して取付けられた前記左
右のパラペットおよび該左右のパラペット間の目地部を
覆う目地カバーとからなることを特徴とする目地装置。
3. The left and right base rails installed on the left and right parapets of the opposite parts of the adjacent left and right buildings, and the left and right base rails respectively attached to the left and right base rails in a predetermined installation state. A plurality of height adjusting metal fittings that can be used, a plurality of fixing pins such as anchor bolts that fix the left and right ground rails to the left and right parapets, and the left and right ground rails can absorb shaking such as an earthquake. A joint device comprising: the left and right parapets attached via left and right attachment fittings; and a joint cover for covering joints between the left and right parapets.
【請求項4】隣接する左右の建物の対向する部位の左右
のパラペット上に複数個の高さ調整金具で所定の設置状
態となるように左右の下地レールを設置する左右の下地
レール設置工程と、この左右の下地レール設置工程後に
左右の下地レールを左右のパラペットに複数本のインカ
ーボルト等の固定ピンで固定する左右の下地レール固定
工程と、この左右の下地レール固定工程後に左右の下地
レールと左右のパラペットとの間の隙間にそれぞれモル
タル等の充填剤を充填する充填剤充填工程と、前記左右
の下地レールにそれぞれ取付け金具を取付ける取付け金
具取付け工程と、この取付け金具取付け工程後に前記左
右のパラペットおよび該左右のパラペット間の目地部を
覆う目地カバーを取付け金具に取付ける目地カバー取付
け工程とを含むことを特徴とする目地装置の設置方法。
4. A left and right ground rail installation step of installing the left and right ground rails so that a plurality of height adjustment metal fittings are in a predetermined installation state on the left and right parapets of the opposite parts of the adjacent left and right buildings. After the left and right ground rail installation process, the left and right ground rails are fixed to the left and right parapets with a plurality of fixing pins such as inker bolts, and the left and right ground rails are fixed after the left and right ground rails fixing step. And the left and right parapets are filled with a filler such as mortar and the like, a mounting bracket mounting process that mounts mounting brackets on the left and right base rails respectively, and the left and right after the mounting bracket mounting process. And a joint cover attaching step of attaching a joint cover that covers the joint between the left and right parapets to the mounting bracket. Installation of joint device according to claim.
JP27562789A 1989-10-23 1989-10-23 Joint device and installation method of joint device Expired - Lifetime JPH06104997B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP27562789A JPH06104997B2 (en) 1989-10-23 1989-10-23 Joint device and installation method of joint device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP27562789A JPH06104997B2 (en) 1989-10-23 1989-10-23 Joint device and installation method of joint device

Publications (2)

Publication Number Publication Date
JPH03137334A JPH03137334A (en) 1991-06-11
JPH06104997B2 true JPH06104997B2 (en) 1994-12-21

Family

ID=17558092

Family Applications (1)

Application Number Title Priority Date Filing Date
JP27562789A Expired - Lifetime JPH06104997B2 (en) 1989-10-23 1989-10-23 Joint device and installation method of joint device

Country Status (1)

Country Link
JP (1) JPH06104997B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4774353B2 (en) * 2006-11-09 2011-09-14 Ykk Ap株式会社 Structure
JP5615066B2 (en) * 2010-07-09 2014-10-29 ミサワホーム株式会社 Building connection structure
JP7194428B2 (en) * 2018-05-07 2022-12-22 株式会社エービーシー商会 Insulation zone for expansion joints and expansion joints

Also Published As

Publication number Publication date
JPH03137334A (en) 1991-06-11

Similar Documents

Publication Publication Date Title
JP3905653B2 (en) Finishing material mounting structure on extruded cement board
JPH06104997B2 (en) Joint device and installation method of joint device
JP2008265939A (en) Landing sill device for elevator
KR860001927B1 (en) Window frame and thereof fixing process
JP3483699B2 (en) Exterior wall panel support structure
JP4410522B2 (en) Platform door device and platform door device installation method
JPH08338094A (en) Fixing structure of alc wall panel
JP2522093B2 (en) Finishing unit panel and tiled curtain wall
JPH0233529Y2 (en)
JP3030606B2 (en) Waterproof pan support device and support method
JPH09177213A (en) Panel mounting structure and deadweight receiving metal fitting
JPS6217553Y2 (en)
JPH0320875B2 (en)
JPH0226024B2 (en)
JPH05148977A (en) External wall fitting method and external wall
JPH0988083A (en) Method of grout filling construction of column-base lower end section and form for forming recessed section for grout filling used for method thereof
JP2687087B2 (en) Mounting mechanism of decorative panel for wall decoration
JP2560027Y2 (en) Installation structure of waterproof pan
JPH0124305Y2 (en)
JPH073974A (en) Roof or balcony handrail fixing structure
JPH0640733Y2 (en) Wall panel mounting equipment
JP2593767B2 (en) Retrofit handrail post holder fixing device
CN112376834A (en) Mooney retaining wall dry-hanging type decorative stone and construction method thereof
JP3358187B2 (en) Vertical wall panel mounting structure and height adjustment bracket
JPH0533461A (en) Fixture for facing material