JPH0571731B2 - - Google Patents

Info

Publication number
JPH0571731B2
JPH0571731B2 JP60093290A JP9329085A JPH0571731B2 JP H0571731 B2 JPH0571731 B2 JP H0571731B2 JP 60093290 A JP60093290 A JP 60093290A JP 9329085 A JP9329085 A JP 9329085A JP H0571731 B2 JPH0571731 B2 JP H0571731B2
Authority
JP
Japan
Prior art keywords
pile
steel pipe
bolt insertion
insertion hole
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP60093290A
Other languages
Japanese (ja)
Other versions
JPS61250228A (en
Inventor
Hideyoshi Takahashi
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tomoe Corp
Original Assignee
Tomoe Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tomoe Corp filed Critical Tomoe Corp
Priority to JP9329085A priority Critical patent/JPS61250228A/en
Publication of JPS61250228A publication Critical patent/JPS61250228A/en
Publication of JPH0571731B2 publication Critical patent/JPH0571731B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/56Screw piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は杭頭部を補強する基礎杭の施工法に
関するものである。
[Detailed Description of the Invention] [Industrial Field of Application] This invention relates to a method of constructing foundation piles for reinforcing pile heads.

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

出願人は先に地盤中に埋設された既製杭の頭部
外周に鋼管からなるケーシングを埋設して曲げモ
ーメントが大きく作用する杭頭部の補強方法に関
連する発明を提案した。(特開昭57−108325号公
報参照) ところで近年杭の打撃工法に代つて低騒音、低
振動による既製杭の埋設工法として中掘り工法、
プレボーリング工法が多用されるに至つている。
The applicant previously proposed an invention related to a method of reinforcing a pile head on which a large bending moment acts by burying a casing made of a steel pipe around the head of a ready-made pile buried in the ground. (Refer to Japanese Unexamined Patent Publication No. 108325/1983) In recent years, the hollow digging method has replaced the pile hammering method as a low-noise, low-vibration burying method for prefabricated piles.
The pre-boring method has come into widespread use.

そこでこの発明も低公害工法の目的に順応すべ
く杭頭部の補強鋼管の埋設に、従来ねじ込み杭工
法において実施されている手段を応用すべくした
ものである。
Therefore, in order to meet the purpose of a low-pollution construction method, this invention also applies the means used in the conventional screw pile construction method to burying reinforcing steel pipes in the pile head.

〔問題点を解決するための手段〕[Means for solving problems]

この発明の要旨は既製杭を地盤中に埋設後、前
記杭をガイドとし、先端部に螺旋状突起等の掘削
刃を有し、また鋼管上部にボルト挿通孔を有する
フランジを有し、かつ前記既製杭よりもその内径
が大径の鋼管に前記ボルト挿通孔にボルトを挿通
して回転装置を取付けてねじりモーメントを加え
ることにより、その鋼管を回転させ、杭頭部外周
の地盤中にねじ込みして埋設し、次いでボルトお
よび回転装置を外し、前記ボルト挿通孔にアンカ
ー鉄筋を挿入して取付ける施工法である。
The gist of this invention is to bury a ready-made pile in the ground, use the pile as a guide, have a digging blade such as a spiral protrusion at the tip, and have a flange with a bolt insertion hole at the top of the steel pipe, and A bolt is inserted into the bolt insertion hole in a steel pipe whose inner diameter is larger than that of the ready-made pile, and a rotating device is attached to apply a torsional moment to rotate the steel pipe and screw it into the ground around the outer periphery of the pile head. This is a construction method in which the bolts and rotating device are removed, and the anchor reinforcing bars are inserted into the bolt insertion holes for installation.

〔実施例〕〔Example〕

まず鉄筋コンクリート杭あるいは鋼管杭等の既
製杭1をプレボーリング工法、中掘工法等によつ
て所定の位置に埋設する。
First, a ready-made pile 1 such as a reinforced concrete pile or a steel pipe pile is buried in a predetermined position by a pre-boring method, a medium digging method, or the like.

杭頭補強用の鋼管2は先端部に螺旋状の突起あ
るいは螺旋状の羽根からなる掘削刃3が設けてあ
る。また頭部には接合用のフランジ4が突設して
あり、このフランジ4にはボルト挿通孔5が穿設
してある。
The steel pipe 2 for reinforcing the pile cap is provided at its tip with a digging blade 3 consisting of a spiral protrusion or spiral blade. Further, a joining flange 4 is protruded from the head, and a bolt insertion hole 5 is bored in this flange 4.

以上鋼管2を既製杭1をガイドとし、鋼管2の
フランジ4のボルト挿通孔5に挿通したボルトお
よびナツトを用いて接合した回転装置6を作動さ
せることにより、ねじりモーメントを加え、鋼管
2を回転させ、螺旋状の掘削刃により地盤を掘削
する。これによつて鋼管2は杭頭部外周の地盤中
に埋設される。
As described above, the steel pipe 2 is rotated by applying a torsional moment by operating the rotating device 6, which is connected to the steel pipe 2 using the ready-made pile 1 as a guide and using bolts and nuts inserted into the bolt insertion holes 5 of the flange 4 of the steel pipe 2. Then, the ground is excavated using a spiral digging blade. As a result, the steel pipe 2 is buried in the ground around the outer periphery of the pile head.

その後前記ボルト挿通孔5に挿通したボルトお
よび回転装置6を外し、フランジのボルト挿通孔
5にはねじ鉄筋7を挿通し、ナツト8により固定
してアンカー鉄筋とする。
Thereafter, the bolt inserted into the bolt insertion hole 5 and the rotating device 6 are removed, and a threaded reinforcing bar 7 is inserted into the bolt insertion hole 5 of the flange and fixed with a nut 8 to serve as an anchor reinforcing bar.

次いで既製杭1の上部内、鋼管2と既製杭1と
の間隙およびフーチング9のコンクリートを造成
して基礎を造成する。
Next, concrete is created in the upper part of the ready-made pile 1, the gap between the steel pipe 2 and the ready-made pile 1, and the footing 9 to create a foundation.

〔発明の効果〕〔Effect of the invention〕

この発明は以上の構成からなり、ケーシングと
なる既製杭頭部を補強する鋼管の先端部には螺旋
状の掘削刃を有するので、先に埋設した既製杭を
ガイドとしてねじりモーメントを加えることによ
り地盤中に埋設することができる。したがつて低
公害の施工が可能となる。
This invention has the above-mentioned configuration, and since the tip of the steel pipe that reinforces the head of the ready-made pile serving as the casing has a spiral digging blade, it is possible to use the previously buried ready-made pile as a guide to apply a torsional moment to the ground. It can be buried inside. Therefore, construction with low pollution is possible.

また鋼管頂部のフランジのボルト挿通孔によつ
て回転装置の取付けを容易とするとともに、従来
溶接によつていたアンカー鉄筋の取付けに前記ボ
ルト挿通孔を利用するので施工が容易かつ確実な
ナツトによる取付けを可能とすることができる。
In addition, the bolt insertion holes in the flange at the top of the steel pipe make it easy to install the rotating device, and the bolt insertion holes are used to install anchor reinforcing bars, which were conventionally welded, making installation easier and more reliable with nuts. Installation can be made possible.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図、第2図は施工状態の概要を示した縦断
面図と−矢視図、第3図、第4図は鋼管の他
の実施例を示した立面図と−矢視図、第5図
は施工完了後の縦断面図、第6図はフランジ平面
図である。 1……既製杭、2……鋼管、3……掘削刃、4
……フランジ、5……ボルト挿通孔、6……回転
装置、7……ねじ鉄筋、8……ナツト、9……フ
ーチング。
Figures 1 and 2 are a vertical sectional view and a view in the direction of the arrow, showing an overview of the construction state, and Figures 3 and 4 are an elevation view and a view in the direction of the arrow, showing other embodiments of the steel pipe. FIG. 5 is a longitudinal sectional view after completion of construction, and FIG. 6 is a flange plan view. 1...Ready-made pile, 2...Steel pipe, 3...Drilling blade, 4
... Flange, 5 ... Bolt insertion hole, 6 ... Rotating device, 7 ... Threaded reinforcing bar, 8 ... Nut, 9 ... Footing.

Claims (1)

【特許請求の範囲】[Claims] 1 既製杭を地盤中に埋設後、前記杭をガイドと
し、先端部に螺旋状の掘削刃を有し、また鋼管上
部にボルト挿通孔を有するフランジを有し、かつ
前記杭より内径が大径の鋼管に前記ボルト挿通孔
にボルトを挿通して回転装置を取付けてねじりモ
ーメントを加えることにより杭頭部外周の地盤中
に埋設し、次いでボルトおよび回転装置を外し、
前記ボルト挿通孔にアンカー鉄筋を挿入して取付
けることを特徴とする杭頭部補強杭の施工法。
1 After burying a ready-made pile in the ground, use the pile as a guide, have a spiral digging blade at the tip, a flange with a bolt insertion hole at the top of the steel pipe, and have a larger inner diameter than the pile. The steel pipe is buried in the ground around the outer periphery of the pile head by inserting a bolt into the bolt insertion hole, attaching a rotating device and applying a torsion moment, and then removing the bolt and rotating device,
A method for constructing a pile head reinforcement pile, which comprises inserting and installing an anchor reinforcing bar into the bolt insertion hole.
JP9329085A 1985-04-30 1985-04-30 Construction of head-reinforced pile Granted JPS61250228A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9329085A JPS61250228A (en) 1985-04-30 1985-04-30 Construction of head-reinforced pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9329085A JPS61250228A (en) 1985-04-30 1985-04-30 Construction of head-reinforced pile

Publications (2)

Publication Number Publication Date
JPS61250228A JPS61250228A (en) 1986-11-07
JPH0571731B2 true JPH0571731B2 (en) 1993-10-07

Family

ID=14078262

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9329085A Granted JPS61250228A (en) 1985-04-30 1985-04-30 Construction of head-reinforced pile

Country Status (1)

Country Link
JP (1) JPS61250228A (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4693423B2 (en) * 2005-01-18 2011-06-01 ジャパンパイル株式会社 Pile head reinforcement method
JP4498348B2 (en) * 2006-12-26 2010-07-07 Jfeスチール株式会社 Screwed steel pipe pile
JP4946695B2 (en) * 2007-07-27 2012-06-06 Jfeスチール株式会社 Construction method of double pipe type pile head structure
JP4943363B2 (en) * 2008-03-11 2012-05-30 新日本製鐵株式会社 Steel pipe pile and its construction method
JP5665980B2 (en) * 2011-06-02 2015-02-04 旭化成建材株式会社 Pile construction method using buried jig and buried jig for pile construction

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS53135108A (en) * 1977-04-28 1978-11-25 Uchida Tankou Kk Method of driving screw anchor
JPS57108325A (en) * 1980-12-23 1982-07-06 Tomoegumi Iron Works Ltd Fixation of pile head

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS53135108A (en) * 1977-04-28 1978-11-25 Uchida Tankou Kk Method of driving screw anchor
JPS57108325A (en) * 1980-12-23 1982-07-06 Tomoegumi Iron Works Ltd Fixation of pile head

Also Published As

Publication number Publication date
JPS61250228A (en) 1986-11-07

Similar Documents

Publication Publication Date Title
JP2002070048A (en) Construction method for steel core of column in inverted construction system, and plier and steel pipe pile used for the method
JP3754506B2 (en) Prestressed concrete pile construction method
JPH0571731B2 (en)
JP2874561B2 (en) Fore piling method with stiffening of the leading leg using a shaft
JPH01142122A (en) Small-diameter steel tubular pile
JP2000136532A (en) Rotary type press-in sheet pile and construction method thereof
JPS6218684B2 (en)
JPH0194112A (en) Construction of steel-pipe pile
JP4129836B2 (en) Construction method of foundation pile, ready-made pile with spiral wing
JPH0559215B2 (en)
JPS6411776B2 (en)
JPS61151325A (en) Method of reinforcing pile head part against horizontal force
JP2773034B2 (en) Rotary press-fitting method for steel pipe piles
JPS6286228A (en) Penetration of casing and casing for extension
JPS59192125A (en) Settlement work of concrete pile with screw
JP2843542B2 (en) Non-discharge type rotary press-fitting pile
JPH0341610B2 (en)
JPS6227541Y2 (en)
JPS6319390Y2 (en)
JPS6128774B2 (en)
JP2893443B2 (en) Foundation pile
JPS60261830A (en) Method of sinking concrete pile
JPS6145233Y2 (en)
JPS60123620A (en) Method of sinking steel pipe concrete composite pile
JP3031246B2 (en) Screw-in type steel pipe pile