Repairing method for building floor face

Info

Publication number
JPH0552043A
JPH0552043A JP22826191A JP22826191A JPH0552043A JP H0552043 A JPH0552043 A JP H0552043A JP 22826191 A JP22826191 A JP 22826191A JP 22826191 A JP22826191 A JP 22826191A JP H0552043 A JPH0552043 A JP H0552043A
Authority
JP
Japan
Prior art keywords
floor face
floor surface
building
small hole
mixed concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP22826191A
Other languages
Japanese (ja)
Inventor
Shigeaki Sekine
繁明 関根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Meiwa Industry Co Ltd
Meiwa Kogyo Co Ltd
Original Assignee
Meiwa Industry Co Ltd
Meiwa Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Meiwa Industry Co Ltd, Meiwa Kogyo Co Ltd filed Critical Meiwa Industry Co Ltd
Priority to JP22826191A priority Critical patent/JPH0552043A/en
Publication of JPH0552043A publication Critical patent/JPH0552043A/en
Pending legal-status Critical Current

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

PURPOSE:To repair the floor face without carrying out objects in a building by boring a small hole at a proper position on the distorted floor face, and pressing ready mixed concrete between the floor face and the ground surface through the small hole. CONSTITUTION:When a gap is generated between the floor face 3 of a building and the ground surface due to the ground settlement and the floor face 3 is distorted, a small hole 5 is bored at a proper position on the floor face 3, and a pressure container 6 with a feed hole 61 communicated to the small hole 5 is installed on it. Ready mixed concrete 7 is filled in the pressure container 6, and the high-pressure air is fed to press the ready mixed concrete 7 between the floor face 3 and the ground surface via the feed hole 61 and the small hole 5. The floor face 3 is lifted upward by the pressed-in ready mixed concrete 7 to correct the distortion of the floor face 3, and the ready mixed concrete 7 is made the support member of the floor face 3 as it is after it is solidified.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は工場等の地表面に直接コ
ンクリート床を形成する建物において、地盤沈下によっ
て床面が歪んだ場合の補修方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of repairing a building where a concrete floor is directly formed on the ground surface, such as a factory, when the floor surface is distorted due to ground subsidence.

【0002】[0002]

【従来の技術及び発明が解決しようとする課題】工場や
倉庫等を建設する場合は、地盤の状態を考慮して建屋1
の傾斜及び沈下が生じないように適宜な杭2を打設して
建屋1を建設しているが、床面3は工作機械その他を設
置するため地表面上に直接鉄筋コンクリートで形成して
いる(図3:イ参照)。しかし地盤沈下の激しい地域で
は建屋1は杭2によって所定の状態を維持しているが、
床面3の直下の地盤が沈下し、床面3の下方に空隙4が
生ずる(図3:ロ参照)。このため床面3が歪み、設置
した工作機械に不都合となるので、補修が必要となる。
2. Description of the Related Art When constructing factories, warehouses, etc., the building 1 should be considered in consideration of the ground condition.
The building 1 is constructed by placing appropriate piles 2 to prevent the inclination and subsidence of the building, but the floor 3 is made of reinforced concrete directly on the ground surface for installing machine tools and the like ( (See FIG. 3: a). However, in areas where ground subsidence is severe, the building 1 maintains a predetermined state with the piles 2,
The ground immediately below the floor surface 3 sinks, and a void 4 is formed below the floor surface 3 (see FIG. 3: B). For this reason, the floor surface 3 is distorted, which is inconvenient for the installed machine tool, and repair is required.

【0003】従来の補修手段は、工場内に設置した機械
類を取り外したり、倉庫内に収納した商品等を搬出し
て、床面の再構築を行っていた。このため床面の補修
(再構築によるコンクリートの固化期間)が終了するま
で工場や倉庫の閉鎖が余儀なくされてしまうそこで本発
明は、工場内の機械類をその儘にして床面の補修を行う
方法を提案したものである。
The conventional repairing means has been to rebuild the floor by removing the machinery installed in the factory or carrying out the products stored in the warehouse. For this reason, the factory or warehouse is forced to be closed until the floor surface is repaired (the solidification period of the concrete due to reconstruction). Therefore, the present invention repairs the floor surface by using the machinery in the factory as the same. It is a proposed method.

【0004】[0004]

【課題を解決するための手段】本発明に係る建築物の補
修方法は、建物の床面と地表面との間に間隙が生じた場
合、床面の適宜個所に小孔を穿設し、床面と地表面との
間に前記小孔より生コンクリートを圧入してなることを
特徴とするものである。
A method for repairing a building according to the present invention is such that, when a gap is generated between a floor surface of a building and a ground surface, a small hole is bored at an appropriate place on the floor surface, It is characterized in that fresh concrete is press-fitted through the small holes between the floor surface and the ground surface.

【0005】[0005]

【作用】床面に穿設した小孔より床下部分の間隙に生コ
ンクリートを圧入すると、圧入された生コンクリートが
自己の粘性であまり広がらずに柱状となり、且つ圧入部
分(小孔部分)の周囲の床面を上方に持ち上げ、床面の
歪みが是正される。更に圧入された生コンクリートはそ
のまま固化するので、床面の支持部材となる。
[Function] When fresh concrete is press-fitted into the gap below the floor from the small holes drilled in the floor surface, the raw concrete press-fitted becomes columnar due to its own viscosity and does not spread so much, and around the press-fitted part (small hole part) Raises the floor surface of the above, and the distortion of the floor surface is corrected. Furthermore, the fresh concrete that has been press-fitted solidifies as it is, and thus becomes a support member for the floor surface.

【0006】[0006]

【実施例】次に本発明の実施例について説明する。工場
や倉庫等は図3(イ)に示すように、建屋1の傾斜及び
沈下が生じないように適宜な杭2を打設して建屋1を建
設し、床面3は工作機械その他を設置するため地表面上
に直接鉄筋コンクリートで形成している。 しかし地盤
沈下の激しい地域では建築後数年で地盤が数十センチメ
ートルも沈下してしまう。地盤沈下が生ずると、図3
(ロ)に示すように建築物のうち建屋1部分は杭2によ
って所定の状態を維持しているが、床面3の下方に空隙
4が生ずる。
EXAMPLES Next, examples of the present invention will be described. As shown in Fig. 3 (a), factories, warehouses, etc., construct the building 1 by placing appropriate piles 2 so that the building 1 does not incline and sink, and the floor 3 is equipped with machine tools and the like. Therefore, it is made of reinforced concrete directly on the ground surface. However, in areas where ground subsidence is severe, the ground subsides tens of centimeters within a few years after construction. When ground subsidence occurs, Fig. 3
As shown in (b), the building 1 portion of the building is maintained in a predetermined state by the piles 2, but a void 4 is formed below the floor surface 3.

【0007】そこで床面3のうち床面支持を必要とする
個所に小孔5を穿設し、小孔5の上方に小孔5と連通す
る供給孔61を有する圧力容器6を設置し、圧力容器6
内に生コンクリート7を充填し、更に圧力容器5にコン
プレッサー(図示せず)からの高圧空気を供給すると、
供給孔61並びに小孔5を通って床下部分の空隙4に生
コンクリート7が圧入される。圧入された生コンクリー
ト7は自己の粘性であまり広がらずに柱状の塊となり、
且つ圧入部分(小孔6部分)の周囲の床面3を上方に持
ち上げ、床面3の歪みを是正する。更に圧入された生コ
ンクリート7はそのままの状態か若しくは僅かに下がっ
て固化するので、固化後は床面3の支持部材7aとな
る。
Therefore, a small hole 5 is formed in a portion of the floor surface 3 where floor support is required, and a pressure vessel 6 having a supply hole 61 communicating with the small hole 5 is installed above the small hole 5. Pressure vessel 6
When ready-mixed concrete 7 is filled in the inside and high pressure air from a compressor (not shown) is further supplied to the pressure vessel 5,
Fresh concrete 7 is press-fitted into the void 4 in the underfloor portion through the supply hole 61 and the small hole 5. The ready-mixed concrete 7 that has been press-fitted has a columnar mass without spreading due to its own viscosity,
Moreover, the floor surface 3 around the press-fitted portion (small hole 6 portion) is lifted upward to correct the distortion of the floor surface 3. Further, the fresh concrete 7 that has been press-fitted is solidified as it is or as it is slightly lowered, so that it becomes the support member 7a of the floor surface 3 after solidification.

【0008】従って工場内に設置した機械類や、倉庫内
に収納した商品等を全部外部に搬出せずに床面の補修が
可能となったものである。尚本発明は床面の表面側から
生コンクリートを圧入するものであれば良いもので、小
孔の穿設、圧力容器等のコンクリート圧入等の具体的手
段は任意に定めて良いものである。
Therefore, the floor surface can be repaired without carrying out all the machines installed in the factory and the products stored in the warehouse to the outside. The present invention is only required to press-fit fresh concrete from the surface side of the floor surface, and concrete means such as punching small holes and press-fitting concrete such as a pressure vessel may be arbitrarily determined.

【0009】[0009]

【発明の効果】本発明は以上の通り地盤沈下によって建
物の床面と地表面との間に間隙が生じ、床面が歪んだ場
合、床面の適宜個所に小孔を穿設し、床面と地表面との
間に前記小孔より生コンクリートを圧入し、圧入した生
コンクリートで床面を上方に持ち上げて床面の歪みを是
正し、而も圧入された生コンクリートをそのまま床面の
支持部材とする補修方法で、工場内に設置した機械類
や、倉庫内に収納した商品等を全部外部に搬出せずに、
工場等を従前通り稼働したままで床面の補修が可能とな
ったものである。
As described above, according to the present invention, when a subsidence occurs between the floor surface of a building and the ground surface due to ground subsidence and the floor surface is distorted, small holes are bored at appropriate places on the floor surface to Press the fresh concrete from the small holes between the surface and the ground surface, correct the floor surface distortion by pressing the floor surface upward with the press-fitted fresh concrete, and also press-fit the fresh concrete as it is on the floor surface. With a repair method that uses a support member, without having to carry out all the machinery installed in the factory and the products stored in the warehouse to the outside,
It is now possible to repair the floor surface while the factory is still operating.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の実施例の補修工事中の状態を示す説明
図である。
FIG. 1 is an explanatory view showing a state during repair work of an embodiment of the present invention.

【図2】同補修工事終了後の状態を示す説明図である。FIG. 2 is an explanatory view showing a state after completion of the repair work.

【図3】地盤沈下の状態を示す説明図、(イ)は沈下前
(ロ)は沈下後を示す。
FIG. 3 is an explanatory diagram showing a state of ground subsidence, (a) shows before subsidence, and (b) shows after subsidence.

【符号の説明】[Explanation of symbols]

1 建屋 2 杭 3 床面 4 空隙 5 小孔 6 圧力容器 7 生コンクリート 1 Building 2 Pile 3 Floor surface 4 Void 5 Small hole 6 Pressure vessel 7 Ready-mixed concrete

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 地盤沈下によって建物の床面と地表面と
の間に間隙が生じ、床面が歪んだ場合、床面の適宜個所
に小孔を穿設し、床面と地表面との間に前記小孔より生
コンクリートを圧入してなることを特徴とする建物床面
の補修方法
1. When ground subsidence causes a gap between a floor surface of a building and the ground surface, and the floor surface is distorted, small holes are bored at appropriate places on the floor surface to separate the floor surface from the ground surface. A method for repairing a building floor surface, characterized by press-fitting fresh concrete through the small holes
JP22826191A 1991-08-13 1991-08-13 Repairing method for building floor face Pending JPH0552043A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22826191A JPH0552043A (en) 1991-08-13 1991-08-13 Repairing method for building floor face

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22826191A JPH0552043A (en) 1991-08-13 1991-08-13 Repairing method for building floor face

Publications (1)

Publication Number Publication Date
JPH0552043A true JPH0552043A (en) 1993-03-02

Family

ID=16873704

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22826191A Pending JPH0552043A (en) 1991-08-13 1991-08-13 Repairing method for building floor face

Country Status (1)

Country Link
JP (1) JPH0552043A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06346603A (en) * 1993-06-11 1994-12-20 Kajima Corp Sink repair method of dirt floor concrete slab
CN106121221A (en) * 2016-07-01 2016-11-16 晟通科技集团有限公司 Building template bracing means

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6327628A (en) * 1986-07-18 1988-02-05 Takenaka Komuten Co Ltd Correcting work for settlement of foundation slab

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6327628A (en) * 1986-07-18 1988-02-05 Takenaka Komuten Co Ltd Correcting work for settlement of foundation slab

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06346603A (en) * 1993-06-11 1994-12-20 Kajima Corp Sink repair method of dirt floor concrete slab
CN106121221A (en) * 2016-07-01 2016-11-16 晟通科技集团有限公司 Building template bracing means

Similar Documents

Publication Publication Date Title
US3377807A (en) Anchor bolt assembly
JPH11256515A (en) Anchoring method for steel bridge pier
JPH0552043A (en) Repairing method for building floor face
US20030133765A1 (en) One step countersink
CN112502156A (en) Obstacle-removing and pile-pressing integrated anchor rod static pressure pile machine and construction method thereof
US3800888A (en) Cushion pot anvil with mechanical and molded joint
JP3840474B2 (en) One-side construction method for structures
CN105908713A (en) Concave-rectangular-double-end agitating drilling machine
CN106051307A (en) Combined fast-assembly pipeline support and mounting method thereof
JPS6327628A (en) Correcting work for settlement of foundation slab
KR200202715Y1 (en) Ruggdness pouring type contrete structure
KR100555378B1 (en) Apparatus for tramping road
EP1329564A1 (en) Dowel connector for concrete layers and its use
KR100244736B1 (en) Cooling water supply device for pile cutting machine
CN105908711A (en) Convex-trapezoidal-head drilling and agitating machine
JPH06331092A (en) Equipment installation method
JPS6332025A (en) Foundation slab structure to be easily repaired for settlement
JPH11230491A (en) Easy mounting method for installation foundation for apparatus, such as, vending machine
CN212469823U (en) Anti-shifting pile end plate punching special equipment
CN107363477A (en) A kind of production technology of high usage, precision steel structures
JPH0835231A (en) Cutting method of slope
JP2612497B2 (en) Drilling method for large diameter underground holes
EP0872595A1 (en) A method for inserting a foundation pile into the ground
JPH09221769A (en) Elevation adjuster and concrete secondary product with adjuster
JP2785541B2 (en) Burial method for pillars