Intermediate joint of underground power transmission line

Info

Publication number
JPH0542887U
JPH0542887U JP9170591U JP9170591U JPH0542887U JP H0542887 U JPH0542887 U JP H0542887U JP 9170591 U JP9170591 U JP 9170591U JP 9170591 U JP9170591 U JP 9170591U JP H0542887 U JPH0542887 U JP H0542887U
Authority
JP
Japan
Prior art keywords
engaging
pin
joint
joint body
action pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP9170591U
Other languages
Japanese (ja)
Other versions
JPH0725507Y2 (en
Inventor
守 深井
敏信 奥村
博幸 榎原
修次 津上
泰人 井出
忠生 近藤
利保 福屋
浩一郎 片寄
修 水田
照弘 三原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kansai Electric Power Co Inc
Original Assignee
Kansai Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kansai Electric Power Co Inc filed Critical Kansai Electric Power Co Inc
Priority to JP1991091705U priority Critical patent/JPH0725507Y2/en
Publication of JPH0542887U publication Critical patent/JPH0542887U/en
Application granted granted Critical
Publication of JPH0725507Y2 publication Critical patent/JPH0725507Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Joints With Sleeves (AREA)
  • Clamps And Clips (AREA)
  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)

Abstract

(57)【要約】 【目的】 地中送電線管路の中間において本管路と長さ
調整管路とを接続するに際し、迅速に両管路を接続でき
る中間継手を提供することである。 【構成】 継手本体1と締付金具2との組合せにより構
成し、上記継手本体1は円筒形をなし、その一部に設け
た切離し部5の両側に係合リブ7を設け、上記締付金具
2を支点ピン10と作用ピン11の両端をリンク12で
連結するとともに作用ピン11にロック片13を取付
け、上記支点ピン10を一方の係合リブ7に係合し、ロ
ック片13を他方の係合リブ7に係合させて、作用ピン
11を中立線mを越えて押下げ、ロックするようにし
た。
(57) [Abstract] [Purpose] To provide an intermediate joint that can quickly connect both pipelines when connecting the main pipeline and the length adjusting pipeline in the middle of the underground transmission line pipeline. [Structure] A combination of a joint body 1 and a tightening metal fitting 2 is formed, and the joint body 1 has a cylindrical shape. The metal fitting 2 connects both ends of the fulcrum pin 10 and the action pin 11 with links 12, and a lock piece 13 is attached to the action pin 11, the fulcrum pin 10 is engaged with one engagement rib 7, and the lock piece 13 is the other. The engaging pin 7 is engaged with the engaging rib 7 to push down the action pin 11 beyond the neutral line m to lock it.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

この考案は地中送電線管路の中間継手に関するものである。 This invention relates to an intermediate joint of an underground power transmission line.

【0002】[0002]

【従来の技術】[Prior Art]

地中に埋設される地中送電線を保護するために、従来からFRP(繊維強化プ ラスチック)製の保護用管路が用いられている。上記のFRP製管路においては 、人孔と人孔との間で管路の長さ調整のために、途中にFRP製の調整管路を介 在し、その調整管路の両端をそれぞれ中間継手により本管路に接続することがあ る。 In order to protect the underground power transmission line buried in the ground, a protection pipeline made of FRP (fiber reinforced plastic) has been conventionally used. In the above-mentioned FRP pipe, in order to adjust the length of the pipe between human holes, there is an FRP adjustment pipe in the middle, and both ends of the adjustment pipe are intermediate. It may be connected to the main pipe with a joint.

【0003】 この場合に用いられる中間継手は、管路の突き合わせ部を両側から覆う一対の 半円筒形の継手本体から成り、管路の突き合わせ部分に止水パッキンを嵌めたの ち、各継手本体を管路の両側に沿わせ、各継手本体の両側に設けたフランジ部分 を2箇所ずつ合計4箇所においてボルトとナットにより結合するようになってい る。The intermediate joint used in this case is composed of a pair of semi-cylindrical joint bodies that cover the abutting portions of the pipeline from both sides. After fitting the water-stop packing to the abutting portions of the pipeline, each joint body Are arranged along both sides of the pipe, and the flange parts provided on both sides of each joint body are connected with bolts and nuts at two places, totaling four places.

【0004】[0004]

【考案が解決しようとする課題】[Problems to be solved by the device]

上述の管路は上下左右に一定の間隔をおいて所要数埋設されるが、場所的な制 限があるため、作業空間を十分広くとることができない。 The above-mentioned pipelines are buried in the required number in the vertical and horizontal directions at a fixed interval, but the working space cannot be made sufficiently wide due to local restrictions.

【0005】 このため、上述の継手本体相互をボルトナットで締結する場合に、手先や工具 を狭い場所に差入れて作業しなければならず、甚だ作業性が低い問題がある。一 方、管路の埋設工事を市街地で行う場合は道路を掘削することになるので、周辺 住民の不便や交通の渋滞を避けるため工事期間の短縮を図る必要がある。Therefore, when the joint bodies are fastened to each other with bolts and nuts, it is necessary to insert a hand or a tool into a narrow space to perform the work, and there is a problem that workability is extremely low. On the other hand, when burying pipes in urban areas, roads will be excavated, so it is necessary to shorten the construction period to avoid inconvenience to local residents and traffic congestion.

【0006】 そこで、この考案は中間継手の構造を改良することにより、狭い場所でも迅速 に管路の接続ができるようにすることを課題とする。Therefore, an object of the present invention is to improve the structure of the intermediate joint so that the pipe lines can be quickly connected even in a narrow space.

【0007】[0007]

【課題を解決するための手段】[Means for Solving the Problems]

上記の課題を解決するために、この考案は継手本体と締付金具との組合せから 成り、上記継手本体はFRP製であって全体として円筒形をなし、その一部に全 長にわたる切離し部を設けるとともにその切離し部の両側に係合リブを設け、か つ各係合リブの外側面に係合溝を形成したものであり、上記締付金具は上記継手 本体よりも長い平行2本の支点ピンと作用ピンの両端相互を上記双方の係合リブ の幅より長い間隔をおいて一対のリンクにより連結し、かつ上記作用ピンにロッ ク片を取付けたものであり、上記支点ピンを継手本体の一方の係合溝に、上記ロ ック片の先端を他方の係合溝にそれぞれ係合し、上記作用ピンが上記両係合溝間 を結ぶ中立線の外側にある非ロック状態と、その中立線の内側にあって継手本体 に接触するロック状態の二つの位置をとる構成としたものである。 In order to solve the above-mentioned problems, the present invention consists of a combination of a joint body and a tightening fitting, and the joint body is made of FRP and has a cylindrical shape as a whole, and a part of which has a cut-off portion over the entire length. It is provided with engaging ribs on both sides of the separated part, and engaging grooves are formed on the outer side surface of each engaging rib. The tightening metal fittings are two parallel fulcrums that are longer than the joint body. Both ends of the pin and the action pin are connected by a pair of links with an interval longer than the width of the engaging ribs on both sides, and a lock piece is attached to the action pin. The one end of the lock piece is engaged with the other engagement groove in the one engagement groove, and the action pin is in the unlocked state outside the neutral line connecting the engagement grooves. A lock located inside the neutral line that contacts the fitting body. It is obtained by a configuration to take two positions in the state.

【0008】[0008]

【作用】[Action]

上記の中間継手を用いて本管路と調整管路とを接続する場合は、両管路の突き 合わせ部分に止水パッキンとその止水パッキンの外周に継手本体を嵌め、継手本 体の一方の係合溝に締付金具の支点ピンを係合させ、他方の係合溝にロック片の 先端を係合させたのち、作用ピン側を押し下げて作用ピンを中立線を越えて継手 本体に接触させてロックする。これにより継手本体の切離し部が引き寄せられ、 止水パッキンと両方の管路に所定の締付け力を及ぼす。 When connecting the main pipeline and the adjustment pipeline using the above-mentioned intermediate joint, fit the waterproof gasket at the abutting part of both pipelines and the fitting main body on the outer periphery of the waterproof packing, and After engaging the fulcrum pin of the tightening bracket with the engaging groove of and the engaging end of the lock piece with the other engaging groove, push down the action pin side and move the action pin over the neutral line to the joint body. Make contact and lock. As a result, the cut-off portion of the joint body is pulled, and a predetermined tightening force is exerted on the water blocking packing and both pipe lines.

【0009】[0009]

【実施例】【Example】

図1から図4に示す第1実施例の中間継手は、継手本体1と締付金具2との組 合せから成る。 The intermediate joint of the first embodiment shown in FIGS. 1 to 4 comprises a combination of a joint body 1 and a fastening member 2.

【0010】 継手本体1はFRP製であり、本管路3(図2参照)及び調整管路4の外径よ り若干大きい外径を有するとともに、両管路3、4の突き合わせ部の両方にわた る長さの円筒形をなし、その一部に全長にわたる切離し部5を有する。切離し部 5の両側において継手本体1の外径面に肩部6、6が形成され、更にその肩部6 、6上に係合リブ7、7が形成される。肩部6、6の上面は切離し部5から離れ るに従って下降する所要の傾斜角θ(図4参照)を有する。また、係合リブ7、 7の外側面には係合溝8、8が形成され、一方の肩部6の立上り部に係合凹所9 が形成される。The joint body 1 is made of FRP and has an outer diameter slightly larger than the outer diameters of the main conduit 3 (see FIG. 2) and the adjusting conduit 4, and both of the abutting portions of both conduits 3 and 4 are joined together. It has a cylindrical shape extending over the entire length, and has a cutout 5 extending over the entire length in a part thereof. Shoulders 6, 6 are formed on the outer diameter surface of the joint body 1 on both sides of the cut-off portion 5, and engaging ribs 7, 7 are further formed on the shoulders 6, 6. The upper surfaces of the shoulders 6 and 6 have a required inclination angle θ (see FIG. 4) that descends as the distance from the cutoff portion 5 increases. Engagement grooves 8 are formed on the outer side surfaces of the engagement ribs 7 and 7, and an engagement recess 9 is formed at the rising portion of one shoulder 6.

【0011】 上記構成の継手本体1はある程度の弾性があり、係合リブ7、7の外側面に内 向きの締付力を加えると、切離し部5が狭くなるように弾性変形する。The joint body 1 having the above-mentioned structure has elasticity to some extent, and when an inward tightening force is applied to the outer side surfaces of the engaging ribs 7, 7, the separating portion 5 is elastically deformed so as to become narrow.

【0012】 締付金具2は、継手本体1より若干長い平行2本の金属製ピン、即ち支点ピン 10と作用ピン11を有し、これらのピン10、11の両端をそれぞれリンク1 2、12により回転自在に連結している。各リンク12、12によって連結され た各ピン10、11間の距離は、両方の係合リブ7、7の外幅W(図4参照)よ り長く形成される。The tightening fitting 2 has two parallel metal pins, which are slightly longer than the joint body 1, that is, a fulcrum pin 10 and an action pin 11, and both ends of these pins 10 and 11 are linked to links 12 and 12, respectively. It is rotatably connected by. The distance between the pins 10 and 11 connected by the links 12 and 12 is formed to be longer than the outer width W (see FIG. 4) of the engaging ribs 7 and 7.

【0013】 上記の作用ピン11にはロック片13の一側辺が固定される。ロック片13の 他側辺は支点ピン10と平行であり、またロック片13の固定部分の中央部に切 欠き14(図2参照)が設けられ、その切欠き14を通して作用ピン11のまわ りに回動自在に爪片15が取付けられる。One side of the lock piece 13 is fixed to the action pin 11. The other side of the lock piece 13 is parallel to the fulcrum pin 10, and a notch 14 (see FIG. 2) is provided in the center of the fixed portion of the lock piece 13, and the action pin 11 is rotated through the notch 14. A claw piece 15 is rotatably attached to the.

【0014】 上記の締付金具2は、図2から図4に示すように両方のリンク12、12を継 手本体1の係合リブ7、7の両端面の外側に沿わせるとともに、支点ピン10を 一方の係合リブ7の係合溝8に係合させ、またロック片13を他方の係合リブ7 の係合溝8に係合させることにより、継手本体1と組合せられる。As shown in FIG. 2 to FIG. 4, the tightening fitting 2 has both links 12, 12 along the outer sides of both end surfaces of the engaging ribs 7, 7 of the joint body 1 and a fulcrum pin. By engaging 10 with the engaging groove 8 of one engaging rib 7 and engaging the locking piece 13 with the engaging groove 8 of the other engaging rib 7, it is combined with the joint body 1.

【0015】 図4の一点鎖線で示す非ロック状態では継手本体1の切離し部5は最大限に開 放され、リンク12、12は作用ピン11側が高くなるように傾斜した状態にあ る。両方の係合溝8、8の曲率中心を結ぶ線を中立線mと称することにすると、 非ロック状態においては作用ピン11は中立線mの外側にある。In the unlocked state shown by the alternate long and short dash line in FIG. 4, the separating portion 5 of the joint body 1 is opened to the maximum extent, and the links 12 and 12 are inclined so that the working pin 11 side becomes higher. When the line connecting the centers of curvature of both engagement grooves 8 and 8 is referred to as the neutral line m, the action pin 11 is outside the neutral line m in the unlocked state.

【0016】 また、図4の実線で示すロック状態では、作用ピン11が中立線mより若干内 側に位置し、かつその作用ピン11が一方の肩部6の上面に接触する。また爪片 15が肩部6の係合凹所9に係合され、作用ピン11の逆戻りが防止される。In the locked state shown by the solid line in FIG. 4, the action pin 11 is located slightly inside the neutral line m, and the action pin 11 contacts the upper surface of the one shoulder 6. Further, the claw piece 15 is engaged with the engagement recess 9 of the shoulder portion 6 to prevent the action pin 11 from returning.

【0017】 第1実施例の中間継手は以上のごときものであり、次にその作用について説明 する。The intermediate joint of the first embodiment is as described above, and its operation will be described below.

【0018】 本管路3の端部に止水パッキン16(図2参照)と継手本体1を通したのち、 調整管路4の端面を本管路3の端面に突き合わせ、上記の止水パッキン16と継 手本体1とを両管路3、4の突き合わせ部分にわたるように引き戻す。After passing the waterproof packing 16 (see FIG. 2) and the joint body 1 at the end of the main conduit 3, the end surface of the adjusting conduit 4 is butted against the end surface of the main conduit 3, and 16 and the joint body 1 are pulled back so as to extend over the abutting portions of the two conduits 3, 4.

【0019】 しかるのちに、締付金具2の両リンク12、12を係合リブ7、7の両端部の 外側に位置せしめ、支点ピン10を一方の係合溝8に係合させると共に、ロック 片13を他方の係合溝8に係合させる。この状態が図4の一点鎖線で示す非ロッ ク状態である。After that, both links 12, 12 of the tightening metal fitting 2 are positioned outside both ends of the engaging ribs 7, 7, and the fulcrum pin 10 is engaged with one of the engaging grooves 8 and is locked. The piece 13 is engaged with the other engagement groove 8. This state is the non-locked state shown by the one-dot chain line in FIG.

【0020】 次に、作用ピン11とリンク12、12を押し下げると、作用ピン11が中立 線mを若干越え、同時に切離し部5の間隔が縮まって止水パッキン16及び管路 3、4の端部に締付け力を及ぼす。締付金具2はこの状態でロック状態となる。 そのロックを確実にするため、爪片15を係合凹所9に差込んで、接続作業を完 了する。Next, when the action pin 11 and the links 12 and 12 are pushed down, the action pin 11 slightly exceeds the neutral line m, and at the same time, the gap between the cut-off portions 5 is reduced and the water-stop packing 16 and the ends of the pipe lines 3 and 4 are reduced. Exerts a tightening force on the part. The tightening metal fitting 2 is locked in this state. In order to secure the lock, the claw piece 15 is inserted into the engagement recess 9 to complete the connection work.

【0021】 次に、図5及び図6に示す第2実施例について説明する。この場合の中間継手 は、支点ピン10の両端に屈曲部18、18が設けられ、その屈曲部18、18 の先端が作用ピン11の両端部に回転自在に連結される。また、ロックピン19 がコの字形に屈曲され、その屈曲端が作用ピン11上において前記の支点ピン1 0の屈曲部18、18の内側で回転自在に連結される。作用ピン11の両端には 抜止め用のナット20、21が螺合される。Next, a second embodiment shown in FIGS. 5 and 6 will be described. In the intermediate joint in this case, bent portions 18, 18 are provided at both ends of the fulcrum pin 10, and the tips of the bent portions 18, 18 are rotatably connected to both ends of the action pin 11. Further, the lock pin 19 is bent in a U-shape, and its bent end is rotatably connected on the action pin 11 inside the bent portions 18, 18 of the fulcrum pin 10. Locking nuts 20 and 21 are screwed onto both ends of the action pin 11.

【0022】 上記の屈曲部18、18は、前述の第1実施例におけるリンク12、12に相 当し、またロックピン19が第1実施例のロック片13に相当する。The bent portions 18, 18 correspond to the links 12, 12 in the first embodiment described above, and the lock pin 19 corresponds to the lock piece 13 in the first embodiment.

【0023】 なお、実用新案登録請求の範囲における「リンク」及び「ロック片」もそれぞ れ上記の屈曲部18及びロックピン19のごときものを含む。The “link” and the “lock piece” in the claims for utility model include the bent portion 18 and the lock pin 19, respectively.

【0024】 また、継手本体1も基本的には第1実施例の場合と同様であるが、この場合は 切離し部5の両側に係合リブ7、7のみが設けられ、第1実施例のごとき肩部6 は設けられていない。係合リブ7、7の両側に係合溝8、8が設けられる。Further, the joint body 1 is basically the same as that of the first embodiment, but in this case, only the engaging ribs 7, 7 are provided on both sides of the separating portion 5, and the joint body 1 of the first embodiment is provided. The shoulder 6 is not provided. Engaging grooves 8, 8 are provided on both sides of the engaging ribs 7, 7.

【0025】 なお、上記第2実施例の変形例として、図7及び図8に示すように、ロックピ ン19の両端部にコの字形のハンドルレバー23を一体に設け、操作をしやすく してもよい。また、図9及び図10に示す他の変形例は一層構造を簡単にしたも のであるが、基本的な構造は図7及び図8のものと同じである。As a modified example of the second embodiment, as shown in FIGS. 7 and 8, the U-shaped handle levers 23 are integrally provided at both ends of the lock pin 19 to facilitate the operation. Good. Further, the other modified examples shown in FIGS. 9 and 10 have a simpler structure, but the basic structure is the same as that of FIGS. 7 and 8.

【0026】 次に、図11から図13に示す第3実施例は、支点ピン10の屈曲部18、1 8の両端にねじ部24、24を設け、ロック片13の両側に設けた突起25、2 5を上記のねじ部24、24に通すと共に、各突起25に作用ピン11の両端を 挿入したものである。上記の突起25はねじ部24、24において二つのロック ナット26、27により固定される。Next, in the third embodiment shown in FIGS. 11 to 13, threaded portions 24 and 24 are provided at both ends of the bent portions 18 and 18 of the fulcrum pin 10, and projections 25 provided on both sides of the lock piece 13 are provided. No. 25 is passed through the screw portions 24, 24, and both ends of the action pin 11 are inserted into each protrusion 25. The above-mentioned protrusion 25 is fixed by two lock nuts 26 and 27 at the screw portions 24 and 24.

【0027】 なお、ロック片13には板状のハンドルレバー23が設けられる。The lock piece 13 is provided with a plate-shaped handle lever 23.

【0028】 上述の第2実施例及び第3実施例のいずれの場合も、支点ピン10を一方の係 合リブ7の係合溝8に係合させると共に、ロックピン19(第2実施例の場合) 又はロック片13(第3実施例の場合)を他方の係合リブ7の係合溝8に係合さ せた非ロック状態から作用ピン11側を中立線mを越えて押し下げてロックさせ るものである。In any of the above-described second and third embodiments, the fulcrum pin 10 is engaged with the engaging groove 8 of the one engaging rib 7, and the lock pin 19 (of the second embodiment is used). Case) or the lock piece 13 (in the case of the third embodiment) is engaged with the engaging groove 8 of the other engaging rib 7 from the unlocked state, and the action pin 11 side is pushed down beyond the neutral line m to lock. It is what makes them.

【0029】[0029]

【考案の効果】[Effect of the device]

以上のように、この考案の中間継手は、相互に独立した継手本体と、締付金具 とにより構成され、継手本体の切離し部の両側に設けた係合リブの部分に締付金 具を嵌めこれをワンタッチで締付けるようにしているので、狭い場所でも取扱い が容易であり、作業性が著しく向上する効果がある。 As described above, the intermediate joint of the present invention is composed of the joint body and the tightening metal fittings which are independent of each other, and the fasteners are fitted to the engaging ribs provided on both sides of the cutout portion of the joint body. Since it is fastened with one touch, it is easy to handle even in a narrow space and has the effect of significantly improving workability.

【図面の簡単な説明】[Brief description of drawings]

【図1】第1実施例の分解斜視図FIG. 1 is an exploded perspective view of a first embodiment.

【図2】同上の使用状態の横断平面図FIG. 2 is a horizontal cross-sectional plan view of the same as above.

【図3】同上の使用状態の正面図FIG. 3 is a front view of the same use condition as above.

【図4】同上の一部拡大断面図FIG. 4 is a partially enlarged sectional view of the above.

【図5】第2実施例の平面図FIG. 5 is a plan view of the second embodiment.

【図6】同上の一部切欠正面図FIG. 6 is a partially cutaway front view of the above.

【図7】同上の変形例の平面図FIG. 7 is a plan view of a modification example of the above.

【図8】同上の変形例の一部切欠正面図FIG. 8 is a partially cutaway front view of the above modification.

【図9】同上の他の変形例の平面図FIG. 9 is a plan view of another modification example of the above.

【図10】同上の他の変形例の一部切欠正面図FIG. 10 is a partially cutaway front view of another modification example of the above.

【図11】第3実施例の平面図FIG. 11 is a plan view of the third embodiment.

【図12】同上の一部切欠正面図FIG. 12 is a partially cutaway front view of the above.

【図13】同上の一部分解斜視図FIG. 13 is a partially exploded perspective view of the above.

【符号の説明】[Explanation of symbols]

1 継手本体 2 締付金具 3 本管路 4 調整管路 5 切離し部 6 肩部 7 係合リブ 8 係合溝 9 係合凹所 10 支点ピン 11 作用ピン 12 リンク 13 ロック片 14 切欠き 15 爪片 16 止水パッキン 18 屈曲部 19 ロックピン 20、21 ナット 23 ハンドルレバー 24 ねじ部 25 突起 26、27 ロックナット 1 Joint Main Body 2 Tightening Fitting 3 Main Pipeline 4 Adjustment Pipeline 5 Separation Part 6 Shoulder Part 7 Engaging Rib 8 Engaging Groove 9 Engaging Recess 10 Support Point Pin 11 Working Pin 12 Link 13 Lock Piece 14 Notch 15 Claw Piece 16 Water-stop packing 18 Bent section 19 Lock pin 20, 21 Nut 23 Handle lever 24 Screw section 25 Protrusion 26, 27 Lock nut

フロントページの続き (72)考案者 津上 修次 大阪市北区中之島3丁目3番22号 関西電 力株式会社内 (72)考案者 井出 泰人 大阪市北区中之島3丁目3番22号 関西電 力株式会社内 (72)考案者 近藤 忠生 大阪市北区中之島3丁目3番22号 関西電 力株式会社内 (72)考案者 福屋 利保 大阪市西区北堀江1丁目12番19号 株式会 社栗本鐵工所内 (72)考案者 片寄 浩一郎 大阪市西区北堀江1丁目12番19号 株式会 社栗本鐵工所内 (72)考案者 水田 修 大阪市西区北堀江1丁目12番19号 株式会 社栗本鐵工所内 (72)考案者 三原 照弘 大阪市西区北堀江1丁目12番19号 株式会 社栗本鐵工所内Front page continuation (72) Inventor Shuji Tsugami, 3-3-22 Nakanoshima, Kita-ku, Osaka City, Kansai Electric Power Co., Inc. (72) Instructor, Yasuhito Ide 3--22, Nakanoshima, Kita-ku, Osaka Kansai Electric Power Co., Ltd. (72) Inventor Tadao Kondo 3-3-22 Nakanoshima, Kita-ku, Osaka City Kansai Electric Power Co., Inc. (72) Inventor Fukuya Riho 1-12-19 Kitahorie, Nishi-ku, Osaka Kurimoto Ironworks Co., Ltd. (72) Koichiro Katayose Koichiro Katayose 1-12-19 Kitahori, Nishi-ku, Osaka Stock Company Shari Kurimoto Ironworks (72) Inventor Osamu Mizuta 1-12-19 Kitahori, Nishi-ku, Osaka City Stock Association Kurimoto Ironworks Co., Ltd. (72) Inventor Teruhiro Mihara 1-12-19 Kitahorie, Nishi-ku, Osaka City Stock Company Kurimoto Ironworks Co., Ltd.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 継手本体と締付金具との組合せから成
り、上記継手本体はFRP製であって全体として円筒形
をなし、その一部に全長にわたる切離し部を設けるとと
もにその切離し部の両側に係合リブを設け、かつ各係合
リブの外側面に係合溝を形成したものであり、上記締付
金具は上記継手本体よりも長い平行2本の支点ピンと作
用ピンの両端相互を上記双方の係合リブの幅より長い間
隔をおいて一対のリンクにより連結し、かつ上記作用ピ
ンにロック片を取付けたものであり、上記支点ピンを継
手本体の一方の係合溝に、上記ロック片の先端を他方の
係合溝にそれぞれ係合し、上記作用ピンが上記両係合溝
間を結ぶ中立線の外側にある非ロック状態と、その中立
線の内側にあって継手本体に接触するロック状態の二つ
の位置をとることを特徴とする地中送電線管路の中間継
手。
1. A combination of a joint main body and a tightening metal fitting, wherein the joint main body is made of FRP and has a cylindrical shape as a whole, a part of which is provided with a cutout portion over the entire length and both sides of the cutout portion. Engaging ribs are provided, and engaging grooves are formed on the outer side surface of each engaging rib. The tightening metal fitting has two parallel fulcrum pins longer than the joint body and both ends of the action pin. Is connected by a pair of links at a distance longer than the width of the engaging rib, and a lock piece is attached to the action pin, and the fulcrum pin is provided in one engagement groove of the joint main body with the lock piece. Of the engaging pin is engaged with the other engaging groove, and the action pin contacts the joint body inside the neutral line and outside the neutral line connecting the engaging grooves. It features two positions in the locked state. Intermediate joint of underground transmission line pipeline to be considered.
JP1991091705U 1991-11-08 1991-11-08 Intermediate joint of underground power transmission line Expired - Lifetime JPH0725507Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1991091705U JPH0725507Y2 (en) 1991-11-08 1991-11-08 Intermediate joint of underground power transmission line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1991091705U JPH0725507Y2 (en) 1991-11-08 1991-11-08 Intermediate joint of underground power transmission line

Publications (2)

Publication Number Publication Date
JPH0542887U true JPH0542887U (en) 1993-06-11
JPH0725507Y2 JPH0725507Y2 (en) 1995-06-07

Family

ID=14033932

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1991091705U Expired - Lifetime JPH0725507Y2 (en) 1991-11-08 1991-11-08 Intermediate joint of underground power transmission line

Country Status (1)

Country Link
JP (1) JPH0725507Y2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08233186A (en) * 1995-01-11 1996-09-10 Georg Fischer Rohrleitungssyst Ag Form consisting of thermoplastic material
JP2014233119A (en) * 2013-05-28 2014-12-11 関西電力株式会社 Protective tube and lock member

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0315071A (en) * 1989-03-15 1991-01-23 Toray Ind Inc Photosensitive resin composition

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0315071A (en) * 1989-03-15 1991-01-23 Toray Ind Inc Photosensitive resin composition

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08233186A (en) * 1995-01-11 1996-09-10 Georg Fischer Rohrleitungssyst Ag Form consisting of thermoplastic material
JP2014233119A (en) * 2013-05-28 2014-12-11 関西電力株式会社 Protective tube and lock member

Also Published As

Publication number Publication date
JPH0725507Y2 (en) 1995-06-07

Similar Documents

Publication Publication Date Title
US5492372A (en) Split replacement flange for water closet and method of replacing
KR101846820B1 (en) units of piles-joint
JPH0542887U (en) Intermediate joint of underground power transmission line
JP4551777B2 (en) Branch pipe fitting fixing device
JP2004535540A (en) Device for connecting and blocking hollow elements to form a fluid distribution plant
US5275506A (en) Perforated drainpipe for railway decks
JP4980146B2 (en) Handhole installation structure
KR20230100265A (en) Apparatus for connecting pipes
CN214425286U (en) Municipal administration road drain pipe fixed mounting device
KR100657177B1 (en) Water supply pipe connecting unit for soft ground
JP4266843B2 (en) Fixing ring mounting jig
JP4121415B2 (en) Anti-rotation device for pipe joints
JP2014121107A (en) Screwless conduit pipe joint
JP3677446B2 (en) Seismic duct structure
JP3764883B2 (en) Concrete product connection structure and method
JPH0973929A (en) Reinforcing steel connecting fitting of lightning conductor and lightning conductor assembly fitting
JPH0540674Y2 (en)
JP4271258B2 (en) Pipe fittings
JP3210612B2 (en) Pipe length adjustment device
JPH0234534Y2 (en)
JP2002028875A (en) Fitting jig for fixed ring
JP2004360399A (en) Concrete member
JP3442599B2 (en) Underground pipe fittings
KR200342312Y1 (en) Pipe connector
JPS5940631Y2 (en) pipe fittings