JPH05346066A - Equipment and material lifting jig - Google Patents

Equipment and material lifting jig

Info

Publication number
JPH05346066A
JPH05346066A JP17888392A JP17888392A JPH05346066A JP H05346066 A JPH05346066 A JP H05346066A JP 17888392 A JP17888392 A JP 17888392A JP 17888392 A JP17888392 A JP 17888392A JP H05346066 A JPH05346066 A JP H05346066A
Authority
JP
Japan
Prior art keywords
frames
jig
counterweight
arm
hoisting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP17888392A
Other languages
Japanese (ja)
Other versions
JP3000069B2 (en
Inventor
Shuichi Ueno
修一 植野
Michiaki Kawaoka
道顕 河岡
Sumio Fukuda
澄男 福田
Mitsushi Suda
充司 須田
Kenji Morita
健二 森田
Takashi Sawada
隆志 沢田
Hiromichi Kaita
廣通 貝田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyu Construction Co Ltd
Original Assignee
Tokyu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyu Construction Co Ltd filed Critical Tokyu Construction Co Ltd
Priority to JP17888392A priority Critical patent/JP3000069B2/en
Publication of JPH05346066A publication Critical patent/JPH05346066A/en
Application granted granted Critical
Publication of JP3000069B2 publication Critical patent/JP3000069B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PURPOSE:To enable easy support to be conducted even with an obstruction existing above and enable safe and efficient lifting to be conducted. CONSTITUTION:A right and a left vertical frame 13 are integrally connected by horizontal frames 14, 15, 16. Arm frames 17 are fitted to the vertical frames 13 near the horizontal frame 16 in such a way as to be orthogonal to these frames 13, 16. A counter weight 18 is placed on the rear extended parts 17a of the arm frames 17 in such a way as to be movable in the longitudinal direction of the arm frames 17. Wheels are fitted to the lower side of the counter weight 18 so as to roll along the rear extended parts 17a. A light receiving part 29 receives laser beams emitted from a portable remote control 30, and a gear motor 24 is remote-operated to move the counter weight 18.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、例えば、PCa(プレ
キャストコンクリート)部材や半PCa部材を採用した
共同住宅等の半PCa製のバルコニーや廊下のような、
建物外面部における構築部材や支保工、その他の資材や
機材を吊り揚げるための治具に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention is applicable to, for example, balconies and corridors made of semi-PCa such as apartment houses using PCa (precast concrete) members and semi-PCa members.
The present invention relates to jigs for hoisting building members, supporting works, and other materials and equipment on the outer surface of a building.

【0002】[0002]

【従来の技術】例えば、PCaバルコニーを支持する支
保工を上階に盛り替える場合には、該支保工を建物の外
方に引き出さないと吊り揚げることができない。
2. Description of the Related Art For example, when a supporter supporting a PCa balcony is relocated to an upper floor, it cannot be lifted unless the supporter is pulled out of the building.

【0003】しかしながら、従来の吊り揚げ装置は、吊
りワイヤー等により単に上方に吊り揚げるだけの構造で
あるので、該吊りワイヤーが邪魔になって、バルコニー
直下の支保工等を盛り替えることは不可能であった。
However, since the conventional hoisting device has a structure in which hoisting wire is simply hoisted upward, the hoisting wire interferes with the hoisting device and the like, and it is impossible to replace the support work directly below the balcony. Met.

【0004】[0004]

【発明が解決しようとする課題】本発明は、上記従来の
問題点を解決するためになされたもので、その目的とす
るところは、上方に障害物があっても容易に支持するこ
とができ、安全かつ能率的に吊り揚げることができる資
機材の吊揚げ用治具を提供することにある。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems of the prior art. The object of the present invention is to easily support even if there is an obstacle above. The purpose is to provide a hoisting jig for materials and equipment that can be hoisted safely and efficiently.

【0005】[0005]

【課題を解決するための手段】本発明の資機材の吊揚げ
用治具は、建物の構築用資機材を載せる少なくとも2本
の水平なアームフレームと、該アームフレームの吊揚げ
手段と、該アームフレームの水平バランスを保持する手
段と、から構成されていることを特徴とする。】上記水
平バランス保持手段としては、上記アームフレームの後
方延長部上に移動可能に配置されたカウンターウエイト
と、該カウンターウエイトの移動手段と、から成る。上
記カウンターウエイトの移動手段としては、上記アーム
フレームに平行に配設されたボールスクリューと、該ボ
ールスクリューに螺合して回転しながらその軸方向に移
動すると共に上記カウンターウエイトに回転自在に取付
けられた駆動プーリと、該駆動プーリを回転駆動するモ
ータと、から構成されている。上記カウンターウエイト
の移動を遠隔操作により行なうことを特徴とする。ま
た、上記アームフレームの水平状態を平行センサーによ
り検知して、表示することを特徴とする。
A jig for hoisting equipment according to the present invention comprises at least two horizontal arm frames on which the equipment for building construction is placed, hoisting means for the arm frames, and And a means for maintaining the horizontal balance of the arm frame. The horizontal balance holding means comprises a counterweight movably arranged on the rear extension of the arm frame and a moving means for the counterweight. As the moving means of the counterweight, a ball screw arranged in parallel with the arm frame and a screw screwed on the ball screw to move in the axial direction while rotating are attached to the counterweight rotatably. And a motor for rotating the drive pulley. It is characterized in that the counterweight is moved by remote control. Also, the horizontal state of the arm frame is detected by a parallel sensor and displayed.

【0006】[0006]

【実施例】以下、本発明の一実施例について図面を参照
しながら説明する。図1において、1はH形鋼からなる
建物躯体としての桁梁であって、耐火被覆PCa板2に
より被覆されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings. In FIG. 1, reference numeral 1 denotes a girder beam as a building frame made of H-shaped steel, which is covered with a fireproof coated PCa plate 2.

【0007】上記桁梁1上には、工場あるいは地上にお
いて製造された半PCaバルコニー3が建物の外方に張
り出すように架設され、場所打ちコンクリート4により
一体に構築される。
A half PCa balcony 3 manufactured in a factory or on the ground is erected on the girder 1 so as to project to the outside of the building, and is integrally constructed by cast-in-place concrete 4.

【0008】上記場所打ちコンクリート4の養生中、上
記半PCaバルコニー3は支保工Aにより支持される。
During the curing of the cast-in-place concrete 4, the half PCa balcony 3 is supported by the support A.

【0009】上記支保工Aは、図2に示すように、主と
して、4本のアルミ製脚柱5と、これらの各脚柱5を連
結する連結杆6と、左または右の各脚柱5の上端部に各
々横架された支持材7と、左右の支持材7上に井桁状に
取り付けられたアルミ製の大引き材8と、各脚柱5の下
端部に設けられたジャッキ9から構成されている。尚、
上記脚柱5の上端部と支持材7との間にもジャッキを設
けてもよい。
As shown in FIG. 2, the supporting work A is mainly composed of four aluminum pedestals 5, a connecting rod 6 for connecting each pedestal 5, and each left or right pedestal 5. From the support members 7 that are respectively laid horizontally on the upper ends of the, the large pulling members 8 made of aluminum that are mounted on the left and right support members 7 in the shape of a cross girder, and the jacks 9 that are provided at the lower ends of the pedestals It is configured. still,
A jack may be provided between the upper end of the pedestal 5 and the support member 7.

【0010】上記支保工Aの大引き材8の外側や外端部
等には、単管等の支柱10が取り付けられ、該支柱10
にはFRP製の手摺11が取り付けられている。また、
これらの支柱10および手摺11には安全ネット12が
張装されている。
A strut 10 such as a single pipe is attached to the outer side or the outer end of the large pulling member 8 of the supporting work A.
A handrail 11 made of FRP is attached to the. Also,
A safety net 12 is stretched over the pillar 10 and the handrail 11.

【0011】半PCaバルコニー3上に打設された場所
打ちコンクリート4が硬化したら、これを支えている支
保工Aを上階に盛り替える。
When the cast-in-place concrete 4 cast on the half PCa balcony 3 is hardened, the supporting work A supporting the cast concrete 4 is transferred to the upper floor.

【0012】図3は上記支保工Aの盛替え用治具Bを示
すものであって、左右の垂直フレーム13は水平フレー
ム14、15および16により一体的に連結されてい
る。該水平フレーム14は垂直フレーム13の上端部
に、また水平フレーム16は垂直フレーム13の下方部
に、各々取り付けられている。水平フレーム15は上記
水平フレーム14および16の中間位置に取り付けられ
ているが、省略してもよい。
FIG. 3 shows a jig B for refilling the support A, in which the left and right vertical frames 13 are integrally connected by horizontal frames 14, 15 and 16. The horizontal frame 14 is attached to the upper end of the vertical frame 13, and the horizontal frame 16 is attached to the lower part of the vertical frame 13. The horizontal frame 15 is attached at an intermediate position between the horizontal frames 14 and 16, but it may be omitted.

【0013】上記水平フレーム16付近の上記垂直フレ
ーム13には、これらのフレーム13、16と直交する
方向にアームフレーム17が取り付けられている。該ア
ームフレーム17は上記支保工Aを支持するのに十分な
長さを有する。該アームフレーム17の後方延長部17
a上には、カウンターウエイト18が前後方向(アーム
フレーム17の長手方向)に移動可能に載置されてい
る。
An arm frame 17 is attached to the vertical frame 13 near the horizontal frame 16 in a direction orthogonal to the frames 13 and 16. The arm frame 17 has a length sufficient to support the support A. Rear extension 17 of the arm frame 17
A counterweight 18 is mounted on a so as to be movable in the front-rear direction (longitudinal direction of the arm frame 17).

【0014】左右のアームフレーム17の後方延長部1
7aの後端部には、これらを連結する連結フレーム19
が取り付けられていると共に、脚フレーム20が垂設さ
れている。21は補強用のブレースフレームである。ま
た、上記アームフレーム17の先端部付近の上面には、
フック部材17bが付設されていて、アームフレーム1
7上に支持した支保工Aの滑落を防止する。
Rear extension 1 of the left and right arm frames 17
At the rear end of 7a, a connecting frame 19 for connecting these
Is attached and the leg frame 20 is vertically installed. 21 is a brace frame for reinforcement. In addition, on the upper surface near the tip of the arm frame 17,
The arm frame 1 is provided with a hook member 17b.
7 Prevent the support work A supported on the top from sliding off.

【0015】図4からも明らかなように、上記カウンタ
ーウエイト18の下側には車輪22が取り付けられてい
る。該車輪22は上記アームフレーム17の後方延長部
17aに沿って転動する。上記カウンターウエイト18
と後方延長部17aとの間には僅かに隙間が形成されて
いるので、カウンターウエイト18が円滑に移動でき
る。23は横ずれ防止ローラである。なお、図3におい
て、22aは補助車輪であって、車輪22で十分な場合
には省略してもよい。
As is apparent from FIG. 4, wheels 22 are attached to the lower side of the counterweight 18. The wheel 22 rolls along the rear extension 17a of the arm frame 17. Counter weight 18 above
Since a slight gap is formed between the rear extension 17a and the rear extension 17a, the counterweight 18 can move smoothly. Reference numeral 23 is a lateral deviation prevention roller. In addition, in FIG. 3, 22a is an auxiliary wheel, and may be omitted when the wheel 22 is sufficient.

【0016】上記カウンターウエイト18の中央部下側
には、ギヤモータ24が設置されていて、図4に示すよ
うに、タイミングプーリ25、歯付ベルト26を介して
駆動プーリ27を回転させるようになっている。該駆動
プーリ27はボールスクリュー28に螺合していて、回
転しながらボールスクリュー28に沿って移動するよう
になっている。該ボールスクリュー28は、図5からも
明かなように、上記アームフレーム17と平行に延びて
いて、その両端部は上記水平フレーム16および連結フ
レーム19に固定されている。
A gear motor 24 is installed below the central portion of the counterweight 18, and as shown in FIG. 4, a drive pulley 27 is rotated via a timing pulley 25 and a toothed belt 26. There is. The drive pulley 27 is screwed onto a ball screw 28 and moves along the ball screw 28 while rotating. As is clear from FIG. 5, the ball screw 28 extends in parallel with the arm frame 17, and both ends thereof are fixed to the horizontal frame 16 and the connecting frame 19.

【0017】図3において、29は受光部であって、携
帯用の光リモコン30から発射されるレーザー光を受光
して、上記ギヤモータ24を遠隔操作し、カウンターウ
エイト18を移動させる。
In FIG. 3, reference numeral 29 denotes a light-receiving portion, which receives a laser beam emitted from a portable optical remote controller 30 to remotely operate the gear motor 24 to move the counterweight 18.

【0018】31は防水カバー付きの発電機であって、
上記ギヤモータ24等に電源を供給する。32は制御盤
であって、各種コントローラを収容している。33は傾
斜表示器であって、盛替え用治具B、特に、アームフレ
ーム17の傾斜状態を適宜自動平衡センサー(図示せ
ず)によりチェックして表示する。
Reference numeral 31 is a generator with a waterproof cover,
Power is supplied to the gear motor 24 and the like. A control panel 32 accommodates various controllers. Reference numeral 33 denotes an inclination display, which appropriately displays the inclination state of the refill jig B, in particular, the arm frame 17, by an automatic balance sensor (not shown).

【0019】以上のように構成された盛替え用治具B
を、図6に示すように、吊ワイヤー34を介して適宜ク
レーン(図示せず)の吊フック35に掛けて吊り上げ
る。この時、光リモコン30による遠隔操作で上記ウエ
イトブレース18を移動調節して、上記アームフレーム
17が水平になるようにする。
Refill jig B constructed as described above
As shown in FIG. 6, it is appropriately hung from a hanging hook 35 of a crane (not shown) through a hanging wire 34 to be lifted. At this time, the weight brace 18 is moved and adjusted by a remote operation of the optical remote controller 30 so that the arm frame 17 becomes horizontal.

【0020】一方、支保工Aのジャッキ9を引き上げて
半PCaバルコニー3の支持を解除しておく。続いて、
盛替え用治具Bを矢印方向に移動させて、上記アームフ
レーム17を上記支保工Aの大引き材8の下側に挿入さ
せる。
On the other hand, the jack 9 of the supporting work A is pulled up to release the support of the half PCa balcony 3. continue,
The refill jig B is moved in the direction of the arrow to insert the arm frame 17 into the lower side of the large pulling member 8 of the support A.

【0021】アームフレーム17が大引き材8の下側に
セットされたら、控えチェーンC(図1参照)を外し
て、図7に示すように、支保工Aを盛替え用治具Bによ
り持ち上げる。この時、上記アームフレーム17に支保
工Aの荷重がかかって盛替え用治具Bのバランスが変化
するので、再び、リモコン操作により上記カウンターウ
エイト18を移動させて、アームフレーム17が水平に
なるように調整する。
When the arm frame 17 is set on the lower side of the large pulling member 8, the retaining chain C (see FIG. 1) is removed, and as shown in FIG. .. At this time, since the load of the supporting work A is applied to the arm frame 17 and the balance of the reshuffling jig B changes, the counter weight 18 is moved again by the remote control operation so that the arm frame 17 becomes horizontal. To adjust.

【0022】盛替え用治具Bによる支保工Aの保持作業
が完了したら、図8に矢印で示すように、クレーンによ
り吊り揚げ移動させて、図9に示すように、上階のバル
コニー上に移動させる。
When the holding work of the support work A by the reshuffling jig B is completed, it is hoisted and moved by a crane as shown by an arrow in FIG. 8, and is placed on the balcony on the upper floor as shown in FIG. To move.

【0023】支保工Aを上階のバルコニー上に盛り替え
たら、図10に示すように、再びジャッキ9を降ろして
位置決めをすると共に、控えチェーンCを取付けてか
ら、盛替え用治具Bを撤去する。盛り替えられた支保工
A上には、新たに半PCaバルコニー(図示せず)をセ
ットする。尚、本発明のPCa部材には、一部を現場打
ち施工する半PCa部材も含まれる。
After the support work A has been re-placed on the balcony on the upper floor, as shown in FIG. 10, the jack 9 is lowered again for positioning, and the spare chain C is attached, and then the re-mounting jig B is mounted. To remove. A new half PCa balcony (not shown) is newly set on the shuffled support work A. The PCa member of the present invention also includes a semi-PCa member that is partially cast on site.

【0024】[0024]

【発明の効果】【The invention's effect】

1)バルコニー用支保工のような上方に障害物がある物
でも、容易に吊り揚げて、盛り替えすることができる。 2)バランスをとりながら吊り揚げ作業をすることがで
きるので、安全である。 3)遠隔操作によりカウンターウエイトを移動させてバ
ランスをとるので、操作が容易で迅速に行える。 4)平衡センサーによりバランスを確認しながら安全か
つ確実に吊り揚げ作業を行なうことができる。
1) Even if there is an obstacle in the upper part such as a support for a balcony, it can be easily lifted and refilled. 2) It is safe because it is possible to perform lifting work while keeping a balance. 3) Since the counterweight is moved by remote control to balance it, the operation is easy and quick. 4) Lifting work can be carried out safely and surely while confirming the balance by the balance sensor.

【図面の簡単な説明】[Brief description of drawings]

【図1】支保工によりPCaバルコニーを支持した状態
の施工図である。
FIG. 1 is a construction drawing showing a state where a PCa balcony is supported by supporting work.

【図2】手摺およびネット付き支保工の斜視図である。FIG. 2 is a perspective view of a handrail and a support with net.

【図3】盛替え治具の斜視図である。FIG. 3 is a perspective view of a refill jig.

【図4】図3のイーイ線に沿った拡大断面図である。FIG. 4 is an enlarged cross-sectional view taken along the line EE of FIG.

【図5】図3のローロ線に沿った拡大断面図である。5 is an enlarged cross-sectional view taken along the line Loro of FIG.

【図6】盛替え治具のセット開始時の施工図である。FIG. 6 is a construction diagram at the start of setting of the refill jig.

【図7】支保工を盛替え治具により支持した状態の施工
図である。
[Fig. 7] Fig. 7 is a construction drawing of a supporting work supported by a relocation jig.

【図8】支保工の盛り替え中の施工図である。FIG. 8 is a construction drawing of the support work being refilled.

【図9】支保工を上階に移動させた状態の施工図であ
る。
FIG. 9 is a construction drawing showing a state in which the support work is moved to the upper floor.

【図10】支保工を上階に盛り替えた状態の施工図であ
る。
FIG. 10 is a construction drawing showing a state in which the support work is relocated to the upper floor.

【符号の説明】[Explanation of symbols]

1 桁梁 2 耐火被覆PCa板 3 半PCaバルコニー 4 場所打ちコンクリート 5 脚柱 6 連結杆 7 支持材 8 大引き材 9 ジャッキ 10 支柱 11 手摺 12 安全ネット 13 垂直フレーム 14 水平フレーム 15 水平フレーム 16 水平フレーム 17 アームフレーム 17a 後方延長部 18 カウンターウエイト 19 連結フレーム 20 腕フレーム 21 ブレースフレーム 22 車輪 22a 補助車輪 23 横ずれ防止ローラ 24 ギヤモータ 25 タイミングプーリ 26 歯付ベルト 27 駆動プーリ 28 ボールスクリュー 29 受光部 30 光リモコン 31 発電機 32 制御盤 33 傾斜表示器 A 支保工 B 盛替え用治具 C 控えチェーン 1 girder beam 2 fireproof coated PCa board 3 half PCa balcony 4 cast-in-place concrete 5 pedestal 6 connecting rod 7 support material 8 large pulling material 9 jack 10 pillar 11 handrail 12 safety net 13 vertical frame 14 horizontal frame 15 horizontal frame 16 horizontal frame 17 Arm Frame 17a Rear Extension 18 Counterweight 19 Connection Frame 20 Arm Frame 21 Brace Frame 22 Wheel 22a Auxiliary Wheel 23 Side-Slip Prevention Roller 24 Gear Motor 25 Timing Pulley 26 Toothed Belt 27 Drive Pulley 28 Ball Screw 29 Light Receiver 30 Optical Remote Control 31 Generator 32 Control panel 33 Tilt indicator A Supporting work B Relocation jig C Resting chain

───────────────────────────────────────────────────── フロントページの続き (72)発明者 森田 健二 兵庫県西宮市大浜町1−59−105 (72)発明者 沢田 隆志 大阪府大阪市阿倍野区阿倍野筋2−2−23 −306 (72)発明者 貝田 廣通 大阪府池田市伏尾台3−13−13 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Kenji Morita 1-59-105 Ohamacho, Nishinomiya-shi, Hyogo Prefecture (72) Inventor Takashi Sawada 2-2-23-306 Abenosuji, Abeno-ku, Osaka-shi, Osaka (72) Inventor Hiromichi Kaida 3-13-13 Fushiodai, Ikeda City, Osaka Prefecture

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 建物の構築用資機材を載せる少なくとも
2本の水平なアームフレームと、該アームフレームの吊
揚げ手段と、該アームフレームの水平バランスを保持す
る手段と、から構成されていることを特徴とする資機材
の吊揚げ用治具。
1. A structure comprising at least two horizontal arm frames for mounting building construction materials, hoisting means for the arm frames, and means for maintaining the horizontal balance of the arm frames. A jig for lifting materials and equipment.
【請求項2】 上記水平バランス保持手段が、上記アー
ムフレームの後方延長部上に移動可能に配置されたカウ
ンターウエイトと、該カウンターウエイトの移動手段
と、から成ることを特徴とする請求項1に記載の資機材
の吊揚げ用治具。
2. The horizontal balance holding means comprises a counterweight movably arranged on a rear extension portion of the arm frame, and a moving means for the counterweight. A jig for hoisting the listed materials and equipment.
【請求項3】 上記カウンターウエイトの移動手段が、
上記アームフレームに平行に配設されたボールスクリュ
ーと、該ボールスクリューに螺合して回転しながらその
軸方向に移動すると共に上記カウンターウエイトに回転
自在に取付けられた駆動プーリと、該駆動プーリを回転
駆動するモータと、から構成されていることを特徴とす
る請求項2に記載の資機材の吊揚げ用治具。
3. The means for moving the counterweight comprises:
A ball screw arranged in parallel with the arm frame, a drive pulley that is screwed onto the ball screw, moves in the axial direction while rotating, and is rotatably attached to the counterweight; The hoisting jig for equipment according to claim 2, characterized in that the hoisting jig comprises a motor that is rotationally driven.
【請求項4】 上記カウンターウエイトの移動を遠隔操
作により行なうことを特徴とする請求項2または3に記
載の資機材の吊揚げ用治具。
4. The hoisting jig for equipment according to claim 2 or 3, wherein the counterweight is moved by remote control.
【請求項5】 上記アームフレームの水平状態を平行セ
ンサーにより検知して、表示することを特徴とする請求
項1、2、3または4に記載の資機材の吊揚げ用治具。
5. The hoisting jig for equipment according to claim 1, wherein the horizontal state of the arm frame is detected and displayed by a parallel sensor.
JP17888392A 1992-06-15 1992-06-15 Jig for lifting equipment and materials Expired - Fee Related JP3000069B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17888392A JP3000069B2 (en) 1992-06-15 1992-06-15 Jig for lifting equipment and materials

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17888392A JP3000069B2 (en) 1992-06-15 1992-06-15 Jig for lifting equipment and materials

Publications (2)

Publication Number Publication Date
JPH05346066A true JPH05346066A (en) 1993-12-27
JP3000069B2 JP3000069B2 (en) 2000-01-17

Family

ID=16056368

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17888392A Expired - Fee Related JP3000069B2 (en) 1992-06-15 1992-06-15 Jig for lifting equipment and materials

Country Status (1)

Country Link
JP (1) JP3000069B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113585776A (en) * 2021-07-28 2021-11-02 河南省第一建筑工程集团有限责任公司 Prefabricated vertical component bin dividing tool and bin dividing method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113585776A (en) * 2021-07-28 2021-11-02 河南省第一建筑工程集团有限责任公司 Prefabricated vertical component bin dividing tool and bin dividing method

Also Published As

Publication number Publication date
JP3000069B2 (en) 2000-01-17

Similar Documents

Publication Publication Date Title
JP2587684B2 (en) Construction wall construction equipment
JPH055987B2 (en)
JPH08296210A (en) Stud constructing method, stud demolishing method and lift-up and rotating device
JPH05346066A (en) Equipment and material lifting jig
JP2775201B2 (en) Lifting member positioning and mounting device for high lift crane
JPH05346065A (en) Timbering replacing method in building outside surface part
JP3018267B2 (en) Composite Shoring for Building Exterior Components
JPH1018598A (en) House-up device
KR20000009699A (en) Safety fence for construction
JP2674975B2 (en) Crane device with work platform for high places
JP3029500B2 (en) All-weather building automatic construction method
JPH10120369A (en) Crane for underground construction
JPH10121737A (en) Horizontal measurement device for structure rising method
JPH1045391A (en) Jack device for heavy structure, etc., and lifting construction method
KR20010055450A (en) Anti dust apparatus for construction works
JPH1018601A (en) Horizontal measuring device for erection method
JPH0215906Y2 (en)
JP3008431U (en) Hanging jig for wall joint material
JPH1046822A (en) Wire tensioning device for erection method and collapse prevention method
RU2047713C1 (en) Attached cradle
CN117144805A (en) Construction device and method for prefabricated T beam
JPH028098B2 (en)
JPH04294894A (en) Working machine for welding for construction
JPH0732548Y2 (en) Crane device for construction of circular structures
JPH0324550Y2 (en)

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081112

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081112

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 10

Free format text: PAYMENT UNTIL: 20091112

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101112

Year of fee payment: 11

LAPS Cancellation because of no payment of annual fees