JPH0533354A - Execution of block wall and elastic engaging pin for the execution - Google Patents
Execution of block wall and elastic engaging pin for the executionInfo
- Publication number
- JPH0533354A JPH0533354A JP18728091A JP18728091A JPH0533354A JP H0533354 A JPH0533354 A JP H0533354A JP 18728091 A JP18728091 A JP 18728091A JP 18728091 A JP18728091 A JP 18728091A JP H0533354 A JPH0533354 A JP H0533354A
- Authority
- JP
- Japan
- Prior art keywords
- side wall
- shells
- block
- web
- wall blocks
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Retaining Walls (AREA)
- Fencing (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、擁壁やブロック塀等の
ようなブロック壁の施工法とその弾性係合ピンに関す
る。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a block wall such as a retaining wall or a block wall and its elastic engagement pin.
【0002】[0002]
【従来の技術】従来のブロック壁の施工法においては、
底または側壁コンクリートブロック(以下、単に側壁ブ
ロックという)に側壁ブロックを上積みする際は、底ま
たは側壁ブロックのフェイスシェルとバックシェルの上
面にモルタルを均一に塗布してから、その上に側壁ブロ
ックを上積みしていた。2. Description of the Related Art In conventional block wall construction methods,
When stacking side wall blocks on the bottom or side wall concrete blocks (hereinafter simply referred to as side wall blocks), evenly apply mortar to the top surface of the bottom or side wall block face shell and back shell, and then place the side wall blocks on top of it. It was on top.
【0003】[0003]
【発明が解決しようとする課題】しかし、上記のモルタ
ルは混練するのに時間がかかり、また、その混練には熟
練を要する欠点と、そのモルタルが硬化するまでは(約
3日間は)、底または側壁ブロックの内部に混練コンク
リートを流し込めず施工期間が長い欠点とがあった。However, the above-mentioned mortar takes a long time to be kneaded, and the kneading requires a skill, and until the mortar is hardened (for about 3 days), the bottom remains. Alternatively, there is a drawback that the kneading concrete cannot be poured into the side wall block and the construction period is long.
【0004】そこで、本発明は、モルタルの混練を必要
としないので、熟練作業者を要せず、しかも施工期間が
短いブロック壁の施工法と施工用弾性係合ピンの提供を
目的とする。Therefore, the present invention does not require kneading of mortar, and therefore does not require a skilled worker, and an object thereof is to provide a method of constructing a block wall and a resilient engaging pin for construction which are short in construction period.
【0005】[0005]
【課題を解決するための手段】本発明による課題解決手
段は、図1の如く、複数の縦鉄筋6の基部6aを複数の
底側壁ブロック5Aに固定し、前記複数の縦鉄筋6に串
刺するように隣接した複数の底側壁ブロック5Aのフェ
イスシェル8とバックシェル10の上面8a,10aに
は軟質緩衝帯12を接着し、前記軟質緩衝帯12に多く
の上積側壁ブロック5を重ねて互いに隣接して行き、下
積側壁ブロック5の第一,第二ウエブシェル9A,9B
の一方の下面9bと、この第一,第二ウエブシェル9
A,9Bの一方の直上に位置する上積側壁ブロック5の
第一,第二ウエブシェル9A,9Bの一方の上面9aと
を、弾性係合ピンPで互に係合連結し、上記の工程を下
積側壁ブロック5と上積側壁ブロック5の間に繰返して
行うことを特徴とするブロック壁の施工法である。As shown in FIG. 1, the means for solving the problems according to the present invention fixes the base portions 6a of a plurality of vertical reinforcing bars 6 to a plurality of bottom side wall blocks 5A and skewers the plurality of vertical reinforcing bars 6. As described above, the soft buffer strips 12 are adhered to the upper surfaces 8a and 10a of the face shells 8 and the back shells 10 of the plurality of adjacent bottom wall blocks 5A, and a large number of stacking side wall blocks 5 are superposed on the soft buffer strips 12 so as to overlap each other. Adjacent to each other, the first and second web shells 9A and 9B of the lower stack side wall block 5
One lower surface 9b and the first and second web shells 9
The upper surface 9a of the first and second web shells 9A and 9B of the upper product side wall block 5 located immediately above one of A and 9B are engaged and connected to each other by the elastic engaging pin P, and the above steps are performed. Is repeatedly performed between the lower product side wall block 5 and the upper product side wall block 5, and is a method of constructing a block wall.
【0006】[0006]
【作用】上記課題解決手段において、従来のモルタルの
スペサー機能を軟質緩衝帯12で代替し、かつモルタル
の接着機能を弾性係合ピンで代替するので、モルタルの
混練を必要としないので、熟練作業者を要せず、しかも
施工期間が短いブロック壁の施工法を実現できる。In the above means for solving the above problems, since the conventional spacer function of the mortar is replaced by the soft buffer zone 12 and the adhesive function of the mortar is replaced by the elastic engagement pin, it is not necessary to knead the mortar, so that skilled work is required. It is possible to realize a block wall construction method that requires no personnel and has a short construction period.
【0007】[0007]
【実施例】以下、本発明の一実施例として擁壁に適用し
た例を図1〜8に基づいて説明する。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An example applied to a retaining wall as an embodiment of the present invention will be described below with reference to FIGS.
【0008】図1ーAのように、基礎砕石1の上側に基
礎コンクリート2を形成し、この基礎コンクリート2の
上面に基礎ブロック3、コンクリート底板4及び底側壁
ブロック5Aを載置し、これら基礎ブロック3及び底側
壁コンクリートブロック5(以下、単に底側壁ブロック
5Aという)に係合した縦鉄筋6の基部6aをプラスチ
ックスペーサ7を押込ことにより底側壁ブロック5Aに
固定する。As shown in FIG. 1-A, a foundation concrete 2 is formed on an upper side of a foundation crushed stone 1, and a foundation block 3, a concrete bottom plate 4 and a bottom side wall block 5A are placed on the upper surface of the foundation concrete 2, and these foundations are placed. The base 6a of the vertical reinforcing bar 6 engaged with the block 3 and the bottom side wall concrete block 5 (hereinafter, simply referred to as the bottom side wall block 5A) is fixed to the bottom side wall block 5A by pushing the plastic spacer 7.
【0009】図4,5,6のように、側壁コンクリート
ブロック5(以下、単に側壁ブロック5という)は、フ
ェイスシェル8と、その背面に突出した左右一対の第
一,第二ウエブシェル9A,9Bと、これら第一,第二
ウエブシェル9A,9Bの背面に接続形成されたバック
シェル10(フェイスシェル8と同じ左右幅を持つ)と
から構成し、フェイスシェル8及びバックシェル10の
上面8a,10a同志と下面8b,10b同志は面一と
し、第一,第二ウエブシェル9A,9Bの上面9aはフ
ェイスシェル8の上面8aより少し下位に形成し、かつ
第一,第二ウエブシェル9A,9Bの下面9bはフェイ
スシェル8の下面8bより少し上位に形成し、第一,第
二ウエブシェル9A,9Bの上面9aには横鉄筋11用
の溝11Aを形成している。As shown in FIGS. 4, 5 and 6, a side wall concrete block 5 (hereinafter, simply referred to as side wall block 5) includes a face shell 8 and a pair of left and right first and second web shells 9A, which project from the back surface thereof. 9B and a back shell 10 (having the same left-right width as the face shell 8) connected to the back surfaces of the first and second web shells 9A and 9B, and the face shell 8 and the upper surface 8a of the back shell 10 are formed. , 10a and lower surfaces 8b, 10b are flush with each other, and the upper surfaces 9a of the first and second web shells 9A, 9B are formed slightly lower than the upper surface 8a of the face shell 8 and the first and second web shells 9A. , 9B has a lower surface 9b formed slightly above the lower surface 8b of the face shell 8, and the upper and lower surfaces 9a of the first and second web shells 9A and 9B are provided with grooves 11A for the horizontal reinforcing bars 11. There.
【0010】図7,8のように、前記底側壁ブロック5
Aは、フェイスシェル8と、その背面に突出した左右一
対の第一,第二ウエブシェル9A,9Bと、これら第
一,第二ウエブシェル9A,9Bの各背面に別々に接続
形成されたバックシェル10(フェイスシェル8の約1
/4の左右幅を持つ)とから構成されている。その他の
構成は、前記側壁ブロック5と同様である。As shown in FIGS. 7 and 8, the bottom side wall block 5 is formed.
A is a face shell 8, a pair of left and right first and second web shells 9A and 9B projecting from the back surface thereof, and a back formed separately on the respective back surfaces of the first and second web shells 9A and 9B. Shell 10 (about 1 of face shell 8
It has a width of / 4). Other configurations are similar to those of the side wall block 5.
【0011】図1−D,図2のように、前記複数の縦鉄
筋6に串刺するように隣接した複数の下積底側壁ブロッ
ク5A及び側壁ブロック5Aのフェイスシェル8とバッ
クシェル10の上面8a,10aには軟質緩衝帯12
(自由時厚さ10mmかつ圧縮時厚さ1mmで片面剥離
紙と接着面とを有するスポンジシール)を接着する。As shown in FIGS. 1-D and 2, a plurality of lower product bottom side wall blocks 5A and face shells 8 of the side wall blocks 5A and upper surfaces 8a of the back shells 10 adjacent to each other so as to be skewered to the plurality of vertical reinforcing bars 6. , 10a has a soft buffer zone 12
(Sponge seal having a thickness of 10 mm when free and a thickness of 1 mm when compressed and having a single-sided release paper and an adhesive surface) is bonded.
【0012】そして、第一,第二ウエブシェル9A,9
Bの溝11Aに横鉄筋11を嵌合し、前記軟質緩衝帯1
2に多くの上積側壁ブロック5を重ねて互いに隣接して
行く。Then, the first and second web shells 9A, 9
The horizontal reinforcing bar 11 is fitted into the groove 11A of B, and the soft buffer strip 1
2. A large number of stacked side wall blocks 5 are overlapped on 2, and they are adjacent to each other.
【0013】次に、下積側壁ブロック5,5Aの第一,
第二ウエブシェル9A,9Bの一方の下面9bと、この
第一,第二ウエブシェル9A,9Bの一方の直上に位置
する上積側壁ブロック5の第一,第二ウエブシェル9
A,9Bの一方の上面9a(横鉄筋用溝11Aの上面を
含む)とを、弾性係合ピンPで互に係合連結する。Next, the first of the lower product side wall blocks 5 and 5A,
The lower surface 9b of one of the second web shells 9A and 9B and the first and second web shells 9 of the laminated side wall block 5 located immediately above one of the first and second web shells 9A and 9B.
The upper surface 9a of one of A and 9B (including the upper surface of the transverse reinforcing bar groove 11A) is engaged and coupled with each other by the elastic engaging pin P.
【0014】次に、前記溝11A間に横鉄筋11を嵌合
し、上積側壁ブロック5の第一,第二ウエブシェル9
A,9Bの他方の下面9bとその上に積まれた側壁ブロ
ック5の第一,第二ウエブシェル9A,9Bの上面9a
(横鉄筋用溝11Aの上面を含む)とを前記とは別の弾
性係合ピンPで互に係合連結する。Next, the horizontal rebars 11 are fitted between the grooves 11A, and the first and second web shells 9 of the side wall block 5 are stacked.
The lower surface 9b of the other side of A and 9B and the upper surface 9a of the first and second web shells 9A and 9B of the side wall block 5 stacked thereon.
And (including the upper surface of the transverse reinforcing bar groove 11A) are engaged and connected to each other by an elastic engaging pin P different from the above.
【0015】そして、上記の工程を下積側壁ブロック
5,5Aと上積側壁ブロック5の間に繰返して行い、積
上側壁ブロック5が約1mになるとその内部空間に混練
コンクリートを充填し、その凝固後に上端側壁ブロック
5の上面に笠木ブロックを重ねてブロック壁の施工は完
了する。Then, the above steps are repeated between the lower side wall blocks 5 and 5A and the upper side wall blocks 5, and when the upper side wall blocks 5 reach about 1 m, the inner space thereof is filled with kneading concrete. After the solidification, the top wall block 5 is overlaid with a headstock block to complete the construction of the block wall.
【0016】また、前記弾性係合ピンPは、図1ーEの
ように、直径2〜4mmの金属線材(例えば鉄線)の折
曲加工により形成し、これは、直状の連結部13と、そ
の上端の持手兼用の円環形上係部14と、前記連結部1
3の下端の凹形下係部15とから構成し、前記上係部1
4には、第一,第二ウエブシェル9A,9Bの上面9a
に係合する際に弾性変形により係合し、前記下係部15
には、第一,第二ウエブシェル9A,9Bの下面9bに
係合する際に下面9bのバリGを逃げた状態で係合する
機能をそれぞれ有せしめている。The elastic engagement pin P is formed by bending a metal wire (for example, an iron wire) having a diameter of 2 to 4 mm, as shown in FIG. , A ring-shaped upper engaging portion 14 serving as a handle at the upper end thereof, and the connecting portion 1
3 and a concave lower engaging portion 15 at the lower end of the upper engaging portion 1.
4 includes upper surfaces 9a of the first and second web shells 9A and 9B.
When engaged with the lower engaging portion 15 by elastic deformation,
Have a function of engaging the lower surfaces 9b of the first and second web shells 9A and 9B in a state where the burrs G on the lower surface 9b escape.
【0017】5Bは、側壁ブロック5のフェイスシェル
8に固着された化粧板である。なお、本発明は、上記実
施例に限定されるものではなく、本発明の範囲内で上記
実施例に多くの修正および変更を加え得ることは勿論で
ある。Reference numeral 5B is a decorative plate fixed to the face shell 8 of the side wall block 5. It should be noted that the present invention is not limited to the above embodiments, and it goes without saying that many modifications and changes can be made to the above embodiments within the scope of the present invention.
【0018】[0018]
【発明の効果】以上の説明から明らかな通り、請求項1
の発明によると、従来のモルタルのスペサー機能を軟質
緩衝帯で代替し、かつモルタルの接着機能を弾性係合ピ
ンで代替するので、モルタルの混練を必要としないの
で、熟練作業者を要せず、しかも施工期間が短いブロッ
ク壁の施工法を実現できる。As is apparent from the above description, claim 1
According to the invention, since the conventional mortar spacer function is replaced by the soft buffer zone, and the mortar adhesive function is replaced by the elastic engagement pin, kneading of the mortar is not required, so that no skilled worker is required. Moreover, it is possible to realize a construction method for a block wall which requires a short construction period.
【0019】また、請求項2の発明によると、弾性係合
ピンは金属線材の折曲加工により形成し、これは、直状
の連結部と、その上端の持手兼用の円環形上係部と、前
記連結部の下端の凹形下係部とから構成し、前記上係部
には、第一,第二ウエブシェルの上面に係合する際に弾
性変形により係合する機能、前記下係部には、第一,第
二ウエブシェルの下面に係合する際に下面のバリを逃げ
た状態で係合する機能をそれぞれ有せしめたので、安価
で施工作業がしやすい弾性係合ピンを提供できる優れた
効果がある。According to the second aspect of the present invention, the elastic engagement pin is formed by bending a metal wire, which is a linear connecting portion and an annular upper engaging portion at its upper end which also serves as a handle. And a concave lower engaging portion at the lower end of the connecting portion, wherein the upper engaging portion has a function of engaging by elastic deformation when engaging with the upper surfaces of the first and second web shells. The engaging parts have the function of engaging with the burrs of the lower surface when engaging with the lower surfaces of the first and second web shells. There is an excellent effect that can be provided.
【図1ーA】本発明方法を施工した擁壁の実施例を示す
側面図である。FIG. 1A is a side view showing an example of a retaining wall to which the method of the present invention has been applied.
【図1ーB】同主要部の切断正面図である。FIG. 1B is a cutaway front view of the same main portion.
【図1ーC】同主要部の切断側面図である。FIG. 1-C is a cut side view of the same main part.
【図1ーD】同擁壁施工途中の斜視図である。FIG. 1-D is a perspective view of the retaining wall during construction.
【図1ーE】同弾性係合ピンの正面図である。FIG. 1-E is a front view of the elastic engagement pin.
【図2】同側壁ブロックへの軟質緩衝帯接着作業の斜視
図である。FIG. 2 is a perspective view of an operation of adhering a soft buffer strip to the side wall block.
【図3】同側壁ブロックへの弾性係合ピン組付作業の斜
視図である。FIG. 3 is a perspective view of an operation of assembling the elastic engagement pin on the side wall block.
【図4】同側壁ブロックの平面図である。FIG. 4 is a plan view of the side wall block.
【図5】同側壁ブロックの正面図である。FIG. 5 is a front view of the side wall block.
【図6】同図4のE−E断面図である。6 is a sectional view taken along line EE of FIG.
【図7】同底側壁ブロックの平面図である。FIG. 7 is a plan view of the bottom side wall block.
【図8】同図7のF−F断面図である。8 is a sectional view taken along line FF of FIG.
P 弾性係合ピン G バリ 5 側壁ブロック 5A 底側壁ブロック 6 縦鉄筋 8 フェイスシェル 9A,9B 第一,第二ウエブシェル 10 バックシェル 12 軟質緩衝帯 13 連結部 14 円環形上係部 15 凹形下係部 P Elastic engagement pin G Bali 5 Side wall block 5A Bottom wall block 6 vertical rebar 8 face shell 9A, 9B First and second web shell 10 back shell 12 Soft buffer zone 13 Connection 14 Torus top section 15 Concave bottom engaging part
Claims (2)
ックに固定し、 前記複数の縦鉄筋に串刺するように隣接した複数の底側
壁ブロックのフェイスシェルとバックシェルの上面には
軟質緩衝帯を接着し、 前記軟質緩衝帯に多くの上積側壁ブロックを重ねて互い
に隣接して行き、 下積側壁ブロックの第一,第二ウエブシェルの一方の下
面と、この第一,第二ウエブシェルの一方の直上に位置
する上積側壁ブロックの第一,第二ウエブシェルの一方
の上面とを、弾性係合ピンで互に係合連結し、 上記の工程を下積側壁ブロックと上積側壁ブロックの間
に繰返して行う、 ことを特徴とするブロック壁の施工法。1. The base of a plurality of vertical reinforcing bars is fixed to a plurality of bottom side wall blocks, and a soft cushion is provided on the upper surfaces of the face shell and the back shell of the plurality of bottom side wall blocks adjacent to each other so as to be skewered to the plurality of vertical reinforcing bars. The strips are adhered to each other, and a large number of stacking side wall blocks are overlapped with each other on the soft buffer strip so as to be adjacent to each other, and the lower surface of one of the first and second web shells of the stacking lower side wall block and the first and second webs. The upper side wall block located immediately above one of the shells and the upper surfaces of one of the first and second web shells are engaged and connected to each other by elastic engagement pins, and the above steps are carried out on the upper side wall block and the upper side wall block. A block wall construction method characterized by being repeated between side wall blocks.
の折曲加工により形成し、これは、直状の連結部と、そ
の上端の持手兼用の円環形上係部と、前記連結部の下端
の凹形下係部とから構成し、前記上係部には、第一,第
二ウエブシェルの上面に係合する際に弾性変形により係
合する機能、前記下係部には、第一,第二ウエブシェル
の下面に係合する際に下面のバリを逃げた状態で係合す
る機能をそれぞれ有せしめたことを特徴とする弾性係合
ピン。2. The elastic engagement pin according to claim 1, which is formed by bending a metal wire, which comprises a straight connecting portion, an annular upper engaging portion at the upper end thereof which also serves as a handle, and The lower engaging portion has a function of engaging with the upper engaging portion by elastic deformation when engaging with the upper surfaces of the first and second web shells. The elastic engagement pins are characterized in that they have a function of engaging the lower surfaces of the first and second web shells in a state where the burrs on the lower surfaces are escaped.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP18728091A JPH07100943B2 (en) | 1991-07-26 | 1991-07-26 | Block wall construction method and construction elastic engagement pin |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP18728091A JPH07100943B2 (en) | 1991-07-26 | 1991-07-26 | Block wall construction method and construction elastic engagement pin |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0533354A true JPH0533354A (en) | 1993-02-09 |
JPH07100943B2 JPH07100943B2 (en) | 1995-11-01 |
Family
ID=16203237
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP18728091A Expired - Lifetime JPH07100943B2 (en) | 1991-07-26 | 1991-07-26 | Block wall construction method and construction elastic engagement pin |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH07100943B2 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08284183A (en) * | 1995-04-17 | 1996-10-29 | Toshihiko Chazono | Concrete block and construction method for retaining wall using the block |
JP2006161369A (en) * | 2004-12-06 | 2006-06-22 | Fukui Block Kogyosho:Kk | Concrete-made horizontal reinforcement block, structure making use of the block and manufacturing method of the concrete-made horizontal reinforcement block |
-
1991
- 1991-07-26 JP JP18728091A patent/JPH07100943B2/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08284183A (en) * | 1995-04-17 | 1996-10-29 | Toshihiko Chazono | Concrete block and construction method for retaining wall using the block |
JP2006161369A (en) * | 2004-12-06 | 2006-06-22 | Fukui Block Kogyosho:Kk | Concrete-made horizontal reinforcement block, structure making use of the block and manufacturing method of the concrete-made horizontal reinforcement block |
Also Published As
Publication number | Publication date |
---|---|
JPH07100943B2 (en) | 1995-11-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH0533354A (en) | Execution of block wall and elastic engaging pin for the execution | |
JP2017177529A (en) | Curved laminate material block, its manufacturing method, and manufacturing method of structural wall using the block | |
TWM558267U (en) | Grid deck with shear-resisting plates | |
JPH04222739A (en) | Three-dimensional truss floor slab with steel plate | |
JPH0665973A (en) | Constructing method of reinforced concrete structure such as foundation, wall, etc., and structure thereof | |
JPH06136856A (en) | Method of connecting precast concrete member | |
JP2007062155A (en) | Precast concrete plate with cotter and its production method | |
JP5679330B2 (en) | Tile presser, PC board using the same, PC board manufacturing method, and tile formwork attaching method | |
GB1574935A (en) | Brick-clad building panel and method of making such a panel | |
JPH09279612A (en) | Bonding method of stone board and constructing method of retaining wall | |
JP6475971B2 (en) | Wooden residual formwork | |
JPS6262224B2 (en) | ||
JPS63261037A (en) | Execution of waffle slab and lower constitution body of waffle slab | |
JPH0741764Y2 (en) | Formwork for floor slab construction | |
JP3701192B2 (en) | Concrete formwork | |
JPH084483Y2 (en) | Beam panel joint structure | |
JPH07127145A (en) | Construction method of concrete building by use of insulation form | |
JP2537419B2 (en) | Structure of wall body and method of joining the wall body and body | |
JP2005048501A (en) | Floor constructing material and floor tile constructing method | |
JPH0742362A (en) | Plate material for formwork | |
JPS58178746A (en) | Joint of precast concrete floor panel | |
JPH04357224A (en) | Precast concrete block formwork | |
JP2000038802A (en) | Method and jig for assembling alc panel for corner | |
JPH03176535A (en) | Manufacture of brick masonry-like stone plate | |
JP2018053699A (en) | Installation method of aseismic slit material |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091101 Year of fee payment: 14 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091101 Year of fee payment: 14 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 15 Free format text: PAYMENT UNTIL: 20101101 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 15 Free format text: PAYMENT UNTIL: 20101101 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 16 Free format text: PAYMENT UNTIL: 20111101 |
|
EXPY | Cancellation because of completion of term | ||
FPAY | Renewal fee payment (prs date is renewal date of database) |