JPH052672Y2 - - Google Patents

Info

Publication number
JPH052672Y2
JPH052672Y2 JP15160488U JP15160488U JPH052672Y2 JP H052672 Y2 JPH052672 Y2 JP H052672Y2 JP 15160488 U JP15160488 U JP 15160488U JP 15160488 U JP15160488 U JP 15160488U JP H052672 Y2 JPH052672 Y2 JP H052672Y2
Authority
JP
Japan
Prior art keywords
frame
gabion
mesh
connecting ring
net
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP15160488U
Other languages
Japanese (ja)
Other versions
JPH0273425U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP15160488U priority Critical patent/JPH052672Y2/ja
Publication of JPH0273425U publication Critical patent/JPH0273425U/ja
Application granted granted Critical
Publication of JPH052672Y2 publication Critical patent/JPH052672Y2/ja
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Description

【考案の詳細な説明】 [産業上の利用分野] 本考案は、護岸、水制、砂防などの工事に使用
される蛇篭に関する。
[Detailed Description of the Invention] [Industrial Application Field] The present invention relates to a gabion used for construction work such as bank protection, water diversions, and erosion control.

[従来の技術] 蛇篭は、組立状態において円筒状をなす蛇篭
と、別名「フトン篭」と称せられる角形(長方
体)をなした蛇篭などがあり、いずれも中に石な
どが詰められて使用される。そして、これらは一
般に胴状網部と、この胴状網部の開口された上面
を覆う上面網部、および開口された下面を閉じる
下面網部とで構成されている。また、この胴状網
部は、各側面毎に区切られてなる複数の側面網部
を互いに連結して円筒または角筒の胴状に形成し
たものや、さらには胴部内を仕切網部で複数の部
屋に区切つたものもある。
[Prior Art] There are two types of gabions: one is cylindrical in the assembled state, and the other is square (rectangular) gabion, also known as ``futon gao.'' Both of them are filled with stones, etc. used. These are generally composed of a trunk-like mesh section, an upper surface mesh section that covers the open upper surface of the trunk-like mesh section, and a lower surface mesh section that closes the opened lower surface. In addition, this trunk-shaped net portion may be formed by connecting a plurality of side net portions separated by each side to each other to form a cylindrical or rectangular trunk shape, or furthermore, a plurality of partition net portions may be formed inside the trunk portion. Some rooms are divided into rooms.

このように複数の網部を互いに連結して所定の
蛇篭を組み立てる施工方法の一つには、胴状網部
となる部分と下面網部となる部分とを工場で連結
して予め組み立て、この状態で現場に運んで残さ
れた部分をさらに組み立てて設置する方法があ
る。この施工方法では、この設置途中で内部に石
などが詰められ、その後上面網部で胴状網部の上
面が閉じられる。また、他の施工方法では各部を
構成する各網部単体を組み立てずに現場へ運び、
現場で下面網部と胴状網部とを順次組み立てて一
体化し、さらに設置途中で内部に石などを詰め、
この後から胴状網部の上面を上面網部で覆うよう
にして設置する方法がある。
One of the construction methods for assembling a predetermined gabion by connecting a plurality of net parts to each other is to connect the part that will become the trunk mesh part and the part that will become the bottom mesh part in a factory and assemble them in advance. There is a method of transporting it to the site in its original condition and then assembling and installing the remaining parts. In this construction method, the interior is filled with stones or the like during installation, and then the upper surface of the trunk-like net is closed with the upper surface net. In addition, with other construction methods, each mesh part that makes up each part is transported to the site without being assembled.
At the site, the lower surface mesh part and the trunk mesh part are assembled and integrated one after another, and during installation, the inside is filled with stones, etc.
After this, there is a method in which the upper surface of the trunk-shaped net is covered with the upper surface net.

[考案が解決しようとする課題] しかしながら、胴状網部と下面網部とを予め工
場で連結して組み立てた後に現場へ運んで設置す
る前者の方法では、輸送時にかさばり、一度に幾
つもの蛇篭を運ぶことができないとともに、取り
扱いもしずらい。このため、輸送コストがかか
り、作業性も悪い問題点などがある。
[Problem to be solved by the invention] However, in the former method, in which the trunk mesh part and the bottom mesh part are connected and assembled in advance at a factory, and then transported and installed at the site, it is bulky during transportation, and it is necessary to handle several gabions at once. It is difficult to carry and handle. Therefore, there are problems such as high transportation costs and poor workability.

一方、各網部単体を組み立てずに現場に運び、
現場で順次組み立てる方法は、各網部を積み重ね
ることができるので一度に多くの網部を運ぶこと
ができる。このため、輸送コストを下げることは
できる。しかし、現場で複雑な組立作業を行わね
ばならないので、作業性が極めて悪くなる問題点
があつた。したがつて、この方法では各網部間を
簡単な作業で連結して組み立てることができる構
造が望まれる。
On the other hand, each net section was transported to the site without being assembled,
The method of sequentially assembling on site allows each mesh section to be stacked on top of each other, so many mesh sections can be transported at one time. Therefore, transportation costs can be reduced. However, since complicated assembly work must be performed on site, there is a problem in that workability is extremely poor. Therefore, in this method, a structure is desired that allows the mesh parts to be connected and assembled with a simple operation.

本考案は、上記問題点に鑑みてなされたもので
あり、その目的は一度に多く運べるとともに、施
工時における作業性を向上させることのできる構
造にした蛇篭を提供することにある。
The present invention was devised in view of the above problems, and its purpose is to provide a gabion with a structure that allows a large number of gabions to be transported at one time and improves workability during construction.

[課題を解決するための手段] 上記目的を達成するため本考案は、それぞれ金
網の周りを枠体で囲んでなる複数の網部で前記枠
体同志を互いに連結させて所定の形状に組み立て
られる蛇篭であつて、互いに連結される前記一方
の枠体の外周にこの枠体の外径寸法よりも大きい
内径寸法を有した連結輪を移動可能に巻回配置す
るとともに、前記一方の枠体と一緒に前記連結輪
内に挿入係合される係止ピンを前記連結輪の前記
移動路内に対応して前記他方の枠体に設けた構成
としたものである。
[Means for Solving the Problems] In order to achieve the above object, the present invention is assembled into a predetermined shape by connecting the frame bodies to each other using a plurality of mesh parts, each of which is formed by surrounding a wire mesh with a frame body. The gabion is a gabion, in which a connecting ring having an inner diameter larger than the outer diameter of the frame is movably wound around the outer periphery of the one frame body which is connected to the other frame body; A locking pin that is inserted into and engaged with the connecting ring is provided on the other frame corresponding to the moving path of the connecting ring.

[作用] 上記構成によれば、連結輪を係止ピンより逃が
した状態で一方の枠体と他方の枠体とを所定の位
置に配置し、その後一方の枠体の外周に巻回取り
付けされている連結輪をこの一方の枠体に沿つて
移動させ、この連結輪内に他方の枠体側に設けら
れている係止ピンを挿入係合させると、この連結
輪内に一方の枠体と係止ピンとが共通に挿入され
た状態になる。そして、この連結輪を介した一方
の枠体と他方の枠体との結合で各網部間が互いに
連結され、所定の蛇篭が簡単に形成される。これ
により作業性を向上させることができる。また、
施設する前は連結輪による結合を解除し、各網部
毎に分解して互いに平たく延ばした状態にしてお
くことができるので、例えば倉庫に保管しておく
場合も小さなスペース内に多くの網部を配してお
くことができる。同時に、現場へ運ぶときなどに
も一度に多くの網部を運ぶことができる。これに
より、保管コストおよび輸送コストを低くするこ
とができる。
[Operation] According to the above configuration, one frame body and the other frame body are placed in a predetermined position with the connecting ring released from the locking pin, and then the frame body is wound and attached to the outer periphery of one frame body. When the connecting ring is moved along one frame and the locking pin provided on the other frame side is inserted into the connecting ring and engaged, one frame and the other frame are inserted into this connecting ring. The locking pin is inserted in common. Then, by connecting one frame body and the other frame body through this connecting ring, the net portions are connected to each other, and a predetermined gabion can be easily formed. This can improve workability. Also,
Before installation, the connections made by the connecting rings can be released and each net section can be disassembled and laid out flat against each other, so for example, when stored in a warehouse, many net sections can be stored in a small space. can be placed. At the same time, it is possible to carry many nets at once when transporting them to the site. Thereby, storage costs and transportation costs can be reduced.

[実施例] 以下、本考案の実施例について図面を用いて詳
細に説明する。
[Example] Hereinafter, an example of the present invention will be described in detail using the drawings.

第1図は、本考案を適用した蛇篭の一実施例を概
略的に示したものである。
FIG. 1 schematically shows an embodiment of a gabion to which the present invention is applied.

図において、蛇篭1は、現場で施設しながら上
面が開口した枠状に形成される蛇篭本体2と、こ
の蛇篭本体2の施設後に蛇篭本体2の上面開口を
閉じる上面網体3などで構成されている。
In the figure, a gabion 1 is composed of a frame-shaped gabion main body 2 with an open top while being installed on site, and an upper mesh body 3 that closes the top opening of the gabion main body 2 after installation of the gabion main body 2. ing.

さらに、蛇篭本体2は、法面上に載置される底
面網部4を備えているとともに、この底面網部4
の各周部分に沿つて立設した胴状網部を形成する
ところの側面網部5と、この側面網部5で画成さ
れる内部空間を複数の小部屋に区切る仕切網部6
などで構成されている。そして、側面網部5は途
中で折り曲げ可能に、さらに複数の側面網部5
A,5B,5C,5D、5Eに分割形成されてい
る。また、底面網部4と側面網部5および仕切網
部6は概略的には、中間部分に比較的太い針金な
どの線材で形成された補強枠8を取り付け同じく
太い針金などの線材で窓枠状に形成された枠体7
と、この枠体7に対して略菱形に編み込まれた金
網10とで各々構成されている、。これら底面部
4、側面網部5、仕切網部6は、現場などに運ぶ
前は第2図に示すように互いに分離されており、
現場における施工時には簡単に連結させて組み立
てることができるようになつている。
Further, the gabion main body 2 includes a bottom net portion 4 placed on the slope, and this bottom net portion 4
a side mesh section 5 that forms a trunk-like mesh section that stands upright along each peripheral portion of the screen, and a partition mesh section 6 that divides the internal space defined by this side mesh section 5 into a plurality of small rooms.
It consists of etc. The side mesh portion 5 can be bent in the middle, and a plurality of side mesh portions 5 are formed.
It is divided into A, 5B, 5C, 5D, and 5E. In addition, the bottom screen section 4, the side screen section 5, and the partition screen section 6 are generally constructed by attaching a reinforcing frame 8 made of a relatively thick wire or the like in the middle part, and forming a window frame using the same thick wire or other wire. A frame body 7 formed in the shape of
and a wire mesh 10 woven into the frame 7 in a substantially diamond shape. These bottom surface part 4, side mesh part 5, and partition mesh part 6 are separated from each other as shown in FIG. 2 before being transported to a site or the like.
They can be easily connected and assembled during on-site construction.

この連結構造についてさらに第3図乃至第5図
を用いて説明すると、第3図は第1図中の符号
で示す部分において底面網部4と側面網部5Dと
を連結固定する構造を示したものである。そし
て、側面網部5Dは、底面網部4側における枠体
7の一辺に対して側面網部5D側における枠体7
の一辺を当接させて配されるが、側面網部5D側
の枠体7にはこの枠体7の外径寸法よりも大きい
内径寸法を有した連結輪20が巻回取り付けされ
ている。この連結輪20は可撓性を有した樹脂材
などでリング状に形成されており、側面網部5D
側の枠体7に沿つて移動可能になつている。一
方、底面網部4側には、連結輪20が移動する経
路に対応して、この底面網部4側における枠体7
上に係止ピン21が溶接固定されている。この係
止ピン21は、連結輪20内に側面網部5D側に
おける枠体7と一緒に挿入可能になつている。ま
た、側面網部5D側における枠体7と底面網部4
側における係止ピン21とが連結輪20内に一緒
に挿入された状態になると、この連結輪20によ
つて側面網部5D側における枠体7と底面網部4
側の係止ピン21との動きが互いに規制される状
態になる。そして、この連結構造は、各網部4、
5,6の間で互いに連結を予定する部分にそれぞ
れ設けられ、この場合は一方側の枠体7に連結輪
20が移動可能に設けられるとともに他方側の枠
体7に係止ピン21が固定されて設けられる。
This connection structure will be further explained using FIGS. 3 to 5. FIG. 3 shows a structure in which the bottom net portion 4 and the side net portion 5D are connected and fixed at the portion indicated by the reference numeral in FIG. 1. It is something. The side mesh portion 5D is arranged so that the frame body 7 on the side surface mesh portion 5D side is different from one side of the frame body 7 on the bottom surface mesh portion 4 side.
A connecting ring 20 having an inner diameter larger than the outer diameter of the frame 7 is wound around the frame 7 on the side mesh portion 5D side. The connecting ring 20 is formed into a ring shape from a flexible resin material, and has a side mesh portion 5D.
It is movable along the side frame 7. On the other hand, a frame body 7 on the bottom net portion 4 side is provided on the bottom net portion 4 side in accordance with the path along which the connecting ring 20 moves.
A locking pin 21 is welded and fixed onto the top. This locking pin 21 can be inserted into the connecting ring 20 together with the frame 7 on the side mesh portion 5D side. In addition, the frame body 7 and the bottom net portion 4 on the side net portion 5D side
When the locking pin 21 on the side is inserted into the connecting ring 20, the connecting ring 20 locks the frame 7 and the bottom mesh 4 on the side mesh 5D side.
The movement with the locking pin 21 on the side is mutually restricted. This connection structure includes each net portion 4,
5 and 6, and in this case, a connecting ring 20 is movably provided on the frame 7 on one side, and a locking pin 21 is fixed on the frame 7 on the other side. and set up.

次に、上面網体3は、蛇篭本体2とは別に独立
して形成されており、蛇篭本体2を形成している
底面網部4、側面網部5、仕切網部6と同様に、
比較的太い針金などの線材で窓枠状に形成された
枠体17を備え、この枠体17に対して略菱形に
編まれた金網10が組み込まれて、シート状に形
成されている。
Next, the top screen body 3 is formed independently from the gabion main body 2, and like the bottom screen section 4, side screen section 5, and partition screen section 6 that form the gabion main body 2,
A frame body 17 formed in the shape of a window frame using a relatively thick wire such as wire is provided, and a wire mesh 10 knitted in a substantially rhombus shape is incorporated into the frame body 17 to form a sheet shape.

このように構成された蛇篭1は、現場において
組み立てる場合、まず第4図中に一点鎖線で示す
ように係止ピン21と対応する部分から連結輪2
0を逃がした状態で、互いに連結される二つの網
部4、5Dにおける枠体7,7を互いに当接させ
る。次いで、逃がしておいた連結輪20を係止ピ
ン21側に、第4図中に実線で示す位置まで移動
させ、連結輪20内に係止ピン21を挿入係合さ
せる。すると、この連結輪20によつて一方の枠
体7と係止ピン21とが一体に支持される。これ
により、両方の網部4,5Dにおける枠体7,7
が互いに連結され、この隣接し合う網部4,5D
間の連結が図られる。なお、第3図はこのように
して連結輪20で底面網部4と側面網部5Dとが
互いに連結され、底面網部4の端部から側面網部
5Dが略直角に立設された状態を示している。そ
して、このようにして連結することにより、互い
に隣接配置される底面網部4と側面網部5A,5
B,5C,5D,5D,5Eと、仕切網部6およ
び上面網体3とを簡単に順次連結させることがで
きる。
When assembling the gabion 1 constructed in this way on-site, first, as shown by the dashed line in FIG.
0 is released, the frames 7, 7 in the two mutually connected net portions 4, 5D are brought into contact with each other. Next, the released connecting ring 20 is moved toward the locking pin 21 to the position shown by the solid line in FIG. 4, and the locking pin 21 is inserted into the connecting ring 20 and engaged. Then, one frame 7 and the locking pin 21 are integrally supported by the connecting ring 20. As a result, the frames 7, 7 in both the net portions 4, 5D
are connected to each other, and these adjacent net portions 4, 5D
The connection between the two is planned. In addition, FIG. 3 shows a state in which the bottom net portion 4 and the side net portion 5D are connected to each other by the connecting ring 20 in this manner, and the side net portion 5D is erected at a substantially right angle from the end of the bottom net portion 4. It shows. By connecting in this way, the bottom net portion 4 and the side net portions 5A, 5 are arranged adjacent to each other.
B, 5C, 5D, 5D, 5E, the partition net portion 6 and the upper surface net body 3 can be easily connected in sequence.

したがつて、このように構成された蛇篭1で
は、工場などから現場へ運ぶとき、各網部3,
4,5,6を互いに連結せずに分離して平たくシ
ート状に延ばした状態で輸送できるので、かさば
らずに幾つもの蛇篭本体2および上面網体3を一
度に運ぶことができる。これにより、輸送コスト
を低くすることができる。また、現場では互いに
連結させる各網部3,4,5,6を互いに当接さ
せた状態で、さらに連結輪20をスライド移動さ
せて係止ピン21に係合させると、各網部3,
4,5,6との間が順次連結されて所定の蛇篭1
を簡単に形成することができるので、作業性の向
上が図れる。
Therefore, when the gabion 1 configured in this way is transported from a factory etc. to a site, each net portion 3,
4, 5, and 6 can be transported in a state where they are separated and stretched out into a flat sheet without being connected to each other, so that several gabion bodies 2 and upper nets 3 can be transported at once without being bulky. Thereby, transportation costs can be reduced. In addition, in the field, when the connecting ring 20 is further slid and engaged with the locking pin 21 with the mesh parts 3, 4, 5, and 6 to be connected to each other in contact with each other, each mesh part 3,
4, 5, and 6 are sequentially connected to form a predetermined gabion 1.
can be easily formed, improving workability.

なお、上記実施例では、仕切網部6と、上面網
体3を設けた構造を開示したが、これらは蛇篭1
の施設場所や施設状況によつては必ずしも取り付
ける必要はないものである。その他、本考案はそ
の要旨の範囲内で種々変形実施可能であることは
勿論のことである。
Although the above embodiment discloses a structure in which the partition net section 6 and the upper surface net body 3 are provided, these are not included in the gabion 1.
Depending on the location and condition of the facility, it may not necessarily be necessary to install it. It goes without saying that the present invention can be modified in various ways within the scope of its gist.

[考案の効果] 以上説明したとおり、本考案に係る蛇篭によれ
ば、連結輪を係止ピンより逃がした状態で一方の
枠体と他方の枠体とを所定の位置に配置し、その
後一方の枠体の外周に巻回取り付けされている連
結輪をこの一方の枠体に沿つて移動させ、この連
結輪内に他方の枠体側に設けられている係止ピン
を挿入係合させると、この連結輪内に一方の枠体
と係止ピンとが共通に挿入された状態になり、こ
の連結輪を介した一方の枠体と他方の枠体との結
合で各網部間が互いに連結され、所定の蛇篭が簡
単に形成される。これにより作業性を向上させる
ことができる。また、施設する前は連結輪による
結合を解除し、各網部毎に分解して互いに平たく
延ばした状態にしておくことができるので、例え
ば倉庫に保管しておく場合も小さなスペース内に
多くの網部を配しておくことができる。同時に、
現場へ運ぶときなどにも一度に多くの網部を運ぶ
ことができる。これにより、保管コストおよび輸
送コストを低くすることができる。
[Effect of the invention] As explained above, according to the gabion according to the invention, one frame body and the other frame body are placed in a predetermined position with the connecting ring released from the locking pin, and then one frame body is placed in a predetermined position. When the connecting ring that is wound around the outer circumference of the frame is moved along one of the frames, and the locking pin provided on the other frame is inserted into and engaged with the connecting ring, One frame body and the locking pin are commonly inserted into this connecting ring, and the mesh parts are connected to each other by connecting one frame body and the other frame body through this connecting ring. , a given gabion is easily formed. This can improve workability. In addition, before installation, the connections made by the connecting rings can be released, and each net section can be disassembled and laid out flat against each other, so when stored in a warehouse, for example, many can be stored in a small space. A net section can be placed. at the same time,
When transporting to the site, many nets can be transported at once. Thereby, storage costs and transportation costs can be reduced.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本考案の蛇篭を施設状態で概略的に示
した一部分解斜視図、第2図は同上蛇篭の分解斜
視図、第3図は第1図中に符号で示した部分に
おける要部拡大斜視図、第4図は同上蛇篭におけ
る連結構造の要部をさらに拡大して示した斜視
図、第5図は第4図の−線に相当する拡大断
面図である。 1……蛇篭、2……蛇篭本体、3……上面網
体、4……底面網部、5……側面網部、6……仕
切網部、20……連結輪、21……係止ピン。
Fig. 1 is a partially exploded perspective view schematically showing the gabion of the present invention in a facility state, Fig. 2 is an exploded perspective view of the same gabion, and Fig. 3 is the main part of the part indicated by the symbol in Fig. 1. FIG. 4 is a further enlarged perspective view showing the main part of the connection structure in the same gabion as above, and FIG. 5 is an enlarged sectional view corresponding to the line - in FIG. 4. DESCRIPTION OF SYMBOLS 1... Gabion, 2... Gabion main body, 3... Top screen body, 4... Bottom screen section, 5... Side screen section, 6... Partition net section, 20... Connection ring, 21... Locking pin.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] それぞれ金網の周りを枠体で囲んでなる複数の
網部で前記枠体同志を互いに連結させて所定の形
状に組み立てられる蛇篭であつて、互いに連結さ
れる前記一方の枠体の外周にこの枠体の外径寸法
よりも大きい内径寸法を有した連結輪を移動可能
に巻回配置するとともに、前記一方の枠体と一緒
に前記連結輪内に挿入係合される係止ピンを前記
連結輪の前記移動路内に対応して前記他方の枠体
に設けたことを特徴とする蛇篭。
A gabion is assembled into a predetermined shape by connecting the frame bodies to each other with a plurality of mesh parts each having a wire mesh surrounded by a frame body, the frame being attached to the outer periphery of one of the frame bodies connected to each other. A connecting ring having an inner diameter larger than the outer diameter of the body is movably wound and arranged, and a locking pin that is inserted and engaged into the connecting ring together with the one frame body is attached to the connecting ring. A gabion, characterized in that the gabion is provided on the other frame corresponding to the inside of the movement path.
JP15160488U 1988-11-21 1988-11-21 Expired - Lifetime JPH052672Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15160488U JPH052672Y2 (en) 1988-11-21 1988-11-21

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15160488U JPH052672Y2 (en) 1988-11-21 1988-11-21

Publications (2)

Publication Number Publication Date
JPH0273425U JPH0273425U (en) 1990-06-05
JPH052672Y2 true JPH052672Y2 (en) 1993-01-22

Family

ID=31425794

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15160488U Expired - Lifetime JPH052672Y2 (en) 1988-11-21 1988-11-21

Country Status (1)

Country Link
JP (1) JPH052672Y2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101708465B1 (en) * 2016-07-22 2017-02-21 주식회사 석송 Frame fixing device of stone net

Also Published As

Publication number Publication date
JPH0273425U (en) 1990-06-05

Similar Documents

Publication Publication Date Title
US4651479A (en) Protective structural module and method for construction
JPH052672Y2 (en)
JPH052671Y2 (en)
JPH052670Y2 (en)
JPH0542106Y2 (en)
JPH052673Y2 (en)
JPH057300Y2 (en)
JPH07189229A (en) Mat cage method
JP2876803B2 (en) How to build an underground cryogenic tank roof
CA1172871A (en) Circumferential stirrup panel
JP3043989B2 (en) Connection structure of net unit members
JPH073801A (en) Box for simple earth retaining wall
JPH0649764Y2 (en) Wire fence
JPS6338055Y2 (en)
JPH052674Y2 (en)
JP3805871B2 (en) Steel fence
JPH04155007A (en) Knocked-down oil retaining dike
JP3025214B2 (en) Concrete fence
JP3673817B2 (en) Jig for forming connecting member of net unit member
JPS5933243Y2 (en) Frame for covered cultivation
JPH02296978A (en) Grave tower by welding structure of stainless steel
JP2553174Y2 (en) Square frame for vegetation community survey
JPH10159053A (en) Cylindrical stone-filled basket and serial stone-filled baskets
JP2557281Y2 (en) Connection structure of bottom net unit
JPH0140603Y2 (en)