JPH05113010A - Method of installing roof top facility equipment and structure therefor - Google Patents

Method of installing roof top facility equipment and structure therefor

Info

Publication number
JPH05113010A
JPH05113010A JP30277591A JP30277591A JPH05113010A JP H05113010 A JPH05113010 A JP H05113010A JP 30277591 A JP30277591 A JP 30277591A JP 30277591 A JP30277591 A JP 30277591A JP H05113010 A JPH05113010 A JP H05113010A
Authority
JP
Japan
Prior art keywords
equipment
building
frame
work
facility equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP30277591A
Other languages
Japanese (ja)
Other versions
JP2743296B2 (en
Inventor
Yoshikazu Tanaka
良和 田中
Shigeo Nakano
繁雄 中野
Yasuo Sasaki
保雄 佐々木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP30277591A priority Critical patent/JP2743296B2/en
Publication of JPH05113010A publication Critical patent/JPH05113010A/en
Application granted granted Critical
Publication of JP2743296B2 publication Critical patent/JP2743296B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PURPOSE:To shorten the period of construction, to ensure a space for maintenance and inspection of facility equipment and to enhance the living environment by alleviating the affection of noise and vibration upon the lower floor. CONSTITUTION:After building a ceiling slab concrete wall 3 of a building 1, a frame 13 is laid on a reverse beams 22 projected from the roof top. Several kinds of facility equipment 19 are laid and fixed on the frame 13, and works relating to water-tightness for the ceiling slab concrete wall 3 and piping and wiring works are carried out underneath the frame 13. Further, pipe lines 25 and wiring may be suspended from the facility equipment 19 set on the frame 13 which is laid on the reverse beams 11 projected from the roof top of the building 1.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、ビル等の建屋の屋上に
各種の設備機器を据え付ける場合の屋上設備機器の据付
工法と屋上設備機器の据付構造に係り、特に、工期の短
縮を図るとともに、設備機器の保守・点検作業の作業性
を向上させ、さらに、設備機器より発生する振動・騒音
の建屋階下への影響を緩和するように工夫したものに関
する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a rooftop equipment installation method and a rooftop equipment installation structure when various equipment are installed on the roof of a building such as a building, and particularly, to shorten the construction period. , Which improve workability of maintenance / inspection work of facility equipment, and further reduce the influence of vibration and noise generated from facility equipment on the downstairs of the building.

【0002】[0002]

【従来の技術】建屋の屋上には、各種設備機器、例え
ば、キュービクル、熱源機器、空調用室外機、各種タン
ク等が設置される。その構造を図3及び図4に示す。ま
ず、建屋としてのコンクリート製建築物101の天井ス
ラブコンクリート壁103の上には、コンリート105
が設けられている。このコンクリート105の上には防
水層107が設置されていて、さらに、その上には、防
水層押さえコンリート109が設置されている。上記防
水層押さえコンクリート109の上には、設備機器用基
礎111が打設されていて、この設備機器用基礎111
の上に各種の設備機器113が据付・固定されている。
2. Description of the Related Art Various equipments such as cubicles, heat source equipments, outdoor units for air conditioning, and various tanks are installed on the roof of a building. Its structure is shown in FIGS. First, on the ceiling slab concrete wall 103 of the concrete building 101 as a building,
Is provided. A waterproof layer 107 is installed on the concrete 105, and further, a waterproof layer presser concrete 109 is installed on the waterproof layer 107. A foundation 111 for equipment is placed on the waterproof layer pressing concrete 109.
Various equipments 113 are installed and fixed on the above.

【0003】次に、上記設備機器113の据付・固定に
到るまでの工事の工程について説明する。まず、屋上階
の天井スラブコンクリート壁103の打設工事が行われ
る。つまり、コンクリートを打設した後一定の養生期間
を経て天井スラブコンクリート壁103の築造が完了す
る。次に、防水関連工事に入る。すなわち、天井スラブ
コンクリート壁103のの上面に下地処理を施した後、
コンクリート105を打設し、その上に防水層107を
設置する。さらに、その上に防水層押さえコンクリート
109を打設するものである。
Next, a construction process until the installation and fixing of the equipment 113 will be described. First, the construction work for placing the ceiling slab concrete wall 103 on the rooftop floor is performed. In other words, the construction of the ceiling slab concrete wall 103 is completed after a certain curing period after pouring concrete. Next, start waterproofing work. That is, after performing the base treatment on the upper surface of the ceiling slab concrete wall 103,
Concrete 105 is placed, and a waterproof layer 107 is placed on it. Furthermore, the waterproof layer pressing concrete 109 is placed on it.

【0004】防水層押さえコンクリート109が築造さ
れたら、設備機器用基礎111の築造を開始する。すな
わち、型枠を設置するとともに型枠の内側に配筋を施
し、アンカーボルトを固定した後、基礎コンクリートを
打設する。そして、表面に仕上げ作業を施すものであ
る。設備機器用基礎111の築造が完了したら、その上
に設備機器113を据付・固定する。すなわち、架台1
15を設置した後、設備機器113を固定するものであ
る。後は、配管117の敷設工事、必要な電気工事を施
して完了するものである。
When the waterproof layer pressing concrete 109 is built, the building of the equipment equipment foundation 111 is started. That is, a form is installed, reinforcement is applied to the inside of the form, anchor bolts are fixed, and then foundation concrete is placed. Then, the surface is finished. When the construction of the equipment device base 111 is completed, the equipment device 113 is installed and fixed thereon. That is, the pedestal 1
After installing 15, the equipment 113 is fixed. After that, the laying work of the pipe 117 and necessary electrical work are performed to complete the process.

【0005】[0005]

【発明が解決しようとする課題】上記従来の構成による
と次のような問題があった。すなわち、天井スラブコン
クリート103の築造完了から設備機器113の据付・
固定が終了するまでに、各種の工事が集中して行われる
ことになり、しかも、それらの工事は平行して行うこと
ができないので、工期の延長を来してしまうという問題
があった。又、屋上部分には、各種の設備機器113や
配管117が所狭しと設置される状態となるので、設置
した後に設備機器113の保守・点検を行う場合にも、
必要な作業空間を確保することが難しく、保守・点検作
業を困難なものとしていた。さらに、従来の構造による
と、設備機器113を運転した場合に、騒音や振動が直
接階下に伝達されることになり、階下の居住環境を悪化
させてしまうという問題もあった。
The above-mentioned conventional structure has the following problems. That is, from the completion of the construction of the ceiling slab concrete 103 to the installation of the equipment 113.
By the time the fixing is completed, various works will be concentrated, and since these works cannot be carried out in parallel, there was a problem that the construction period would be extended. In addition, since various equipments 113 and pipes 117 are installed in a narrow space on the rooftop portion, even when the equipments 113 are maintained and inspected after installation,
It was difficult to secure the necessary work space, making maintenance and inspection work difficult. Further, according to the conventional structure, when operating the equipment 113, noise and vibration are directly transmitted to the downstairs, which causes a problem that the living environment of the downstairs is deteriorated.

【0006】本発明はこのような点に基づいてなされた
ものでその目的とするところは、工期の短縮を図ること
ができるとともに、設備機器の保守・点検作業のための
空間を確保し、階下への振動及び騒音の影響を緩和して
居住環境の向上を図ることが可能な屋上設備機器の据付
工法と屋上設備機器の据付構造を提供することにある。
The present invention has been made on the basis of the above points, and the purpose thereof is to shorten the construction period, to secure a space for maintenance and inspection work of facility equipment, To provide a method for installing rooftop equipment and a structure for installing rooftop equipment that can reduce the influence of vibration and noise on the roof and improve the living environment.

【0007】[0007]

【課題を解決するための手段】上記目的を達成するべく
本願発明による屋上設備機器の据付工法は、建屋の天井
スラブコンクリート壁を築造した後、屋上に突出配置さ
れた逆梁上に架台を掛け渡すように設置し、上記架台上
において各種の設備機器の据付・固定を行うとともに、
上記架台下において上記天井スラブコンクリート壁への
防水関連工事及び配管・配線工事を行うようにしたこと
を特徴とするものである。
In order to achieve the above object, a method of installing rooftop equipment according to the present invention is to construct a ceiling slab concrete wall of a building, and then mount a pedestal on a reverse beam projectingly arranged on the roof. It is installed so that it can be handed over, and various equipment and devices can be installed and fixed on the above stand.
Under the frame, waterproofing work and piping / wiring work are performed on the ceiling slab concrete wall.

【0008】又、本願発明による屋上設備機器の据付構
造は、建屋の屋上に逆梁を突出配置させ、上記逆梁上に
架台を掛け渡すように設置し、上記架台上に各種の設備
機器を設置するとともに、配管及び配線を上記架台より
吊り下げるように設置したことを特徴とするものであ
る。
Further, in the installation structure for rooftop equipment according to the present invention, a reverse beam is projectingly arranged on the roof of a building, and a pedestal is installed over the reverse beam, and various equipment are installed on the pedestal. In addition to being installed, the piping and the wiring are installed so as to be suspended from the gantry.

【0009】[0009]

【作用】まず、屋上設備機器の据付工法の場合である
が、逆梁を屋上に突出配置して、この逆梁上に架台を掛
け渡すように設置したので、架台の上と下の空間が区画
されることになり、架台の上において各種の設備機器の
据付・固定を行うとともに、架台の下において天井スラ
ブコンクリート壁への防水関連工事及び配管・配線工事
を行うことが可能になった。よって、工期が大幅に短縮
されることになる。
[Function] First, in the case of the installation method for rooftop equipment, the reverse beam is arranged so as to project on the roof, and the installation is made so as to bridge the reverse beam, so the space above and below the frame is divided. As a result, it became possible to install and fix various equipment on the pedestal, and to perform waterproofing work and piping / wiring work on the ceiling slab concrete wall under the pedestal. Therefore, the construction period will be greatly shortened.

【0010】又、屋上設備機器の据付構造の場合である
が、架台の下に空間が確保されるとともに、配管・配線
類を架台より吊り下げて敷設しているので、設備機器の
回りに広い空間を確保することができる。よって、保守
・点検作業の作業性も大幅に向上することになる。又、
設備機器と建屋の階下との間に、架台及び空間が介在す
ることになるので、設備機器より発生する振動・騒音が
階下に与える影響を低減させることができる。
In the case of a rooftop equipment installation structure, a space is secured under the gantry, and pipes and wiring are hung from the gantry to be laid so that it is wide around the equipment. A space can be secured. Therefore, the workability of maintenance / inspection work will be greatly improved. or,
Since the gantry and the space are provided between the equipment and the downstairs of the building, it is possible to reduce the influence of vibration and noise generated from the equipment on the downstairs.

【0011】[0011]

【実施例】以下、図1及び図2を参照して本発明の一実
施例を説明する。まず、屋上設備機器の据付構造から説
明する。まず、建屋としてのコンクリート製建築物1の
天井スラブコンクリート壁3があり、この天井スラブコ
ンクリート壁3の上には、コンクリート5が打設されて
いる。このコンクリート5の上面には、防水シート7が
設置されていて、この防水シート7は防水押さえブロッ
ク9によって押さえられている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT An embodiment of the present invention will be described below with reference to FIGS. First, the installation structure of the rooftop equipment will be described. First, there is a ceiling slab concrete wall 3 of a concrete building 1 as a building, and concrete 5 is placed on the ceiling slab concrete wall 3. A waterproof sheet 7 is installed on the upper surface of the concrete 5, and the waterproof sheet 7 is pressed by a waterproof pressing block 9.

【0012】又、コンクリート製建築物1の屋上部分に
は、逆梁11が突出配置されている。その代わりに、天
井内部には梁がない構造になっている。そして、逆梁1
1と別の逆梁11との間には、架台としての設備機器設
置用鉄骨架台13が掛け渡されている。この設備機器設
置用鉄骨架台13の上には、防振架台17を介して設備
機器19が据付・固定されている。又、設備機器19が
据付・固定されていない部分には、メッシュ上をなす鋼
製エキスパンドメタル15を設置する。この鋼製エキス
パンドメタル15上は歩行可能な空間となっている。
又、上記防振架台17には、防振用バネ部材21が介挿
されている。
Further, a reverse beam 11 is projectingly arranged on the roof portion of the concrete building 1. Instead, there is no beam inside the ceiling. And reverse beam 1
A steel frame 13 for installing equipment as a frame is laid between 1 and another reverse beam 11. On the steel frame 13 for installing the equipment, the equipment 19 is installed and fixed via a vibration isolation stand 17. Further, a steel expanded metal 15 forming a mesh is installed in a portion where the equipment 19 is not installed and fixed. This steel expanded metal 15 is a walkable space.
A vibration-proof spring member 21 is inserted in the vibration-proof frame 17.

【0013】上記設備機器設置用鉄骨架台13の下方に
は、空間23が形成されている。又、各種配管類25及
び図示市内配線類は、上記設備機器設置用鉄骨架台13
よりブラケット29を介して吊り下げられるようにして
敷設される。又、設備機器19の保守・点検を行う場合
には、図に示すように、空間23内に作業員27が入っ
て行うことができるようになっている。
A space 23 is formed below the steel frame 13 for installing the equipment. Further, the various pipes 25 and the illustrated city wirings are the steel frame mounts 13 for installing the above-mentioned equipment and devices.
It is laid so as to be suspended via the bracket 29. Further, when the maintenance / inspection of the equipment 19 is performed, the worker 27 can enter the space 23 as shown in the figure.

【0014】次に、屋上設備機器の据付工法について説
明する。まず、天井スラブコンクリート壁1の築造を行
う。この時点で逆梁11も築造される。次に、逆梁11
上に、設備機器設置用鉄骨架台13を設置する。設備機
器設置用鉄骨架台13の設置が完了したら、設備機器1
9の据付・固定を行う。その際、防振架台17を介在さ
せる。
Next, a method of installing the rooftop equipment will be described. First, the ceiling slab concrete wall 1 is built. At this point, the reverse beam 11 is also built. Next, the reverse beam 11
A steel frame stand 13 for installing equipment is installed on the top. After the installation of the steel frame 13 for installing the equipment, the equipment 1
9. Install and fix 9. At that time, the vibration isolation frame 17 is interposed.

【0015】一方、上記作業と平行して、設備機器設置
用鉄骨架台13の下方では、防水関連工事と配管・配線
作業が行われている。すなわち、設備機器19の据付・
固定作業は、全て設備機器設置用鉄骨架台13の上方で
行われており、設備機器設置用鉄骨架台13の下方で行
われる防水関連工事と配管・配線作業とは相互に干渉し
ないようになっている。具体的には、天井スラブコンク
リート壁3の上にコンクリート5が打設され、その上面
に防水シート7が設置される。そして、その上に防水押
さえブロック9が設置される。又、配管25及び図示し
ない配線の敷設作業は、設備機器設置用鉄骨架台13よ
り、ブラケット29等を介して行われる。
On the other hand, in parallel with the above work, under the steel frame 13 for installing equipment, waterproofing work and piping / wiring work are performed. That is, installation of the equipment 19
All fixing work is performed above the steel frame 13 for installation of facility equipment, and the waterproofing work and piping / wiring work performed below the steel frame 13 for installation of facility equipment do not interfere with each other. There is. Concretely, concrete 5 is cast on the ceiling slab concrete wall 3, and the waterproof sheet 7 is installed on the upper surface thereof. And the waterproof pressing block 9 is installed on it. Further, the laying work of the pipe 25 and the wiring (not shown) is performed from the steel frame base 13 for installing the equipment through the bracket 29 and the like.

【0016】以上本実施例によると次のような効果を奏
することができる。まず、工期の短縮を図ることができ
る。これは、逆梁11を設けるとともに、この逆梁11
上に設備機器設置用鉄骨架台13を設置して、設備機器
設置用鉄骨架台13の上の空間と下の空間とを区画し
て、上の空間で行われる作業と下の空間で行われる作業
とが相互に干渉しないようにしたからである。つまり、
設備機器19の据付・固定作業と、防水関連工事及び配
管・配線工事を同時に行うことができるようになったか
らである。
According to this embodiment, the following effects can be obtained. First, the work period can be shortened. This is provided with the reverse beam 11 and
A steel frame 13 for installation of facility equipment is installed on the upper side, and a space above and below the steel frame 13 for installation of facility equipment is partitioned, and work performed in the upper space and work performed in the lower space. This is because and did not interfere with each other. That is,
This is because the installation / fixing work of the equipment 19 and the waterproofing work and the piping / wiring work can be performed at the same time.

【0017】又、設備機器19を設置した後の保守・点
検作業の作業性が大幅に向上したものである。つまり、
設備機器19の回りに広い作業空間が確保されたからで
ある。具体的には、配管・配線類が、設備機器設置用鉄
骨架台13の下面側に敷設されたことにより、設備機器
19の回りの空間が広くなったものであり、又、設備機
器設置用鉄骨架台13の下面側にも広い空間23が確保
されたからである。そして、このように広い作業空間が
確保されたので、設備機器19に対して六面方向から
(全周から)点検作業を施すことができるようになり、
又、架台や大型機器の揚重のためにタワークレーン等の
使用も可能になるものである。
Further, the workability of the maintenance / inspection work after the installation of the equipment 19 is greatly improved. That is,
This is because a wide working space is secured around the equipment 19. Specifically, since the pipes / wirings are laid on the lower surface side of the equipment-installation steel-frame base 13, the space around the equipment 19 is widened, and the equipment-installation steel frame is also provided. This is because a wide space 23 is secured on the lower surface side of the gantry 13. Since such a wide working space is secured, it becomes possible to perform inspection work on the equipment 19 from six directions (from the entire circumference).
In addition, a tower crane or the like can be used to lift a platform or large equipment.

【0018】又、設備機器19の運転に伴う振動及び騒
音の問題であるが、設備機器設置用鉄骨架台13を設置
するとともに、その下に空間23を形成したので、階下
への影響は大幅に緩和されることになり、階下の居住環
境を良好なものとすることができる。又、逆梁11を屋
上に突出させる代わりに、天井内の梁がなくなったの
で、天井内における空調ダクト工事等がやり易くなっ
た。又、天井高さを変えることなく階高を下げるような
ことも可能になる。さらに、天井が無いような室(例え
ば、スタジオ)にあっては、障害物が無くなるという利
点もある。
Further, regarding the problem of vibration and noise associated with the operation of the equipment 19, the steel frame base 13 for installing the equipment is installed and the space 23 is formed under it, so that the influence on the downstairs is greatly affected. It will be mitigated and the living environment downstairs can be improved. Further, instead of projecting the reverse beam 11 on the roof, the beam in the ceiling is eliminated, which facilitates the construction of an air conditioning duct in the ceiling. It is also possible to lower the floor height without changing the ceiling height. Furthermore, in a room without a ceiling (for example, a studio), there is an advantage that obstacles are eliminated.

【0019】尚、本発明は前記一実施例に限定されるも
のではない。逆梁11の位置、設備機器設置用鉄骨架台
13の位置、高さ、等については適宜設定すればよい。
又、設備機器設置用鉄骨架台13上に設備機器19を直
接設置してもよい。
The present invention is not limited to the above embodiment. The position of the reverse beam 11, the position and height of the steel frame 13 for installing equipment may be set appropriately.
Further, the equipment 19 may be directly installed on the equipment installation steel frame 13.

【0020】[0020]

【発明の効果】以上詳述したように本発明による屋上設
備機器据付工法と屋上設備機器据付構造によると、架台
の上と下でそれぞれの作業を同時に行うことができるよ
うになったので、工期が大幅に短縮されることになる。
又、設備機器の回りに広い空間を確保することができる
ので、保守・点検作業の作業性が向上することになる。
さらに、設備機器と建屋の階下との間に架台と空間が介
在することになるので、設備機器より発生する振動・騒
音の階下への影響を緩和させることができる。
As described in detail above, according to the rooftop equipment installation method and the rooftop equipment installation structure of the present invention, it is possible to perform both the work above and below the pedestal at the same time. Will be shortened to.
Further, since a wide space can be secured around the equipment, workability of maintenance / inspection work is improved.
Further, since the gantry and the space are interposed between the equipment and the downstairs of the building, it is possible to reduce the influence of vibration and noise generated by the equipment on the downstairs.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例を示す図で屋上設備機器据付
構造の断面図である。
FIG. 1 is a cross-sectional view of a rooftop equipment installation structure, showing the embodiment of the present invention.

【図2】本発明の一実施例を示す図で屋上設備機器据付
構造の平面図である。
FIG. 2 is a plan view of the rooftop equipment installation structure, showing the embodiment of the present invention.

【図3】従来例を示す図で屋上設備機器据付構造の断面
図である。
FIG. 3 is a cross-sectional view of a rooftop equipment installation structure, showing a conventional example.

【図4】従来例を示す図で屋上設備機器据付構造の平面
図である。
FIG. 4 is a plan view of a rooftop equipment installation structure showing a conventional example.

【符号の説明】[Explanation of symbols]

1 コンクリート製建築物(建屋) 3 天井スラブコンクリート壁 5 コンクリート 7 防水シート 9 防水押さえブロック 11 逆梁 13 設備機器設置用鉄骨架台(架台) 25 配管 1 Concrete building (building) 3 Ceiling slab concrete wall 5 Concrete 7 Waterproof sheet 9 Waterproof holding block 11 Reverse beam 13 Steel frame (frame) for installation of equipment 25 Piping

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 建屋の天井スラブコンクリート壁を築造
した後、屋上に突出配置された逆梁上に架台を掛け渡す
ように設置し、上記架台上において各種の設備機器の据
付・固定を行うとともに、上記架台下において上記天井
スラブコンクリート壁への防水関連工事及び配管・配線
工事を行うようにしたことを特徴とする屋上設備機器の
据付工法。
1. After constructing a ceiling slab concrete wall of a building, the rack is installed so as to hang on a reverse beam projectingly arranged on the roof, and various equipments are installed and fixed on the rack. A method for installing rooftop equipment, wherein waterproofing work and piping / wiring work are performed on the ceiling slab concrete wall under the frame.
【請求項2】 建屋の屋上に逆梁を突出配置させ、上記
逆梁上に架台を掛け渡すように設置し、上記架台上に各
種の設備機器を設置するとともに、配管及び配線を上記
架台より吊り下げるように設置したことを特徴とする屋
上設備機器の据付構造。
2. A reverse beam is projectingly arranged on the roof of a building, and a pedestal is installed so as to span the reverse beam, and various equipment and devices are installed on the pedestal, and piping and wiring are provided from the pedestal. An installation structure for rooftop equipment that is installed so that it is suspended.
JP30277591A 1991-10-23 1991-10-23 Installation method of roof equipment and installation structure of roof equipment Expired - Fee Related JP2743296B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP30277591A JP2743296B2 (en) 1991-10-23 1991-10-23 Installation method of roof equipment and installation structure of roof equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP30277591A JP2743296B2 (en) 1991-10-23 1991-10-23 Installation method of roof equipment and installation structure of roof equipment

Publications (2)

Publication Number Publication Date
JPH05113010A true JPH05113010A (en) 1993-05-07
JP2743296B2 JP2743296B2 (en) 1998-04-22

Family

ID=17912981

Family Applications (1)

Application Number Title Priority Date Filing Date
JP30277591A Expired - Fee Related JP2743296B2 (en) 1991-10-23 1991-10-23 Installation method of roof equipment and installation structure of roof equipment

Country Status (1)

Country Link
JP (1) JP2743296B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006125806A (en) * 2004-11-01 2006-05-18 Sanki Eng Co Ltd Air-conditioning equipment, method for installing outdoor air conditioner, and method for producing air-conditioning equipment
JP2011012449A (en) * 2009-07-02 2011-01-20 Osaka Gas Co Ltd Structure for installing photovoltaic power generating module
JP2015200087A (en) * 2014-04-07 2015-11-12 株式会社竹中工務店 fall prevention wall

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006125806A (en) * 2004-11-01 2006-05-18 Sanki Eng Co Ltd Air-conditioning equipment, method for installing outdoor air conditioner, and method for producing air-conditioning equipment
JP4624073B2 (en) * 2004-11-01 2011-02-02 三機工業株式会社 Air conditioning equipment, installation method of external air conditioner, and manufacturing method of air conditioning equipment
JP2011012449A (en) * 2009-07-02 2011-01-20 Osaka Gas Co Ltd Structure for installing photovoltaic power generating module
JP2015200087A (en) * 2014-04-07 2015-11-12 株式会社竹中工務店 fall prevention wall

Also Published As

Publication number Publication date
JP2743296B2 (en) 1998-04-22

Similar Documents

Publication Publication Date Title
JP2743296B2 (en) Installation method of roof equipment and installation structure of roof equipment
JP3827431B2 (en) Construction method of clean room building
JPH07292986A (en) Device and method for constructing long-span roof
CN103276840B (en) Nuclear power plant composite floor slab module and construction method thereof
JP7376371B2 (en) Duct construction method
JP2002256666A (en) Attaching construction for safety rope support-cum- antenna guy fittings
JPS62228975A (en) Method of construction of nuclear plant
JPH0270848A (en) Floor slab
JP2733507B2 (en) Industrialization of racks for piping and wiring
KR200201267Y1 (en) Floor slab system
RU2198988C2 (en) Process of erection of monolithic walls of buildings and structures in permanent forms
JP2001049779A (en) Closing method of construction for floor opening for prefabricated equipment
JPH0860784A (en) Execution method for ceiling and attic facility
JPH0688442A (en) Machine room in building
JP3917782B2 (en) Production floor
JPS61286462A (en) Integral suspension construction method of iron beam and pipings of atomic power plant building
JP2005097929A (en) Building floor structure of nuclear power plant
JPH07100959B2 (en) Dry floor structure
JPH05321322A (en) Floor structure for balcony
JP2020097861A (en) Piping installation structure and piping pit construction method
JP2001049885A (en) Semiconductor factory
JPH09126540A (en) Mounting method of preceding lifting machine
JPH10260284A (en) Plant building, construction method for the building and modular structure used for the construction
JPH06240873A (en) Execution of work for ceiling
JP2000346242A (en) Construction system wiring and piping and work execution method therefor

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19971209

LAPS Cancellation because of no payment of annual fees