JPH0462748U - - Google Patents
Info
- Publication number
- JPH0462748U JPH0462748U JP10354190U JP10354190U JPH0462748U JP H0462748 U JPH0462748 U JP H0462748U JP 10354190 U JP10354190 U JP 10354190U JP 10354190 U JP10354190 U JP 10354190U JP H0462748 U JPH0462748 U JP H0462748U
- Authority
- JP
- Japan
- Prior art keywords
- reinforcing bar
- jig
- hoisting
- hanging
- prevention device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000002265 prevention Effects 0.000 claims description 4
- 230000003014 reinforcing effect Effects 0.000 claims 4
- 230000002787 reinforcement Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Load-Engaging Elements For Cranes (AREA)
Description
第1図は本考案に係る実施例の正面図、第2図
は第1図におけるA−A断面拡大図、第3図は実
施例の吊り治具を3組用いて運搬する際の各部材
の関連を示す図、第4図は第3図のA矢視略図で
ある。
2……吊り治具用バー、3……鉄筋ユニツト、
3a……主筋、5……鉄筋ずれ止め装置、7……
主筋ずれ止めピン、8……吊り治具フレーム、9
……主筋支持ピース。
Fig. 1 is a front view of an embodiment of the present invention, Fig. 2 is an enlarged cross-sectional view taken along line A-A in Fig. 1, and Fig. 3 is a diagram showing various parts when transporting using three sets of hanging jigs of the embodiment. FIG. 4 is a schematic view taken along arrow A in FIG. 3. 2... Hanging jig bar, 3... Rebar unit,
3a...Main reinforcement, 5...Rebar slippage prevention device, 7...
Main reinforcement pin, 8... Hanging jig frame, 9
...Main reinforcement support piece.
Claims (1)
吊り治具と、該吊り治具をほぼ水平に吊持する吊
り治具用バーとより成り、前記吊り治具フレーム
の下面には鉄筋ユニツトの主筋を吊り上げるため
の複数の主筋支持ピースを同じ向きに固着すると
共に吊り治具フレームの上面には複数の主筋ずれ
止めピンを有する鉄筋ずれ止め装置を回動可能に
設けたことを特徴とする鉄筋ユニツト吊り治具。 It consists of a hanging jig frame, a lifting jig equipped with a reinforcing bar slip prevention device, and a hanging jig bar that suspends the hoisting jig almost horizontally. A reinforcing bar unit characterized in that a plurality of main reinforcing bar support pieces for hoisting are fixed in the same direction, and a reinforcing bar slippage prevention device having a plurality of main bar slippage prevention pins is rotatably provided on the upper surface of the lifting jig frame. Hanging jig.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10354190U JPH0462748U (en) | 1990-10-01 | 1990-10-01 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10354190U JPH0462748U (en) | 1990-10-01 | 1990-10-01 |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH0462748U true JPH0462748U (en) | 1992-05-28 |
Family
ID=31848460
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP10354190U Pending JPH0462748U (en) | 1990-10-01 | 1990-10-01 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0462748U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2021008752A (en) * | 2019-07-01 | 2021-01-28 | 株式会社クギン | Foundation construction method and beam unit |
-
1990
- 1990-10-01 JP JP10354190U patent/JPH0462748U/ja active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2021008752A (en) * | 2019-07-01 | 2021-01-28 | 株式会社クギン | Foundation construction method and beam unit |