JPH0449322Y2 - - Google Patents

Info

Publication number
JPH0449322Y2
JPH0449322Y2 JP11679885U JP11679885U JPH0449322Y2 JP H0449322 Y2 JPH0449322 Y2 JP H0449322Y2 JP 11679885 U JP11679885 U JP 11679885U JP 11679885 U JP11679885 U JP 11679885U JP H0449322 Y2 JPH0449322 Y2 JP H0449322Y2
Authority
JP
Japan
Prior art keywords
formwork
concrete structure
attachment
pipe
cantilevered
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP11679885U
Other languages
Japanese (ja)
Other versions
JPS6223938U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP11679885U priority Critical patent/JPH0449322Y2/ja
Publication of JPS6223938U publication Critical patent/JPS6223938U/ja
Application granted granted Critical
Publication of JPH0449322Y2 publication Critical patent/JPH0449322Y2/ja
Expired legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

【考案の詳細な説明】 〔産業上の利用分野〕 本考案は、集合住宅やホテル、病院のバルコニ
ー、ベランダで代表される片持ちコンクリートス
ラブ等の片持ちコンクリート構造体を作製する場
合において、打設コンクリート構造体が所定の強
度を発現するまでは、型枠に取付けられて、コン
クリート構造体に対する返し型枠の工事やコンク
リートの打設工事に供され、コンクリート構造体
が所定の強度を発現した後は、そのコンクリート
構造体に支持されて、型枠の解体、撤去や外装工
事等に供される足場における足場枠に関する。詳
しくは、片持ちコンクリート構造体作製用の型枠
および作製された片持ちコンクリート構造体に選
択的に取付け可能な取付け部の2つを、片持ちコ
ンクリート構造体の突出方向に適宜間隔を隔てて
設けてある片持ちコンクリート構造体用足場枠に
関する。
[Detailed description of the invention] [Industrial application field] This invention is suitable for use when producing cantilevered concrete structures such as cantilevered concrete slabs, which are typified by the balconies and balconies of housing complexes, hotels, and hospitals. Until the concrete structure develops the specified strength, it is attached to formwork and used for construction of return formwork and concrete pouring work for the concrete structure, until the concrete structure develops the specified strength. The rest relates to a scaffold frame in a scaffold that is supported by the concrete structure and used for dismantling and removing formwork, exterior work, etc. Specifically, the formwork for producing the cantilevered concrete structure and the mounting part that can be selectively attached to the produced cantilevered concrete structure are installed at appropriate intervals in the protruding direction of the cantilevered concrete structure. The present invention relates to a scaffolding frame for a cantilevered concrete structure.

〔従来の技術〕[Conventional technology]

従来のこの種の型持ちコンクリート構造体用足
場枠においては、前記の両取付け部が、型枠の解
体・撤去前にはその型枠の支保工に固定連結し、
型枠の解体・撤去後は、アンカーボルトを介して
コンクリート構造体に固定連結するものであつた
(例えば、実公昭58−34189号公報)。
In a conventional scaffolding frame for a molded concrete structure of this type, both of the above-mentioned attachment parts are fixedly connected to the shoring of the formwork before the formwork is dismantled or removed;
After dismantling and removing the formwork, it was fixedly connected to the concrete structure via anchor bolts (for example, Publication of Utility Model Publication No. 58-34189).

しかしながら、上記従来の足場枠によるとき
は、打設コンクリート構造体が所定の強度を発現
して、型枠が不必要となり、そのコンクリート構
造体下側に対する作業を行い易くし、また、型枠
の転用化を図るために、型枠を解体・撤去する
際、前記両取付け部の支保工への固定連結を解除
しなければならず、そのため、型枠、特に、支保
工の解体・撤去を手間取らせるといつた欠点があ
つた。
However, when using the above-mentioned conventional scaffolding frame, the poured concrete structure develops a predetermined strength, making the formwork unnecessary, making it easier to work on the underside of the concrete structure, and making it easier to use the formwork. When dismantling and removing the formwork in order to repurpose it, it is necessary to release the fixed connection of both attachment parts to the shoring, which makes dismantling and removing the formwork, especially the shoring, a hassle. It had some flaws when I let it go.

〔考案が解決しようとする問題点〕[Problem that the invention attempts to solve]

本考案は、かかる実状にかんがみて勘案された
ものであつて、その目的は、型枠の解体・撤去の
作業性を向上する点にある。
The present invention was developed in view of the above circumstances, and its purpose is to improve the workability of dismantling and removing formwork.

〔問題点を解決するための手段〕[Means for solving problems]

上記目的達成のために講じた本考案による片持
ちコンクリート構造体用足場枠の特徴構成は、前
記取付け部のうち片持ちコンクリート構造体先端
側に位置する取付け部を前記型枠に取付けるため
の取付具として、その型枠のせき板を厚さ方向で
貫通し、かつ、一端側を作製されたコンクリート
構造体内に埋設固定されるボルトを設け、前記型
枠を載置する下方の型枠載置部に支柱を介して支
持される支持部を、前記突出方向に直交する幅方
向視において前記先端側の取付け部の直下又はほ
ぼ直下に位置してその先端側の取付け部を支持す
る状態に前記先端側の取付け部に連結してある点
にある。そして、それによる作用・効果は次の通
りである。
The characteristic configuration of the scaffolding frame for cantilevered concrete structures according to the present invention, which was taken to achieve the above object, is that the mounting portion located on the tip side of the cantilevered concrete structure among the mounting portions is attached to the formwork. As a fixture, a bolt is provided that penetrates the weir plate of the formwork in the thickness direction and is buried and fixed at one end in the prepared concrete structure, and the lower formwork on which the formwork is placed is installed. The support part supported by the support part via a strut is positioned directly below or almost directly below the distal end side attachment part when viewed in the width direction orthogonal to the protrusion direction, and supports the distal side attachment part. It is located at a point connected to the attachment part on the tip side. The effects and effects thereof are as follows.

〔作用〕[Effect]

型枠の解体・撤去に際しては、支保工は、コン
クリート構造体下側の作業を行い易くする上で必
ず解体・撤去する要があるものの、せき板の一部
が残置していても、その下側作業の邪魔にならな
い点に着目して、先端側の取付け部を、コンクリ
ート構造体に埋込まれてアンカーボルトとして作
用するボルトによつて支保工でなくせき板に取付
けてあるから、その先端側の取付け部が取付けら
れたせき板部分を残す状態で型枠を解体・撤去す
ることにより、その型枠の解体・撤去に際して先
端側の取付け部を型枠から取外す必要がない。し
かも、コンクリート構造体が所定の強度を発現し
てボルトがそのコンクリート構造体に強固に取付
けられた状態では、先端側の取付け部の取付け強
度を十分に確保して足場の載置荷重を確実に受止
めることができるものの、コンクリート構造体が
所定の強度を発現しておらず、せき板への取付け
のみによつて先端側の取付け部が支持されている
状態では、せき板が支保工に比較して強度の低い
ものであるため、十分な支持強度を得ることがむ
ずかしいのであるが、本考案によるときは、支柱
を介して下方の型枠載置部に支持される支持部
を、前記先端側の取付け部の直下又はほぼ直下に
位置してその先端側の取付け部を支持する状態に
その先端側の取付け部に連結してあるから、この
支持部を支柱を介して下方の型枠載置部に支持さ
せることにより、先端側の取付け部をボルトを介
してコンクリート構造体に支持させるまでの支持
強度を補償することができる。換言すると、支持
部を設けたことによつて、先端側の取付け部をせ
き板のみに取付けるものにできるようになつた。
When dismantling or removing the formwork, it is necessary to dismantle and remove the shoring to make it easier to work underneath the concrete structure, but even if some of the shedding boards remain, the Focusing on the point that it does not interfere with side work, the attachment part on the tip side is attached to the weir plate instead of the shoring with bolts that are embedded in the concrete structure and act as anchor bolts. By dismantling and removing the formwork while leaving the weir plate portion to which the side attachment portions are attached, there is no need to remove the tip side attachment portions from the formwork when the formwork is dismantled and removed. Moreover, when the concrete structure has developed a specified strength and the bolts are firmly attached to the concrete structure, the mounting strength of the attachment part on the tip side is ensured to ensure that the load placed on the scaffold can be reliably supported. However, if the concrete structure does not have the specified strength and the attachment part on the tip side is supported only by attachment to the sheathing, the shedding will be However, according to the present invention, the support part supported by the lower formwork mounting part via the column is Since it is located directly under or almost directly below the side attachment part and is connected to the tip side attachment part in a state that supports the tip side attachment part, this support part can be attached to the lower formwork via the support. By supporting the mounting part, it is possible to compensate for the support strength until the distal end side mounting part is supported by the concrete structure via the bolt. In other words, by providing the support part, the attachment part on the tip side can be attached only to the weir plate.

〔考案の効果〕[Effect of idea]

したがつて、本考案は、コンクリート構造体が
所定の強度を発現するまでおよび発現したのちの
いずれにおいても、十分な取付け強度を確保し
て、足場の使用を可能にしながらも、コンクリー
ト構造体が所定の強度を発現するまでに型枠の支
保工に取付ける取付け部を基端側の取付け部のみ
として、コンクリート構造体が所定の強度を発現
したのちの型枠の解体・撤去の作業性を向上し
て、工期の短縮化を図ることができる片持ちコン
クリート構造体用足場枠を提供し得るに至つた。
Therefore, the present invention enables the use of scaffolding by ensuring sufficient installation strength both until and after the concrete structure develops a predetermined strength. By reducing the number of attachment points that are attached to the support of the formwork until the specified strength is achieved, only the base-end attachment section is used, which improves the workability of dismantling and removing the formwork after the concrete structure has achieved the specified strength. As a result, we have been able to provide a scaffolding frame for cantilevered concrete structures that can shorten the construction period.

〔実施例〕〔Example〕

以下、本考案の実施例を図面い基づいて説明す
る。
Embodiments of the present invention will be described below with reference to the drawings.

Aは、集合住宅における各階のバルコニーB
(片持ちコンクリート構造体の一例)を作製する
ための型枠であり、Cは、この型枠Aの外側に配
設した足場である。
A is the balcony B on each floor in an apartment complex
(An example of a cantilevered concrete structure) This is a formwork for producing a cantilevered concrete structure, and C is a scaffold placed outside this formwork A.

前記型枠Aは、せき板1と、これを地面または
作製された下階のバルコニーBに支持させる支保
工2とから構成されている。前記支保工2は、バ
ルコニーBの突出方向に沿つた姿勢でバルコニー
幅方向に適宜間隔を隔てて位置して前記のせき板
1を載置支持する複数の根太2aと、バルコニー
幅方向に沿つた姿勢でバルコニー突出方向に適宜
間隔を隔てて位置して前記根太2aを載置支持す
る2本の大引2bと、これら大引2bを支持する
長さ調節自在な複数のパイプサポート2cとから
構成されている。なお、せき板1の基端側は、梁
側型枠A′に釘打ちされるものである。
The formwork A is composed of a weir plate 1 and a shoring 2 that supports it on the ground or on a lower floor balcony B that has been prepared. The shoring 2 includes a plurality of joists 2a positioned along the protruding direction of the balcony B at appropriate intervals in the width direction of the balcony, and on which the shedding boards 1 are placed and supported; It is composed of two large pullers 2b that are positioned at appropriate intervals in the balcony projecting direction and support the joists 2a, and a plurality of pipe supports 2c that support these large pullers 2b and whose lengths are freely adjustable. has been done. Note that the base end side of the weir plate 1 is nailed to the beam side formwork A'.

前記足場Cは、バルコニー幅方向の適宜間隔を
隔てて配設した複数のパイプ製足場枠3と、これ
ら足場枠3間に亘つて掛け渡した鋼製の足場板4
とから構成されている。
The scaffolding C includes a plurality of pipe scaffolding frames 3 arranged at appropriate intervals in the width direction of the balcony, and steel scaffolding boards 4 spanning between these scaffolding frames 3.
It is composed of.

前記足場枠3は、バルコニー突出方向に適宜間
隔を隔てた2箇所にそれぞれ取付け部3A,3B
を備えるとともに、先端側の取付け部3Aの外側
箇所に足場板4の載置部3Cを備え、かつ、先端
側の取付け部3Aの下方箇所に、型枠Aを載置支
持する下方の載置部、つまり、地面または下階の
バルコニーBにパイプサポート5を介して支持さ
れるための支持部3Dを備えている。
The scaffolding frame 3 has attachment portions 3A and 3B at two locations appropriately spaced in the balcony protrusion direction.
and a mounting section 3C for the scaffold board 4 at a location outside the mounting section 3A on the distal end side, and a lower mounting section for mounting and supporting the formwork A at a location below the mounting section 3A on the distal end side. In other words, a support part 3D is provided to be supported on the ground or a balcony B on a lower floor via a pipe support 5.

前記先端側の取付け部3Aは、前記せき板1を
厚さ方向で貫通し、かつ、バルコニーB内に埋設
固定される2本のボルト6によりせき板1の先端
近くに取付け可能なものであつて、バルコニー突
出方向のほぼ中央部に位置する上下向き姿勢の第
1パイプP1の上端に固着したアングル7をもつ
て構成されている。
The attachment portion 3A on the tip side passes through the sheath plate 1 in the thickness direction and can be attached near the tip of the sheath plate 1 with two bolts 6 buried and fixed in the balcony B. It is constructed with an angle 7 fixed to the upper end of the first pipe P1 , which is positioned approximately at the center in the balcony projecting direction and is oriented upwardly.

前記基端側の取付け部3Bは、前記大引2bに
クランプ金具8を介して固定連結可能な第1取付
け部3aと、前記せき板1に下方から当接可能な
第2取付け部分3bとから構成されており、前記
第1取付け部分3aは、前記第1パイプP1に固
着した水平向き姿勢の第2パイプP2をもつて構
成されており、第2取付け部分3bは、前記第2
パイプP2の遊端に固着した上下向き姿勢の第3
パイプP3とこの第3パイプP3に上方から挿入保
持され、その上端のベースプレート9aをせき板
1に当接可能なねじ式のジヤツキ9とから構成さ
れている。
The attachment portion 3B on the proximal end side includes a first attachment portion 3a that can be fixedly connected to the main drawer 2b via a clamp fitting 8, and a second attachment portion 3b that can come into contact with the weir plate 1 from below. The first attachment portion 3a is configured with a second pipe P2 fixed to the first pipe P1 in a horizontal orientation, and the second attachment portion 3b is configured with a second pipe P2 fixed to the first pipe P1.
The third pipe is fixed to the free end of pipe P2 and is in an up-down position.
It is composed of a pipe P 3 and a screw-type jack 9 which is inserted and held into the third pipe P 3 from above and whose upper end base plate 9 a can be brought into contact with the sheath plate 1 .

前記載置部3Cは、前記第1パイプP1に固着
した水平向き姿勢の第4パイプP4をもつて構成
されている。
The mounting section 3C is configured with a fourth pipe P4 in a horizontal orientation, which is fixed to the first pipe P1 .

前記支持部3Dは、パイプサポート5の上端部
を下方から差込み可能なものであつて、前記第1
パイプP1の下端部をもつて構成されている。つ
まり、バルコニー突出方向に直交する幅方向視に
おいて前記先端側の取付け部3Aの直下又はほぼ
直下に位置してその先端側の取付け部3Aを支持
する状態にその先端側の取付け部3Aに連結して
いる。
The support part 3D is into which the upper end part of the pipe support 5 can be inserted from below, and
It is composed of the lower end of the pipe P1 . In other words, when viewed in the width direction perpendicular to the balcony projecting direction, it is connected to the distal end mounting portion 3A in a state where it is located directly under or almost directly below the distal end mounting portion 3A and supports the distal end mounting portion 3A. ing.

また、前記第4パイプP4の遊端には、その上
端に手摺10を止め付けるためのチエンジクラン
プ11が固着された手摺り用の第5パイプP5
固着されており、この第5パイプP5の下端部近
くと第1パイプP1の下端部近くとの間および、
前記第3パイプP3の下端部近くと第1パイプP1
の下端部近くとの間にはそれぞれ、斜め姿勢の補
強パイプPが掛架されている。
Further, a fifth pipe P5 for a handrail is fixed to the free end of the fourth pipe P4 , and a change clamp 11 for fixing the handrail 10 is fixed to the upper end of the fifth pipe P5 . between near the lower end of P5 and near the lower end of first pipe P1 , and
Near the lower end of the third pipe P3 and the first pipe P1
Reinforcement pipes P in diagonal postures are suspended between near the lower ends of the respective parts.

前記クランプ金具8は、第4図にも示すよう
に、上下姿勢のパイプ状本体8Aの上端に、締付
けボルト8aを介して大引2bに固定可能なコの
字形のクランプ8Bを固着するとともに、前記本
体8Aの下端に、前記第2パイプP2に固定可能
なチエンジクランプ8Cを固着して、構成されて
いる。
As shown in FIG. 4, the clamp fitting 8 has a U-shaped clamp 8B fixed to the upper end of the pipe-shaped main body 8A in an up-down position, which can be fixed to the main drawer 2b via a tightening bolt 8a. A change clamp 8C, which can be fixed to the second pipe P2 , is fixed to the lower end of the main body 8A.

前記ボルト6による先端側の取付け部3A、つ
まり、アングル7のせき板1への取付け手段は、
第2図、第3図にも示すように、アンカーとして
作用するインサート12をボルト6に締込み螺合
させて、バルコニーBの下面に水切b(第1図参
照)を形成するための面木13とともにアングル
7をせき板1に取付ける手段である。つまり、ボ
ルト6は、バルコニーBに直接に固定されるので
はなく、インサート12への螺合連結によりバル
コニーBに固定され、インサート12から螺合離
脱することにより、バルコニーBから取外せるも
のである。
The attachment portion 3A on the tip side using the bolt 6, that is, the means for attaching the angle 7 to the sheir plate 1 is as follows:
As shown in FIGS. 2 and 3, the insert 12 that acts as an anchor is tightened and screwed into the bolt 6 to form a cutout b (see FIG. 1) on the lower surface of the balcony B. 13 is a means for attaching the angle 7 to the weir plate 1. In other words, the bolt 6 is not directly fixed to the balcony B, but is fixed to the balcony B by screwing to the insert 12, and can be removed from the balcony B by screwing and unscrewing from the insert 12. .

もつて、足場枠3は、先端側の取付け部3Aの
せき板1への取付けおよび第1取付け部分3aの
クランプ金具8を介する大引2bへの固定連結に
より、型枠Aに取付けられ、その状態で支持部3
Dにパイプサポート5を差込んで載置部に支持さ
せることにより、足場載置荷重に対抗する支持強
度を発現するとともに、第1取付け部分3aの大
引2bへの固定連結で足場載置荷重による支持部
3D周りでの回倒を阻止され、バルコニーBが所
定の強度を発現したのちは、先端側の取付け部3
Aのボルト6を介するバルコニーBへの取付けに
より、足場荷重に対抗する支持強度を発現し、か
つ、第2取付け部分3b、つまり、ジヤツキ9の
せき板1への当接により足場載置荷重による先端
側の取付け部3A周りでの回倒を阻止されるよう
に構成されている。
The scaffolding frame 3 is attached to the formwork A by attaching the distal end side attachment part 3A to the weir plate 1 and fixedly connecting the first attachment part 3a to the main puller 2b via the clamp fitting 8. Support part 3 in state
By inserting the pipe support 5 into D and supporting it on the mounting part, it develops support strength that can withstand the load placed on the scaffold, and the fixed connection of the first attachment part 3a to the main puller 2b allows the load placed on the scaffold to be supported. After the balcony B is prevented from rotating around the support part 3D and has developed a predetermined strength, the attachment part 3
The attachment of A to the balcony B via the bolts 6 provides support strength against the scaffolding load, and the contact of the second attachment portion 3b, that is, the jack 9 to the weir plate 1, prevents the loading of the scaffolding from occurring. It is configured to be prevented from rotating around the attachment portion 3A on the distal end side.

なお、前記せき板1のうち、足場枠3の先端側
の取付け部3Aが取付けられ、かつ、第2取付け
部分3bが当接する足場枠取付け部分1aは、他
の部分から分離可能に構成されている。
In addition, of the weir plate 1, the scaffold frame attachment part 1a to which the attachment part 3A on the tip side of the scaffold frame 3 is attached and to which the second attachment part 3b abuts is configured to be separable from other parts. There is.

14は養生ネツトであり、15は上下の足場枠
3を連結する建地管であり、16は左右の建地管
15を連結する布管である。
14 is a curing net, 15 is a construction pipe that connects the upper and lower scaffolding frames 3, and 16 is a cloth pipe that connects the left and right construction pipes 15.

上記の構成によれば、バルコニーBが所定の強
度を発現したならば、クランプ金具8による第1
取付け部分3aの大引2bへの固定連結を解除す
るとともに、ジヤツキ9を第3パイプP3にセツ
トしてせき板1に当接させることにより、バルコ
ニーBに支持させることができるから、型枠Aの
解体・撤去を行える。
According to the above configuration, once the balcony B has developed a predetermined strength, the first
By releasing the fixed connection of the mounting part 3a to the main puller 2b and setting the jack 9 on the third pipe P3 and bringing it into contact with the weir plate 1, it can be supported on the balcony B. A can be dismantled and removed.

なお、足場Cを型枠Aに組付けるにあたつて
は、型枠Aをバルコニー作製箇所で組立て、この
組立てられた型枠Aに足場Cを組付けても良い
が、例えば、型枠Aを地上等で組立て、この組立
型枠Aをバルコニー作製箇所に搬入してセツトす
る場合には、型枠Aと同様に、地上等で型枠Aに
足場Cを組付けて、足場Cと一体の状態でバルコ
ニー作製箇所に搬入、セツトすることが、作業上
望ましい。この場合、足場枠3は、バルコニー作
製箇所にセツトするまでは、先端側取付け部3A
のせき板1への取付けと第1取付け部分3aの大
引2bへの固定連結とによつて型枠Aに取付けて
おき、セツト後に、パイプサポート5で支持部3
Dを支持させるのである。
In addition, when assembling scaffolding C to formwork A, formwork A may be assembled at the balcony production location and scaffolding C may be assembled to this assembled formwork A. For example, formwork A may be assembled to formwork A. When assembling on the ground, etc., and transporting this assembled formwork A to the balcony construction site and setting it, as with formwork A, assemble scaffolding C to formwork A on the ground, etc., and integrate it with scaffolding C. For work purposes, it is desirable to transport and set up the balcony in this condition. In this case, until the scaffolding frame 3 is set at the location where the balcony will be constructed, the tip side attachment portion 3A
It is attached to the formwork A by attachment to the weir plate 1 and fixed connection of the first attachment part 3a to the main puller 2b, and after setting, the support part 3 is attached to the pipe support 5.
This makes them support D.

また、上記実施例においては、水切6の部分に
おいてインサート12を利用して足場枠3をバル
コニーBに取付けているため、足場枠3を取外し
てもインサート12はそのままバルコニーBに残
る。そのため、インサート12にキヤツプを螺合
装着しておくことにより、後で改装や塗装等を行
う場合、そのインサート12を利用して足場枠3
の取付けが行え、その改装や塗装のための作業足
場の構築を簡単に行える。
Furthermore, in the above embodiment, since the scaffolding frame 3 is attached to the balcony B using the insert 12 at the drainer 6, the insert 12 remains on the balcony B even if the scaffolding frame 3 is removed. Therefore, by screwing a cap onto the insert 12, when renovating or painting later, the insert 12 can be used to attach the scaffold frame 3.
can be installed, and construction of work scaffolding for renovation and painting can be easily done.

【図面の簡単な説明】[Brief explanation of the drawing]

図面は本考案に係る片持ちコンクリート構造体
用足場枠の実施例を示し、第1図は側面図、第2
図は要部の拡大平面図、第3図は要部の拡大側面
図、第4図は要部の拡大正面図である。 A……型枠、B……コンクリート構造体、3
A,3B……取付け部、1……せき板、6……ボ
ルト、5……支柱、3D……支持部、2……支保
工、3a……第1取付け部、3b……第2取付け
部。
The drawings show an embodiment of the scaffolding frame for a cantilevered concrete structure according to the present invention, and FIG. 1 is a side view, and FIG.
The figure is an enlarged plan view of the main part, FIG. 3 is an enlarged side view of the main part, and FIG. 4 is an enlarged front view of the main part. A...Formwork, B...Concrete structure, 3
A, 3B... Attachment part, 1... Shelter plate, 6... Bolt, 5... Support column, 3D... Support part, 2... Shoring, 3a... First attachment part, 3b... Second attachment Department.

Claims (1)

【実用新案登録請求の範囲】 1 片持ちコンクリート構造体作製用に型枠Aお
よび作製された片持ちコンクリート構造体Bに
選択的に取付け可能な取付け部の2つ3A,3
Bを、片持ちコンクリート構造体Bの突出方向
に適宜間隔を隔てて設けてある片持ちコンクリ
ート構造体用足場枠であつて、前記取付け部3
A,3Bのうち片持ちコンクリート構造体B先
端側に位置する取付け部3Aを前記型枠Aに取
付けるための取付具として、その型枠Aのせき
板1を厚さ方向で貫通し、かつ、一端側を作製
されたコンクリー構造体B内に埋設固定される
ボルト6を設け、前記型枠Aを載置する下方の
型枠載置部に支柱5を介して支持される支持部
3Dを、前記突出方向に直交する幅方向視にお
いて前記先端側の取付け部3Aの直下又はほぼ
直下に位置してその先端側の取付け部3Aを支
持する状態に前記先端側の取付け部3Aに連結
してある片持ちコンクリート構造体用足場枠。 2 前記コンクリート構造体Bの基端側に位置す
る取付け部3Bが、前記型枠Aの支保工2に固
定連結可能な第1取付け部分3aと、前記せき
板1に下方から当接可能な第2取付け部分3b
とから構成されたものである実用新案登録請求
の範囲第1項に記載の片持ちコンクリート構造
体用足場枠。
[Claims for Utility Model Registration] 1. Two attachment parts 3A and 3 that can be selectively attached to the formwork A for producing a cantilevered concrete structure and the produced cantilevered concrete structure B.
B is a scaffolding frame for a cantilever concrete structure that is provided at appropriate intervals in the protruding direction of the cantilever concrete structure B, and the mounting portion 3
As a fixture for attaching the attachment part 3A located on the tip side of the cantilever concrete structure B among A and 3B to the formwork A, it penetrates the weir plate 1 of the formwork A in the thickness direction, and A bolt 6 is provided which is embedded and fixed in the concrete structure B prepared at one end, and a support part 3D is supported via a support 5 on a lower formwork mounting part on which the formwork A is placed. It is connected to the distal end mounting portion 3A in a state where it is located directly under or almost directly below the distal end mounting portion 3A when viewed in the width direction orthogonal to the protrusion direction, and supports the distal end mounting portion 3A. Scaffolding frame for cantilevered concrete structures. 2 The attachment part 3B located on the base end side of the concrete structure B has a first attachment part 3a that can be fixedly connected to the shoring 2 of the formwork A, and a first attachment part 3a that can come into contact with the weir plate 1 from below. 2 mounting part 3b
A scaffolding frame for a cantilevered concrete structure according to claim 1 of the utility model registration claim, which comprises:
JP11679885U 1985-07-29 1985-07-29 Expired JPH0449322Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11679885U JPH0449322Y2 (en) 1985-07-29 1985-07-29

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11679885U JPH0449322Y2 (en) 1985-07-29 1985-07-29

Publications (2)

Publication Number Publication Date
JPS6223938U JPS6223938U (en) 1987-02-13
JPH0449322Y2 true JPH0449322Y2 (en) 1992-11-19

Family

ID=31001724

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11679885U Expired JPH0449322Y2 (en) 1985-07-29 1985-07-29

Country Status (1)

Country Link
JP (1) JPH0449322Y2 (en)

Also Published As

Publication number Publication date
JPS6223938U (en) 1987-02-13

Similar Documents

Publication Publication Date Title
JPS6348753Y2 (en)
JPH0449322Y2 (en)
JPH0536042Y2 (en)
JPH0673243U (en) Steel pipe scaffolding staircase frame
JPS63184665A (en) Method for embedding anchor for mounting handrail support
JPH0311299Y2 (en)
JPH0542544B2 (en)
JPH0410282Y2 (en)
JPH076378Y2 (en) Mounting bracket for handrail support for construction
JPS647150Y2 (en)
JPH0532588Y2 (en)
JPH0447300Y2 (en)
JPH0650456Y2 (en) Horizontal pillar prefabricated rebar erection device
JPH0211552Y2 (en)
JPH0522765U (en) Hanging scaffolding frame
JPH0311303Y2 (en)
JPH0635054Y2 (en) Scaffolding equipment
JPH0438039Y2 (en)
JP2502915B2 (en) Fixing method for building scaffolding
KR100255585B1 (en) Installation method of temporary working board using connection clamp
JP2590508Y2 (en) Overhang scaffolding bracket
JPS6136698Y2 (en)
JPS5916439Y2 (en) scaffolding equipment
JPS637462A (en) Scaffold apparatus for building
JPH0430277Y2 (en)