JPH04323414A - Draw-up device for time series data rule - Google Patents

Draw-up device for time series data rule

Info

Publication number
JPH04323414A
JPH04323414A JP3088885A JP8888591A JPH04323414A JP H04323414 A JPH04323414 A JP H04323414A JP 3088885 A JP3088885 A JP 3088885A JP 8888591 A JP8888591 A JP 8888591A JP H04323414 A JPH04323414 A JP H04323414A
Authority
JP
Japan
Prior art keywords
pattern
symbol string
specific event
symbol
qualitative
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP3088885A
Other languages
Japanese (ja)
Inventor
Kazuo Nose
能勢 和夫
Takeshi Tsujii
辻井 剛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kobe Steel Ltd
Original Assignee
Kobe Steel Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kobe Steel Ltd filed Critical Kobe Steel Ltd
Priority to JP3088885A priority Critical patent/JPH04323414A/en
Publication of JPH04323414A publication Critical patent/JPH04323414A/en
Pending legal-status Critical Current

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Devices For Executing Special Programs (AREA)

Abstract

PURPOSE:To draw up a rule for surely foreseeing the occurrence of a clogging phenomenon due to a ground improving agent in a ground improving device. CONSTITUTION:In a draw-up device 1 for a time series data rule, time series numeric value data, at every data sampling time from a ground improving device 20, are converted into time series mark data via a making-mark means 4, and are stored together with data showing a clogging phenomenon in a qualitative mark memory means 5. A mark row pattern, a precursor for the clogging phenomena, is drawn from the qualitative mark memory means 5 to be stored in a pattern memory means 9 with a factor selection means 7. When a precursor false report is given by a rule having the mark row pattern, another mark row pattern of a second priority is added to the mark row pattern with a false report checking means, and mark row patterns are added successively until a false report is ungiven. This can improve a condition part for a precursor rule.

Description

【発明の詳細な説明】[Detailed description of the invention]

【0001】0001

【産業上の利用分野】本発明は,プラントの操業上,例
えば多大な影響を及ぼす特定事象の発生を,上記プラン
トからの所定のデータサンプリング時刻毎の複数種の操
業データ及び検出された特定事象に基づいて予知するた
めのルールを作成する時系列データルール作成装置に係
り,特に上記特定事象の発生を精度良く予知するための
ルールを作成することのできる時系列データルール作成
装置に関する。
[Industrial Field of Application] The present invention detects the occurrence of a specific event that has a great impact on the operation of a plant, using multiple types of operational data at each predetermined data sampling time from the plant and the detected specific event. The present invention relates to a time-series data rule creation device that creates rules for making predictions based on the above, and particularly relates to a time-series data rule creation device that can create rules for accurately predicting the occurrence of the specific event described above.

【0002】0002

【従来の技術】プラントの種類によっては,ある特定事
象が発生すると,操業面で多大な影響を及ぼす場合があ
る。例えば,後述するような,地盤を掘削する掘削軸か
ら噴射された地盤改良剤と土砂とを混合して上記地盤を
強化する地盤改良装置では,操業中に上記地盤改良剤が
掘削軸の先端で詰まる特定の現象(以下,詰まり事象と
いう)を生じることがある。上記詰まり事象が操業中に
発生すると,上記地盤改良装置を一旦停止した上,上記
掘削軸を途中から引き抜いて掘削軸の詰まり部位のメン
テナンスを行う必要がある。これらのメンテナンスは多
大な手間と時間とを要するため,上記地盤改良装置の操
業上の観点から上記地盤改良剤が詰まる以前に対策を講
じる必要がある。一方,上記地盤改良装置のオペレータ
は,詰まり事象に至るまでの当該装置からの種々の時系
列的な操業データと過去に検出された詰まり事象発生に
係るデータとに基づいて,上記詰まり事象を予知するた
めの何らかの知識を有している。そこで,上記オペレー
タの知識をルール化し,当該ルールを用いて上記地盤改
良装置の詰まり事象を予知することが考えられる。
2. Description of the Related Art Depending on the type of plant, the occurrence of a certain event may have a significant impact on the plant's operations. For example, in a ground improvement device that strengthens the ground by mixing earth and sand with a soil improvement agent injected from an excavation shaft that excavates the ground, as described below, the soil improvement agent is sprayed at the tip of the excavation shaft during operation. Certain clogging phenomena (hereinafter referred to as clogging events) may occur. If the above-mentioned clogging event occurs during operation, it is necessary to temporarily stop the above-mentioned ground improvement device, pull out the above-mentioned excavation shaft from the middle, and perform maintenance on the clogged part of the excavation shaft. Since such maintenance requires a great deal of effort and time, it is necessary to take measures from the operational standpoint of the soil improvement equipment before the soil improvement agent becomes clogged. On the other hand, the operator of the ground improvement equipment can predict the clogging event based on various time-series operational data from the equipment up to the clogging event and data related to the occurrence of clogging events detected in the past. have some knowledge to do so. Therefore, it is conceivable to formulate the operator's knowledge into rules and use the rules to predict clogging events in the ground improvement equipment.

【0003】0003

【発明が解決しようとする課題】ところで,上記したよ
うなオペレータの保有する詰まり事象の予知知識は,経
験に基づく定性的な知識である場合が多く,その量及び
質共に個人差がある。一方,上記地盤改良装置からの詰
まり事象に至るまでの操業データに基づいてルールを作
成する場合に,上記操業データは時系列的な数値データ
の羅列として出力されるので,特に数値データの取扱い
に不慣れな人にとってはこれらの数値データに基づいて
上記予知知識をルール化することは極めて困難であり,
上記詰まり事象を確実に予知するためのルールを作成す
る手法が確立されていなかった。そこで,本発明の第1
の目的とするところは,プラントの特定事象の発生を確
実に予知するためのルールを作成することのできる時系
列データルール作成装置を提供することにある。ところ
で,上記ルールを用いて詰まり事象を確実に予知できた
としても,その予知動作に長時間を要していては,上記
詰まり事象解決のための対策を講じる時期が遅れる。そ
こで,予知システムの効率を上げて予知動作に要する時
間を短縮化するためには,内容が冗長にならないルール
を作成することもひとつの手法である。従って,本発明
の第2の目的とするところは,プラントの特定事象の発
生を確実に予知するためのルールを作成することが可能
で,且つ内容が冗長でないルールを作成することのでき
る時系列データルール作成装置を提供することにある。
[Problems to be Solved by the Invention] However, the above-mentioned predictive knowledge of clogging events possessed by operators is often qualitative knowledge based on experience, and the quantity and quality of this knowledge differs from person to person. On the other hand, when creating rules based on the operational data from the above-mentioned soil improvement equipment up to the clogging event, the above-mentioned operational data is output as an enumeration of chronological numerical data, so it is especially difficult to handle numerical data. It is extremely difficult for inexperienced people to formulate the above predictive knowledge into rules based on these numerical data.
A method for creating rules for reliably predicting the above-mentioned clogging event has not been established. Therefore, the first aspect of the present invention
The purpose of this invention is to provide a time-series data rule creation device that can create rules for reliably predicting the occurrence of specific plant events. By the way, even if a clogging event can be reliably predicted using the above rules, if the prediction operation takes a long time, the time to take measures to solve the clogging event will be delayed. Therefore, one method to increase the efficiency of a prediction system and shorten the time required for prediction operations is to create rules that do not have redundant content. Therefore, the second object of the present invention is to create a time series that enables the creation of rules for reliably predicting the occurrence of specific events in a plant, and that also allows the creation of rules whose contents are not redundant. An object of the present invention is to provide a data rule creation device.

【0004】0004

【課題を解決するための手段】上記第1の目的を達成す
るために,第1の発明が採用する主たる手段は,その要
旨とするところが,特定事象を生じるプラントからの所
定のデータサンプリング時刻毎の複数種の操業データ及
び検出された特定事象に基づいて上記特定事象の発生を
予知するためのルールを作成する時系列データルール作
成装置において,予め複数に分割された上記操業データ
の区分の,いずれかの区分に含まれる操業データに当該
操業データの大きさを表現する定性記号を付与する定性
記号付与手段と,優先順位の定められた各種の操業デー
タの定性記号及び上記検出された特定事象を上記データ
サンプリング時刻毎に格納する定性記号記憶手段と,あ
る特定事象が発生した時点から遡った所定期間内の最上
位優先順位の操業データの定性記号よりなる記号列パタ
ーンを上記定性記号記憶手段に格納された定性記号から
抽出する記号列抽出手段と,上記定性記号記憶手段の定
性記号列から上記最上位優先順位の操業データの定性記
号よりなる記号列パターンと同一の記号列パターンを検
索し,該検索された記号列パターンに対応した上記ある
特定事象発生時点のデータサンプリング時刻における上
記特定事象を上記定性記号記憶手段から検索する特定事
象検索手段と,上記特定事象検索手段が上記ある特定事
象とは異なる特定事象を抽出した記号列パターンに,上
記所定期間に対応した優先順位を考慮した別種の操業デ
ータの記号列パターンを付加して付加記号列パターンを
作成し,該付加記号列パターンを上記特定事象検索手段
に上記最上位優先順位の記号列パターンに代えて入力し
て上記ある特定事象を抽出するまで上記付加記号列パタ
ーンの作成を繰り返す付加パターン作成手段と,上記特
定事象検索手段が上記異なる特定事象を抽出し得なかっ
た場合の記号列パターン及び/若しくは上記付加パター
ン作成手段により作成された付加記号列パターンを格納
するパターン記憶手段と,上記パターン記憶手段に格納
された記号列パターン及び/若しくは上記付加記号列パ
ターンよりなる条件部と上記ある特定事象よりなる結論
部とを備えたルールを作成するルール作成手段とを具備
してなる点に係る時系列データルール作成装置として構
成されている。また,上記第2の目的を達成するために
,第2の発明が採用する主たる手段は,その要旨とする
ところが,上記第1の発明に係る主たる手段に加えて,
上記パターン記憶手段に格納された記号列パターン若し
くは上記付加記号列パターンの最下位優先順位の記号列
パターンから少なくともひとつの定性記号を削除して記
号削除パターンを作成すると共に該記号作成パターンを
上記定性記号記憶手段から検索し,該検索された記号削
除パターンに対応した特定事象発生時点のデータサンプ
リング時刻に上記ある特定事象が格納されている場合に
,上記パターン記憶手段の記号列パターン若しくは上記
付加記号列パターンを上記記号削除パターンに書換え更
新し,上記削除から書換え更新までの処理を少なくとも
1回以上繰り返すパターン更新手段を具備してなる点に
係る時系列データルール作成装置として構成されている
[Means for Solving the Problems] In order to achieve the above-mentioned first object, the main means adopted by the first invention is that data is sampled every predetermined time from a plant where a specific event occurs. In a time-series data rule creation device that creates a rule for predicting the occurrence of the specific event based on multiple types of operational data and detected specific events, the operating data is divided into a plurality of sections in advance. Qualitative symbol assigning means for assigning a qualitative symbol expressing the size of the operational data to the operational data included in any of the categories, and the qualitative symbol for each type of prioritized operational data and the detected specific event. a qualitative symbol storage means for storing the above-mentioned data at each data sampling time; and a qualitative symbol storage means for storing a symbol string pattern consisting of qualitative symbols of the highest priority operational data within a predetermined period dating back from the time when a certain specific event occurred. a symbol string extraction means for extracting from the qualitative symbols stored in the qualitative symbol storage means, and a symbol string pattern that is the same as the symbol string pattern consisting of the qualitative symbols of the operation data with the highest priority, from the qualitative symbol strings in the qualitative symbol storage means. , specific event search means for searching the qualitative symbol storage means for the specific event at the data sampling time at the time of occurrence of the specific event corresponding to the searched symbol string pattern; An additional symbol string pattern is created by adding a symbol string pattern of another type of operation data that takes into account the priority order corresponding to the above-mentioned predetermined period to a symbol string pattern that extracts a specific event different from the above. additional pattern creation means that repeats the creation of the additional symbol string pattern until the particular event is extracted by inputting it into the specific event search means in place of the symbol string pattern with the highest priority; and the specific event search means. A pattern storage means for storing a symbol string pattern when the different specific event cannot be extracted and/or an additional symbol string pattern created by the additional pattern creation means, and a symbol string pattern stored in the pattern storage means. and/or constituted as a time-series data rule creation device comprising: a rule creation means for creating a rule having a condition part made up of the above-mentioned additional symbol string pattern and a conclusion part made up of the above-mentioned certain specific event; ing. In addition, the gist of the main means adopted by the second invention in order to achieve the second object is that in addition to the main means according to the first invention,
Deleting at least one qualitative symbol from the symbol string pattern stored in the pattern storage means or the symbol string pattern of the lowest priority of the additional symbol string pattern to create a symbol deletion pattern, and converting the symbol creation pattern into the qualitative symbol string pattern. When the symbol storage means is searched and the specific event is stored at the data sampling time of the occurrence of the specific event corresponding to the searched symbol deletion pattern, the symbol string pattern of the pattern storage device or the additional symbol The present invention is configured as a time-series data rule creation device comprising pattern updating means for rewriting and updating the column pattern into the symbol deletion pattern and repeating the process from deletion to rewriting and updating at least once.

【0005】[0005]

【作用】上記第1の発明によれば,特定事象を生じるプ
ラントからの所定のデータサンプリング時刻毎の複数種
の操業データ及び検出された特定事象に基づいて,先ず
定性記号付与手段が予め複数に分割された上記操業デー
タの区分のいずれかの区分に含まれる操業データに,当
該操業データの大きさを表現する定性記号を付与する。 上記各種の操業データには予め優先順位が定められてお
り,これらの操業データの定性記号及び上記検出された
特定事象は定性記号記憶手段にデータサンプリング時刻
毎に格納される。そして,記号列抽出手段はある特定事
象が発生した時点から遡った所定期間内の最上位優先順
位の操業データの定性記号よりなる記号列パターンを上
記定性記号記憶手段に格納された定性記号から抽出する
。また,特定事象検索手段は上記抽出された記号列パタ
ーンと同一の記号列パターンを上記定性記号記憶手段に
格納された定性記号列から検索し,該検索された定性記
号記憶手段の記号列パターンに対応した上記ある特定事
象発生時点のデータサンプリング時刻における上記特定
事象を定性記号記憶手段から検索する。そこで,上記特
定事象検索手段が上記ある特定事象とは異なる特定事象
を抽出したとき,付加パターン作成手段は上記ある特定
事象とは異なる特定事象を抽出した記号列パターンに,
上記所定期間に対応した優先順位を考慮した別種の操業
データの記号列パターンを付加して付加記号列パターン
を作成する。そして上記付加パターン作成手段は上記付
加記号列パターンを上記最上位優先順位の記号列パター
ンに代えて特定事象検索手段に入力して上記ある特定事
象を抽出するまで上記付加記号列パターンの作成を繰り
返す。このようにして,上記特定事象検索手段が上記異
なる特定事象を抽出し得なかった場合の記号列パターン
及び/若しくは上記付加パターン作成手段により作成さ
れた付加記号列パターンはパターン記憶手段に格納され
る。そして,上記パターン記憶手段に格納された記号列
パターン及び/若しくは上記付加記号列パターンよりな
る条件部と上記ある特定事象よりなる結論部とを備えた
ルールがルール作成手段により作成される。従って,上
記特定事象検索手段が上記ある特定事象を抽出するまで
ルールの条件が強化されるので,上記ルールはある特定
事象の発生を精度良く予知することができる。
[Operation] According to the first aspect of the invention, first, the qualitative symbol assigning means is configured to generate a plurality of qualitative symbols in advance based on a plurality of types of operational data at each predetermined data sampling time from a plant that causes a specific event and a detected specific event. A qualitative symbol expressing the size of the operation data is given to the operation data included in any of the divided divisions of the operation data. Priorities are determined in advance for the various types of operational data, and the qualitative symbols of these operational data and the detected specific events are stored in the qualitative symbol storage means at each data sampling time. The symbol string extraction means extracts a symbol string pattern consisting of qualitative symbols of the highest priority operational data within a predetermined period dating back from the time when a certain specific event occurred from the qualitative symbols stored in the qualitative symbol storage means. do. Further, the specific event retrieval means searches the qualitative symbol strings stored in the qualitative symbol storage means for the same symbol string pattern as the extracted symbol string pattern, and uses the retrieved symbol string pattern in the qualitative symbol storage means. The specific event at the data sampling time at which the corresponding specific event occurs is retrieved from the qualitative symbol storage means. Therefore, when the specific event search means extracts a specific event different from the specific event, the additional pattern creation means adds the symbol string pattern extracted from the specific event different from the specific event.
An additional symbol string pattern is created by adding a symbol string pattern of another type of operation data in consideration of the priority order corresponding to the predetermined period. Then, the additional pattern creation means replaces the additional symbol string pattern with the highest priority symbol string pattern and inputs it into the specific event search means, and repeats creating the additional symbol string pattern until the certain specific event is extracted. . In this way, the symbol string pattern when the specific event retrieval means cannot extract the different specific event and/or the additional symbol string pattern created by the additional pattern creation means are stored in the pattern storage means. . Then, a rule is created by the rule creation means, which includes a condition part consisting of the symbol string pattern and/or the additional symbol string pattern stored in the pattern storage means, and a conclusion part consisting of the certain specific event. Therefore, since the conditions of the rule are strengthened until the specific event search means extracts the specific event, the rule can accurately predict the occurrence of a specific event.

【0006】一方,上記第2の発明によれば,上記第1
の発明において上記パターン記憶手段に格納された記号
列パターン及び/若しくは付加記号列パターンに対し,
パターン更新手段が上記それぞれのパターンの最下位優
先順位の記号列パターンから少なくとも1つの定性記号
を削除して記号削除パターンを作成すると共に該記号削
除パターンを上記定性記号記憶手段から検索する。そし
てこのとき検索された記号削除パターンに対応した特定
事象発生時点のデータサンプリング時刻に上記ある特定
事象が格納されている場合に,上記パターン更新手段は
上記パターン記憶手段の記号列パターン若しくは上記付
加記号列パターンを上記記号削除パターンに書換え更新
する。上記削除から書換え更新までの処理はパターン更
新手段により少なくとも1回以上繰り返される。従って
,パターン更新手段により書換え更新された上記記号列
パターン若しくは付加記号列パターンは上記ある特定事
象を予知するためのルールの条件部として適用される場
合に記号削除以前のパターンと比べてそのパターン構成
が小さくなる。
On the other hand, according to the second invention, the first invention
In the invention, for the symbol string pattern and/or additional symbol string pattern stored in the pattern storage means,
A pattern updating means deletes at least one qualitative symbol from the lowest priority symbol string pattern of each of the patterns to create a symbol deletion pattern, and retrieves the symbol deletion pattern from the qualitative symbol storage means. If the specific event is stored at the data sampling time of the specific event occurrence corresponding to the symbol deletion pattern searched at this time, the pattern updating means updates the symbol string pattern of the pattern storage means or the additional symbol. Rewrite and update the column pattern to the above symbol deletion pattern. The process from deletion to rewriting/updating is repeated at least once by the pattern updating means. Therefore, when the above-mentioned symbol string pattern or additional symbol string pattern that has been rewritten and updated by the pattern updating means is applied as a condition part of a rule for predicting a certain specific event, its pattern structure is compared with the pattern before symbol deletion. becomes smaller.

【0007】[0007]

【実施例】以下添付図面を参照して,本発明を具体化し
た実施例につき説明し,本発明の理解に供する。尚,以
下の実施例は,本発明を具体化した一例であって,本発
明の技術的範囲を限定する性格のものではない。ここに
,図1は本発明の一実施例に係る時系列データルール作
成装置が適用された地盤改良装置を示す概略構成図,図
2は上記時系列データルール作成装置のブロック構成図
,図3は上記地盤改良装置からの数値データの残差の経
時変化を示すグラフ図,図4は上記時系列データルール
作成装置の定性記号記憶手段に記憶された定性記号及び
詰まり事象データの格納状態を示す説明図,図5は詰ま
り事象に関与する全ての要因のパターン長Mの記号列パ
ターンよりなるある詰まり事例を示す説明図,図6は上
記時系列データルール作成装置の処理手順を示すフロー
チャートである。本実施例に係る時系列データルール作
成装置1が適用される地盤改良装置20は,図1に示す
ように,地盤28を掘削して粉状の地盤改良剤を注入す
る掘削注入機21と,上記地盤改良剤を一時貯溜する改
良剤サイロ22と,上記改良剤サイロ22からの地盤改
良剤を所定量分上記掘削注入機21に空気圧送により供
給する供給機23とより主としてなっている。上記掘削
注入機21はモータ26により回転駆動される掘削軸2
5の先端に,土砂を攪拌しつつ上記掘削軸25を地盤2
8中に掘り進める攪拌翼27を備えている。また,上記
改良剤サイロ22は回転するスリット羽根式の供給ホイ
ル(図外)を備え,上記供給ホイルの回転数や供給空気
24の圧力等により上記地盤改良剤の供給量が決定され
る。そして,上記地盤改良剤は,掘削軸25が地盤28
から抜き出されるとき,攪拌翼27近傍の噴射口から地
盤28中へ空気と共に噴射されて周囲の土砂と所定比率
で攪拌混合されることにより土砂と化合する。これによ
って,地盤28中に改良柱体29が形成される。上記地
盤改良装置20は,運転中に上記噴射口の近傍で地盤改
良剤の詰まりを生じ,中途で運転を停止せざるを得ない
ことがある。そして,このように中途で運転が停止され
ると,運転再開までに多くの手間と長い時間を要する。 上記したような詰まり事象はいきなり生じるものではな
く,その前兆として供給空気24の圧力や供給ホイルの
回転数に特徴的な変動が起こる。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Examples embodying the present invention will be described below with reference to the accompanying drawings to provide an understanding of the present invention. It should be noted that the following examples are examples of embodying the present invention, and are not intended to limit the technical scope of the present invention. Here, FIG. 1 is a schematic configuration diagram showing a ground improvement device to which a time-series data rule creation device according to an embodiment of the present invention is applied, FIG. 2 is a block diagram of the above-mentioned time-series data rule creation device, and FIG. is a graph showing the change over time of the residual of the numerical data from the above-mentioned soil improvement device, and FIG. 4 shows the storage state of the qualitative symbols and clogging event data stored in the qualitative symbol storage means of the above-mentioned time-series data rule creation device. An explanatory diagram, FIG. 5 is an explanatory diagram showing a certain clogging case consisting of a symbol string pattern of pattern length M for all factors involved in the clogging event, and FIG. 6 is a flowchart showing the processing procedure of the above-mentioned time series data rule creation device. . As shown in FIG. 1, the ground improvement device 20 to which the time-series data rule creation device 1 according to the present embodiment is applied includes an excavation injection machine 21 that excavates the ground 28 and injects a powdered ground improvement agent; It mainly consists of an improvement agent silo 22 for temporarily storing the soil improvement agent, and a feeder 23 that supplies a predetermined amount of the soil improvement agent from the improvement agent silo 22 to the excavation injection machine 21 by pneumatic feeding. The excavation injection machine 21 has an excavation shaft 2 which is rotationally driven by a motor 26.
5, insert the excavation shaft 25 into the ground 2 while stirring the earth and sand.
8 is provided with stirring blades 27 that dig into the interior. Further, the improvement agent silo 22 is equipped with a rotating slit vane type supply foil (not shown), and the amount of the soil improvement agent supplied is determined by the rotation speed of the supply foil, the pressure of the supply air 24, etc. The above-mentioned ground improvement agent is applied so that the excavation shaft 25 is in the ground 28.
When it is extracted from the ground, it is injected together with air from the injection port near the stirring blade 27 into the ground 28, and is mixed with the surrounding earth and sand at a predetermined ratio, thereby combining with the earth and sand. As a result, improved columns 29 are formed in the ground 28. During operation, the soil improvement device 20 may become clogged with the ground improvement agent near the injection port, and the operation may have to be stopped midway. If the operation is stopped midway in this way, it takes a lot of effort and a long time to restart the operation. The clogging event as described above does not occur suddenly, but characteristic fluctuations in the pressure of the supply air 24 and the rotational speed of the supply foil occur as a precursor.

【0008】そこで,本発明者らは上記詰まり事象の前
兆となる種々の数値データ(以下,詰まり事象の要因と
いう)の変動に基づいて,上記詰まり事象の発生を確実
に予知するべく,以下の時系列データルール作成装置1
(以下,ルール作成装置1という)を開発した。上記ル
ール作成装置1は,図2に示すように,地盤改良装置2
0からの50msec毎に入力される供給空気24の圧
力,供給機23内の供給ホイルの回転数等といった各種
の数値データに含まれるノイズを除去するノイズ除去手
段2と,ノイズ除去後の数値データと該数値データに最
小2乗法を適用して得たトレンド式との残差e(k)(
(4)式参照)を算出して上記数値データの変化傾向を
取り除くトレンド除去手段3と,予め設定された複数の
閾値−m3 〜+p3 (図3)により複数に分割され
た区分の,いずれかの区分に含まれる残差e(k)に当
該残差の大きさを表現する定性記号NB〜PB(図3)
を付与する記号化手段4と,地盤改良装置20に設けら
れた詰まり検出器(図外)からの詰まり事象データ(Y
/N)と上記数値データの種類毎の定性記号をデータサ
ンプリング時刻毎に格納する定性記号記憶手段5と,詰
まり事象が発生した時点から遡った所定期間内の操業デ
ータの定性記号よりなる記号列パターンを上記定性記号
記憶手段に格納された定性記号から抽出するパターン抽
出手段8と,該パターン抽出装置8により抽出された全
ての要因に係る記号列パターン及びこれらの記号列パタ
ーンを構成する各定性記号に対応したフラグをそれぞれ
格納するパターン記憶手段9と,このパターン記憶手段
9に格納された記号列パターンを条件部とするルールの
誤報チェックを行う誤報チェック手段10と,上記ルー
ルの条件部の内容の冗長性をチェックする冗長性チェッ
ク手段11と上記ルールの条件部に取り込まれるべき記
号列パターンの数値データの種類(要因)を選択する要
因選択手段7と一定の条件のもとで複数のルールの条件
部の内容を統合化してひとつのルールとするルール統合
手段12とを具備してなっている。上記パターン記憶手
段9には,上記パターン抽出手段により抽出された記号
列パターンを格納するパターン記憶領域9p と上記フ
ラグを格納するフラグ記憶領域9f が確保され,この
フラグ記憶領域9f のフラグは上記パターン記憶領域
9p の各要因毎であってパターン長Mの各定性記号毎
に対応して設けられている。なお,上記ノイズ除去手段
2,トレンド除去手段3,記号化手段4,要因選択手段
7,パターン抽出手段8,誤報チェック手段10,冗長
性チェック手段11,ルール統合手段12は,それぞれ
上記ルール作成装置1の図示せぬ演算部が備えたメモリ
に,予め格納された動作プログラムによって具現化され
る。
[0008] Therefore, the present inventors conducted the following in order to reliably predict the occurrence of the above-mentioned clogging event based on fluctuations in various numerical data (hereinafter referred to as factors of the clogging event) that are precursors to the above-mentioned clogging event. Time series data rule creation device 1
(hereinafter referred to as rule creation device 1). As shown in FIG. 2, the rule creation device 1 includes a ground improvement device 2
Noise removing means 2 that removes noise contained in various numerical data such as the pressure of the supply air 24 input every 50 msec from 0, the rotation speed of the supply foil in the supply machine 23, etc., and the numerical data after noise removal. The residual e(k)(
(4)) and removes the tendency of change in the above numerical data; and the trend removing means 3 which calculates the change tendency of the numerical data (see formula (4)); Qualitative symbols NB to PB (Figure 3) expressing the magnitude of the residual e(k) included in the division of
clogging event data (Y
/N), a qualitative symbol storage means 5 for storing qualitative symbols for each type of numerical data at each data sampling time, and a symbol string consisting of qualitative symbols of operational data within a predetermined period dating back from the time when the clogging event occurred. A pattern extraction means 8 for extracting patterns from the qualitative symbols stored in the qualitative symbol storage means, symbol string patterns related to all factors extracted by the pattern extraction device 8, and each qualitative character constituting these symbol string patterns. A pattern storage means 9 for storing flags corresponding to the symbols, a false alarm check means 10 for checking false alarms of a rule whose condition part is the symbol string pattern stored in the pattern storage means 9, and a false alarm check means 10 for checking the false alarm of a rule whose condition part is the symbol string pattern stored in the pattern storage means 9. A redundancy checking means 11 for checking the redundancy of contents, a factor selection means 7 for selecting the type (factor) of the numerical data of the symbol string pattern to be incorporated into the condition part of the rule, and a plurality of The rule integrating means 12 integrates the contents of the condition part of the rule into one rule. The pattern storage means 9 has a pattern storage area 9p for storing the symbol string pattern extracted by the pattern extraction means and a flag storage area 9f for storing the flags. It is provided for each factor in the storage area 9p and for each qualitative symbol of pattern length M. The noise removal means 2, the trend removal means 3, the symbolization means 4, the factor selection means 7, the pattern extraction means 8, the false alarm checking means 10, the redundancy checking means 11, and the rule integration means 12 are the rule creation device, respectively. This is realized by an operation program stored in advance in a memory included in a calculation unit (not shown).

【0009】本実施例に係るルール作成装置1は,上記
したように構成されている。引き続き,図6を中心とし
図1乃至図5を用いて,上記ルール作成装置1により地
盤改良装置20における地盤改良剤の詰まり事象を予知
するためのルールを作成する処理手順について説明する
。なお,図6中S1,S2,・・・はそれぞれ上記ルー
ル作成装置1の動作ステップを示す。先ず,地盤改良装
置20からの供給ホイルの回転数,供給空気24の圧力
等の時系列上の数値データx(i)(iは50msec
毎のデータサンプリング時刻を示し,i=1,2,3・
・・である)はルール作成装置1のノイズ除去手段2に
入力される。ノイズ除去手段2は上記数値データx(i
)に基づいてある時点iから10点(n=10)先の時
刻迄の移動平均数値データy(j),y(j+1),・
・・を(1)式((1)−1,(1)−2,…)を用い
て時刻i毎に求める。 但し,x(i);i=1,2,3,・・・    (5
0msec) y(i);i=1,2,3,・・・    (n=10
)これにより,母データである当初の数値データx(i
)に含まれるノイズが除去される。なお,上記移動平均
数値データに代えて上記10点の時刻の期間毎の平均値
を求めてもよい。
The rule creation device 1 according to this embodiment is configured as described above. Next, a processing procedure for creating a rule for predicting a clogging event of the ground improvement agent in the ground improvement device 20 using the rule creation device 1 will be described with reference to FIG. 6 and FIGS. 1 to 5. Note that S1, S2, . . . in FIG. 6 indicate operation steps of the rule creation device 1, respectively. First, time-series numerical data x(i) (i is 50 msec
Indicates the data sampling time for each i=1, 2, 3・
) is input to the noise removal means 2 of the rule creation device 1. The noise removing means 2 extracts the numerical data x(i
) based on the moving average numerical data y(j), y(j+1), .
... is obtained at each time i using equation (1) ((1)-1, (1)-2, . . . ). However, x(i); i=1, 2, 3,... (5
0msec) y(i); i=1, 2, 3,... (n=10
) As a result, the initial numerical data x(i
) is removed. Note that instead of the moving average numerical data, an average value for each period of the 10 points may be calculated.

【0010】続いて,ノイズ除去手段2からの移動平均
数値データはトレンド除去手段3に入力され(2)〜(
3)式によってその変化傾向が除去される。             y(j)=a(k)+b(k
)(k−j)Δt                 
     +e(j)               
               …(2)但し,Δt=
tj+1 −tj       (N=20)k=1,
2,3,・・・ j=k−N+1,k−N+2,・・・,k      
      Y(j)=A(k)+B(k)(k−j)
Δt        …(3)           
 e(k)=y(k)−Y(k)          
            …(4)即ち,(2)式で示
すモデル式と,このモデル式に含まれる誤差e(j)の
2乗和を最小にするときのa(k),b(k)をそれぞ
れA(k),B(k)とする(3)式で示すトレンド式
とから,(4)式を用いて求められる残差e(k)には
,上記移動平均数値データの変化傾向が含まれないこと
になる。一方,上記ルール作成装置1では,(5)式で
示すN個の要因群Xの各要因xN の選択優先順位が外
部から,例えばマニュアルによって要因選択手段7に設
定入力される(S1)。                   X={x1 ,
x2 ,・・・,xN }            …
(5)この場合,地盤改良装置20にとって詰まり事象
発生を予知する上で経験上重要な指標となる要因から順
に優先順位が設定される。例えば,第1優先順位の要因
x1 を上記供給ホイルの回転数とし,第2優先順位の
要因x2 を上記供給空気24の圧力として以下同様に
優先順に設定されて上記要因選択手段7に格納される。
[0010] Subsequently, the moving average numerical data from the noise removal means 2 is inputted to the trend removal means 3 (2) to (
3) The change tendency is removed by the equation. y(j)=a(k)+b(k
)(k-j)Δt
+e(j)
...(2) However, Δt=
tj+1 −tj (N=20)k=1,
2, 3,... j=k-N+1, k-N+2,..., k
Y(j)=A(k)+B(k)(k-j)
Δt...(3)
e(k)=y(k)−Y(k)
...(4) In other words, a(k) and b(k) are respectively A( The residual e(k) obtained using equation (4) from the trend equation shown in equation (3), where k) and B(k), does not include the change trend of the moving average numerical data mentioned above. It turns out. On the other hand, in the rule creation device 1, the selection priority order of each factor xN of the N factor group X shown by equation (5) is set and input into the factor selection means 7 from the outside, for example, manually (S1). X={x1,
x2 ,...,xN}...
(5) In this case, priorities are set in order of factors that are empirically important indicators for the ground improvement device 20 in predicting the occurrence of a clogging event. For example, the first priority factor x1 is the rotation speed of the supply wheel, the second priority factor x2 is the pressure of the supply air 24, and the following are similarly set in priority order and stored in the factor selection means 7. .

【0011】続いて,上記残差e(k)を複数の区分に
識別するための複数の閾値−m3 〜+p3 が外部か
ら記号化手段4に設定入力されて格納される(S2,図
3)。そこで上記残差e(k)が記号化手段4に入力さ
れると(S3),上記記号化手段4はこのとき入力され
た残差e(k)と上記閾値とを(6)式((6)−1〜
(6)−7)を用いて比較し,当該残差e(k)にその
値の大きさを表現する定性記号NB〜PBを付与する(
S4)。 e≦−m3   →NB      (6)−1−m3
 <e≦−m2   →NM      (6)−2−
m2 <e≦−m1   →NS      (6)−
3−m1 <e≦+p1   →ZE      (6
)−4+p1 <e≦+p2   →PS      
(6)−5+p2 <e≦+p3   →PM    
  (6)−6+p3 <e          →P
B      (6)−7なお,上記定性記号は上記残
差e(k)の値がNB=極めて小さい,NM=小さい,
NS=やや小さい,ZE=殆ど変化なし,PS=やや大
きい,PM=大きい,PB=極めて大きい,であること
を示す。即ち,上記記号化手段4が本発明にいう定性記
号付与手段である。これらの時刻j毎の各要因の定性記
号は,図4に示すように,時系列記号データとして上記
定性記号記憶手段5に格納される。また,上記詰まり検
出器からの詰まり事象データ(Y/N)も時刻j毎に記
憶される。この場合,上記詰まり事象データは,詰まり
事象が発生して詰まり検出器からの入力があったときを
Yで示し,上記入力がないときをNで示す。通常,上記
定性記号や詰まり事象データは過去に発生した複数件の
詰まり事象に係るものがそれぞれ詰まり事象毎に用いら
れる。  一方,上記詰まり事象が発生した時点(例え
ば図4の時刻j=11)から予知期間Lを見越して過去
に遡った所定期間の期間長Mが外部からパターン抽出手
段8に設定入力され格納される(S5)。上記期間長M
はこの期間内の要因x1 〜xN 毎の定性記号よりな
る時系列方向の記号列パターンを特定するために設定さ
れた期間長であって上記記号列パターンのパターン長M
を表す。本実施例装置では,上記パターン長M内の記号
列パターンに基づいて上記詰まり事象を予知するための
ルールが作成される。上記パターン長M内の全ての要因
の記号列パターンよりなるある詰まり事例Pを図5に示
す。上記詰まり事例Pは複数件の詰まり事象毎に作成さ
れ,それぞれパターン記憶手段9のパターン記憶領域9
p に事例毎に記憶される。そして,上記要因選択手段
7のカウンタの要因抽出回数Kが1の値に初期設定され
る(S6)。
[0011] Subsequently, a plurality of threshold values -m3 to +p3 for discriminating the residual e(k) into a plurality of categories are set and input into the encoding means 4 from the outside and stored (S2, FIG. 3). . Therefore, when the residual e(k) is input to the encoding means 4 (S3), the encoding means 4 converts the input residual e(k) and the threshold value into the equation (6) (( 6)-1~
(6)-7), and assign qualitative symbols NB to PB to the residual e(k) to express the magnitude of the value (
S4). e≦-m3 →NB (6)-1-m3
<e≦−m2 →NM (6)−2−
m2 <e≦−m1 →NS (6)−
3-m1 <e≦+p1 →ZE (6
)-4+p1 <e≦+p2 →PS
(6)-5+p2 <e≦+p3 →PM
(6)-6+p3 <e →P
B (6)-7 Note that the above qualitative symbol indicates that the value of the residual e(k) is NB = extremely small, NM = small,
NS=slightly small, ZE=almost no change, PS=slightly large, PM=large, PB=extremely large. That is, the symbolizing means 4 is the qualitative symbol assigning means according to the present invention. These qualitative symbols for each factor at each time j are stored in the qualitative symbol storage means 5 as time-series symbol data, as shown in FIG. Further, clogging event data (Y/N) from the clogging detector is also stored at each time j. In this case, the clogging event data is indicated by Y when a clogging event occurs and there is an input from the clogging detector, and N when there is no input. Usually, the qualitative symbols and clogging event data related to a plurality of clogging events that have occurred in the past are used for each clogging event. On the other hand, a period length M of a predetermined period extending back in time from the time when the clogging event occurred (for example, time j=11 in FIG. 4) in anticipation of the prediction period L is set and input into the pattern extraction means 8 from the outside and stored. (S5). The above period length M
is the period length set to specify the symbol string pattern in the time series direction consisting of qualitative symbols for each factor x1 to xN within this period, and is the pattern length M of the symbol string pattern.
represents. In the device of this embodiment, a rule for predicting the jam event is created based on the symbol string pattern within the pattern length M. FIG. 5 shows a blockage case P consisting of symbol string patterns of all factors within the pattern length M. The above-mentioned clogging cases P are created for each of a plurality of clogging events, and are each created in the pattern storage area 9 of the pattern storage means 9.
p for each case. Then, the factor extraction count K of the counter of the factor selection means 7 is initialized to a value of 1 (S6).

【0012】そこで先ず,上記要因選択手段7は設定さ
れた上記優先順位に従って第1優先順位の要因x1 を
選択する(S7)。次いで,パターン抽出手段8は全て
の詰まり事例に対し上記パターン長Mの要因x1 に係
る記号列パターンp1,1 (x1 ),p1,2 (
x1 ),・・・をそれぞれ抽出し(S8),(7)式
で示す第1次マッチングパターン群P1 とする(S9
)。                 P1 =(p1,1
   OR  p1,2   OR  ・・・)  …
(7)上記記号列パターンはルールの条件部として用い
られる,いわゆるマッチングパターンである。この場合
,パターン抽出手段8が,上記記号列パターンp1,1
 (x1 ),p1,2 (x1 )・・・の各定性記
号に対応するフラグ記憶領域9f のフラグをたてるこ
とによりこのときのマッチングパターン群が上記パター
ン記憶領域9pから抽出される。即ち,上記パターン抽
出手段8及びフラグ記憶領域9fのフラグが本発明にい
う記号列抽出手段である。続いて,上記第1次マッチン
グパターン群P1 は誤報チェック手段10により誤報
の発生をチェックされる(S10)。この場合誤報とは
,例えば上記第1次マッチングパターン群P1 を構成
する事例毎の記号列パターンを条件部とするルールを用
いて上記詰まり事象を予知する場合に,実際には地盤改
良装置20に詰まり事象が発生していないにもかかわら
ず,上記詰まり事象の発生が予知されることをいう。そ
こで,誤報チェック手段10は,上記第1次マッチング
パターン群P1 の各記号列パターンと同一の上記要因
x1 の記号列パターンを定性記号記憶手段5の定性記
号列から検索する。そして,上記同一の記号列パターン
が検索されれば,該検索された記号列パターンの最終時
刻から予知期間L先のデータサンプリング時刻(例えば
図4の時刻j=11)における詰まり事象データY(あ
る特定事象)を上記定性記号記憶手段5から検索する。 即ち,上記誤報チェック手段10が本発明にいう特定事
象検索手段である。そして,当該データサンプリング時
刻における詰まり事象データがYであれば(S11,N
O),上記検索された記号列パターンを取り込んだルー
ルによっては詰まり事象予知の誤報を発生しないと考え
られる。従って,当該マッチングパターン群P1 は引
き続き冗長性解消ステップ(S30以降)に導かれる。
First, the factor selection means 7 selects the factor x1 having the first priority according to the set priority order (S7). Next, the pattern extraction means 8 extracts symbol string patterns p1,1 (x1), p1,2 (
x1 ), .
). P1 = (p1,1
OR p1,2 OR...)...
(7) The above symbol string pattern is a so-called matching pattern used as a condition part of a rule. In this case, the pattern extraction means 8 extracts the symbol string pattern p1, 1 from the symbol string pattern p1,1.
The matching pattern group at this time is extracted from the pattern storage area 9p by setting flags in the flag storage area 9f corresponding to the qualitative symbols (x1), p1, 2(x1), . . . That is, the pattern extracting means 8 and the flag in the flag storage area 9f are the symbol string extracting means according to the present invention. Subsequently, the first matching pattern group P1 is checked for occurrence of false alarms by the false alarm checking means 10 (S10). In this case, a false alarm means, for example, when predicting the clogging event using a rule whose condition part is the symbol string pattern for each case constituting the first matching pattern group P1, the false alarm actually occurs in the ground improvement device 20. This means that the occurrence of the above-mentioned clogging event is predicted even though no clogging event has occurred. Therefore, the false alarm checking means 10 searches the qualitative symbol strings in the qualitative symbol storage means 5 for the symbol string pattern of the factor x1 that is the same as each symbol string pattern of the first matching pattern group P1. If the same symbol string pattern is retrieved, the blockage event data Y (a certain specific event) is retrieved from the qualitative symbol storage means 5. That is, the false alarm check means 10 is the specific event search means according to the present invention. If the clogging event data at the data sampling time is Y (S11, N
O) It is considered that the rules that incorporate the searched symbol string pattern do not generate false alarms for predicting blockage events. Therefore, the matching pattern group P1 is subsequently led to the redundancy elimination step (S30 onwards).

【0013】一方,上記詰まり事象データがN(異なる
特定事象)のとき(S11,YES),上記第1次マッ
チングパターン群P1 の各記号列パターンと同一の記
号列パターンが上記定性記号記憶手段5に存在している
にもかかわらず,この記号列パターンによっては,上記
誤報を発することになる。そのため,このような記号列
パターンよりなるルールの条件は強化される必要がある
。 そこで,誤報チェック手段10は上記誤報を発すること
になる全ての記号列パターンpK,i ,pK,j ,
・・・(以下,誤報パターンという。添字iはi番目の
詰まり事例,jはj番目の詰まり事例を示す)を上記第
1次マッチングパターン群P1 から抽出し(S20)
,これらの誤報パターンによって第K(K=1)次誤報
パターンEK を(8)式のように決定する(S21)
。     EK ={pK,i   OR  PK,j 
  OR  ・・・}…(8)そして,次に優先順位の
高い要因があれば(S22,YES),要因選択手段7
は要因抽出回数KをK+1に繰り上げて(S23),次
順位の要因xK+1,例えばx2 を選択する(S24
)。そして,上記誤報を発することとなる記号列パター
ンの期間長Mに対応した要因xK+1 の記号列パター
ンを上記パターン記憶領域9p の当該事例から抽出す
る(S25)。上記要因xK+1 の記号列パターンは
要因xK の記号列パターンに対し付加(AND条件)
されて付加パターンが作成される。例えば,上記誤報パ
ターンpK,i ,pK,j ,・・・についての付加
パターンは(9)式((9)−1,…)のように示され
る。   なお,(9)式中の,例えば記号列パターンpK+
1,i,1 の添字について,K+1は優先順位がK+
1番目であり,iは詰まり事例番号であり,1は当該記
号列パターンがその事例中に複数存在する場合の識別番
号であることを示す。そこで,上記パターン抽出手段8
により作成された付加記号列パターンと,ステップS1
1において誤報を発しないと判断された記号列パターン
(このパターンを例えばpK,s ,pK,t とする
)とから,第K+1次マッチングパターン群pK+1 
が(10)式のように決定される。(S26)。           PK+1 =(pK,s   O
R  pK,t   OR  ・・・        
          OR  (pK,i   AND
  pK+1,i,1 )             
     OR  (pK,i   AND  pK+
1,i,2 )                  
OR  ・・・                  
OR  (pK,j   AND  pK+1,j,1
 )                  OR  ・
・・)                      
      …(10)          PK+1
 =(pK+1,1   OR  pK+1,2   
                OR  pK+1,
3   ・・・)                 
 …(11)(11)式は(10)式右辺の各記号列パ
ターンの添字を新たな添字に整理統合したものである。 上記第K+1次マッチングパターン群PK+1 はステ
ップS10において上記と同様の誤報チェック処理がな
され,そのときのマッチングパターン群について誤報を
発することがないと(S11,NO)判断されるまで,
上記ステップS10,S11,S20〜S26が繰り返
される。これにより,上記マッチングパターン群中の誤
報パターンに優先順位を考慮した次の要因の記号列パタ
ーンが上記繰り返しステップの実行毎に付加される。従
って,上記ステップS11において誤報を生じないと判
断されたとき,このときのマッチングパターン群には上
記詰まり事象の予知に最小限必要な要因が全て取り込ま
れたことになる。 即ち,上記要因選択手段7,パターン抽出手段8及びフ
ラグ記憶領域9f のフラグが本発明にいう付加パター
ン作成手段である。なお,まだマッチングパターン群に
対し次の要因を取り込む必要があるにも拘らわず上記繰
り返しステップの実行中に次の要因が見つからない場合
には(S22,NO),現在設定されている上記閾値や
上記パターン長の設定条件の下ではこれ以上誤報を発生
することのないように,ルールの条件を強化し得ないと
考えられる。そこで,処理ステップはステップS2に戻
り,記号化手段4における残差e(k)の層別条件,即
ち上記閾値やパターン抽出手段8におけるパターン長が
マニュアルにより変更設定される(S2,S5)。
On the other hand, when the clog event data is N (different specific event) (S11, YES), the same symbol string pattern as each symbol string pattern of the first matching pattern group P1 is stored in the qualitative symbol storage means 5. However, depending on this symbol string pattern, the above-mentioned false alarm will be issued. Therefore, the conditions for rules consisting of such symbol string patterns need to be strengthened. Therefore, the false alarm checking means 10 checks all the symbol string patterns pK,i, pK,j, which will generate the above-mentioned false alarm.
... (hereinafter referred to as a false alarm pattern. The subscript i indicates the i-th clogging case, and j indicates the j-th clogging case) from the first matching pattern group P1 (S20).
, based on these false alarm patterns, the Kth (K=1)th false alarm pattern EK is determined as shown in equation (8) (S21)
. EK = {pK,i OR PK,j
OR...}...(8) Then, if there is a factor with the next highest priority (S22, YES), the factor selection means 7
increases the number of factor extractions K to K+1 (S23) and selects the next-ranked factor xK+1, for example x2 (S24)
). Then, a symbol string pattern with a factor xK+1 corresponding to the period length M of the symbol string pattern that causes the false alarm is extracted from the case in the pattern storage area 9p (S25). The symbol string pattern of the above factor xK+1 is added to the symbol string pattern of factor xK (AND condition)
additional patterns are created. For example, the additional pattern for the above-mentioned false alarm patterns pK,i, pK,j, . . . is expressed as equation (9) ((9)-1, . . .). In addition, in equation (9), for example, the symbol string pattern pK+
For subscripts 1,i,1, K+1 has priority K+
It is the first, i is the jam case number, and 1 indicates the identification number when there is more than one symbol string pattern in the case. Therefore, the pattern extraction means 8
The additional symbol string pattern created by and step S1
From the symbol string patterns determined not to generate false alarms in step 1 (these patterns are, for example, pK,s, pK,t), the Kth+1st matching pattern group pK+1 is created.
is determined as in equation (10). (S26). PK+1 = (pK,s O
R pK,t OR...
OR (pK,i AND
pK+1,i,1)
OR (pK,i AND pK+
1, i, 2)
OR...
OR (pK,j AND pK+1,j,1
) OR・
・・)
...(10) PK+1
=(pK+1,1 OR pK+1,2
OR pK+1,
3...)
...(11) Equation (11) is obtained by organizing and integrating the subscripts of each symbol string pattern on the right side of Equation (10) into a new subscript. The above K+1st matching pattern group PK+1 is subjected to the same false alarm check process as above in step S10, and until it is determined that the matching pattern group at that time will not issue a false alarm (S11, NO),
The above steps S10, S11, S20 to S26 are repeated. As a result, a symbol string pattern of the next factor is added to the false alarm pattern in the matching pattern group each time the repeating step is executed, taking priority into consideration. Therefore, when it is determined in step S11 that no false alarm will occur, the matching pattern group at this time includes all the minimum factors necessary for predicting the clogging event. That is, the factor selection means 7, the pattern extraction means 8, and the flag in the flag storage area 9f are the additional pattern creation means according to the present invention. Note that if the next factor is not found during the execution of the above repeating step even though it is still necessary to incorporate the next factor into the matching pattern group (S22, NO), the currently set above threshold value is It is considered that the rule conditions cannot be strengthened to prevent further false alarms under the above pattern length setting conditions. Therefore, the processing step returns to step S2, and the stratification conditions for the residual e(k) in the symbolizing means 4, ie, the threshold value and the pattern length in the pattern extracting means 8, are manually changed and set (S2, S5).

【0014】上記したように,上記フラグ記憶領域9f
 のフラグにより確定された,詰まり事象予知の誤報を
生じることのない最終的なマッチングパターン群PF 
は,引き続いてパターン長の冗長性解消ステップ(S3
0以降)に供される。上記マッチングパターン群PF 
の各記号列パターン(付加記号列パターンを含む)の一
例を(12)式に示す。
As mentioned above, the flag storage area 9f
The final matching pattern group PF that does not cause a false alarm of clogging event prediction is determined by the flag of
is followed by pattern length redundancy elimination step (S3
0 onwards). The above matching pattern group PF
An example of each symbol string pattern (including the additional symbol string pattern) is shown in equation (12).

【数1】 なお(12)式の記号要素Zは上記定性記号NB〜PB
を示す。そこで,ステップS30では上記冗長性チェッ
ク手段11が,ある記号列パターンpF,i の最下位
優先順位の要因xr の記号列パターンから最後部の記
号要素Zr,M を仮に削除する。上記記号要素Zr,
M はフラグ記憶領域9f の対応するフラグを倒すこ
とにより仮に削除される。更に,冗長性チェック手段1
1は記号削除パターンと同じ記号列パターンを上記定性
記号記憶手段5から検索し,このとき検索された記号削
除パターンに対応した詰まり事象発生時点のデータサン
プリング時刻に上記詰まり事象データYが格納されてい
るか否かをチェックする。即ち,上記ステップS10と
同様の誤報チェック処理が実行される。そこで,上記詰
まり事象データYが格納されていなければ(S31,Y
ES),冗長性チェック手段11は上記記号削除パター
ンの要因Xr のこの時点において最後部の記号要素Z
r,M−1 を更に削除した記号削除パターンを作成す
る。上記要因xr の記号列パターン最後部からの記号
要素の削除動作は,上記詰まり事象データYが抽出され
るまで順次繰り返される。そして,上記詰まり事象デー
タYが抽出されたとき(S31,NO),パターン記憶
領域9p に格納されているマッチングパターン群PF
 の上記ある記号列パターンpF,i をこのときの記
号削除パターンに書換え更新する(S32)。上記した
ような記号削除パターンの作成から上記書換え更新まで
の処理ステップ(S30〜S32)は上記マッチングパ
ターン群PF の残りの記号列パターンについてもそれ
ぞれ実行される。即ち,上記フラグ記憶領域9f のフ
ラグ,誤報チェック手段10,冗長性チェック手段11
が本発明にいうパターン更新手段である。今度は逆に,
上記書換え更新された記号削除パターンの要因xr の
最先部の記号要素Zr,1 から最後部に向けて順次削
除,誤報チェック,記号削除パターンの書換え更新の処
理動作が行われる(S33〜S35)。これらの処理動
作は上記ステップS30〜32と同様にマッチングパタ
ーン群PF の各記号列パターンについて順次実行され
る。なお,上記記号列パターンから削除される記号要素
の削除開始位置としては,上記最先部若しくは最後部に
限らず,例えば任意の位置であってもよい。
[Equation 1] Note that the symbol element Z in equation (12) is the above qualitative symbol NB~PB
shows. Therefore, in step S30, the redundancy check means 11 temporarily deletes the last symbol element Zr,M from the symbol string pattern of the lowest priority factor xr of a certain symbol string pattern pF,i. The above symbol element Zr,
M is temporarily deleted by defeating the corresponding flag in the flag storage area 9f. Furthermore, redundancy check means 1
1 searches the qualitative symbol storage means 5 for a symbol string pattern that is the same as the symbol deletion pattern, and the jam event data Y is stored at the data sampling time at the time of occurrence of the jam event corresponding to the retrieved symbol deletion pattern. Check to see if there is one. That is, a false alarm check process similar to step S10 above is executed. Therefore, if the above-mentioned clogging event data Y is not stored (S31, Y
ES), the redundancy check means 11 checks the last symbol element Z at this point in the factor Xr of the symbol deletion pattern.
A symbol deletion pattern is created by further deleting r, M-1. The operation of deleting the symbol elements from the end of the symbol string pattern of the factor xr is sequentially repeated until the jam event data Y is extracted. Then, when the above-mentioned clogging event data Y is extracted (S31, NO), the matching pattern group PF stored in the pattern storage area 9p
The certain symbol string pattern pF,i is rewritten and updated to the symbol deletion pattern at this time (S32). The processing steps (S30 to S32) from the creation of the symbol deletion pattern to the rewriting update described above are also executed for each of the remaining symbol string patterns of the matching pattern group PF. That is, the flag in the flag storage area 9f, the false alarm check means 10, and the redundancy check means 11
is the pattern updating means referred to in the present invention. This time, on the contrary,
The processing operations of sequentially deleting, checking for false alarms, and rewriting and updating the symbol deletion pattern are performed from the foremost symbol element Zr,1 of the rewritten and updated symbol deletion pattern factor xr toward the last part (S33 to S35). . These processing operations are sequentially executed for each symbol string pattern of the matching pattern group PF in the same manner as steps S30 to S32 above. Note that the deletion start position of the symbol element to be deleted from the symbol string pattern is not limited to the first or last position, but may be, for example, any position.

【0015】このように,上記ルール作成装置1は,必
要最小限の要因をマッチングパターン群PF の記号列
パターンとして取り込む一方,上記記号列パターンの最
下位優先順位の要因から誤報を生じることのない範囲で
記号要素Zを削除し得るので,このマッチングパターン
群PF を用いたルールの条件部の冗長性を解消するこ
とができる。これによって,例えばルール推論の演算速
度を向上化できる。一方,ルール統合手段12は,冗長
性解消ステップ実行済のマッチングパターン群において
これに含まれる記号列パターンの記号要素のうち,ある
サンプリング時刻の記号要素のレベル(定性記号NP〜
PB)が1ランク異なるのみで他の残りの記号要素がい
ずれも同一である場合にこれらの記号列パターンを一つ
に統合する(S36)。例えば,以下に示す(13)式
と(14)式に示す2つの記号列パターンp1,1 (
x1 ),p1,2 (x2 )において,最先部の記
号要素のレベルがそれぞれPB,PMであって1ランク
のレベル差であり,他の残りの記号要素が全て同じあっ
たとき,ルール統合手段12は最先部の記号要素のレベ
ルを共通のPBMとして(15)式に示すような1つの
新たな記号列パターンに統合し,上記パターン記憶領域
9p に書換え更新する。これによって,上記マッチン
グパターン群PF の冗長性はより一層解消される。           p1,1 (x1 )={PB,
・・・・・・}            …(13) 
         p1,2 (x1 )={PM,・
・・・・・}            …(14)  
        p1,1 (x1 )={PBM,・
・・・・}            …(15)このよ
うにして,フラグ記憶領域9f のフラグにより最終的
に書換え更新されたマッチングパターン群PF は上記
演算部により地盤改良装置20の詰まり事象を予知する
ためのルールの条件部として用いられる一方,上記詰ま
り事象データYは上記ルールの結論部として用いられる
。即ち,上記演算部が,パターン記憶手段に格納された
記号列パターン及び/若しくは上記付加記号列パターン
よりなる条件部と上記ある特定事象よりなる結論部とを
備えたルールを作成する本発明のルール作成手段である
In this way, the rule creation device 1 incorporates the minimum necessary factors into the symbol string pattern of the matching pattern group PF, while preventing false alarms from occurring from the lowest priority factors of the symbol string pattern. Since the symbol element Z can be deleted within the range, redundancy in the condition part of the rule using this matching pattern group PF can be eliminated. As a result, for example, the calculation speed of rule inference can be improved. On the other hand, the rule integration means 12 determines the level of the symbol element at a certain sampling time (qualitative symbol NP~
PB) differ by only one rank and all other remaining symbol elements are the same, these symbol string patterns are integrated into one (S36). For example, two symbol string patterns p1,1 (
x1 ), p1,2 (x2 ), when the levels of the symbol elements at the top are PB and PM, respectively, with a level difference of 1 rank, and all other remaining symbol elements are the same, rule integration The means 12 integrates the level of the symbol element at the beginning as a common PBM into one new symbol string pattern as shown in equation (15), and rewrites and updates the pattern storage area 9p. This further eliminates redundancy in the matching pattern group PF. p1,1 (x1)={PB,
......} ...(13)
p1,2 (x1)={PM,・
...} ...(14)
p1,1 (x1)={PBM,・
...} ...(15) In this way, the matching pattern group PF finally rewritten and updated by the flag in the flag storage area 9f is used by the above-mentioned calculation unit as a rule for predicting a clogging event in the ground improvement device 20. The blockage event data Y is used as the conclusion part of the rule. That is, the rule of the present invention in which the arithmetic unit creates a rule having a condition part consisting of the symbol string pattern and/or the additional symbol string pattern stored in the pattern storage means and a conclusion part consisting of the certain specific event. It is a means of creation.

【0016】上記したように,本実施例のルール作成装
置1は,地盤改良装置20からのデータサンプリング時
刻毎の数値データを定性記号に変換した後,これらの定
性記号よりなる時系列的な記号列パターンであって地盤
改良装置20の詰まり事象に関わるものを抽出すること
ができる。この記号列パターンは数値データの取扱いに
不慣れな人にとってもパターンとして認識し易い。従っ
て,上記抽出された記号列パターンに基づいて,たとえ
人手であっても詰まり予知のルール作成が容易になる。 一方,ルールの条件部に用いられる記号列パターンにお
いて誤報が生じる場合には,上記誤報が生じなくなるま
で当該記号列パターンに優先順位を考慮した別の記号列
パターンが付加される。これによって,上記ルールの条
件が厳しくされるので,当該ルールを用いた場合,上記
詰まり事象を極めて精度良く予知することができる。加
えて,上記ルール作成装置1は最下位優先順位の要因に
係る記号列パターンについて誤報を生じない範囲で当該
パターンの記号要素を削除したり,あるいは極めて近似
した記号列パターン同士を一つに統合するので,ルール
条件部の内容が冗長でなくなる。なお,本実施例のルー
ル作成装置1は地盤改良装置20の掘削軸25における
地盤改良剤の詰まり事象に適用されたが,それに限定さ
れるものではなく,あるプラントに対して大きな影響を
及ぼすような特定の事象を上記プラントからの時系列デ
ータに基づいて精度良く予知する場合に好適である。
As described above, the rule creation device 1 of this embodiment converts the numerical data at each data sampling time from the ground improvement device 20 into qualitative symbols, and then converts the numerical data from the ground improvement device 20 into time-series symbols consisting of these qualitative symbols. It is possible to extract row patterns that are related to the clogging event of the ground improvement device 20. This symbol string pattern is easy to recognize as a pattern even for people who are unfamiliar with handling numerical data. Therefore, based on the extracted symbol string pattern, rules for clogging prediction can be easily created even manually. On the other hand, if a false alarm occurs in the symbol string pattern used in the condition part of the rule, another symbol string pattern is added to the symbol string pattern in consideration of priority until the false alarm no longer occurs. This makes the conditions of the rule stricter, so when the rule is used, the clogging event can be predicted with extremely high accuracy. In addition, the rule creation device 1 deletes the symbol elements of the symbol string pattern related to the lowest priority factor within the range that does not cause false alarms, or integrates extremely similar symbol string patterns into one. Therefore, the contents of the rule condition part are no longer redundant. Although the rule creation device 1 of this embodiment was applied to the clogging of the soil improvement agent in the excavation shaft 25 of the soil improvement device 20, the rule creation device 1 is not limited to this, and is applied to cases that may have a large impact on a certain plant. This is suitable for predicting specific events with high accuracy based on time series data from the plant.

【0017】[0017]

【発明の効果】第1の発明は上記したように構成されて
いる。従って,プラントの特定事象の発生を極めて精度
良く予知するためのルールを作成することができる。ま
た,第2の発明は上記したように構成されているので,
上記プラントの特定事象の発生を極めて精度良く予知す
るためのルールであって且つ条件部の内容が冗長でない
ルールを作成することができる。
[Effects of the Invention] The first invention is constructed as described above. Therefore, it is possible to create rules for predicting the occurrence of specific plant events with extremely high accuracy. Moreover, since the second invention is configured as described above,
It is possible to create a rule for predicting the occurrence of the specific event in the plant with extremely high accuracy, and the content of the condition part is not redundant.

【図面の簡単な説明】[Brief explanation of the drawing]

【図1】  本発明の一実施例に係る時系列データルー
ル作成装置が適用された地盤改良装置を示す概略構成図
FIG. 1 is a schematic configuration diagram showing a ground improvement device to which a time-series data rule creation device according to an embodiment of the present invention is applied.

【図2】  上記時系列データルール作成装置のブロッ
ク構成図。
FIG. 2 is a block configuration diagram of the time-series data rule creation device.

【図3】  上記地盤改良装置からの数値データの残差
の経時変化を示すグラフ図。
FIG. 3 is a graph diagram showing changes over time in the residual of numerical data from the ground improvement device.

【図4】  上記時系列データルール作成装置の定性記
号記憶手段に記憶された定性記号及び詰まり事象データ
の格納状態を示す説明図。
FIG. 4 is an explanatory diagram showing the storage state of qualitative symbols and clogging event data stored in the qualitative symbol storage means of the time-series data rule creation device.

【図5】  詰まり事象に関与する全ての要因のパター
ン長Mの記号列パターンよりなるある詰まり事例を示す
説明図。
FIG. 5 is an explanatory diagram showing a case of a blockage consisting of symbol string patterns of pattern length M for all factors involved in the blockage event.

【図6】  上記時系列データルール作成装置の処理手
順を示すフローチャート。
FIG. 6 is a flowchart showing the processing procedure of the time-series data rule creation device.

【符号の説明】[Explanation of symbols]

1…時系列データルール作成装置 4…記号化手段(定性記号付与手段) 5…定性記号記憶手段 8…パターン抽出手段(記号列抽出手段)9…パターン
記憶手段 9p …パターン記憶領域 9f …フラグ記憶領域 10  …誤報チェック手段 11…冗長性チェック手段 20…地盤改良装置
1... Time series data rule creation device 4... Symbolization means (qualitative symbol assigning means) 5... Qualitative symbol storage means 8... Pattern extraction means (symbol string extraction means) 9... Pattern storage means 9p... Pattern storage area 9f... Flag storage Area 10... False alarm checking means 11... Redundancy checking means 20... Ground improvement device

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】  特定事象を生じるプラントからの所定
のデータサンプリング時刻毎の複数種の操業データ及び
検出された特定事象に基づいて上記特定事象の発生を予
知するためのルールを作成する時系列データルール作成
装置において,予め複数に分割された上記操業データの
区分の,いずれかの区分に含まれる操業データに当該操
業データの大きさを表現する定性記号を付与する定性記
号付与手段と,優先順位の定められた各種の操業データ
の定性記号及び上記検出された特定事象を上記データサ
ンプリング時刻毎に格納する定性記号記憶手段と,ある
特定事象が発生した時点から遡った所定期間内の最上位
優先順位の操業データの定性記号よりなる記号列パター
ンを上記定性記号記憶手段に格納された定性記号から抽
出する記号列抽出手段と,上記定性記号記憶手段の定性
記号列から上記最上位優先順位の操業データの定性記号
よりなる記号列パターンと同一の記号列パターンを検索
し,該検索された記号列パターンに対応した上記ある特
定事象発生時点のデータサンプリング時刻における上記
特定事象を上記定性記号記憶手段から検索する特定事象
検索手段と,上記特定事象検索手段が上記ある特定事象
とは異なる特定事象を抽出した記号列パターンに,上記
所定期間に対応した優先順位を考慮した別種の操業デー
タの記号列パターンを付加して付加記号列パターンを作
成し,該付加記号列パターンを上記特定事象検索手段に
上記最上位優先順位の記号列パターンに代えて入力して
上記ある特定事象を抽出するまで上記付加記号列パター
ンの作成を繰り返す付加パターン作成手段と,上記特定
事象検索手段が上記異なる特定事象を抽出し得なかった
場合の記号列パターン及び/若しくは上記付加パターン
作成手段により作成された付加記号列パターンを格納す
るパターン記憶手段と,上記パターン記憶手段に格納さ
れた記号列パターン及び/若しくは上記付加記号列パタ
ーンよりなる条件部と上記ある特定事象よりなる結論部
とを備えたルールを作成するルール作成手段とを具備し
てなることを特徴とする時系列データルール作成装置。
[Claim 1] Time-series data for creating a rule for predicting the occurrence of the specific event based on a plurality of types of operational data at each predetermined data sampling time from a plant that causes the specific event and the detected specific event. In the rule creation device, a qualitative symbol assigning means for assigning a qualitative symbol expressing the size of the operational data to operational data included in any of the divisions of the operational data divided into a plurality of divisions in advance, and a priority order. Qualitative symbol storage means for storing the qualitative symbols of various operational data defined in the above and the detected specific event for each data sampling time, and the highest priority within a predetermined period retroactive from the time when a certain specific event occurred. a symbol string extracting means for extracting a symbol string pattern consisting of qualitative symbols of the operational data of the ranking from the qualitative symbols stored in the qualitative symbol storage means; A symbol string pattern that is the same as a symbol string pattern consisting of qualitative symbols of data is searched, and the specific event at the data sampling time at the time of occurrence of the specific event corresponding to the searched symbol string pattern is stored in the qualitative symbol storage means. A specific event search means to be searched, and a symbol string pattern of another type of operation data that takes into account the priority order corresponding to the predetermined period, based on the symbol string pattern from which the specific event search means has extracted a specific event different from the certain specific event. is added to create an additional symbol string pattern, and the additional symbol string pattern is input to the specific event search means in place of the symbol string pattern with the highest priority, and the additional symbol string is used until the specific event is extracted. Additional pattern creation means that repeatedly creates a sequence pattern, and a symbol string pattern when the specific event search means cannot extract the different specific event and/or an additional symbol string pattern created by the additional pattern creation means. a rule creation means for creating a rule comprising a pattern storage means for storing, a condition part consisting of the symbol string pattern and/or the additional symbol string pattern stored in the pattern storage means, and a conclusion part consisting of the certain specific event. A time series data rule creation device comprising:
【請求項2】  特定事象を生じるプラントからの所定
のデータサンプリング時刻毎の複数種の操業データ及び
検出された特定事象に基づいて上記特定事象の発生を予
知するためのルールを作成する時系列データルール作成
装置において,予め複数に分割された上記操業データの
区分の,いずれかの区分に含まれる操業データに当該操
業データの大きさを表現する定性記号を付与する定性記
号付与手段と,優先順位の定められた各種の操業データ
の定性記号及び上記検出された特定事象を上記データサ
ンプリング時刻毎に格納する定性記号記憶手段と,ある
特定事象が発生した時点から遡った所定期間内の最上位
優先順位の操業データの定性記号よりなる記号列パター
ンを上記定性記号記憶手段に格納された定性記号から抽
出する記号列抽出手段と,上記定性記号記憶手段の定性
記号列から上記最上位優先順位の操業データの定性記号
よりなる記号列パターンと同一の記号列パターンを検索
し,該検索された記号列パターンに対応した上記ある特
定事象発生時点のデータサンプリング時刻における上記
特定事象を上記定性記号記憶手段から検索する特定事象
検索手段と,上記特定事象検索手段が上記ある特定事象
とは異なる特定事象を抽出した記号列パターンに,上記
所定期間に対応した優先順位を考慮した別種の操業デー
タの記号列パターンを付加して付加記号列パターンを作
成し,該付加記号列パターンを上記特定事象検索手段に
上記最上位優先順位の記号列パターンに代えて入力して
上記ある特定事象を抽出するまで上記付加記号列パター
ンの作成を繰り返す付加パターン作成手段と,上記特定
事象検索手段が上記異なる特定事象を抽出し得なかった
場合の記号列パターン及び/若しくは上記付加パターン
作成手段により作成された付加記号列パターンを格納す
るパターン記憶手段と,上記パターン記憶手段に格納さ
れた記号列パターン若しくは上記付加記号列パターンの
最下位優先順位の記号列パターンから少なくともひとつ
の定性記号を削除して記号削除パターンを作成するとと
もに該記号削除パターンを上記定性記号記憶手段から検
索し,該検索された記号削除パターンに対応した特定事
象発生時点のデータサンプリング時刻に上記ある特定事
象が格納されている場合に,上記パターン記憶手段の記
号列パターン若しくは上記付加記号列パターンを上記記
号削除パターンに書換え更新し,上記削除から書換え更
新までの処理を少なくとも1回以上繰り返すパターン更
新手段と,上記パターン記憶手段に格納された記号列パ
ターン及び/若しくは上記付加記号列パターンよりなる
条件部と上記ある特定事象よりなる結論部とを備えたル
ールを作成するルール作成手段とを具備してなることを
特徴とする時系列データルール作成装置。
[Claim 2] Time-series data for creating a rule for predicting the occurrence of the specific event based on a plurality of types of operational data at each predetermined data sampling time from a plant that causes the specific event and the detected specific event. In the rule creation device, a qualitative symbol assigning means for assigning a qualitative symbol expressing the size of the operational data to operational data included in any of the divisions of the operational data divided into a plurality of divisions in advance, and a priority order. Qualitative symbol storage means for storing the qualitative symbols of various operational data defined in the above and the detected specific event for each data sampling time, and the highest priority within a predetermined period retroactive from the time when a certain specific event occurred. a symbol string extracting means for extracting a symbol string pattern consisting of qualitative symbols of the operational data of the ranking from the qualitative symbols stored in the qualitative symbol storage means; A symbol string pattern that is the same as a symbol string pattern consisting of qualitative symbols of data is searched, and the specific event at the data sampling time at the time of occurrence of the specific event corresponding to the searched symbol string pattern is stored in the qualitative symbol storage means. A specific event search means to be searched, and a symbol string pattern of another type of operation data that takes into account the priority order corresponding to the predetermined period, based on the symbol string pattern from which the specific event search means has extracted a specific event different from the certain specific event. is added to create an additional symbol string pattern, and the additional symbol string pattern is input to the specific event search means in place of the symbol string pattern with the highest priority, and the additional symbol string is used until the specific event is extracted. Additional pattern creation means that repeatedly creates a sequence pattern, and a symbol string pattern when the specific event search means cannot extract the different specific event and/or an additional symbol string pattern created by the additional pattern creation means. creating a symbol deletion pattern by deleting at least one qualitative symbol from the symbol string pattern stored in the storing pattern storage means and the symbol string pattern of the lowest priority of the symbol string pattern or the additional symbol string pattern; The symbol deletion pattern is retrieved from the qualitative symbol storage means, and when the specific event is stored at the data sampling time of the specific event occurrence corresponding to the retrieved symbol deletion pattern, the pattern storage means is pattern updating means for rewriting and updating the symbol string pattern or the additional symbol string pattern into the symbol deletion pattern and repeating the processing from the deletion to the rewriting and updating at least once; and the symbol string pattern and the symbol string pattern stored in the pattern storage means. A time-series data rule creation device comprising: a rule creation means for creating a rule having a condition part made up of the additional symbol string pattern and a conclusion part made up of the certain specific event.
JP3088885A 1991-04-20 1991-04-20 Draw-up device for time series data rule Pending JPH04323414A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3088885A JPH04323414A (en) 1991-04-20 1991-04-20 Draw-up device for time series data rule

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3088885A JPH04323414A (en) 1991-04-20 1991-04-20 Draw-up device for time series data rule

Publications (1)

Publication Number Publication Date
JPH04323414A true JPH04323414A (en) 1992-11-12

Family

ID=13955442

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3088885A Pending JPH04323414A (en) 1991-04-20 1991-04-20 Draw-up device for time series data rule

Country Status (1)

Country Link
JP (1) JPH04323414A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024603A (en) * 2018-08-09 2018-12-18 中国三峡建设管理有限公司 Grouting process state switching method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6017202A (en) * 1983-06-22 1985-01-29 ア−・ベ−・ボルボ・ペンタ Rotor apparatus
JPH04166698A (en) * 1990-10-31 1992-06-12 Mitsui Miike Mach Co Ltd Contrarotating axial fan

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6017202A (en) * 1983-06-22 1985-01-29 ア−・ベ−・ボルボ・ペンタ Rotor apparatus
JPH04166698A (en) * 1990-10-31 1992-06-12 Mitsui Miike Mach Co Ltd Contrarotating axial fan

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024603A (en) * 2018-08-09 2018-12-18 中国三峡建设管理有限公司 Grouting process state switching method
CN109024603B (en) * 2018-08-09 2021-06-08 中国三峡建设管理有限公司 Grouting process state switching method

Similar Documents

Publication Publication Date Title
JP4490350B2 (en) Input operation support device and input operation support method
CN203559895U (en) Electric mining rope excavator, electric mining drilling machine and system
CA2559020C (en) Method and apparatus for drilling waste disposal engineering and operations using a probabilistic approach
CN102841916B (en) The registration of address date and the method and system of maintenance about each service point in area
US6691138B1 (en) Flexible configuration file manager
US7809719B2 (en) Predicting textual candidates
CN106156103A (en) A kind of search processing method and device
EP1257887A1 (en) System and method for monitoring a control process in a process plant
JP7219181B2 (en) Construction management method for shield machine
JPH04323414A (en) Draw-up device for time series data rule
US20110066996A1 (en) Schematic wire annotation tool
US20030126165A1 (en) Method for defining and optimizing criteria used to detect a contextually specific concept within a paragraph
Niemann et al. Further results on restarting automata
JPH04343909A (en) Time series data rule renewing device
CN108182071A (en) A kind of configuration error detection method of software-oriented upgrading
CN111794742B (en) Shale gas drilling engineering tracking deduction method
CN115098365A (en) SQL code debugging method and device, electronic equipment and readable storage medium
Arranz et al. A generic framework for data quality analytics.
JP2020057281A (en) Plant device information management system
JP2000172739A (en) Design supporting device
CN112100366B (en) Pavement structure layer display method and device, computer equipment and storage medium
CN109086548A (en) A kind of solution about hydro-structure three-dimensional arrangement of reinforcement
DE102019101391A1 (en) Processing time prediction unit
KR20100086860A (en) Method for deriving thesaurus database from statistics
JP6805101B2 (en) Document retrieval method and equipment