JPH04302616A - Crushing of cast-in-place pile and removal of reinforcing steel cage - Google Patents

Crushing of cast-in-place pile and removal of reinforcing steel cage

Info

Publication number
JPH04302616A
JPH04302616A JP9374891A JP9374891A JPH04302616A JP H04302616 A JPH04302616 A JP H04302616A JP 9374891 A JP9374891 A JP 9374891A JP 9374891 A JP9374891 A JP 9374891A JP H04302616 A JPH04302616 A JP H04302616A
Authority
JP
Japan
Prior art keywords
cast
diameter
hole
reinforcing bar
crushing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP9374891A
Other languages
Japanese (ja)
Inventor
Kiyomi Ishioka
石岡 清見
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ISHIOKA KENSETSU KK
Original Assignee
ISHIOKA KENSETSU KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ISHIOKA KENSETSU KK filed Critical ISHIOKA KENSETSU KK
Priority to JP9374891A priority Critical patent/JPH04302616A/en
Publication of JPH04302616A publication Critical patent/JPH04302616A/en
Pending legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

PURPOSE:To extract a reinforcing steel cage in the state of cutting soil pressure by way of changing an existing cast-in-place pile into a hollow pile and crushing its concrete from the inside by means of diameter expansion and to simultaneously prevent breaking of the ground around an extraction hole of the reinforcing steel cage. CONSTITUTION:A cast-in-place pile is changed into a hollow pile by forming a cut hole a in the central part of the cast-in-place pile, and peripheral concrete of the cut hole a is expanded in diameter from the inside and crushed 6. A reinforcing steel cage 2 is extracted by cutting soil pressure by way of burying a casing underground in order to surround a crushed concrete structure and engaging a diameter expansion member 5 with the lower part side of the reinforcing steel cage. Thereafter, the casing 12 is extracted after charging backfilling sand C in the extracted hole.

Description

【発明の詳細な説明】[Detailed description of the invention]

【0001】0001

【産業上の利用分野】本発明は、地中に埋設されている
場所打ち杭を破砕し、かつ、杭内部に存した鉄筋かごを
撤去するための場所打ち杭の破砕ならびに鉄筋かごの撤
去方法に関する。
[Industrial Application Field] The present invention provides a method for crushing a cast-in-place pile buried underground and removing a reinforcing bar cage that is inside the pile. Regarding.

【0002】0002

【従来の技術】上記の場所打ち杭は、例えばアースオー
ガで掘削した地中の掘削穴に筒状の鉄筋かごを挿入し、
当該鉄筋かごを埋入するように掘削穴内にコンクリート
を打設して構築されている。
[Prior Art] The above-mentioned cast-in-place pile is made by inserting a cylindrical reinforcing bar cage into an underground hole excavated with an earth auger, for example.
It is constructed by pouring concrete into an excavated hole to bury the reinforcing cage.

【0003】かゝる場所打ち杭を撤去するのに従来は、
下端に切削爪を備えた筒状のケーシングを場所打ち杭の
周部において掘削下降させつつ、当該場所打ち杭のコン
クリートをアースオーガで切削し、かつ、埋入されてい
る鉄筋かごをオーガビットで切断して、これらを地上に
排除し、次いで、アースオーガを引き抜いて場所打ち杭
の排除穴に埋め戻し用土砂を投入し、ケーシングを引き
抜く手段がとられている。
Conventionally, to remove such cast-in-place piles,
While excavating and lowering a cylindrical casing with a cutting claw at the lower end around the cast-in-place pile, the concrete of the cast-in-place pile is cut with an earth auger, and the embedded reinforcing bar cage is removed with an auger bit. The method is to cut them and remove them to the ground, then pull out the earth auger, put backfilling earth and sand into the removal hole of the cast-in-place pile, and pull out the casing.

【0004】0004

【発明が解決しようとする課題】しかし、鉄筋かごの主
鉄筋は、直径が20〜25mmにも及ぶ太いものが用い
られており、これをオーガビットで切断することは極め
て困難であり、かつ、鉄筋かごの主鉄筋は、例えば番線
等によって鉄筋かごの途中で結束されていることが殆ど
であって、この主鉄筋の結束部分すなわち端部側にオー
ガビットによる切断力が作用した際(杭先端側からの破
砕初期についても同様)には、主鉄筋の直径が如何に太
くても当該主鉄筋の端部側が折り曲げられてしまって、
オーガビットはこの主鉄筋の周面部を削ぐように切断作
用することになり、爾後の掘進が極めて困難で長時間を
要する上にオーガビットが早期に摩耗し、あるいは、切
削掘進すること自体が不能になることがあった。
[Problems to be Solved by the Invention] However, the main reinforcing bars of reinforcing bar cages are thick, with a diameter of 20 to 25 mm, and it is extremely difficult to cut them with an auger bit. In most cases, the main reinforcing bars of a reinforcing bar cage are tied together in the middle of the reinforcing bar cage, for example, by wires, etc., and when cutting force by an auger bit is applied to the tied part of the main reinforcing bars, that is, to the end side (the tip of the pile The same applies to the initial stage of fracture from the side), no matter how thick the diameter of the main reinforcing bar is, the end side of the main reinforcing bar is bent.
The auger bit has a cutting action that scrapes the peripheral surface of the main reinforcing bar, and subsequent digging is extremely difficult and takes a long time, and the auger bit wears out early, or it becomes impossible to cut and dig at all. Sometimes it became.

【0005】一方、鉄筋かごのフープ筋は、オーガビッ
トの切削方向に対して緩傾斜の状態で位置することから
、上記した主鉄筋の端部が曲げられた状態と同じように
、オーガビットはこのフープ筋を削ぐようにして所謂面
切削の状態で切断するように作用し、而して、その直径
が如何に細くても、これの切断が極めて困難で時間がか
ゝる上に、やはりオーガビットが早期に摩耗してしまう
ものであった。
On the other hand, since the hoop reinforcement of the reinforcing bar cage is located at a gentle slope with respect to the cutting direction of the auger bit, the auger bit is It acts to cut this hoop line in a so-called surface cutting state, and no matter how thin the diameter is, cutting this is extremely difficult and time consuming. The auger bit wore out prematurely.

【0006】あるいは、鉄筋が切断されなかった場合に
は、鉄筋がオーガビットやアースオーガに絡み付いてし
まって、ケーシングとの間で鉄筋を擦る異様な軋み音を
発したり掘進が不能になったりし、この時、一旦アース
オーガを引き抜いて、穴内で鉄筋を溶断するといった極
めて危険な作業が度々強いられ、総じて、杭を先端側か
ら少しずつ破砕し且つ鉄筋かごの一部を撤去することを
繰り返し行うことで、1本当たりの場所打ち杭の撤去に
長時間を要するものであった。
[0006] Alternatively, if the reinforcing bars are not cut, the reinforcing bars may become entangled with the auger bit or earth auger, causing the reinforcing bars to rub against the casing, making strange creaking noises, or making it impossible to excavate. At this time, we were often forced to pull out the earth auger and melt the reinforcing bars inside the hole, which was extremely dangerous work.In general, we had to repeatedly break the pile little by little from the tip and remove part of the reinforcing bar cage. This required a long time to remove each cast-in-place pile.

【0007】本発明は、かゝる実情に鑑みて、上記の不
都合を一切伴わせずに、短時間で場所打ち杭を撤去でき
る方法を提供することを目的としている。
[0007] In view of these circumstances, it is an object of the present invention to provide a method for removing cast-in-place piles in a short time without any of the above-mentioned inconveniences.

【0008】[0008]

【課題を解決するための手段】上記の目的を達成するに
至った本発明による場所打ち杭の破砕ならびに鉄筋かご
の撤去方法は、筒状の鉄筋かご内部のコンクリートを切
削排除して場所打ち杭の中心部に切削穴を形成し、当該
切削穴の周部コンクリートを破砕手段によって穴底部側
から上方にわたって順次破砕し、この破砕されたコンク
リート構造物を囲うようにケーシングを地中に埋入させ
、かつ、回転に伴って拡径する拡径部材を前記破砕され
たコンクリート塊中に突入させて前記拡径部材を拡径さ
せ、当該拡径部材を鉄筋かごの下部側に係止させて鉄筋
かごを引き抜き、この鉄筋かごの引き抜きによって形成
された穴内に埋め戻し用土砂を投入して後にケーシング
を引き抜く点に特徴がある。
[Means for Solving the Problems] The method of crushing cast-in-place piles and removing reinforcing bar cages according to the present invention, which has achieved the above object, is to remove the concrete inside the cylindrical reinforcing cage by cutting and removing the cast-in-place piles. A cut hole is formed in the center of the cut hole, the concrete surrounding the cut hole is sequentially crushed from the bottom of the hole upward using a crushing means, and a casing is buried in the ground to surround the crushed concrete structure. , and a diameter-expanding member whose diameter expands as it rotates is plunged into the crushed concrete mass to expand the diameter of the diameter-expanding member, and the diameter-expanding member is locked to the lower side of the reinforcing bar cage to remove the reinforcing bars. The feature is that the cage is pulled out, backfilling soil is poured into the hole formed by pulling out the reinforcing cage, and the casing is then pulled out.

【0009】[0009]

【作用】即ち、場所打ち杭を中空の杭と化して、これを
底部側から順次破砕し、かつ、この破砕されたコンクリ
ート構造物のまわりにケーシングを位置させて、当該コ
ンクリート構造物に対する土圧をカットし、かゝる状態
で鉄筋かごの下部側に拡径部材を係止させて当該鉄筋か
ごを引き抜くもので、鉄筋かごの切断を行うことなく、
一部コンクリート塊を含む鉄筋かごの全体を、土圧カッ
トの状態で簡易に且つ一挙に引き抜くことができる。
[Operation] That is, the cast-in-place piles are turned into hollow piles, which are sequentially crushed from the bottom side, and a casing is placed around the crushed concrete structure, so that the earth pressure against the concrete structure is This method involves cutting the reinforcing bar cage, locking the diameter expanding member on the lower side of the reinforcing bar cage while it is being held, and pulling out the reinforcing bar cage, without cutting the reinforcing bar cage.
The entire reinforcing bar cage, including a part of the concrete mass, can be easily pulled out at once in a state of earth pressure cutting.

【0010】そして、土圧カット用のケーシングの引き
抜き前に、当該ケーシングの内部に土砂を埋め戻すので
、ケーシングを引き抜いた場所打ち杭の撤去完了の状態
で、その引き抜き穴まわりの地盤崩壊も確実に防止され
る。
[0010] Furthermore, before the casing for earth pressure cutting is pulled out, the inside of the casing is backfilled with earth and sand, so it is ensured that the ground collapses around the pull-out hole when the cast-in-place pile from which the casing has been pulled out has been completely removed. is prevented.

【0011】[0011]

【実施例】以下、本発明による場所打ち杭の破砕ならび
に鉄筋かごの撤去手順について説明する。先ず、図1(
A),(B)に示すように、場所打ち杭1に埋入されて
いる筒状の鉄筋かご2の組立内径よりもやゝ小径のオー
ガビット3を備えたアースオーガ4によって、前記鉄筋
かご2の内部コンクリートを杭下端を貫通するまで切削
排除する。
[Example] The procedure for crushing cast-in-place piles and removing reinforcing bar cages according to the present invention will be explained below. First, Figure 1 (
As shown in A) and (B), an earth auger 4 equipped with an auger bit 3 having a diameter slightly smaller than the assembled inner diameter of a cylindrical reinforcing bar cage 2 embedded in a cast-in-place pile 1 is used to Cut and remove the internal concrete from step 2 until it penetrates the bottom end of the pile.

【0012】この内部コンクリートの切削排除に際して
、例えばオーガビット1にエアまたは水の吹き出しノズ
ルを備えさせておいて、高圧の水やエアを切削部に噴出
させることが望ましい。尚、図2および図3に示すよう
に、前記オーガビット3には、切削方向の回転とは逆方
向の回転に伴って拡径する拡径部材5が備えられている
When removing the internal concrete by cutting, it is desirable that, for example, the auger bit 1 is equipped with an air or water blowing nozzle to blow high-pressure water or air into the cutting part. As shown in FIGS. 2 and 3, the auger bit 3 is provided with a diameter-expanding member 5 whose diameter increases as the auger bit rotates in a direction opposite to the cutting direction.

【0013】次に、前記アースオーガ4を地上に引き抜
いて、図1(C)に示すように、前記場所打ち杭1を中
心部に切削穴aが形成された中空の杭1aと化し、この
中空の杭1aの前記切削穴a内に破砕手段6を挿入して
、当該切削穴aの周部コンクリートを穴底部側から杭上
方にわたって順次破砕させるのである。
Next, the earth auger 4 is pulled out to the ground, and the cast-in-place pile 1 is turned into a hollow pile 1a with a cut hole a formed in the center, as shown in FIG. A crushing means 6 is inserted into the cut hole a of the hollow pile 1a, and the concrete around the cut hole a is sequentially crushed from the bottom of the hole to the top of the pile.

【0014】前記破砕手段6の一例を図4に示す。この
破砕手段6は、係止ピン7の引き抜きによって伸長し且
つ当該係止ピン7の挿入によって連結固定される伸縮ロ
ッド8の下端に、往復動タイプの油圧シリンダ9を横設
させると共に、当該油圧シリンダ9に対する圧油の供給
ホース10を伸縮ロッド8内に挿通させ、かつ、前記油
圧シリンダ9のピストンロッド9aとシリンダチューブ
9bに、夫々押圧部材11を設けて成るもので、前記油
圧シリンダ9の収縮下における押圧部材11の外端間寸
法が切削穴aの内径よりもやゝ小に、かつ、伸長下にお
ける押圧部材11の外端間寸法が切削穴aの内径よりも
大になるように、前記油圧シリンダ9をストローク設定
してある。
An example of the crushing means 6 is shown in FIG. This crushing means 6 has a reciprocating type hydraulic cylinder 9 installed horizontally at the lower end of a telescoping rod 8 which is extended by pulling out the locking pin 7 and is connected and fixed by the insertion of the locking pin 7. A pressure oil supply hose 10 for the cylinder 9 is inserted into the telescopic rod 8, and a pressing member 11 is provided on the piston rod 9a and cylinder tube 9b of the hydraulic cylinder 9, respectively. The dimension between the outer ends of the pressing member 11 under contraction is slightly smaller than the inner diameter of the cut hole a, and the dimension between the outer ends of the pressing member 11 under extension is larger than the inner diameter of the cut hole a. , the stroke of the hydraulic cylinder 9 is set.

【0015】而して、前記伸縮ロッド8を例えば60度
おきや90度置きに間欠回転させて、その都度、前記油
圧シリンダ9を伸縮させることで、前記鉄筋かご2を含
む中空杭1aの切削穴a周部のコンクリートが拡径破砕
されるのであり、この破砕を穴底部側から順次中空杭1
a上端にわたって行うのである。
The hollow pile 1a including the reinforcing bar cage 2 is cut by rotating the telescopic rod 8 intermittently, for example, every 60 degrees or every 90 degrees, and expanding and contracting the hydraulic cylinder 9 each time. The concrete around hole a is expanded in diameter and crushed, and this crushing is sequentially carried out from the bottom of the hole by hollow pile 1.
This is done over the upper edge of a.

【0016】上記の破砕を確認した上で前記破砕手段6
を取り除き、図1(D)に示すように、前記破砕手段6
によって破砕されたコンクリート構造物(鉄筋かご2と
破砕されたコンクリート塊1b)を囲うように、当該コ
ンクリート構造物まわりの地中にケーシング12を埋入
させて、コンクリート構造物に対する土圧をカットさせ
るのである。
After confirming the above-mentioned crushing, the crushing means 6
is removed, and as shown in FIG. 1(D), the crushing means 6
A casing 12 is buried in the ground around the concrete structure so as to surround the crushed concrete structure (the reinforcing steel cage 2 and the crushed concrete mass 1b) to cut the earth pressure against the concrete structure. It is.

【0017】この土圧のカット下において、図1(E)
に示すように、前記アースオーガ4を再び切削穴a内に
挿通し、かつ、当該アースオーガ4を切削方向に回転さ
せてオーガビット3を拡径部材5と共にコンクリート塊
1b中に突入させるのである。そして、当該アースオー
ガ4を切削方向とは逆方向に回転させて前記拡径部材5
を拡径させ、この拡径部材5を鉄筋かご2の下部側に係
止させるのである。
[0017] Under this earth pressure cut, Fig. 1(E)
As shown in the figure, the earth auger 4 is inserted into the cutting hole a again, and the earth auger 4 is rotated in the cutting direction, so that the auger bit 3 and the diameter expanding member 5 are plunged into the concrete mass 1b. . Then, the earth auger 4 is rotated in a direction opposite to the cutting direction, and the diameter-expanding member 5 is
is expanded in diameter, and this diameter-expanding member 5 is locked to the lower side of the reinforcing bar cage 2.

【0018】このようにして、拡径部材5を鉄筋かご2
に係止させて後に、図1(F)に示すように、前記アー
スオーガ4を引き上げ、前記ケーシング12による土圧
カットの下で、一部絡み付いているコンクリート塊1b
を含む鉄筋かご2の全体を、その下部側から一挙に地上
に引き抜くのである。
In this way, the diameter expanding member 5 is attached to the reinforcing bar cage 2.
As shown in FIG. 1(F), the earth auger 4 is pulled up and, under the earth pressure cut by the casing 12, the concrete mass 1b that is partially entangled is removed.
The entire reinforcing bar cage 2, including the reinforcing bar cage 2, is pulled out to the ground from the lower side at once.

【0019】この鉄筋かご2の引き抜きは、前記ケーシ
ング12による土圧カットの下で行われるので簡易に行
われる。そして、鉄筋かご2を引き抜いて後に、前記土
圧カット用のケーシング12を引き抜く前に、前記鉄筋
かご2の引き抜によって形成された穴b内に埋め戻し用
土砂cを投入する。
This pulling out of the reinforcing bar cage 2 is carried out under the earth pressure cut by the casing 12, so that it is easily carried out. After the reinforcing bar cage 2 is pulled out, and before the earth pressure cutting casing 12 is pulled out, backfilling soil c is thrown into the hole b formed by pulling out the reinforcing bar cage 2.

【0020】次いで、図1(Gに示すように、前記ケー
シング12を引き抜くのであり、以上をもって場所打ち
杭1の破砕ならびに鉄筋かご2の撤去を完了するのであ
るが、前記ケーシング12を引き抜く前に、前記ケーシ
ング引き抜き穴bに埋め戻し用土砂cを投入させている
ので、当該引き抜き穴bまわりの地盤崩壊が確実に防止
される。
Next, as shown in FIG. 1 (G), the casing 12 is pulled out, and this completes the crushing of the cast-in-place pile 1 and the removal of the reinforcing bar cage 2. However, before pulling out the casing 12, Since backfilling soil c is thrown into the casing pull-out hole b, the ground collapse around the pull-out hole b is reliably prevented.

【0021】[0021]

【発明の効果】以上説明したように本発明による場所打
ち杭の破砕ならびに鉄筋かごの撤去方法は、鉄筋かごの
切断を行わせずして、即ち、オーガビットの早期摩耗あ
るいは切削掘進の不能といった事態を伴わせずに、場所
打ち杭を中空の杭と化して破砕し、このコンクリート塊
を含む鉄筋かごの全体を土圧カットの状態で一挙に引き
抜くことものであって、場所打ち杭の撤去が短時間で且
つ簡易に達成される。
[Effects of the Invention] As explained above, the method of crushing cast-in-place piles and removing reinforcing bar cages according to the present invention eliminates the problem of premature wear of the auger bit or inability to cut and dig without cutting the reinforcing bar cages. The method involves turning cast-in-place piles into hollow piles, crushing them, and pulling out the entire reinforcing cage, including the concrete mass, all at once while cutting the earth pressure, without causing any damage.Removal of cast-in-place piles can be achieved easily and in a short time.

【0022】しかも、土圧カット用のケーシングの引き
抜き前に、当該ケーシングの内部に土砂を埋め戻すので
、ケーシングを引き抜いた場所打ち杭の撤去完了下での
地盤崩壊も確実に防止される。
[0022] Moreover, since the inside of the casing for earth pressure cutting is backfilled with earth and sand before being pulled out, it is reliably prevented from ground collapse even after the removal of the cast-in-place pile from which the casing has been pulled out is completed.

【図面の簡単な説明】[Brief explanation of the drawing]

【図1】図1(A)〜(G)は場所打ち杭の破砕ならび
に鉄筋かごの撤去手順を示す説明図である。
FIG. 1A to FIG. 1G are explanatory diagrams showing the procedure for crushing cast-in-place piles and removing reinforcing bar cages.

【図2】拡径部材を拡径させたアースオーガ下部側の側
面図である。
FIG. 2 is a side view of the lower part of the earth auger in which the diameter of the diameter-expanding member is expanded.

【図3】拡径部材の拡径状態を示すアースオーガの底面
図である。
FIG. 3 is a bottom view of the earth auger showing a diameter-expanded state of the diameter-expanding member.

【図4】破砕手段の断面図である。FIG. 4 is a sectional view of the crushing means.

【符号の説明】[Explanation of symbols]

1…場所打ち杭、1b…コンクリート塊、2…鉄筋かご
、5…拡径部材、6…破砕手段、12…ケーシング、a
…切削穴、b…ケーシング引き抜き穴、c…埋め戻し用
土砂。
DESCRIPTION OF SYMBOLS 1... Cast-in-place pile, 1b... Concrete lump, 2... Reinforced cage, 5... Diameter expansion member, 6... Crushing means, 12... Casing, a
... Cutting hole, b... Casing pullout hole, c... Earth and sand for backfilling.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】  筒状の鉄筋かご内部のコンクリートを
切削排除して場所打ち杭の中心部に切削穴を形成し、当
該切削穴の周部コンクリートを破砕手段によって穴底部
側から上方にわたって順次破砕し、この破砕されたコン
クリート構造物を囲うようにケーシングを地中に埋入さ
せ、かつ、回転に伴って拡径する拡径部材を前記破砕さ
れたコンクリート塊中に突入させて前記拡径部材を拡径
させ、当該拡径部材を鉄筋かごの下部側に係止させて鉄
筋かごを引き抜き、この鉄筋かごの引き抜きによって形
成された穴内に埋め戻し用土砂を投入して後にケーシン
グを引き抜くことを特徴とする場所打ち杭の破砕ならび
に鉄筋かごの撤去方法。
Claim 1: Cutting away the concrete inside the cylindrical reinforcing cage to form a cut hole in the center of the cast-in-place pile, and sequentially crushing the concrete around the cut hole from the bottom of the hole upward using a crushing means. Then, a casing is buried in the ground to surround the crushed concrete structure, and a diameter-expanding member that expands in diameter as it rotates is plunged into the crushed concrete mass. The diameter-expanding member is locked to the lower side of the reinforcing bar cage, the reinforcing bar cage is pulled out, backfilling soil is thrown into the hole formed by pulling out the reinforcing bar cage, and the casing is later pulled out. Characteristic methods for crushing cast-in-place piles and removing reinforcing cages.
JP9374891A 1991-03-29 1991-03-29 Crushing of cast-in-place pile and removal of reinforcing steel cage Pending JPH04302616A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9374891A JPH04302616A (en) 1991-03-29 1991-03-29 Crushing of cast-in-place pile and removal of reinforcing steel cage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9374891A JPH04302616A (en) 1991-03-29 1991-03-29 Crushing of cast-in-place pile and removal of reinforcing steel cage

Publications (1)

Publication Number Publication Date
JPH04302616A true JPH04302616A (en) 1992-10-26

Family

ID=14091048

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9374891A Pending JPH04302616A (en) 1991-03-29 1991-03-29 Crushing of cast-in-place pile and removal of reinforcing steel cage

Country Status (1)

Country Link
JP (1) JPH04302616A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010189952A (en) * 2009-02-19 2010-09-02 Kantoku Kogyo Kk Existing pile removing device
JP2010265666A (en) * 2009-05-14 2010-11-25 Kantoku Kogyo Kk Method of removing existing concrete pile
JP2013130312A (en) * 2011-12-20 2013-07-04 Takenaka Komuten Co Ltd Method for installing ground heat exchanger
JP2014163213A (en) * 2013-02-27 2014-09-08 Sanwa Kizai Co Ltd Removal method for existing pile
CN104895057A (en) * 2015-05-15 2015-09-09 上海长凯岩土工程有限公司 Big diameter steel pipe protective wall artificial digging-hole bottom expanding pile and building foundation reinforcement method
JP2018048445A (en) * 2016-09-20 2018-03-29 鹿島建設株式会社 Demolition method
CN111119064A (en) * 2020-01-16 2020-05-08 天津新亚太工程建设监理有限公司 Prefabricated supporting device for reinforcement cage of pier body of cross-sea bridge and supervision method of prefabricated supporting device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010189952A (en) * 2009-02-19 2010-09-02 Kantoku Kogyo Kk Existing pile removing device
JP2010265666A (en) * 2009-05-14 2010-11-25 Kantoku Kogyo Kk Method of removing existing concrete pile
JP2013130312A (en) * 2011-12-20 2013-07-04 Takenaka Komuten Co Ltd Method for installing ground heat exchanger
JP2014163213A (en) * 2013-02-27 2014-09-08 Sanwa Kizai Co Ltd Removal method for existing pile
CN104895057A (en) * 2015-05-15 2015-09-09 上海长凯岩土工程有限公司 Big diameter steel pipe protective wall artificial digging-hole bottom expanding pile and building foundation reinforcement method
JP2018048445A (en) * 2016-09-20 2018-03-29 鹿島建設株式会社 Demolition method
CN111119064A (en) * 2020-01-16 2020-05-08 天津新亚太工程建设监理有限公司 Prefabricated supporting device for reinforcement cage of pier body of cross-sea bridge and supervision method of prefabricated supporting device

Similar Documents

Publication Publication Date Title
JP6932544B2 (en) Construction method of support pile
JPH04302616A (en) Crushing of cast-in-place pile and removal of reinforcing steel cage
JP5799474B2 (en) Retaining method for retaining wall
JP2000008796A (en) Pipe type lock bolt
JP2007332559A (en) Removal method for existing underground pile
JP3361776B2 (en) Crushing equipment for underground piles
JP2000220142A (en) Nailing device
KR100217845B1 (en) Construction process of underground structure
KR102099282B1 (en) Partially enlarging apparatus for underground pipe and composite cast in place pile method using the same
JP3948306B2 (en) Hollow pipe pile construction method
JP4400700B2 (en) Cutting and drawing method and equipment for existing piles
JPH03235812A (en) Underground earth removal anchor establishment method
JP6465511B2 (en) Plucking machine chucking mechanism and pile removal method
JPS6128770B2 (en)
JP2000120066A (en) Execution method for steel pipe pile
JP2631816B2 (en) Unnecessary buried pipe removal and restoration method
JPH10306441A (en) Steel-pipe pile cement-milk foot-protection pipe jacking with inner excavation system and auger used for the same
JPH0820945A (en) Foot protection at front end of foundation pile and device therefor
JPH0637830B2 (en) Vertical shaft for shield method
JP2004218378A (en) Removing method for existing pile
JP2642585B2 (en) Pile construction method using existing piles
JPH0325121A (en) Sinking of pile in inner drilling pile method
JPH06108462A (en) Method and apparatus for foot protection on front end of foundation pile
JPH0759873B2 (en) Pile hole excavation method and device
JP2006009468A (en) Driving method of inner excavation type steel pipe sheet pile and the steel pipe sheet pile used therefor