JPH0429526A - Generator output controller - Google Patents

Generator output controller

Info

Publication number
JPH0429526A
JPH0429526A JP2136862A JP13686290A JPH0429526A JP H0429526 A JPH0429526 A JP H0429526A JP 2136862 A JP2136862 A JP 2136862A JP 13686290 A JP13686290 A JP 13686290A JP H0429526 A JPH0429526 A JP H0429526A
Authority
JP
Japan
Prior art keywords
output
generator
combustion engine
time
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2136862A
Other languages
Japanese (ja)
Inventor
Masahiko Masumitsu
益満 政彦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2136862A priority Critical patent/JPH0429526A/en
Publication of JPH0429526A publication Critical patent/JPH0429526A/en
Pending legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

PURPOSE:To eliminate adverse influence on an internal-combustion engine by providing output signals from a power detector, a pulse generator and a time limit unit to a controller in order to operate generators in parallel while synchronizing with commercial power supply and controlling the outputs from the generators, in step, only when the internal combustion engine is started. CONSTITUTION:When the output from a generator 2 reaches a power set value 12Po, a pulse generator 5a and a time limit unit 5b are actuated. A time T1 to be elapsed before the output from the generator 13 reaches 50% of rated value is preset and the number of pulses is counted during the time interval. Output from an AND 5c is then provided to a controller 6 in order to sustain constant light load operation. Upon elapse of the set time T1, output from the generator 2 is blocked from increasing for a time interval T2. Upon elapse of the time interval T2, the time limit unit 5b confirms warming of an internal combustion engine 1 and then the output from the generator increases toward a constant full load output during a time interval T3. When the output of genera tor reaches a constant set output, the time limit unit 5b stops provision of output and the AND 5c is turned OFF, thus sustaining the generator output, as it is, through the controller.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は冷却時のエンジン始動を適正に行う発電機の
出力制御装置に関するものである。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a generator output control device that properly starts an engine during cooling.

〔従来の技術〕[Conventional technology]

第5図は、特開昭61−244228号公報に示された
従来の内燃力発電設備に対する電力負荷投入制御方法に
おける発電機出力制御装置を示すブロック構成図であり
、図において、lは内燃機関、2は発電機、3は商用電
源、4は発電機用しゃ断器、5は電力検出器、6は制御
装置、7は発電機2と商用電源3とを同期運転する同期
投入装置、8は内燃機関1の回転速度を制御する調速機
、9は発電機出力装置としての負荷、1oは商用電源用
しゃ断器である。また、第6図は発電機運転時の電力分
布図であり、11は負荷電力、12は負荷電力11の電
力設定値、13は発電機2の出力を設定する発電機一定
出力設定値である。第7図は発電機始動時の電力分布図
であり、14は発電機出力曲線である。
FIG. 5 is a block configuration diagram showing a generator output control device in the conventional power load input control method for internal combustion power generation equipment disclosed in Japanese Patent Application Laid-Open No. 61-244228. , 2 is a generator, 3 is a commercial power source, 4 is a breaker for the generator, 5 is a power detector, 6 is a control device, 7 is a synchronization device for synchronously operating the generator 2 and the commercial power source 3, 8 is a A speed governor controls the rotational speed of the internal combustion engine 1, 9 is a load as a generator output device, and 1o is a commercial power supply circuit breaker. Further, FIG. 6 is a power distribution diagram during generator operation, where 11 is the load power, 12 is the power setting value of the load power 11, and 13 is the generator constant output setting value that sets the output of the generator 2. . FIG. 7 is a power distribution diagram at the time of starting the generator, and 14 is the generator output curve.

次に動作について説明する。まず、第5図の内燃機関l
により発を機2が駆動され、単独負荷供給時の発電機出
力を電力検出器5により監視するそこで休止中の負荷9
を投入する場合、負荷始動時の始動容量を商用電源3と
発電機2とで並列運転し商用側に負荷を負わせる。その
後、負荷9が軽くなった時に商用電源用しゃ断器10を
開放して商用電源3を解列し、内燃機関1による発電機
2にて単独運転を行うものである。このような運転にお
いて、電力検出器5は負荷電力11を監視している。そ
の時、負荷電力11が電力設定値P、12を超えると制
御装置6より出力指令を発生して同期投入装置7を駆動
し商用電源用しゃ断器IOを投入する。そして商用電源
3と発電機2とを並列運転に切換える。このようにして
発電機2の電力不足分を商用電源3の供給によってカバ
〜する。この場合、発電機2の出力は常に一定電力を出
力している。第6図はその電力分布図を示しており電力
設定値12を境にして負荷電力11の一定出力で全てを
カバーしていた。
Next, the operation will be explained. First, let's start with the internal combustion engine l in Figure 5.
The generator 2 is driven by the generator 2, and the power detector 5 monitors the generator output when a single load is supplied.
When turning on the power source, the commercial power source 3 and the generator 2 are operated in parallel to increase the starting capacity at the time of load start-up, and the load is placed on the commercial side. Thereafter, when the load 9 becomes lighter, the commercial power source breaker 10 is opened to disconnect the commercial power source 3, and the generator 2 driven by the internal combustion engine 1 is operated independently. In such operation, the power detector 5 monitors the load power 11. At that time, when the load power 11 exceeds the power set value P,12, the control device 6 generates an output command, drives the synchronization device 7, and closes the commercial power supply circuit breaker IO. Then, the commercial power source 3 and the generator 2 are switched to parallel operation. In this way, the power shortage of the generator 2 is covered by the supply of the commercial power source 3. In this case, the generator 2 always outputs constant electric power. FIG. 6 shows the power distribution diagram, in which the entire load was covered with a constant output of load power 11 with the power setting value 12 as the boundary.

このような運転を行うに際して、従来の発電機出力曲線
14は電力設定値12を越えた点から、第7図に示すよ
うに出力零から発電機一定出力設定値Pc、13まで一
気に上昇させていた。
When performing such operation, the conventional generator output curve 14 is such that from the point exceeding the power set value 12, the output is increased from zero to the generator constant output set value Pc, 13, as shown in FIG. Ta.

〔発明が解決しようとする課題〕[Problem to be solved by the invention]

従来の発電機出力制御装置は以上のように構成されてい
るので、負荷の電力検出により発電機出力を一定にする
ように制御している。しかし冷態時より一気に100パ
ーセント負荷運転に入るとエンジンシリンダ及びシリン
ダヘッド等に過激な熱膨張を発生し、冷却水中に気泡が
生じて一次的なエアーポケット現象を来たし、熱が冷却
水に伝達されず加熱状態となり亀裂が発生し、エンジン
寿命を短縮させる他、エンジンが安定状態に入るまで燃
料消費量が増大するという課題があった。
Since the conventional generator output control device is configured as described above, the generator output is controlled to be constant by detecting the power of the load. However, when operating at 100% load all at once from a cold state, extreme thermal expansion occurs in the engine cylinder, cylinder head, etc., and bubbles form in the cooling water, causing a temporary air pocket phenomenon, and heat is transferred to the cooling water. In addition to shortening the engine's lifespan, the problem was that fuel consumption increased until the engine reached a stable state.

この発明は上記のような課題を解消するためになされた
もので、冷態時、電力検出器にて負荷電力を検出するこ
とによりエンジンを始動させ発電機の電力を検出するこ
とによりエンジンに悪影響を与えないように該エンジン
始動時の立上げをスチップ状に制御して段階的に発電機
出力を発生させることができる発電機の出力制御装置を
得ることを目的とする。
This invention was made to solve the above-mentioned problems.When the engine is cold, the power detector detects the load power to start the engine, and by detecting the power of the generator, it does not adversely affect the engine. It is an object of the present invention to provide a generator output control device capable of generating generator output in stages by controlling the start-up of the engine in a stepwise manner so as not to cause the engine start-up.

〔課題を解決するための手段〕[Means to solve the problem]

この発明に係る発電機の出力制御装置は、前記内燃機関
の始動と発電機の並入運転後に調速機特性に合せてパル
ス信号を発生するパルス発生器、及び所定のプログラム
限時出力信号を発生する時限装置と、その時限装置の出
力信号及び前記パルス発生器の出力パルス信号とから発
電機出力を階段状に制御する信号を制御装置に入力し、
その時限装置による調速機と駆動制御と併せて商用電源
及び発電機出力との並列運転を続行し、発電機−定出力
の設定値に達すると、これを維持する同期投入装置とを
もって構成したものである。
The generator output control device according to the present invention includes a pulse generator that generates a pulse signal in accordance with governor characteristics after starting the internal combustion engine and parallel operation of the generator, and generating a predetermined program time-limited output signal. inputting a signal for controlling the generator output in a stepwise manner from the output signal of the timer and the output pulse signal of the pulse generator into the control device;
In addition to the speed governor and drive control using the timer, it continues parallel operation with the commercial power supply and generator output, and when the set value of the generator - constant output is reached, it is configured with a synchronization device that maintains this. It is something.

〔作 用〕[For production]

この発明における発電機の出力制御装置は、電力検出器
により受電契約電力量と負荷電力との電力差を検出し、
その差が所定値を超えると発電機を始動し、該発電機の
始動時のみエンジン調速機特性に合せたパルス発生器と
時限装置による調速機駆動の2段出力制御を実行し、エ
ンジン暖気運転が完了すると発電機の全負荷一定出力制
御に移行するので、エンジン冷却時の全負荷運転時にエ
ンジンに悪い影響を与えることがなくなる。
The generator output control device according to the present invention detects the power difference between the received contract power amount and the load power using a power detector,
When the difference exceeds a predetermined value, the generator is started, and only when the generator is started, two-stage output control for speed governor drive is performed using a pulse generator and timer that match the characteristics of the engine speed governor, and the engine When the warm-up operation is completed, the generator shifts to full-load constant output control, so that the engine will not be adversely affected during full-load operation during engine cooling.

〔発明の実施例〕[Embodiments of the invention]

以下、この発明の一実施例を図について説明する。図中
、第5図と同一の部分は同一の符号をもって図示した第
1図において、5aはエンジン調速機特性に合せて発電
機出力の上昇値を決めるパルス発生器、5bは内燃機関
1のエンジン調速機特性及び発電機出力の電力に合せた
2段出力制御の暖気時間を設定する時限装置で、電力検
出器5と制御装置6との組合せによって発電機2の出力
を制御する。
An embodiment of the present invention will be described below with reference to the drawings. In FIG. 1, the same parts as in FIG. 5 are designated by the same reference numerals. In FIG. This is a timer that sets a warm-up time for two-stage output control in accordance with engine governor characteristics and generator output power, and controls the output of the generator 2 by a combination of a power detector 5 and a control device 6.

第2図はこの発明における電力分布を示す説明図で、電
力検出値12P、を境に内燃機関1を始動し、その内燃
機関に悪影響を与えない程度の2段出力制御(出力L=
、50%Pc )13aを行い、エンジン暖気運転完了
後に発電機一定出力13を行うものである。
FIG. 2 is an explanatory diagram showing the power distribution in this invention, in which the internal combustion engine 1 is started at the power detection value 12P, and the two-stage output control (output L=
, 50%Pc) 13a, and after the engine warm-up operation is completed, the generator constant output 13 is performed.

第3図は、発電機始動時の電力分布拡大図で、2段出力
制御13 aの細部動作を示している。また、前記時限
袋W5bはプログラム設定機能を有し、T1及びT4時
間は出力信号を発生するが、そのT2及び13時間経過
後は出力信号を休止する。T、、T3の出力信号発生時
間にパルス発生器5aから出力されるパルス信号が論理
積(AND)5iを経て制御装置6に入力される。
FIG. 3 is an enlarged view of the power distribution at the time of starting the generator, showing the detailed operation of the two-stage output control 13a. Further, the time limit bag W5b has a program setting function, and generates an output signal during times T1 and T4, but stops outputting the signal after hours T2 and 13 have elapsed. A pulse signal outputted from the pulse generator 5a at the output signal generation time of T, , T3 is inputted to the control device 6 through a logical product (AND) 5i.

次に、第4図のフローチャートを参照して動作について
説明する。まず、発電機出力制御は電力検出器5により
商用電源3の受電契約電力と負荷9の使用電力との差を
検出し、後者の電力が大なる場合に制御装置6により内
燃機関1を始動しエンジン調速機特性に合せて発電機2
を動作させる。
Next, the operation will be explained with reference to the flowchart in FIG. First, in the generator output control, the power detector 5 detects the difference between the contract power received by the commercial power source 3 and the power used by the load 9, and when the latter power is large, the control device 6 starts the internal combustion engine 1. Generator 2 according to engine governor characteristics
make it work.

その後、同期投入装置7によりしゃ断器4を投入しくし
ゃ断器10は投入法)、商用電源3と発電@2の並列運
転を開始する(ステップ5TI)。
Thereafter, the breaker 4 is turned on by the synchronization turning on device 7 (the breaker 10 is turned on), and parallel operation of the commercial power source 3 and the power generation@2 is started (step 5TI).

この状態でガバナモータに増指令を与え発電機出力を第
2図に示すように徐々に増大させる(ここで、発電機出
力と内燃機関のガバナ特性とは略比例する。)(ステッ
プ5T2)、発電機2の出力は電力検出器5によって常
時監視されている。この状態で前記出力が電力設定値1
2P、に達すると第3図に示すようにパルス発生器5a
と時限装置5bとが同時に作動を開始する(ステップ5
T3)。まず、時限装置5bによる調速機8の駆動は第
3図に示すように発電機一定出力13が50%に達する
時間T、を予め設定し、この間パルス数を計数してAN
D5Cの出力を制御袋W6に与え強制出力して軽負荷一
定出力運転を続行する(ステップ5T4)。
In this state, an increase command is given to the governor motor to gradually increase the generator output as shown in Fig. 2 (here, the generator output and the governor characteristics of the internal combustion engine are approximately proportional) (step 5T2). The output of the machine 2 is constantly monitored by a power detector 5. In this state, the output is set to 1
2P, the pulse generator 5a is activated as shown in FIG.
and the timer 5b start operating at the same time (step 5
T3). First, the speed governor 8 is driven by the timer 5b by presetting a time T for the generator constant output 13 to reach 50% as shown in FIG. 3, and counting the number of pulses during this time.
The output of D5C is applied to the control bag W6 and forcedly outputted to continue the light load constant output operation (step 5T4).

次に、経過時間が設定時間T、を過ぎると12時間だけ
発電機2の出力上昇を休止する。時限装置5bの出力も
停止しAND5cの出力をオフして制御装置6への入力
信号を停止する。次に12時間が過ぎると時限装置5b
により内燃機関1の暖気を確認し、暖気運転完了後に再
びT1時間の発電機全負荷一定出力に向かって出力上昇
を行う(ステップ5T5)。この間、ガバナモータ増°
指令は続行する(ステップ5T6)。かくして、13時
間が経過し発電機2の出力が発電機一定出力設定値に達
すると時限装置5bは出力を停止し、AND5cの出力
信号はオフされて制御装置は発電機出力をその状態に維
持するように制御する(ステップ5T7)。
Next, when the elapsed time passes the set time T, the output increase of the generator 2 is stopped for 12 hours. The output of the timer 5b is also stopped, the output of the AND 5c is turned off, and the input signal to the control device 6 is stopped. Next, when 12 hours have passed, the timer 5b
It is confirmed that the internal combustion engine 1 has warmed up, and after the warm-up operation is completed, the output is increased again toward the generator full load constant output for time T1 (step 5T5). During this time, the governor motor increases
The command continues (step 5T6). Thus, when 13 hours have passed and the output of the generator 2 reaches the generator constant output setting value, the timer 5b stops the output, the output signal of the AND 5c is turned off, and the control device maintains the generator output in that state. (Step 5T7).

〔発明の効果〕〔Effect of the invention〕

以上のようにこの発明によれば、発電機の出力制御装置
に電力検出器とパルス発生器、及び時限装置とを設け、
それぞれの出力信号を制御装置に与えて商用電源との同
期をとって発電機を並入運転し、内燃機関の始動時のみ
発電機出力を階段状に制御するので、内燃機関への悪影
響を防止し、安価で信転性が高く、かつ耐久性に冨んだ
装置が得られる効果がある。また、内燃機関を始動時の
み調速機制御するので、燃料消費量が低下し省エネルギ
ー効果も大きいという効果がある。
As described above, according to the present invention, the power detector, the pulse generator, and the timer are provided in the output control device of the generator,
Each output signal is given to the control device to synchronize with the commercial power supply and operate the generator in parallel, and the generator output is controlled in a stepwise manner only when the internal combustion engine is started, thereby preventing adverse effects on the internal combustion engine. However, it is possible to obtain a device that is inexpensive, has high reliability, and is highly durable. Further, since the internal combustion engine is controlled by the governor only when starting, fuel consumption is reduced and energy saving effects are also large.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図はこの発明の一実施例による発電機出力制御装置
の構成を示すブロック図、第2図及び第3図はこの発明
の電力分布を示す説明図、第4図は第1図の動作順序を
示すフローチャート、第5図は従来の発電機出力制御装
置の構成を示すブロック図、第6図及び第7図は従来の
電力分布を示す説明図である。 図において、1は内燃機関、2は発電機、3は商用電源
、5は電力検出器、6は制御装置、7は同期投入装置、
8は調速機、5aはパルス発生器、5bは時限装置であ
る。 なお、図中、同一符号は同一、又は相当部分を示す。
Fig. 1 is a block diagram showing the configuration of a generator output control device according to an embodiment of the present invention, Figs. 2 and 3 are explanatory diagrams showing the power distribution of the invention, and Fig. 4 is the operation of Fig. 1. FIG. 5 is a block diagram showing the configuration of a conventional generator output control device, and FIGS. 6 and 7 are explanatory diagrams showing conventional power distribution. In the figure, 1 is an internal combustion engine, 2 is a generator, 3 is a commercial power source, 5 is a power detector, 6 is a control device, 7 is a synchronization device,
8 is a speed governor, 5a is a pulse generator, and 5b is a timer. In addition, in the figures, the same reference numerals indicate the same or equivalent parts.

Claims (1)

【特許請求の範囲】[Claims] 商用電源により駆動される負荷の電力状態を電力検出器
によって検出し、その検出信号を一つの入力として発電
機を制御する制御装置と、前記商用電源の使用量が所定
の電力設定値を超えると内燃機関を始動して発電を開始
する発電機とを有する発電機の出力制御装置において、
前記内燃機関の始動と発電機の並入運転後に調速機特性
に合せてパルス信号を発生するパルス発生器及び所定の
プログラム限時出力信号を発生する時限装置と、前記時
限装置の出力信号及び前記パルス発生器の出力信号とか
ら発電機出力を階段状に制御する信号を上記制御装置に
入力し、前記時限装置による調速機駆動制御と併せて商
用電源及び発電機出力との並列運転を続行し、発電機一
定出力の設定値に達するとこれを維持する同期投入装置
とを備えたことを特徴とする発電機の出力制御装置。
A control device that detects the power state of a load driven by a commercial power source using a power detector and controls a generator using the detection signal as one input; In a generator output control device having a generator that starts an internal combustion engine to start generating electricity,
a pulse generator that generates a pulse signal in accordance with the speed governor characteristics after starting the internal combustion engine and parallel operation of the generator; a timer that generates a predetermined program time limit output signal; and an output signal of the timer and the A signal for controlling the generator output stepwise from the output signal of the pulse generator is input to the control device, and parallel operation with the commercial power supply and the generator output is continued in conjunction with governor drive control by the timer. and a synchronization device that maintains a set value of a constant output of the generator when it reaches a set value.
JP2136862A 1990-05-25 1990-05-25 Generator output controller Pending JPH0429526A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2136862A JPH0429526A (en) 1990-05-25 1990-05-25 Generator output controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2136862A JPH0429526A (en) 1990-05-25 1990-05-25 Generator output controller

Publications (1)

Publication Number Publication Date
JPH0429526A true JPH0429526A (en) 1992-01-31

Family

ID=15185258

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2136862A Pending JPH0429526A (en) 1990-05-25 1990-05-25 Generator output controller

Country Status (1)

Country Link
JP (1) JPH0429526A (en)

Similar Documents

Publication Publication Date Title
US6035626A (en) Gas turbine starter assist torque control system
US20040237535A1 (en) Method of operating a gas turbine
MX2013003433A (en) Gas turbine start with frequency convertor.
US20050072164A1 (en) Combined heat and power system
CA2242073C (en) Combined cycle power generation plant
JPH0429526A (en) Generator output controller
JP3105673B2 (en) Gas turbine startup method
JPH03289325A (en) Output controller for generator
JP2002031021A (en) Engine generation system and its controller
JP2002374625A (en) Cogeneration system provided with uninterruptible power supply function
JP6288991B2 (en) Power generation system and control method thereof
JPS61169628A (en) Compressor driver
JP4218778B2 (en) Gas turbine start-up control method
JPH1077946A (en) Ignition device for gas turbine engine
JPH0693880A (en) Gas turbine facility and operation thereof
JP2826394B2 (en) Pressure control system for combined cycle power plant
JP2964646B2 (en) Operating devices for gas turbine engines
JP3151692B2 (en) Gas turbine starter
JPH0252920A (en) Exhaust fan rotating speed controller for hot water supply apparatus
JPH0486307A (en) Gas turbine starting device
JPH03195399A (en) Combined cycle plant
JPH018847Y2 (en)
JPH04311655A (en) Dynamo engine stop control device
JP3557302B2 (en) Gas turbine controller
JP2002291160A (en) Cogeneration system