JPH04203935A - Monitoring apparatus for operation of equipment - Google Patents

Monitoring apparatus for operation of equipment

Info

Publication number
JPH04203935A
JPH04203935A JP32890290A JP32890290A JPH04203935A JP H04203935 A JPH04203935 A JP H04203935A JP 32890290 A JP32890290 A JP 32890290A JP 32890290 A JP32890290 A JP 32890290A JP H04203935 A JPH04203935 A JP H04203935A
Authority
JP
Japan
Prior art keywords
work
setup
time
equipment
operation monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP32890290A
Other languages
Japanese (ja)
Inventor
Tadamasa Kamikubo
上久保 忠正
Yukiro Tsuji
辻 征郎
Mineo Azuma
東 峰生
Masayoshi Ozeki
正義 大関
Shiyunji Mouri
毛利 峻治
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP32890290A priority Critical patent/JPH04203935A/en
Publication of JPH04203935A publication Critical patent/JPH04203935A/en
Pending legal-status Critical Current

Links

Landscapes

  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

PURPOSE:To improve the producing efficiency by predicting the finishing time of the work, obtaining the staring time of a preparatory work necessary for the next work, and indicating the preparatory work at the starting time. CONSTITUTION:The NC data and data for arranging components necessary to operate an equipment 1 are formed by a data forming machine 6, and retained in a line management station 7. The station 7 supplies the necessary NC data and the component arranging data to a cell management station 9 in accordance with the working data. The data are temporarily retained in the station 9. The station 9 feeds the NC data to the equipment 1 while monitoring the proceeding state of the work of the equipment 1, and generates an indication to arrange the components to the operator based on the component arranging data at the exchanging time of lots. At the same time, the station 9 orders a preparation of components necessary for the arrangement so as to set the components immediately to the equipment 1. In this manner, the arrangement work can be started immediately.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、設備の運転状況及び複数の設備で構成される
ラインの運転状況を監視する設備運転監視装置に関する
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to an equipment operation monitoring device that monitors the operating status of equipment and the operating status of a line composed of a plurality of pieces of equipment.

〔従来の技術〕[Conventional technology]

製品の多様化、ライフサイクルの短命化に伴い。 With the diversification of products and shorter life cycles.

生産現場で扱うワークは、多品種化の傾向を強め、生産
するロットサイズも小さくなってきているため、1日に
扱うロットの数は増加し、それに伴い、ロット切り替え
による段取り作業が増加している。
The workpieces handled at production sites are becoming increasingly diverse, and the lot sizes produced are becoming smaller.As a result, the number of lots handled in a day is increasing, and as a result, the amount of setup work required to change lots has increased. There is.

段取り作業は、従来、文献ファクトリ・オートメーショ
ン、 ’ 89.8. p P、 39−43における
「カラーテレビニ場プリント基板実装のFA事例」で示
されるように、現場端末よりロット毎の作業指示がださ
れ、作業者は、この指示に従って段取り作業を行なって
いる。段取り作業に必要な諸情報は、現場端末を操作す
ることにより即座に出力でき、部品の準備等の段取り準
備作業は作業者の判断に任されている。
The setup work has traditionally been carried out by Document Factory Automation, '89.8. As shown in "FA Example of Color TV Printed Circuit Board Mounting" in P, 39-43, work instructions are issued for each lot from the on-site terminal, and workers perform setup work according to these instructions. . Various information necessary for setup work can be immediately output by operating a site terminal, and setup preparation work such as preparing parts is left to the discretion of the operator.

〔発明が解決しようとする課題〕[Problem to be solved by the invention]

上記従来技術は、設備に対して行なう段取り作業のため
に必要な、段取り準備作業の点については配慮がされて
おらず、作業者は、段取り内容からその準備に必要な時
間を見積り、作業の進行状況を常に気にしながら段取り
準備作業を開始する時期を決定しなければならない問題
があった。また2作業の進行状況とは独立して段取り準
備作業を行なうと、段取りで使う部品等が現場に仕掛る
問題があった。
The above-mentioned conventional technology does not take into consideration the setup preparation work necessary for the setup work to be performed on the equipment, and the operator estimates the time required for preparation from the setup details and performs the work. There was a problem in which it was necessary to decide when to start the setup preparation work while always being aware of the progress. Furthermore, if the setup preparation work is performed independently of the progress status of the two operations, there is a problem in that parts used in the setup are not delivered to the site.

本発明は、ロット切り替え時における段取り作業を円滑
に行なうことを目的としており、さらに、そのために必
要な段取り準備作業を適切な時期に指示することを目的
とする。
An object of the present invention is to smoothly perform setup work at the time of lot changeover, and further, to instruct necessary setup preparation work at an appropriate time.

〔課題を解決するための手段〕[Means to solve the problem]

上記目的を達成するために、現時点での作業進捗状況、
設備の状態及び過去における作業実績。
In order to achieve the above objectives, the current work progress,
Equipment condition and past work performance.

故障回復実績を基に、現在行なわれている作業(ロット
)の終了時刻を予測する手段、現在行なわれている作業
と次に行なう作業とを比較し段取り作業及びその準備作
業を求める手段、求めた段取り準備作業を行なうために
必要な時間を予測する手段、上記作業終了予測時刻と段
取り準備作業予測時間から段取り準備作業開始時刻を求
め、その時刻に段取り準備作業を指示する手段を設備運
転監視装置に設ける。
A method for predicting the end time of the work currently being performed (lot) based on failure recovery records, a means for comparing the currently being performed work with the next work and determining the setup work and its preparatory work. Equipment operation monitoring includes a means for predicting the time required to perform the set-up preparation work, a means for determining the start time of the set-up preparation work from the predicted end time of the work and the predicted time of the set-up preparation work, and a means for instructing the set-up preparation work at that time. Provided in the device.

また、作業終了時刻や段取り準備作業時間の予測で用い
る作業実績(作業を行なうために実際にかかった時間)
、故障回復実績(設備の故障時。
In addition, work results (the actual time taken to perform the work) are used to predict the work completion time and setup preparation work time.
, failure recovery record (when equipment breaks down).

復旧までに実際にかかった時間)1段取り準備作業時間
実績(段取り準備作業に実際にかかった時間)を、作業
終了、故障回復及び段取り準備作業終了時に更新する手
段を設備運転監視装置に設ける。
The equipment operation monitoring device is provided with a means for updating the actual time taken for one set-up preparation work (the time actually taken for the set-up preparation work) at the end of the work, failure recovery, and completion of the set-up preparation work.

〔作用〕[Effect]

現在行なわれている作業の終了時刻を予測する手段は、
現時点での作業進捗状況から残りの作業量を求め、現在
の設備の状態に応じて、過去における作業実績を基に(
設備が故障の場合は、故障回復実績も用いて)現在行な
われている作業の終了時刻を予測する。段取り作業及び
その準備作業を求める手段は、現在行なわれている作業
で使用する部品と設備にセットされているその位置、及
び次に行なう作業で使用する部品と設備にセットするそ
の位置の比較と部品の残量から段取り作業を求める。ま
た、現在質なわれている作業で使用する部品と次に行な
う作業で使用する部品との比較及び部品の残量から段取
り準備作業を求める。
A means of predicting the end time of the work currently being carried out is
Calculate the remaining work amount from the current work progress, and calculate the amount of work (
If the equipment is out of order, the end time of the work currently being carried out is predicted using the track record of recovery from the outage. The means for determining setup work and its preparation work is to compare the parts used in the current work and their positions set in the equipment, and the parts used in the next work and their positions set in the equipment. Calculate setup work from the remaining amount of parts. In addition, the setup preparation work is determined from the comparison between the parts used in the current work and the parts to be used in the next work, and the remaining amount of parts.

段取り準備作業を行なうために必要な時間を予測する手
段は、過去における段取り準備作業時間実績に基づき、
上記で求めた段取り準備作業について、準備作業時間を
予測する。段取り準備作業を指示する手段は、作業の終
了時刻を予測する手段による作業終了予想時刻と段取り
準備作業を行なうために必要な時間を予測する手段によ
る準備作業予想時間から段取り準備作業の開始時刻を求
め。
The method of predicting the time required to perform setup preparation work is based on past setup preparation work time records.
For the setup preparation work obtained above, the preparation work time is predicted. The means for instructing the setup preparation work determines the start time of the setup preparation work based on the expected work end time determined by the means for predicting the end time of the work and the estimated preparation work time determined by the means for predicting the time required to perform the setup preparation work. Seek.

その時刻に上記で求めた段取り準備作業を指示する。ま
た、作業実績、故障回復実績1段取り準備作業時間実績
は、これらを更新する手段により、作業終了時、故障回
復時及び段取り準備作業終了時に更新する。
At that time, the setup preparation work determined above is instructed. Further, the work performance and failure recovery performance 1 setup preparation work time performance are updated by means for updating these at the time of work completion, failure recovery, and setup preparation work completion.

以上の作用によって、段取り準備作業の指示に従って段
取り準備作業を開始することにより、ロット切り替えに
よる段取り作業の開始時には段取り準備作業は終了し、
直ちに段取り作業に取りかかるごとができ、生産効率を
向上することができる。
As a result of the above actions, by starting the setup preparation work according to the instructions for the setup preparation work, the setup preparation work is completed when the setup work due to lot change starts.
It is possible to start the setup work immediately, and production efficiency can be improved.

〔実施例〕〔Example〕

以下、本発明の一実施例を説明する。第2図は、プリン
ト板に部品を実装するプリント板組立ラインにおけるラ
イン管理システムのシステム構成である。ローダ、デイ
スペンサ、マウンタ等の設備1が、プリント板の製造プ
ロセスに従って配置され、ライン2上を流れるプリント
板3に対して組立作業を行なう。設備1を運転するには
、設illの動きを規定するNCデータや設備1で使用
する部品とそれをセットする場所を規定する部品段取り
データが必要であり、ロットが切り替わる毎に使用する
NCデータや部品段取りデータを対応するものに切り替
えて使用する。設備1を運転するのに必要なNCデータ
や部品段取りデータは、CADシステム4からのCAD
データを基にCAMステーション5で、またはデータ作
成機6によって作成され、ライン管理ステーション7て
保管される。ライン管理ステーション7は1作業針画デ
ータ8に従って、必要なNCデータや部品段取りデータ
を設備運転監視装置であるセル管理ステーション9に供
給し、セル管理ステーション9で一時保管する。セル管
理ステーション9は、設備1の作業進行状況をみながら
、設備1に対して、前もってNCデータを供給し、また
、ロット切り替え時に1部品段取りデータを基に、作業
者に対して部品段取り指示を出す。更に、部品段取り指
示が出された時に、直ちに部品を設備1にセットできる
ようにするために、部品段取りに必要な部品の準備を指
示する部品段取り準備指示を前もって行なう。
An embodiment of the present invention will be described below. FIG. 2 shows the system configuration of a line management system in a printed board assembly line for mounting parts on printed boards. Equipment 1 such as a loader, dispenser, mounter, etc. is arranged according to the printed board manufacturing process, and performs assembly work on printed boards 3 flowing on a line 2. To operate Equipment 1, NC data that defines the movement of the ill, and parts setup data that defines the parts used in Equipment 1 and where to set them are required, and NC data that is used every time the lot changes. or parts setup data to the corresponding one. The NC data and parts setup data necessary to operate equipment 1 are CAD data from CAD system 4.
It is created based on the data at the CAM station 5 or by the data creation machine 6, and is stored at the line management station 7. The line management station 7 supplies necessary NC data and parts setup data to the cell management station 9, which is an equipment operation monitoring device, according to the one-work needle drawing data 8, and temporarily stores them at the cell management station 9. The cell management station 9 monitors the work progress of the equipment 1, supplies NC data to the equipment 1 in advance, and also instructs workers to set up parts based on the 1 part setup data when changing lots. issue. Furthermore, in order to be able to set the parts in the equipment 1 immediately when the parts setup instruction is issued, a parts setup preparation instruction is given in advance to instruct the preparation of parts necessary for the parts setup.

第1図は、設備運転監視装置であるセル管理ステーショ
ン9の内部処理構成を示したものである。
FIG. 1 shows the internal processing configuration of a cell management station 9, which is an equipment operation monitoring device.

ライン管理ステーション用通信部10は、ライン管理ス
テーション7との間でデータの送受信を行なう。作業計
画14は、第3図のように、プリント板を組み立てる作
業日14−a、作業日における作業114− b 、作
業を行なう基板種14−c、作成する予定枚数14−d
から構成される。部品段取りデータ11は、第4図のよ
うに、作業計画14に示すプリント板を予定枚数作成す
るために必要な部品種11−すとその個数11−c及び
設備1にセットするレーンNo、11−aから構成され
、設備と基板種の組に対してそれぞれ存在する。部品段
取りデータ11は、ライン管理ステーション7から、ラ
イン管理ステーション用通信部10によって供給され、
部品段取りデータ管理部12で管理される。作業実績1
5は、第5図(a)のプリント板実績と第5図(b)の
使用部品実績がある。プリント板実績は、″実際に作業
が行なわれたプリント板の作業日15−a2作業順15
−b、基板種15−cと作業を行なった実績枚数15−
d、それにかかった作業時間15−e、その作業が作業
中か完了かを示す作業状態15−fから構成される。使
用部品実績は、実際に使用した部品の部品種15−hと
その使用部品数15−1、設備上のレーンNo、15−
gから構成され、設備と基板種の組に対してそれぞれ存
在する。段取り作業・段取り準備作業抽出部13は、予
め登録された作業計画14から次作業を、また作業実績
15から使用部品数を求め、現在行なわれている作業で
使用する部品と設備1にセントされているその位置、及
び次に行なう作業で使用する部品と設備1にセットする
その位置の比較と部品の残量から段取り作業を求める。
The line management station communication unit 10 transmits and receives data to and from the line management station 7. As shown in FIG. 3, the work plan 14 includes a work day 14-a for assembling printed boards, a work 114-b on the work day, a type of board to be worked on 14-c, and a planned number of sheets to be produced 14-d.
It consists of As shown in FIG. 4, the parts setup data 11 includes the types of parts 11- and the number of parts 11-c necessary to create the scheduled number of printed boards shown in the work plan 14, and the lane No. 11 to be set in the equipment 1. -a, and exists for each set of equipment and board type. The component setup data 11 is supplied from the line management station 7 by the line management station communication unit 10,
It is managed by the parts setup data management section 12. Work record 1
5 has the printed board results shown in FIG. 5(a) and the used parts results shown in FIG. 5(b). The printed board results are ``Work date 15-a2 Work order 15 of the printed board where work was actually performed.
-b, actual number of sheets worked with board type 15-c 15-
d, the working time 15-e taken for the task, and the work status 15-f indicating whether the task is in progress or completed. The results of parts used include the type of parts actually used 15-h, the number of parts used 15-1, the lane number on the equipment, 15-h
g, and exists for each set of equipment and board type. The setup work/setup preparation work extraction unit 13 calculates the next work from the work plan 14 registered in advance and the number of parts used from the work record 15, and calculates the parts used in the work currently being performed and the cents for the equipment 1. The setup work is determined from the comparison of the position of the part to be used in the next work, the position of the part to be set in the equipment 1, and the remaining amount of parts.

また、現在行なわれている作業で使用する部品と次に行
なう作業で使用する部品との比較及び部品の残量から段
取り準備作業を求める。段取り準備作業時間予測部16
は、段取り準備作業時間実績管理部T7で管理される段
取り準備作業時間実績18に基づいて、段取り作業・段
取り準備作業抽出部13で求めた段取り準備作業にかか
る時間を予測する。段取り準備作業時間実績18は、第
6図のように、毎回の段取り準備作業にかかった時間の
合計である総準備作業時間18−aと段取り準備作業で
il!備した部品の合計である総部品数18−bから構
成される。段取り準備作業時間実績18は、段取り準備
作業が終了した時点で、終了したことをキーボード等で
入力することにより、実際にかかった時間が段取り準備
作業時間実績管理部17によって計測され、総部品数と
共に更新される。設備用通信部I9は、設[1との間で
データの送受信を行なう。作業進捗状況監視部20は、
設置!1で行われている作業に関して、作業終了プリン
ト板数や使用部品数を、設備用通信部19を通して設備
1より受は取り、作業にかかった時間と共に作業実績1
5として作業実績管理部21に登録する。設備状態監視
部22は、設備用通信部19によって設備1の状態を監
視し、設備1が故障の場合は故障回復までの時間を計測
し、故障原因と共に故障回復実績23として故障回復実
績管理部24に登録する。故障回復実績23は、第7図
のように、故障原因23−aとその故障回数23−b、
回復するまでにかかった時間の合計である総置復時間2
3−Cから構成され、設備毎に存在する。故障回数23
−b。
Further, the setup preparation work is determined from the comparison between the parts used in the current work and the parts to be used in the next work, and the remaining amount of parts. Setup preparation work time prediction unit 16
predicts the time required for the setup preparation work obtained by the setup work/setup preparation work extraction unit 13 based on the setup preparation work time record 18 managed by the setup preparation work time record management unit T7. As shown in FIG. 6, the setup preparation work time record 18 is calculated by the total preparation work time 18-a, which is the total time required for each setup preparation work, and the setup preparation work. The total number of parts is 18-b, which is the total number of parts provided. The setup preparation work time record 18 calculates the actual time taken by the setup preparation work time record management unit 17 by inputting the fact that the setup preparation work has been completed using a keyboard, etc., and calculates the total number of parts. will be updated with. The equipment communication unit I9 sends and receives data to and from the equipment [1]. The work progress monitoring unit 20
Installation! Regarding the work being done in 1, the number of printed circuit boards completed and the number of parts used are received from the equipment 1 through the equipment communication section 19, and the work results 1 are recorded along with the time taken for the work.
5 in the work record management section 21. The equipment status monitoring unit 22 monitors the status of the equipment 1 using the equipment communication unit 19, measures the time until failure recovery when the equipment 1 is out of order, and sends it to the failure recovery record management unit as a failure recovery record 23 along with the cause of the failure. Register on 24th. As shown in FIG. 7, the failure recovery record 23 includes the failure cause 23-a, the number of failures 23-b,
Total recovery time 2, which is the total time it took to recover
It consists of 3-C and exists for each facility. Number of failures 23
-b.

総置復時間23−cは、設備状態監視部22によって更
新される。作業終了時刻予測部25は1作業量画14と
現時点での作業実績15とから残りの作業量を求め、設
備状態監視部22からの現在の設備1の状態に応じて、
設備1が正常運転であれば、過去における作業実績15
を基に、設備1が故障の場合は。
The total return time 23-c is updated by the equipment status monitoring unit 22. The work end time prediction unit 25 calculates the remaining work amount from the 1 work amount picture 14 and the current work record 15, and according to the current state of the equipment 1 from the equipment state monitoring unit 22,
If equipment 1 is operating normally, past work record 15
Based on , if equipment 1 is out of order.

故障回復実績23も用いて現在行われている作業の終了
時刻を予測する。段取り準備作業指示部26は、作業終
了時刻予測部25で求めた現在行なわれている作業の終
了予想時刻と段取り準備作業時間予測部16で求めた段
取り準備作業予想時間から段取り準備作業を開始する時
刻を求め、その時刻に1段取り作業・段取り準備作業抽
出部13で求めた段取り準備作業を表示や印字により作
業者に指示する。
The failure recovery record 23 is also used to predict the end time of the work currently being performed. The setup preparation work instruction section 26 starts the setup preparation work from the expected end time of the currently being performed work determined by the work end time prediction section 25 and the expected setup preparation work time determined by the setup preparation work time prediction section 16. The time is determined, and at that time, the setup preparation work determined by the first setup work/setup preparation work extraction unit 13 is instructed to the operator by display or print.

また同時に、段取り準備作業時間実績管理部17に対し
て、段取り準備作業を開始したことと段取り準備する部
品数を知らせる。
At the same time, the setup preparation work time record management section 17 is informed that the setup preparation work has started and the number of parts to be prepared.

作業終了時刻の予測の処理フローを第8図のステップに
従って説明する。
The processing flow for predicting the work end time will be explained according to the steps shown in FIG.

ステップl:現在作業中のロットのプリント板に対して
、ロットの残作業量を求める。つまり、作業計画の予定
枚数と作業実績の現時点での実績枚数とから残りの枚数
を求める。第3図の作業計画に従って、現状が第5図の
ように基板種”DEF−5678”の作業を行っている
場合、残作業量は150枚である。
Step 1: Calculate the remaining work amount of the lot for the printed board of the lot currently being worked on. In other words, the remaining number of sheets is calculated from the planned number of sheets in the work plan and the actual number of sheets at the present time in the work results. According to the work plan shown in FIG. 3, if work is currently being done on the board type "DEF-5678" as shown in FIG. 5, the remaining work amount is 150 sheets.

ステップ2ニステツプ1で求めた残作業に必要な時間を
予測する。予測方法としては1例えば、第5図の現在作
業中の基板種” DEF −5678”の実績枚数15
−dとそれにかかった作業時間15−eから1枚あたり
の平均作業時間(3分)を求め、ステップ1で求めた残
作業量(150枚)から残作業に必要な時間(450分
)を求める。他の方法には、1枚あたりの平均作業時間
として、予め与えられた定数を用いる方法、作業時間1
5−eに設備1の故障時間を含めず、今後も故障しない
と仮定して上記と同様に計算する方法等がある。
Step 2: Predict the time required for the remaining work determined in step 1. The prediction method is 1. For example, the actual number of sheets of the board type "DEF-5678" currently being worked on in Figure 5 is 15.
-d and the working time it took 15-e to find the average working time per sheet (3 minutes), and from the remaining work amount (150 sheets) found in step 1, calculate the time required for the remaining work (450 minutes). demand. Other methods include a method using a constant given in advance as the average working time per sheet, and a method using a working time of 1
There is a method in which the failure time of equipment 1 is not included in 5-e, and the calculation is performed in the same way as above, assuming that there will be no failure in the future.

ステップ3:設備1の状態を調べる。設備状態監視部2
2より設f11の状態を調べ、正常に稼働している時は
ステップ4へ、設備が故障している時はステップ5へ移
る。
Step 3: Check the status of equipment 1. Equipment status monitoring section 2
2, the status of the equipment f11 is checked, and if the equipment is operating normally, the process goes to step 4; if the equipment is out of order, the process goes to step 5.

ステップ4:現在作業中のロットの終了時刻を予測する
。ステップ2で求めた残作業に必要な時間(450分)
から、ステップ3の設備状態が正常稼働の場合は、今か
ら450分後、故障の場合は。
Step 4: Predict the end time of the lot currently being worked on. Time required for remaining work determined in step 2 (450 minutes)
If the equipment status in step 3 is in normal operation, 450 minutes from now, or in case of failure.

ステップ5で求めた故障回復時刻から450分後を作業
終了時刻とする。
The work end time is set to be 450 minutes after the failure recovery time determined in step 5.

ステップ5:設備1が故障している時、故障が回復する
時刻を予測する。設備状態監視部22より故障原因を求
め、第7図の故障原因23−aから一致するレコードを
求める。当該レコードの故障回数23−bと総回復時間
23−cより、故障1回あたりの平均回復時間を求め、
今から平均回復時間後を回復時刻とする。
Step 5: When equipment 1 is out of order, predict the time when the outage will be recovered. The cause of the failure is determined from the equipment status monitoring unit 22, and a matching record is determined from the cause of failure 23-a in FIG. From the number of failures 23-b and total recovery time 23-c of the record, calculate the average recovery time per failure,
The time after the average recovery time is set as the recovery time.

第9図は1段取り作業抽出処理の処理フローである。FIG. 9 is a processing flow of one-stage work extraction processing.

ステップ1:作業実績15から現在行なわれている作業
を求め、作業計画14からその次に行なう作業を求める
Step 1: Find the work currently being done from the work record 15, and find the next work from the work plan 14.

ステップ2:現在行なわれている作業の部品段取りデー
タ11と次に行なう作業の部品段取りデータ11を比較
する。レーンNo、11−a毎に部品種11−すを比較
し、次に行なう作業の部品段取りデータ11のうち、部
品種11−bが異なるレコードを段取り作業のデータと
する。
Step 2: Compare the parts setup data 11 of the work currently being performed with the parts setup data 11 of the next work. The parts types 11-a are compared for each lane No. 11-a, and among the parts setup data 11 for the next work, records with different parts types 11-b are set as data for the setup work.

ステップ3:部品種11−bが等しいレーンについて、
@在の作業を開始する前の部品数と作業実績15の使用
部品数15−i、実績枚数15−d及び作業計画14の
予定枚数14−dから、現在の作業が終了した時の部品
の残数を予測し、その残数が、次作業の同レーンで使う
個数11−Cより少ない場合は、次作業の部品段取りデ
ータ11の当該レコードを段取り作業のデータとする。
Step 3: For lanes with the same component type 11-b,
@ From the number of parts before starting the current work, the number of used parts 15-i of work record 15, the actual number 15-d, and the planned number of parts 14-d of work plan 14, calculate the number of parts when the current work is completed. The remaining number is predicted, and if the remaining number is less than the number 11-C to be used in the same lane in the next operation, the corresponding record of the parts setup data 11 for the next operation is set as the data for the setup operation.

第1O図は、段取り準備作業抽出処理の処理フローであ
る。
FIG. 1O is a processing flow of the setup preparation work extraction process.

ステップ1:作業実績15から現在行なわれている作業
を求め、作業計画14からその次に行なう作業を求める
Step 1: Find the work currently being done from the work record 15, and find the next work from the work plan 14.

ステップ2:現在行なわれている作業の部品段取りデー
タ11と次に行なう作業の部品段取りデータ11を比較
する。部品種11−bを比較し、次に行なう作業の部品
段取りデータ11のうち、現在行なわれている作業の部
品種にない部品種11−bのレコードを段取り準備作業
のデータとする。
Step 2: Compare the parts setup data 11 of the work currently being performed with the parts setup data 11 of the next work. The part types 11-b are compared, and the record of the part type 11-b, which is not included in the part type of the work currently being performed, among the part setup data 11 of the work to be performed next, is set as the data of the setup preparation work.

ステップ3:次作業に等しい部品種がある現在行なわれ
ている作業の部品種11−bについて、現在の作業を開
始する前の部品数と作業実績15の使用部品数15− 
i 、実績枚数15−d及び作業計画14の予定枚数1
4−dから、現在の作業が終了した時の部品の残数を予
測し、その残数が、次作業の同部品種11−bの個数1
1−〇より少ない場合は、次作業の部品段取りデータ1
1の当該レコードを段取り準備作業のデータとする。
Step 3: For the part type 11-b of the current work that has the same part type as the next work, the number of parts before starting the current work and the number of used parts 15- in the work record 15.
i, actual number of sheets 15-d and planned number of sheets of work plan 14 1
From 4-d, predict the number of parts remaining when the current work is completed, and the remaining number is 1, the number of parts of the same type 11-b in the next work.
If it is less than 1-〇, parts setup data 1 for the next operation
The relevant record of No. 1 is used as the data for the setup preparation work.

第11図は、段取り準備作業時間予測処理の処理フロー
である。
FIG. 11 is a processing flow of the setup preparation work time prediction process.

ステップ1:段取り作業・段取り準備作業抽出部13よ
り、段取り準備作業で扱う部品数を求める。
Step 1: The setup work/setup preparation work extraction unit 13 calculates the number of parts to be handled in the setup preparation work.

ステップ2:段取り準備作業時間実績18の総準備作業
時閏18−aと縁部品数18−bより、1部品あたりの
準備作業時間を求める。
Step 2: Obtain the preparation work time per part from the total preparation work time leap 18-a and the number of edge parts 18-b of the setup preparation work time record 18.

ステップ3ニステツプ1で求めた部品数とステップ2で
求めた1部品あたりの準備作業時間より、段取り準備作
業にかかる時間を求める。
Step 3 From the number of parts obtained in step 1 and the preparation time per part obtained in step 2, calculate the time required for setup preparation work.

尚、以上示した作業終了時刻予測方法2段取り作業抽出
方法2段取り準備作業時間実績2段取り準備作業時間予
測方法は、それを実現する一方法てあり、他の方法でも
かまわない。
Note that the work finish time prediction method, 2-setup work extraction method, 2-setup preparation work time record, and 2-setup preparation work time prediction method shown above are only one method for realizing this, and other methods may be used.

本実施例によれば、段取り$備作業の指示に従って段取
り準備作業を開始することにより、ロット切り替えによ
る段取り作業の開始時には段取り準備作業は終了し、直
ちに段取り作業に取りかかることができ、生産効率を向
上することができる。
According to this embodiment, by starting the setup preparation work in accordance with the instructions for the setup $ preparation work, the setup preparation work is completed when the setup work due to lot switching starts, and the setup work can be started immediately, improving production efficiency. can be improved.

〔発明の効果〕〔Effect of the invention〕

本発明によれば、ロット切り替えによる段取り作業の開
始時に、直ちに段取り作業に取りかかることができるよ
うに段取り準備作業を指示するので、円滑に段取り作業
を開始することができ、生産効率の向上に効果がある。
According to the present invention, at the start of the setup work due to lot changeover, the setup preparation work is instructed so that the setup work can be started immediately, so the setup work can be started smoothly, which is effective in improving production efficiency. There is.

特に、段取り準備作業に時間がかかる場合に効果は大き
い。
This is particularly effective when the setup preparation work takes a long time.

また、段取り作業で用いる部品は、現場に留まることな
く直ちに設備にセットされるので、現場における部品仕
掛りの減少と部品在庫の減少に効果が有る。
Further, since the parts used in the setup work are immediately set in the equipment without remaining at the site, it is effective in reducing the number of parts in progress at the site and the inventory of parts.

また、自動部品供給装置によって部品を供給する場合、
供給開始のきっかけとして、今までは、ロット切り替え
による段取り作業の開始指示であったが、本発明では、
段取り$備作業の指示で行なうことができ、自動部品供
給装置との組合せに対しても生産効率向上の効果がある
In addition, when parts are supplied by an automatic parts supply device,
Until now, the trigger for starting supply was an instruction to start setup work due to lot switching, but in the present invention,
This can be done in accordance with instructions for setup work, and when used in combination with an automatic parts supply device, it also has the effect of improving production efficiency.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は、設備運転監視装置の内部処理構成図。 第2図は、本発明の一実施例であるプリント板組立ライ
ン管理システムの全体構成図、第3図は、作業計画の例
を示す図、第4図は1部品段取りデータの例を示す図、
第5図は、作業実績の例を示す図、第6図は1段取り準
備作業時間実績の例を示す図、第7図は、故障回復実績
の例を示す図、第8図は、作業終了時刻予測処理フロー
、第9図は、段取り作業抽出処理フロー、第10図は、
段取り準備作業抽出処理フロー、第11図は、段取り準
備作業時間予測処理フローである。 9・・・設備運転監視装置、11・・・部品段取りデー
タ。 13・・・段取り作業・段取り11!備作業抽呂部。 14・・作業計画、15・・・作業実績。 16・・段取り準備作業時間予測部。 18・・段取り準備作業時間実績。 23・・故障回復実績、25・・作業終了時刻予測部。 26・・・段取り準備作業指示部。 集 I 図 為 2 図 第 3 図 集 4.7 纂 5 函 (旦) 第6図 第 7 図 88 閏 算 9 図
FIG. 1 is an internal processing configuration diagram of the equipment operation monitoring device. FIG. 2 is an overall configuration diagram of a printed board assembly line management system that is an embodiment of the present invention, FIG. 3 is a diagram showing an example of a work plan, and FIG. 4 is a diagram showing an example of one-part setup data. ,
Figure 5 is a diagram showing an example of work results, Figure 6 is a diagram showing an example of one setup preparation work time record, Figure 7 is a diagram showing an example of failure recovery record, and Figure 8 is a diagram showing an example of work completion time. The time prediction processing flow, FIG. 9 is the setup work extraction processing flow, and FIG. 10 is the
Setup Preparation Work Extraction Processing Flow FIG. 11 is a setup preparation work time prediction processing flow. 9...Equipment operation monitoring device, 11...Parts setup data. 13...Setup work/Setup 11! Preparation work drawing room. 14...Work plan, 15...Work results. 16... Setup preparation work time prediction section. 18... Record of setup preparation work time. 23... Failure recovery record, 25... Work end time prediction unit. 26... Setup preparation work instruction section. Collection I Design 2 Figure 3 Figure collection 4.7 Collection 5 Box Figure 6 Figure 7 Figure 88 Leap calculation 9 Figure

Claims (1)

【特許請求の範囲】 1、設備運転監視装置であって、現時点での作業進捗状
況、設備の状態及び過去における作業実績、故障回復実
績を基に、現在行なわれている作業の終了時刻を予測し
、その予測終了時刻から、次作業に必要な段取りのため
の準備作業の開始時刻を求め、その開始時刻に段取り準
備を指示することを特徴とする設備運転監視装置。 2、設備運転監視装置であって、設備における作業や故
障の実績、及び段取り準備作業の実績を蓄積することに
より、その実績と運転監視による現状から、現在行なわ
れている作業の終了時刻を予測し、次作業の段取り準備
作業の開始時刻を求め、段取り準備を指示することを特
徴とする設備運転監視装置。 3、設備運転監視装置であって、現在行なわれている作
業の進捗状況から、残作業量を求め、予め定めた平均作
業時間から残作業量に必要な時間を算出し、現在行なわ
れている作業の終了時刻を予測する請求項1記載の設備
運転監視装置。 4、設備運転監視装置であって、現在行なわれている作
業の進捗状況から、残作業量を求め、作業開始から今ま
でにかかった作業時間から残作業量に必要な時間を算出
し、現在行なわれている作業の終了時刻を予測する請求
項1記載の設備運転監視装置。 5、設備運転監視装置であって、現在行なわれている作
業の進捗状況から、残作業量を求め、作業開始から今ま
でにかかった設備の停止時間を除いた実稼働作業時間か
ら残作業量に必要な時間を算出し、現在行なわれている
作業の終了時刻を予測する請求項1記載の設備運転監視
装置。 6、段取り準備及び段取り作業の指示方法であって、現
在行なっている作業の状況を考慮することにより、次作
業における段取りが現状と異なり変更が必要である項目
についてのみ指示することを特徴とする段取り準備及び
段取り作業の指示方法。 7、ライン管理システムであって、請求項1記載の設備
運転監視装置を複数台と、それらの装置に対するデータ
授受によってライン全体を管理するライン管理ステーシ
ョンで構成され、ライン上のワークの流れに従って、現
在流れているロットに対する各設備の作業終了予想時刻
を表示し、次のロットに対する段取り準備を各設備毎に
指示することを特徴とするライン管理システム。 8、設備運転監視装置であって、請求項1記載の設備運
転監視装置と設備への部品供給装置で構成され、請求項
1記載の段取り準備指示を部品供給装置に対して行なう
ことを特徴とする設備運転監視装置。
[Claims] 1. An equipment operation monitoring device that predicts the end time of the work currently being performed based on the current work progress, equipment status, past work results, and failure recovery results. An equipment operation monitoring device characterized in that, from the predicted end time, the start time of preparation work for the setup necessary for the next work is determined, and the setup preparation is instructed at the start time. 2. It is an equipment operation monitoring device that accumulates the results of work and failures in the equipment, as well as the results of setup preparation work, and predicts the end time of the work currently being performed based on the results and the current status of operation monitoring. An equipment operation monitoring device characterized in that the equipment operation monitoring device determines the start time of the setup preparation work for the next work and instructs the setup preparation. 3. Equipment operation monitoring device that calculates the amount of remaining work from the progress of the work currently being performed, calculates the time required for the remaining amount of work from a predetermined average work time, and monitors the amount of work currently being performed. The equipment operation monitoring device according to claim 1, which predicts the end time of work. 4. An equipment operation monitoring device that calculates the amount of remaining work from the progress of the work currently being performed, calculates the time required for the remaining amount of work from the work time taken from the start of work, and The equipment operation monitoring device according to claim 1, which predicts the end time of the work being performed. 5. An equipment operation monitoring device that calculates the remaining work amount from the progress of the work currently being performed, and calculates the remaining work amount from the actual operating time excluding the equipment stoppage time from the start of work until now. 2. The equipment operation monitoring device according to claim 1, wherein the equipment operation monitoring device calculates the time required for the work and predicts the end time of the work currently being performed. 6. A method for instructing setup preparation and setup work, which is characterized by giving instructions only for items for which the setup for the next work is different from the current situation and requires changes, by considering the status of the current work. Instruction method for setup preparation and setup work. 7. A line management system, comprising a plurality of equipment operation monitoring devices according to claim 1 and a line management station that manages the entire line by sending and receiving data to and from these devices, and according to the flow of work on the line, A line management system characterized by displaying the expected completion time of each piece of equipment for the currently running lot and instructing each piece of equipment to prepare for the next lot. 8. An equipment operation monitoring device, comprising the equipment operation monitoring device according to claim 1 and a parts supply device to the equipment, and characterized in that the setup preparation instruction according to claim 1 is given to the parts supply device. equipment operation monitoring device.
JP32890290A 1990-11-30 1990-11-30 Monitoring apparatus for operation of equipment Pending JPH04203935A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP32890290A JPH04203935A (en) 1990-11-30 1990-11-30 Monitoring apparatus for operation of equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP32890290A JPH04203935A (en) 1990-11-30 1990-11-30 Monitoring apparatus for operation of equipment

Publications (1)

Publication Number Publication Date
JPH04203935A true JPH04203935A (en) 1992-07-24

Family

ID=18215370

Family Applications (1)

Application Number Title Priority Date Filing Date
JP32890290A Pending JPH04203935A (en) 1990-11-30 1990-11-30 Monitoring apparatus for operation of equipment

Country Status (1)

Country Link
JP (1) JPH04203935A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006163676A (en) * 2004-12-06 2006-06-22 Hitachi Medical Corp Method of analyzing medical appliance operation efficiency and system for supporting operation planning
JP2016200862A (en) * 2015-04-07 2016-12-01 富士通株式会社 Estimation program, estimation device and estimation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006163676A (en) * 2004-12-06 2006-06-22 Hitachi Medical Corp Method of analyzing medical appliance operation efficiency and system for supporting operation planning
JP2016200862A (en) * 2015-04-07 2016-12-01 富士通株式会社 Estimation program, estimation device and estimation method

Similar Documents

Publication Publication Date Title
US7321803B2 (en) System and processes for performing quick changeovers on assembly lines
CN1811337B (en) Checking result informing device
CN104756622B (en) Electronic component mounting system
CN104770080B (en) Electronic component mounting system
JP7281613B2 (en) Production control device and production control method
JPH04203935A (en) Monitoring apparatus for operation of equipment
JP4454977B2 (en) Molding machine management system, molding machine management apparatus, portable information terminal, program used for molding machine management apparatus, and program used for portable information terminal
JPH04240060A (en) Manufacturing system
JP6114921B2 (en) Component mounting system and component mounting method
JP2732061B2 (en) Flexible production system
EP3484255B1 (en) Production plan creation system and production plan creation method
JP6120676B2 (en) Board production management device
JPH09260231A (en) Production control system and its equipment
CN116187630A (en) Dynamic debugging system based on reconfigurable production line
JP2017201528A (en) Molding frame supply operation support system
JP2021033566A (en) Line control system and work command determination method
JPH06277990A (en) Cell controller
JP3195014B2 (en) Non-operation data collection apparatus and method
CN114819698B (en) Intelligent dispatching system of drilling machine
CN106168784A (en) A kind of protective relaying device operation is changed processing method and controls device
JP2732060B2 (en) Flexible production system
JPS63306861A (en) System for creating and correcting production program
JP3268811B2 (en) Mounting process management system
JPH0456398A (en) Mounting machine with automatic step replacing function
JP2022124546A (en) Time estimation device and time estimation method