JPH04198534A - Jointing method with column and beam in precast reinforced concrete structure - Google Patents
Jointing method with column and beam in precast reinforced concrete structureInfo
- Publication number
- JPH04198534A JPH04198534A JP32540090A JP32540090A JPH04198534A JP H04198534 A JPH04198534 A JP H04198534A JP 32540090 A JP32540090 A JP 32540090A JP 32540090 A JP32540090 A JP 32540090A JP H04198534 A JPH04198534 A JP H04198534A
- Authority
- JP
- Japan
- Prior art keywords
- column
- beams
- section
- notch
- reinforced concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims description 8
- 239000011150 reinforced concrete Substances 0.000 title claims description 8
- 239000004567 concrete Substances 0.000 claims abstract description 16
- 230000002787 reinforcement Effects 0.000 claims description 18
- 238000010276 construction Methods 0.000 claims description 6
- 238000005452 bending Methods 0.000 abstract 1
- 238000004873 anchoring Methods 0.000 description 8
- 230000000694 effects Effects 0.000 description 2
- 238000007664 blowing Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
Description
【発明の詳細な説明】
(産業−にの利用分野)
本発明はプレキャスト鉄筋コンクリート造における柱、
梁の接合方法に係るものである。[Detailed description of the invention] (Industrial field of application) The present invention relates to columns in precast reinforced concrete construction,
This relates to the method of joining beams.
(従来の技術)
従来この種の柱、梁接合工法においては、柱aの柱頭に
載架された梁))の端部下端主筋におム」る先端定着部
Cを」二向きに曲成して、柱梁接合コンクリ−1−を打
設している。(第5図参照)また最上階外端部の梁主筋
dの定着長さ!を確保するため、粱成りを大きくして対
応している。(Prior art) Conventionally, in this type of column/beam joining method, the tip anchoring part C, which rests on the main reinforcement at the lower end of the beam mounted on the capital of column a, is bent in two directions. Then, the column-beam joint concrete 1- is poured. (See Figure 5) Also, the anchorage length of the main beam reinforcement d at the outer end of the top floor! In order to ensure this, we have responded by increasing the size of the container.
(第6図参照)
(発明が解決しようとする課B)
前記pc梁の下端主筋は上向き定着となっているため、
梁成が小さい場合は仕口内心こ定着不可能となる。(See Figure 6) (Problem B to be solved by the invention) Since the main reinforcement at the lower end of the PC beam is fixed upward,
If the beam size is small, it will not be possible to establish the inner part of the shiguchi.
また柱寸法が小さい場合は、X7両方向の下端主筋の先
端定着部が小さな仕口コア部に集まるごととなり、コン
クリートの充填作業に問題が残る。In addition, if the column dimensions are small, the tip anchoring parts of the lower end main reinforcement in both X7 directions will gather in a small joint core part, which will cause problems in concrete filling work.
このため住宅等においてはプレキャスト鉄筋コンクリー
ト構造を断念するケースが多い。For this reason, precast reinforced concrete structures are often abandoned for housing.
本発明は前記従来技術の有する問題点に鑑のて提案され
たもので、その目的とする処は、梁成が節減され、柱梁
接合コンクリートの充填性が向」ニされたプレキャスト
鉄筋コンクリート造における柱、梁の接合方法を提供す
る点にある。The present invention has been proposed in view of the problems of the prior art, and its purpose is to reduce the beam size and improve the filling properties of column-beam joint concrete in precast reinforced concrete structures. The point is that it provides a method for joining columns and beams.
(課題を解決するための手段)
前記の目的を達成するため、本発明に係るプレキャスト
鉄筋コンクリート造における柱、梁の接合方法によれば
、梁成か欠截されたpc柱の上端面におけるX方向、ま
たはXY力方向中央部に欠込部を形成し、pc梁の端部
下端主筋における下方に曲成された定着部を前記欠込部
に挿入し、同欠込部に接合コンクリ−1−を打設するも
のである。(Means for Solving the Problems) In order to achieve the above object, according to the method for joining columns and beams in precast reinforced concrete construction according to the present invention, , or by forming a notch in the center in the XY force direction, inserting the downwardly bent fixing part of the lower main reinforcement at the end of the PC beam into the notch, and inserting the joining concrete into the notch. The concrete is to be poured.
(作用)
本発明によれは梁成か欠截されたPC扛の十θ:11面
に、X方向またはXY力方向中央部に欠込部を形成し、
少なくとも一方向のP’Jek載架部を載置部たに
状態で同梁を柱頭部り載架して、同梁の端部下端主筋に
おける下方に曲成された定着部を前記欠込部に挿入して
同欠込部に接合コンクリートを打設することによって、
pc柱頂部と梁の端部下端主筋先端の定着部が柱フープ
筋によって拘束されるので、後打コンクリート部により
前記pc柱、梁が堅固に一体化される。(Function) According to the present invention, a notch is formed in the center of the X direction or the XY force direction on the 11th θ:11 plane of the PC board with the beam formed or cut out,
The beam is mounted on the column head with the P'Jek mounting part in at least one direction as the mounting part, and the downwardly bent fixing part of the lower main reinforcement at the end of the beam is connected to the notch part. By inserting the concrete into the notch and placing joint concrete in the notch,
Since the anchoring portions of the top of the PC column and the tip of the main reinforcement at the lower end of the beam are restrained by the column hoop reinforcement, the PC column and beam are firmly integrated by the post-cast concrete portion.
(実施例) 以下本発明を図示の実施例について説明する。(Example) The present invention will be described below with reference to the illustrated embodiments.
1はpc柱で梁成が欠截された上面に、第3図に示す3
LうにX方向、または第4図に示すよ・うにX7両方向
に欠込部2を設i−1、少なくとも一方向のpc梁の載
架部を残置する。1 is a PC column with the beam cut out on the top surface, and 3 as shown in Figure 3.
Recesses 2 are provided in the L and X directions, or in both the X7 directions as shown in FIG.
同pc梁3の端部下端主筋における先端の定着部4は下
方に曲成れていて、第1図に示すよ・うに、前記pc柱
1の柱頭部にpc粱3を載架して、同pc梁3における
前記端部下端主筋の下向きの定着部4を、pc柱1の欠
込部2に挿入して間部に接合コンクリ−1へを打設する
ことにより、pc柱1の頂部と、pc梁3の端部下端主
筋の定着部4とが、pc柱の柱頭部の欠込部2に露出し
たフープ筋5によって拘束されることによって、前記p
c柱1とPCC84が一体に結合される。なお図中5は
スラブ天端である。The anchoring part 4 at the tip of the main reinforcement at the lower end of the PC beam 3 is bent downward, and as shown in FIG. 1, the PC beam 3 is mounted on the column head of the PC column 1. By inserting the downward anchoring part 4 of the lower end main reinforcement of the PC beam 3 into the notch 2 of the PC column 1 and pouring it into the joint concrete 1 in the space, the top of the PC column 1 can be fixed. and the anchoring portion 4 of the lower end main reinforcement at the end of the PC beam 3 are restrained by the hoop reinforcement 5 exposed in the notch 2 of the column head of the PC column.
c Pillar 1 and PCC 84 are joined together. Note that 5 in the figure is the top of the slab.
前記実施例によれば、pc梁3の下端主筋か柱頭部にお
いて下向き定着とすることができるので、梁成tが構造
上必要な寸法に縮減され、定着長によって梁成が決まる
という不合理を解消することができる。またX7両方向
のpc粱3の一方は上向き定着とし、他方は下向き定着
とすることによって、柱梁接合部のコンクリート充填性
が従来より向」−する。According to the above embodiment, since the PC beam 3 can be anchored downward at the lower end main reinforcement or the column head, the beam thickness t can be reduced to a structurally necessary dimension, and the unreasonableness that the beam thickness is determined by the anchorage length can be avoided. It can be resolved. Also, by fixing one of the PC wires 3 in both X7 directions upward and the other downward, the concrete filling property of the column-beam joint is improved compared to the conventional method.
第2図は本発明を最上階外端部のpc柱、梁の接合に適
用した実施例を示し、梁上端主筋の先端定着部6か下向
きに曲成され、最−L階のpc粱3の−1−端主筋及び
ド端主筋の下向きの先端定着部か、前記pc柱1の吹込
部2に挿入され、間部2にコンクリートが打設されるご
とによって十分な定着効果が発揮され、pc93の梁成
tを縮減しうるちのである。なお図中7はPC梁の肋筋
である。FIG. 2 shows an embodiment in which the present invention is applied to the connection of PC columns and beams at the outer end of the top floor. -1- The downward tip fixing part of the end main bar and the do end main bar is inserted into the blowing part 2 of the PC column 1, and a sufficient fixing effect is exhibited every time concrete is poured in the gap 2, This is because the beam size t of PC93 can be reduced. Note that 7 in the figure is the rib of the PC beam.
(発明の効果)
本発明によればpc柱の柱頭部に欠込部を設けるととも
に、pc梁の端部下端主筋の定着部を下方に曲成し、柱
頭部に載架された前記PC梁の前記定着部を前記欠込部
に挿入して接合コンクリ−1〜を打設することによって
、前記pc柱、梁を一体に接合されるとともに、梁成か
構造上必要な寸法だけで決まり、梁成が梁筋の定着長に
よって決まる不合理かなくなり、梁成を節減することが
できる。(Effects of the Invention) According to the present invention, a notch is provided in the column head of a PC column, and the anchoring portion of the lower end main reinforcement of the PC beam is bent downward, and the PC beam mounted on the column head is By inserting the fixing part into the recess and pouring the joining concrete 1~, the PC column and the beam are joined together, and the beam structure is determined only by the structurally necessary dimensions, This eliminates the unreasonable problem that the beam size is determined by the fixed length of the beam reinforcement, and the beam size can be reduced.
また柱頭に配設された一方向のPC梁の梁下端主筋定着
部を下向き、他力向のIIC梁の同定着部を−に向きと
することによって、柱断面の小さい場合等における柱、
梁接合部におけるコンクリートの充填性を向上しうるち
のである。In addition, by setting the main reinforcement anchorage at the lower end of the PC beam installed in one direction at the column head facing downward, and the anchoring area of the IIC beam in the other direction facing downward, the column can be easily used in cases where the column cross section is small, etc.
This improves the filling properties of concrete at beam joints.
かくして本発明によれば階高が低く、柱梁寸法を比較的
小さくする住宅等の建物に、プレキャスト鉄筋コンクリ
ート工法が適用しうるちのである。Thus, according to the present invention, the precast reinforced concrete construction method can be applied to buildings such as residences with low floor heights and relatively small column and beam dimensions.
第1図は本発明に係るプレキャスト鉄筋コンクリート造
における柱、梁の接合方法の一実施例の実施状況を示す
縦断面図である。
第2図は本発明の方法の他の実施例の実施状況を示す縦
断面図である。
第3図はpc柱の柱頭部の一実施例を示す斜視図である
。
第4図はpc柱の柱頭部の他の実施例を示す斜視図であ
る。
第5図は従来工法の一例の実施状況を示す縦断面図であ
る。
第6図は従来工法の他の例の実施状況を示す縦断面図で
ある。
(希号の説明)
1 pc柱
2 欠込部
3 [)C梁
49下端筋における定着部
代理人 弁理士 岡 本 重 文
外1名
第5図FIG. 1 is a longitudinal cross-sectional view showing an embodiment of the method for joining columns and beams in a precast reinforced concrete structure according to the present invention. FIG. 2 is a longitudinal sectional view showing another embodiment of the method of the present invention. FIG. 3 is a perspective view showing an embodiment of the column head of the PC column. FIG. 4 is a perspective view showing another embodiment of the column head of the PC column. FIG. 5 is a longitudinal cross-sectional view showing an example of the implementation of a conventional construction method. FIG. 6 is a longitudinal sectional view showing the implementation status of another example of the conventional construction method. (Explanation of rare numbers) 1 PC column 2 Notch part 3 [) Anchor part at the lower end reinforcement of C beam 49 Agent Patent attorney Shige Okamoto 1 outsider Figure 5
Claims (1)
はXY方向の中央部に欠込部を形成し、PC梁の端部下
端主筋における下方に曲成された定着部を前記欠込部に
挿入し、同欠込部に接合コンクリートを打設することを
特徴とするプレキャスト鉄筋コンクリート造における柱
、梁の接合方法。A notch is formed in the center of the upper end surface of the PC beam in the X direction or the XY direction, and the downwardly curved fixing part of the lower main reinforcement at the end of the PC beam is inserted into the notch. A method for joining columns and beams in precast reinforced concrete construction, which is characterized by inserting the column into the notch and pouring joining concrete into the notch.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP32540090A JPH04198534A (en) | 1990-11-29 | 1990-11-29 | Jointing method with column and beam in precast reinforced concrete structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP32540090A JPH04198534A (en) | 1990-11-29 | 1990-11-29 | Jointing method with column and beam in precast reinforced concrete structure |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH04198534A true JPH04198534A (en) | 1992-07-17 |
Family
ID=18176425
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP32540090A Pending JPH04198534A (en) | 1990-11-29 | 1990-11-29 | Jointing method with column and beam in precast reinforced concrete structure |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH04198534A (en) |
-
1990
- 1990-11-29 JP JP32540090A patent/JPH04198534A/en active Pending
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2001342679A (en) | CONNECTING METHOD FOR PCa BEAM MEMBER AT COLUMN/BEAM JUNCTION AND PCa BEAM MEMBER FOR IT | |
JPH04198534A (en) | Jointing method with column and beam in precast reinforced concrete structure | |
JPH03257234A (en) | Connection structure of joint for precast concrete large beam and precast concrete small beam | |
JP2003268875A (en) | Method for connecting precast concrete columns and precast concrete beams to each other, and the columns | |
JP2562779Y2 (en) | Joint structure between column and beam | |
JP2928941B2 (en) | Beam-column connection structure | |
JPH0617481A (en) | Column/beam junction construction method for concrete building column/beam junction block used for this method | |
JP2757080B2 (en) | Long span precast concrete beams | |
JPS6128801Y2 (en) | ||
JPH0647091Y2 (en) | Overhang jig for prestressing concrete slabs | |
JP2998450B2 (en) | Connection method between PC beam and column | |
JP2968714B2 (en) | Assembled reinforcing bar unit for reinforcing openings in foundation reinforcing frames | |
JPS61109843A (en) | Connection of pillar and beam | |
JPH0732645Y2 (en) | Precast concrete concrete beam-column joint structure | |
JP2718744B2 (en) | Architectural structure consisting of reinforced concrete shear walls and steel beams | |
JP2729132B2 (en) | How to join columns and precast concrete beams | |
JPS61290136A (en) | Construction of reinforced concrete pillar | |
JPS6123133Y2 (en) | ||
JP2893406B2 (en) | Precast concrete beam-column joining method | |
JPH0738485Y2 (en) | Joint structure between reinforced concrete column and steel beam | |
JPS61109842A (en) | Connection of pillar and beam | |
JPS5830459B2 (en) | Construction method of precast reinforced concrete structure | |
JPS61250240A (en) | Connection of pc pillar and beam | |
JPH0665932A (en) | Joint structure of pc beam and column | |
JPS626034A (en) | Construction of concrete structure |